The document outlines the specifications for the supply and stacking of rubble stone, stone aggregates, and sand for accommodation works under specific job numbers in Nagaland. It details the quantities, stacking requirements, quality control tests, and payment terms for the materials required. The contractor is responsible for ensuring the materials meet specified physical and grading requirements, as well as covering all associated costs and royalties.

Uploaded by

Ak Yam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views5 pages

SWK Accdn 8 Seo-15brtf@bro - Gov.in

The document outlines the specifications for the supply and stacking of rubble stone, stone aggregates, and sand for accommodation works under specific job numbers in Nagaland. It details the quantities, stacking requirements, quality control tests, and payment terms for the materials required. The contractor is responsible for ensuring the materials meet specified physical and grading requirements, as well as covering all associated costs and royalties.

Uploaded by

Ak Yam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

SPECIFICATION FOR SUPPLY AND STACKING OF RUBBLE STONE, STONE

AGGREGATES OF VARIOUS SIZES AND SAND FOR ACCOMODATION WORKS


UNDER JOB NO. 80/655 AND 80/660 OF SEWAK COMPLEX UNDER 89 RCC/15BRTF
(P) SEWAK IN NAGALAND STATE

1. SCOPE OF WORK: The work consists of supply and stacking of the following items:

S/No Items A/U Quantity % Voids


Gross Qty Net Qty
(a) Rubble stone Cum 59.26 51.86 12.5 %
(b) S/metal 45 mm Cum 13.31 11.98 10 %
(c) S/metal 40 mm 10 %
Cum 83.87 75.48

(d) S/Chips 20 mm Cum 6.57 6.25 05 %


(e) S/Chips 10 mm Cum 3.27 3.10 05 %
(f) Sand (river) Cum 241.65 229.56 05 %

2. STACKING & MEASUREMENTS FOR PAYMENT:

2.1 Contractor/Supplier will obtain the location for stacking from OC RCC, if not
specified in the Terms and Condition of the GeM Contract. The materials supplied by
the Contractor shall be stacked at his own cost on a level ground at HQ 15 BRTF
location as per quantities given in Para-1 above.

2.2 Measurement for payment shall be as per Para 520.5 of MoRT&H


Specification of Road & Bridge Wks (5th Rev). All materials supplied by the
Contractor and measured shall be paid in cubic meters. The actual volume of the
aggregates / stone to be paid for shall be computed after deducting the percentage
of voids specified above, from the volume computed by stack measurements to allow
for bulking / voids. Unless otherwise directed, measurements shall not be taken until
sufficient materials for use have been collected and stacked. Immediately after
measurement, the stacks shall be marked with lime or other means as directed.

2.3 Quantities given in the bid documents are net quantities after deduction of
voids. The Contractor shall supply the corresponding gross quantities, considering
the percentage voids and payment shall be made for the net quantities. Rates
quoted by the Contractor shall be for the net quantities.

2.4 However, if the rate of river sand is quoted as per unit weight (i.e. Kg, MT etc.)
then weight of river sand for payment to the contractor shall be calculated
considering the density of sand as 1700 kg/cum. Payment will be made by
measuring volume of stack in cum and voids will be deducted (as given in Para-1
above) from the stack measurement to arrive at the net quantity to be paid for.

3. RUBBLE STONE:

3.1 GENERAL:

Page 1 of 5
The rubble stone as given in the bid documents and to be supplied under this
contract shall be hard, sound, durable and free from cracks, decay and
weathering and shall be freshly quarried from an approved quarry.

3.2 GRADING REQUIREMENT:


The size of rubble stone shall not be less than 20 cm X 15 cm X10 cm.

3.3 PHYSICAL REQUIREMENT:


The stone, when immersed in water for 24 hours, shall not absorb water of
more than 5 percent of their dry weight when tested in accordance with IS:
1124. It shall satisfy physical requirements specified in under mentioned table.

TABLE: PHYSICAL REQUIREMENT OF STONE RUBBLE


S/No Test Requirement Remarks
(a) Minimum density 22 kN/cum As per IRC:SP:116-2018
(b) Los Angeles Abrasion Not more than As per IRC:SP:116-2018
Value 45

3.4 QUALITY CONTROL TESTS:


Frequency for quality control tests are as under:

S/No Test Min Frequency Remarks


(a) Size One test per 50 Cum
(b) Water Absorption One test per 350 Cum
(c) Minimum Density One test per 350 Cum
(d) Los Angeles Abrasion Test One test per 350 Cum

The test shall be done by the Contractor from NABL laboratories / other
laboratories approved by the buyer.

4. STONE METAL/CHIPS (45 MM, 40 MM, 20 MM and 10 MM):

4.1 GENERAL:
4.1.1 Stone metal 45 mm, stone metal 40 mm, stone chips 20 mm and stone
chips 10 shall conform to the requirements as per Para 1007 of MoRT&H
Specification of Roads & Bridge Works (5th Revision).

4.1.2 The stone metal/chips specified in the bid documents and to be


supplied under this contract shall consist of clean, hard, strong, dense, non-
porous and durable pieces of crushed stone, crushed gravel. They shall not
contain pieces of disintegrated stones, soft, flaky, elongated particles, salt
alkali, vegetable matter or other deleterious materials in such quantities as to
reduce the strength and durability of the concrete. Coarse aggregates having
positive alkali-silica reaction shall not be used.

4.2 GRADING REQUIREMENT:


4.2.1 Stone aggregates shall conform to the grading requirements given in
Table 1000-1 of MoRTH Specifications of Road and Bridges Works (5th
Revision).

Page 2 of 5
IS Sieve Percentage Passing for Graded Aggregate of Normal Size
size 40 mm 20 mm 10 mm
63 mm - - -
40 mm 95-100 100 -
20 mm 30-70 95-100 -
12.5 - - 100
10 mm 10-35 25-55 85-100
4.75 mm 0-5 0-10 0-20
2.36 mm - - 0-5
*Grading requirement for 10 mm nominal size aggregate shall be as per IS
383 (2016).
4.2.2 For 45 mm nominal size of aggregate, all aggregates shall pass
through 53 mm sieve and wholly retained on 26.5 mm sieve as per Table 500-
49 of MoRTH Specifications of Road and Bridges Works (5th Revision).
4.3 PHYSICAL REQUIREMENT:
Physical requirements of stone metal and stone chips shall be as per IS 383-
2016.

S/No Test Requirement Testing Method


(a) Combined Flakiness and 40% Max IS-2386 (Part-I)
Elongation Index
(b) Aggregate Impact Value 45% Max IS-2386 (Part-IV)
(c) Water Absorptions 2% Max IS-2386 (Part- III)

4.4 QUALITY CONTROL TEST:


The test shall be done by the Contractor from NABL laboratories / other
laboratories approved by the buyer. Frequency for quality control tests are as
under:

S/No Test Frequencies


(a) Gradation test (for 45mm, 40mm, 20mm,10 One test per 50 Cum
mm)
(b) Combined Elongation and Flakiness Indices One test per 350 Cum
(for 45 mm, 40mm, 20mm, 10mm agg)
(c) AIV (for 45 mm, 40mm, 20 mm & 10mm One test per 350 Cum
agg)
(d) Water absorption (for 45 mm, 40mm, One test for each
20mm, 10 mm agg) source and additional
test required whenever
there is change in the
source of stone

5. RIVER SAND (FINE AGGREGATE):

5.1 GENERAL:
Fine aggregates shall conform to the requirements as per Para 1008 of
MoRTH Specifications of Roads and Bride Works (5th Revision). The fine
aggregates shall be dense, durable, clean and free from veins and adherent
Page 3 of 5
coating and other deleterious substances. They shall not contain dust, lumps,
soft or flaky materials, mica or other deleterious materials in such quantities as
to reduce the strength and durability of the structure, or to attack the
embedded steel. Mechanised sand washing machines should be used to
remove impurities from sand. Fine aggregates having positive alkali-silica
reaction shall not be supplied.
5.2 GRADING REQUIREMENT:
The river sand shall conform to the grading for Zone-II as per Table 1000-2 of
MoRTH Specifications of Road and Bridge Works (5th Rev).
Table: 1000-2: GRADING REQUIREMENT FOR FINE AGGREGATES
IS SIEVE SIZE GRADING ZONE-II (% PASSING)
10 mm 100
4.75 mm 90-100
2.36 mm 75-100
1.18 mm 55-90
600 micron 35-59
300 micron 8-30
150 micron 0-10

Note: When the grading falls outside the limits of any particular grading zone
of sieves other than 600-micron IS Sieve by a total amount not exceeding 5
percent, it shall be regarded as falling within the grading zone. However for
crushed stone sand, the permissible limit on 150-micron IS Sieve is increased
to 20 percent. Reference shall be made to Clause: 4.3 of IS: 383.

5.3 PHYSICAL REQUIREMENT:


All fine aggregates shall conform to IS:383 and tests for conformity shall be
carried out as per IS:2386, (Parts I to VIII). The fineness modulus of fine
aggregate shall neither be less than 2.0 nor greater than 3.5.

5.4 QUALITY CONTROL TEST:


Sand shall confirm IS:383 and tests for conformity shall be carried out as per
IS:2386, Part I to VIII.

S/No Test Test Method Minimum Frequency


(a) Gradation IS 2386 One test per 50 Cum
(b) Fineness Modulus IS 2386 One test per 50 Cum

6. MATERIAL TESTING:

Tests shall be done by the Contractor at his own cost from NABL Laboratories or the
laboratories approved by the buyer. Rates quoted by the Contractor shall be deemed
to include the testing charges and nothing extra shall be admissible on this account.

7. RATES:

Page 4 of 5
7.1 The unit rates quoted for various materials shall be inclusive of all charges in
full of colleting, conveying and stacking or storage at the place of delivery including
full payments for:

(a) All royalties, fees and insurances.


(b) All leads, lifts and conveyance.
(c) All labour and other incidentals to complete the supplies.
(d) All necessary testing wherever required or specified.
(e) All the taxes payable like GST, custom duty, excise duty, labour-cess or
any other taxes payable under the Central /State Govt/local bodies.

7.2 It shall be the responsibility of the Contractor to pay royalty charges, if any, to
the concerned department.

8. CONSIGNEE:

The consignee of the contract items shall be OC 520 SS&TC(GREF). The materials
shall be delivered and stacked at HQ 15 BRTF location and no extra amount shall be
paid for.