Machine Efficiency
Machine Efficiency
5 Removing PSG 85 some leakage outside the machine because the drain line was blocked no , and need to monthly purging for
the drain pathway
Problems in some Conveyor belts and the compressed air system in addition to
8 Seconed screen printing 62 yes , and some other problems
the problem in the software of the machine
10 Testing & sorting 90 new problem in CDA input valves of the machine
still solving it
12 Manual string welding 100 no faults until now no , but we will make suction pins to
hold the cell
13 Layup 95 no faults until now no , need some tools amd training to replace
one cell in the strinhg
no faults until now but we need to make door no , but we need to make door
14 EL test 90 above the panel to reduce the light above the panel to reduce the light
15 Lamination 100 no faults until now just Preventive maintenance no , need Weekly monitoring for
Oil level in each pump
16 Fraiming 85 there was a problem in compressed air system but now it works good
no , need some tools for selicon gun