The document outlines an electrical distribution system starting from a utility supply at 11 kV, which is stepped down to 400 V using a transformer and distributed through a Main Distribution Board (MDB) to several Sub Distribution Boards (SDBs). Each SDB supplies lighting, sockets, and HVAC units, while special loads like elevators and fire pumps are also connected to the MDB. Additionally, an optional monitoring system can track energy consumption and provide alerts for overcurrent or outages.

Uploaded by

Lithmi Perera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Utility Supply

The document outlines an electrical distribution system starting from a utility supply at 11 kV, which is stepped down to 400 V using a transformer and distributed through a Main Distribution Board (MDB) to several Sub Distribution Boards (SDBs). Each SDB supplies lighting, sockets, and HVAC units, while special loads like elevators and fire pumps are also connected to the MDB. Additionally, an optional monitoring system can track energy consumption and provide alerts for overcurrent or outages.

Uploaded by

Lithmi Perera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

+-------------------+

| Utility Supply |
| (11 kV) |
+-------------------+
|
v
+-------------------------------+
| Step-down Transformer |
| (11 kV / 400 V, 315 kVA) |
+-------------------------------+
|
v
+---------------------------------+
| Main Distribution |
| Board (MDB) |
| [MCCBs | SPD | Energy Meter] |
+---------------------------------+
|
+------------------+------------------+
| | |
v v v
+-----------+ +-----------+ +-----------+
| SDB 1 | .... | SDB 5 | ... | SDB 10 |
+-----------+ +-----------+ +-----------+
| | |
+------+-----+ +-----+------+ +-----+-----+
| Lighting | | Lighting | | Lighting |
| Sockets | | Sockets | | Sockets |
| HVAC | | HVAC | | HVAC |
+------------+ +------------+ +------------+
|
v
+------------------------------------------+
| Special Loads from MDB |
| [Elevator System | Fire Pump | Backup] |
+------------------------------------------+

|
v
+--------------------------------------+
| Monitoring System (Arduino-based) |
| [Energy Logging & Performance] |

[UTILITY SUPPLY – 11kV]


|
v
-----------------------------------------------------------
| STEP-DOWN TRANSFORMER |
| (11kV / 400V, 315 kVA, Dry Type) |
| Converts high-voltage to low-voltage supply |
-----------------------------------------------------------
|
v

==================================================
===========
|| MAIN DISTRIBUTION BOARD (MDB) ||
||----------------------------------------------------------||
|| - MCCBs (Main Breakers for protection & isolation) ||
|| - SPD (Surge Protection Device for transient protection) ||
|| - Energy Meter (for monitoring total consumption) ||
|| - Earthing Bar & Neutral Bar ||

==================================================
===========
|
-------------------------------------------------------------------------
| | | | |
v v v v v
[SDB–1] [SDB–2] [SDB–3] ... [SDB–10] (One per Floor)
| | | |
v v v v
+---------+ +-------------+ +--------------+ +------------------+
| Lighting| | Sockets | | HVAC Units | | Floor Appliances |
| Circuits| | (13A, 16A) | | (Split ACs) | | (TV, fridge, etc)|
+---------+ +-------------+ +--------------+ +------------------+

Each SDB includes:


- 3-Phase MCBs
- ELCBs (30 mA leakage protection)
- Floor-wise phase indicators

-------------------------------------------------------------------------
|
v
[SPECIAL SYSTEMS SUPPLIED FROM MDB OR DEDICATED SDB]
-------------------------------------------------------------
| ▪ Elevator Motors (2 x 7.5 kW – Starters & Brakes) |
| ▪ Fire Fighting Pump (15 kW – Auto Start on Fire Alarm) |
| ▪ Emergency Lighting Circuits |
| ▪ Exit Sign Lighting & Corridor UPS |
-------------------------------------------------------------

|
v
[MONITORING & AUTOMATION SYSTEM – OPTIONAL]
-------------------------------------------------------------
| ▪ Arduino/ESP32 System Connected to MDB |
| ▪ Measures: Load Current, Voltage, Energy Consumption |
| ▪ Sends data to central server or local dashboard |
| ▪ Optional IoT Alerts for Overcurrent/Outages |
-------------------------------------------------------------

[EARTHING SYSTEM – Safety Backbone]


----------------------------------
| ▪ Lightning Protection Earthing
| ▪ Equipment Earthing (All Panels)
| ▪ Common Earthing Grid on Basement
----------------------------------