0% found this document useful (0 votes)
11 views1 page

PM-Flame Detector MOS

This document outlines a specific task method statement for a contractor's work involving a flame detector. It details the steps required to complete the task, including obtaining permits, conducting safety talks, and performing tests. The document also specifies the necessary equipment and tools for each step of the process.

Uploaded by

Hussein Hisham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

PM-Flame Detector MOS

This document outlines a specific task method statement for a contractor's work involving a flame detector. It details the steps required to complete the task, including obtaining permits, conducting safety talks, and performing tests. The document also specifies the necessary equipment and tools for each step of the process.

Uploaded by

Hussein Hisham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SPECIEFIC TASK METHOD STATEMENT

Contractor’s Company Project/ contract


Date of the work scheduled: name ANTON number BLK9/IRQ-OP-
CON-0537
Facility/Area/Location
SAP Work Order №:
General Work Title:

Equipment Info/№: Flame Detector


 If Applicable: ✔
Type of Permit: CWP. ✔ SPWP. HWP.
Type of Certificate: CSEC. EXC. RC. Scaffolding Cert. N/A
Type of Isolation: EIC. MIC. N/A.
 PO & PA confirm that the task will be carried out as per the defined steps in this MS
Permit Originator
Name Rajesh Signature
/ Performing Authority

 IA accepts and endorses steps of work defined in this MS


Issuing Authority Name Signature

 Breck down the job steps:


№ Main steps of the work process Equipment / Tools Required
1
Obtain work permit
2
Inform Area authority before start the activities
3
Conduct tool box talk, Gas Test Portable Gas tester

4
Apply the MOS to avoid un wanted alarm
5
Clean the Flame detector Rugs
6
Clean the glass and check alarm status Hand Tools
7
Conform the terminal tightness complete loop Hand Tools
8
Do function test by simulating UV/IR Torch UV/IR Torch
9
Conform the alarm and reset
10
Normalize The Loop
11
Check alarm status and remove the MOS to bring back the FD online
12
Updated Area authority about the job status
13
Housekeeping
14
Close out PTW
15
Submit to PTW coordinator