Design Summary PDF
Design Summary PDF
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 2 of 9
Levels : 1. FOUNDATION
2. 1.372 m
3. 2.743 m
4. 4.267 m
5. 5.791 m
6. 7.315 m
7. 8.839 m
8. 10.363 m
9. 11.887 m
10. 14.935 m
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 3 of 9
Column/Wall : C1
FrameType : Lateral
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 :
1 TO 350 X T8 @ 70 +
Fe500 : 25 34 760.68 -10.41 34.63 0.74 0.57 8-T12
2 350 T8 @ 175
Fe415
M20 :
2 TO 350 X T8 @ 70 +
Fe500 : 22 31 746.03 -21.91 2.97 0.74 0.71 8-T12
3 350 T8 @ 175
Fe415
M20 :
3 TO 350 X T8 @ 70 +
Fe500 : 25 34 664.92 0.99 27.42 0.74 0.39 8-T12
4 350 T8 @ 175
Fe415
M20 :
4 TO 350 X T8 @ 70 +
Fe500 : 16 25 276.27 -22.65 3.55 0.74 0.54 8-T12
5 350 T8 @ 175
Fe415
M20 :
6 TO 350 X T8 @ 70 +
Fe500 : 25 34 196.61 -1.62 17.92 1.03 0.98 4-T16 + 4-T12
7 350 T8 @ 175
Fe415
M20 :
8 TO 350 X T8 @ 70 +
Fe500 : 14 23 54.2 -10.16 8.14 0.74 0.53 8-T12
9 350 T8 @ 175
Fe415
M20 :
9 TO 305 X T8 @ 65 +
Fe500 : 14 23 28.59 15.7 -3.04 0.97 0.38 8-T12
10 305 T8 @ 150
Fe415
Column/Wall : C2
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 :
1 TO 350 X T8 @ 70 +
Fe500 : 22 31 1003.22 -54.47 0.5 0.72 0.5 10-T12
2 450 T8 @ 175
Fe415
M20 :
2 TO 350 X T8 @ 70 +
Fe500 : 18 27 1089.52 38.97 12.33 0.72 0.43 10-T12
3 450 T8 @ 175
Fe415
M20 :
3 TO 350 X T8 @ 70 +
Fe500 : 22 31 785.08 -49.78 9.15 0.72 0.44 10-T12
4 450 T8 @ 175
Fe415
M20 :
4 TO 350 X T8 @ 70 +
Fe500 : 25 34 502.44 29.23 -19.33 0.72 0.34 10-T12
5 450 T8 @ 175
Fe415
M20 :
6 TO 350 X T8 @ 70 +
Fe500 : 22 31 335.92 -36.15 5.52 0.72 0.83 10-T12
7 450 T8 @ 175
Fe415
M20 :
8 TO 350 X T8 @ 70 +
Fe500 : 1 10 123.81 -26.46 3.2 0.72 0.45 10-T12
9 450 T8 @ 175
Fe415
M20 :
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 4 of 9
9 TO 350 X Fe500 : T8 @ 70 +
16 25 36.82 -15.28 -1.5 0.72 0.17 10-T12
10 450 Fe415 T8 @ 175
Column/Wall : C3
FrameType : Lateral
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 : T10 @ 120
2 TO 350 X
Fe500 : 22 31 672.86 -20.86 -5.3 2.63 0.98 4-T25 + 4-T20 + T8 @
3 350
Fe415 175
M20 :
4 TO 350 X T8 @ 70 +
Fe500 : 22 31 565.88 -22.17 -9.54 0.74 0.9 8-T12
5 350 T8 @ 175
Fe415
M20 :
6 TO 350 X T8 @ 70 +
Fe500 : 22 31 330.53 -19.13 -3.71 0.74 0.5 8-T12
7 350 T8 @ 175
Fe415
M20 :
8 TO 350 X T8 @ 70 +
Fe500 : 22 31 102.75 -12.13 -3.93 0.74 0.29 8-T12
9 350 T8 @ 175
Fe415
M20 :
9 TO 350 X T8 @ 70 +
Fe500 : 22 31 32.07 8.67 5.63 0.74 0.2 8-T12
10 350 T8 @ 175
Fe415
Column/Wall : C4
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 350 X T8 @ 80 +
Fe500 : 24 33 1187.05 47.2 20.91 3.12 0.94 10-T25
3 450 T8 @ 175
Fe415
M20 :
4 TO 350 X T8 @ 70 +
Fe500 : 22 31 771.41 -13.57 -49.64 0.94 0.95 4-T16 + 6-T12
5 450 T8 @ 175
Fe415
M20 :
6 TO 350 X T8 @ 70 +
Fe500 : 22 31 358.52 -2.97 38.26 0.72 0.6 10-T12
7 450 T8 @ 175
Fe415
M20 :
8 TO 350 X T8 @ 70 +
Fe500 : 22 31 123.22 5.1 -25.45 0.72 0.41 10-T12
9 450 T8 @ 175
Fe415
M20 :
9 TO 350 X T8 @ 70 +
Fe500 : 22 31 30.04 14.08 -8.97 0.72 0.21 10-T12
10 450 T8 @ 175
Fe415
Column/Wall : C5
FrameType : Lateral
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 5 of 9
Column/Wall : C6
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 500 X T8 @ 120 +
Fe500 : 1 10 1760.18 130.07 -0.18 2.86 0.87 12-T25 + 4-T20
3 500 T8 @ 250
Fe415
M20 :
4 TO 500 X - T8 @ 70 +
Fe500 : 1 10 1376.78 0.19 1.15 0.91 12-T16 + 4-T12
5 500 153.86 T8 @ 175
Fe415
M20 :
6 TO 500 X T8 @ 70 +
Fe500 : 1 10 703.33 125.89 -1.41 1.15 0.48 12-T16 + 4-T12
7 500 T8 @ 175
Fe415
M20 :
8 TO 500 X T8 @ 70 +
Fe500 : 1 10 214.21 -96.11 1.11 1.15 0.37 12-T16 + 4-T12
9 500 T8 @ 175
Fe415
Column/Wall : C7
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 500 X T8 @ 120 +
Fe500 : 1 10 1792.57 110.54 -2.02 2.29 0.95 4-T25 + 12-T20
3 500 T8 @ 250
Fe415
M20 :
4 TO 500 X - T8 @ 70 +
Fe500 : 1 10 1331.05 5.84 0.86 0.94 4-T16 + 12-T12
5 500 136.24 T8 @ 175
Fe415
M20 :
6 TO 500 X T8 @ 70 +
Fe500 : 1 10 676.83 120.08 -11.94 1.15 0.48 12-T16 + 4-T12
7 500 T8 @ 175
Fe415
8 TO 500 X M20 : T8 @ 70 +
1 10 205.99 -94.85 12.39 1.15 0.38 12-T16 + 4-T12
9 500 Fe500 : T8 @ 175
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 6 of 9
Fe415
Column/Wall : C8
FrameType : Lateral
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 350 X T8 @ 80 +
Fe500 : 18 27 909.98 53.56 -3.14 2.44 0.89 4-T25 + 6-T20
3 450 T8 @ 175
Fe415
M20 :
4 TO 350 X T8 @ 70 +
Fe500 : 18 27 764.44 43.3 -8.55 0.72 0.77 10-T12
5 450 T8 @ 175
Fe415
M20 :
6 TO 350 X T8 @ 70 +
Fe500 : 18 27 346.24 -23.65 5.53 0.72 0.32 10-T12
7 450 T8 @ 175
Fe415
M20 :
8 TO 350 X T8 @ 70 +
Fe500 : 22 31 87.1 28.46 6.18 0.72 0.31 10-T12
9 450 T8 @ 175
Fe415
Column/Wall : C9
FrameType : Lateral
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 : T8 @ 110
2 TO 400 X
Fe500 : 22 31 786.12 -16.01 2.65 2.8 0.93 4-T25 + 8-T20 + T8 @
3 400
Fe415 200
M20 : T8 @ 110
4 TO 400 X
Fe500 : 22 31 594.04 -9.5 7.06 2.36 0.9 12-T20 + T8 @
5 400
Fe415 200
M20 :
6 TO 400 X T8 @ 70 +
Fe500 : 22 31 336.63 -5.58 3.59 0.85 0.92 12-T12
7 400 T8 @ 175
Fe415
M20 :
8 TO 400 X T8 @ 70 +
Fe500 : 22 31 83.94 -2.51 2.81 0.85 0.28 12-T12
9 400 T8 @ 175
Fe415
M20 :
9 TO 400 X T8 @ 70 +
Fe500 : 22 31 19.93 7.61 2.38 0.85 0.09 12-T12
10 400 T8 @ 175
Fe415
Column/Wall : C10
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 : 1 10 1205.96 1.77 31.31 1.86 0.95 12-T20
2 TO 450 X Fe500 : T8 @ 110 +
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 7 of 9
Column/Wall : C11
FrameType : Lateral
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 450 X T8 @ 95 +
Fe500 : 1 10 911.46 -41.98 -6.66 1.41 0.89 4-T20 + 8-T16
3 450 T8 @ 225
Fe415
M20 :
4 TO 450 X T8 @ 70 +
Fe500 : 18 27 675.64 57.38 4.34 0.67 0.65 12-T12
5 450 T8 @ 175
Fe415
M20 :
6 TO 450 X T8 @ 70 +
Fe500 : 24 33 274.31 -38.28 32.57 0.67 0.47 12-T12
7 450 T8 @ 175
Fe415
M20 :
8 TO 450 X T8 @ 70 +
Fe500 : 1 10 85.05 41.89 -9.16 0.84 0.31 4-T16 + 8-T12
9 450 T8 @ 175
Fe415
Column/Wall : C12
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 500 X - T8 @ 120 +
Fe500 : 1 10 1554.13 3.69 2.01 0.98 16-T20
3 500 112.07 T8 @ 250
Fe415
M20 :
4 TO 500 X T8 @ 70 +
Fe500 : 1 10 1196.08 133.34 -1.25 1.15 0.94 12-T16 + 4-T12
5 500 T8 @ 175
Fe415
M20 :
6 TO 500 X - T8 @ 70 +
Fe500 : 1 10 598.21 -1.09 1.15 0.65 12-T16 + 4-T12
7 500 122.21 T8 @ 175
Fe415
M20 :
8 TO 500 X T8 @ 70 +
Fe500 : 1 10 186.17 95.78 1.04 1.15 0.37 12-T16 + 4-T12
9 500 T8 @ 175
Fe415
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 8 of 9
Column/Wall : C13
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 500 X - T8 @ 120 +
Fe500 : 1 10 1594.79 1.14 2.29 0.92 4-T25 + 12-T20
3 500 127.08 T8 @ 250
Fe415
M20 :
4 TO 500 X T8 @ 70 +
Fe500 : 1 10 1226.72 141.62 1.18 1.15 0.98 12-T16 + 4-T12
5 500 T8 @ 175
Fe415
M20 :
6 TO 500 X - T8 @ 70 +
Fe500 : 1 10 616.77 -3.02 1.15 0.69 12-T16 + 4-T12
7 500 134.07 T8 @ 175
Fe415
M20 :
8 TO 500 X T8 @ 70 +
Fe500 : 1 10 191.72 105.43 2.65 1.15 0.41 12-T16 + 4-T12
9 500 T8 @ 175
Fe415
Column/Wall : C14
FrameType : Lateral
Level Size Material LC Analysis P (kN) Mx My Pt Interaction Main Links
(mm) LC No (kNm) (kNm) (%) Ratio Reinforcement
M20 :
2 TO 500 X - T8 @ 120 +
Fe500 : 1 10 1594.98 -5.65 2.01 0.98 16-T20
3 500 105.48 T8 @ 250
Fe415
M20 :
4 TO 500 X T8 @ 70 +
Fe500 : 1 10 1177.03 121.45 9.56 1.15 0.91 12-T16 + 4-T12
5 500 T8 @ 175
Fe415
M20 :
6 TO 500 X - T8 @ 70 +
Fe500 : 1 10 586.46 -10.03 1.15 0.65 12-T16 + 4-T12
7 500 119.45 T8 @ 175
Fe415
M20 :
8 TO 500 X T8 @ 70 +
Fe500 : 1 10 181.28 93.12 10.47 1.15 0.37 12-T16 + 4-T12
9 500 T8 @ 175
Fe415
Column/Wall : C15
FrameType : Lateral
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 : T8 @ 110
2 TO 450 X
Fe500 : 25 34 760.43 45.38 9.47 2.21 0.95 4-T25 + 8-T20 + T8 @
3 450
Fe415 225
M20 :
4 TO 450 X T8 @ 70 +
Fe500 : 25 34 590.51 -38.12 -7.04 0.67 0.81 12-T12
5 450 T8 @ 175
Fe415
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024
Column Design: Column Design Summary Page 9 of 9
M20 :
6 TO 450 X T8 @ 70 +
Fe500 : 25 34 292.03 -39.85 -7.16 0.67 0.42 12-T12
7 450 T8 @ 175
Fe415
M20 :
8 TO 450 X T8 @ 70 +
Fe500 : 24 33 63.3 19.54 6.72 0.67 0.19 12-T12
9 450 T8 @ 175
Fe415
Column/Wall : C16
FrameType : Gravity
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 :
5 TO 350 X
Fe500 : 22 31 274.66 -24.15 -0.05 1.68 0.87 4-T20 + 4-T16 T8 @ 75
6 350
Fe415
M20 :
7 TO 350 X
Fe500 : 22 31 27.38 15.85 -5.44 0.74 0.34 8-T12 T8 @ 50
8 350
Fe415
Column/Wall : C17
FrameType : Gravity
Level Size Material LC Analysis P Mx My Pt Interaction Main Links
(mm) LC No (kN) (kNm) (kNm) (%) Ratio Reinforcement
M20 :
5 TO 450 X
Fe500 : 18 27 272.39 10.42 2.94 0.67 0.55 12-T12 T8 @ 50
6 450
Fe415
M20 :
7 TO 450 X
Fe500 : 18 27 116.16 17.44 3.48 0.67 0.22 12-T12 T8 @ 50
8 450
Fe415
file:///C:/Users/pc/AppData/Local/Temp/tmp1A74.tmp 10/21/2024