MM PM Integration
MM PM Integration
L
required for maintenance tasks.
I
This integration ensures seamless coordination between
A H
maintenance activities and inventory/procurement
S R
functions.
WA
📌 Overview of MM-PM Integration
BE
The MM-PM integration allows:
B
Automatic reservation and goods issue of materials for
PA
maintenance orders.
Purchase requisition generation from PM for external
services or non-stock materials.
Inventory updates based on maintenance activities.
Cost tracking for materials and services used in
maintenance.
L
Maintenance Order Creation Material Reservation / PR generation
H I
External Service Purchase Requisition for Service
A
Requirement
S R
Material Issue from Stores Goods Issue against Reservation
WA
Goods Receipt Goods Receipt against Purchase Order
BE
Cost Booking Valuation of consumed material/services
B
📌 Important T-Codes
PA
T-Code Description
L
maintenance tasks.
I
Materials and services can be added to the order.
A H
2.Material Planning:
S R
Stock materials → Reservation is created automatically.
A
Non-stock materials → Purchase requisition (PR) is
E W
automatically generated.
B
External services → Service PR is generated.
A B
3.Material Procurement:
P
MM converts PR to PO (ME21N).
PO can be for materials or services (with service
specifications).
4.Goods Movement:
Stock materials are issued to the maintenance order via
L
Settlement is done using transaction KO88.
I
📌 Important Tables
SA HTable
R
Description
A
AUFK Order Master Data
E W
RESB Reservation/Dependent Requirements
BB
EBAN Purchase Requisition
PA
EKPO Purchasing Document Item
IL
Accurate cost tracking and budgeting for maintenance
H
activities.
SA
Automation of PR and reservation creation reduces manual
effort.
AR
W
📌 Example Scenario
BE
A pump in a plant breaks down:
B
A maintenance technician creates a maintenance order in
A
PM.
P
They add a stock material (e.g., gasket) → Reservation is
created.
A non-stock item (e.g., special sealant) is added → PR is
generated.
→ Service PR is created.
A service (e.g., welding) is added
After receiving the materials/services → Goods movement
and cost booking occurs automatically.