0% found this document useful (0 votes)
14 views1 page

1Z0-1075-24 - PRINT-part-15

Uploaded by

sankardotb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

1Z0-1075-24 - PRINT-part-15

Uploaded by

sankardotb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

51. A Production Operator is executing work order in your plant.

After completing move transactions, he


notices that he has performed some incorrect move operations, including incorrect scrap and reject
transactions. He is required to perform a reverse transaction to correct the errors. The operations are
not count point enabled and not auto charged. What four transactions are required to correct this
situation? (Choose al correct answers)

A. Reverse the product at the last operation


B. Reverse at an operation
C. Reverse resources charged to a work order
D. Reverse material issued to a work order
E. Reverse from scrap to ready
F. Reverse from reject to ready

52. An employee is responsible for dealing with different manufacturing practices and processes,
machines, tools, and equipment that turn raw material into a product. Which seeded job role must this
employee be provided with?

A. Manufacturing Supervisor
B. Manufacturing Engineer
C. Production Supervisor
D. Production Engineer
E. Production Operator

53. Which entity should you use to configure the manufacturing plant in Functional Setup Manager?

A. Legal Entity
B. Plant
C. Business Unit
D. Organization