0% found this document useful (0 votes)
2 views

Sample SD Layout

Uploaded by

Gaston Hidalgo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Sample SD Layout

Uploaded by

Gaston Hidalgo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Issued by

GENERAL NOTES
A. REFER TO SHEET G0.02 FOR SYMBOLS LEGEND

B. NOTES BY SYMBOL ARE SHEET SPECIFIC.

Date
EXTERIOR FINISH LEGEND UPDATE REFERENCES

REVISIONS
F-1 DRESSED LUEDERS LIMESTONE; ROUGHBACK;
GOLD, SALADO QUARRY; FINISH FACE IS TO BE
SPLIT FACE AND WHEN A SIDE FACE IS EXPOSED
ON CORNERS, IT IS TO MATCH THE SPLIT FACE

Description
FINISH.
F-2 LUEDERS LIMESTONE; CHARCOAL, SALADO
QUARRY, FINISH FACE IS TO BE SPLIT FACE AND
WHEN SIDE FACE IS EXPOSED ON CORNERS, IT IS
TO MATCH THE SPLIT FACE FINISH OUTER.

NOTES BY SYMBOL " X "


1. XXXX

No.
2. XXXX

3. XXXX

F-1

30% DESIGN SUBMITTAL


1 BUILDING ELEVATION
A2.01 1/8" = 1'-0"

Level 4
25' - 0"

Level 3
20' - 0"

Level 2
ISSUE DATE: 05/09/25
12' - 6"

Level 1
0"

LANCASTER FIRE STATION NO. 4

BELT LINE ROAD & LANCASTER HUTCHINS ROAD


2 BUILDING ELEVATION EAST

EXTERIOR ELEVATIONS
A2.01 1/8" = 1'-0"

LANCASTER, TEXAS 75146

4/28/2025 10:25:30 AM
SHEET SIZE 30 x 42

KAI JOB NUMBER: 2023.166

DATE: 2025.05.09

DRAWN BY: Author

4' 0 4' 8' 16' CHECKED BY: Checker

GRAPHIC SCALE: 1/8" = 1'-0"


A2.01
© 2021 Komatsu Architecture, Inc.
Issued by
GENERAL NOTES
A. REFER TO SHEET G0.02 FOR SYMBOLS LEGEND

B. NOTES BY SYMBOL ARE SHEET SPECIFIC.

Date
EXTERIOR FINISH LEGEND UPDATE REFERENCES

REVISIONS
F-1 DRESSED LUEDERS LIMESTONE; ROUGHBACK;
GOLD, SALADO QUARRY; FINISH FACE IS TO BE
SPLIT FACE AND WHEN A SIDE FACE IS EXPOSED
ON CORNERS, IT IS TO MATCH THE SPLIT FACE

Description
FINISH.
F-2 LUEDERS LIMESTONE; CHARCOAL, SALADO
QUARRY, FINISH FACE IS TO BE SPLIT FACE AND
WHEN SIDE FACE IS EXPOSED ON CORNERS, IT IS
TO MATCH THE SPLIT FACE FINISH OUTER.

NOTES BY SYMBOL " X "


1. XXXX

No.
2. XXXX

3. XXXX

30% DESIGN SUBMITTAL


1 BUILDING ELEVATION SOUTH
A2.02 1/8" = 1'-0"

Level 4
25' - 0"

Level 3
20' - 0"

Level 2 ISSUE DATE: 05/09/25

12' - 6"

Level 1
0"

2 BUILDING ELEVATION WEST


A2.02 1/8" = 1'-0"

LANCASTER FIRE STATION NO. 4

BELT LINE ROAD & LANCASTER HUTCHINS ROAD

EXTERIOR ELEVATIONS
LANCASTER, TEXAS 75146
Level 4
25' - 0"

Level 3
20' - 0"

Level 2
12' - 6"

Level 1
0"

3 SIGNAGE ELEVATION
A2.02 1/8" = 1'-0"

4/28/2025 10:25:34 AM
SHEET SIZE 30 x 42

KAI JOB NUMBER: 2023.166

DATE: 2025.05.09

DRAWN BY: Author

CHECKED BY: Checker


4' 0 4' 8' 16'
GRAPHIC SCALE: 1/8" = 1'-0" A2.02
© 2021 Komatsu Architecture, Inc.
Issued by
1
A2.02 GENERAL NOTES UPDATE REFERENCES

A. REFER TO SHEET G0.02 FOR SYMBOLS LEGEND

B. NOTES BY SYMBOL ARE SHEET SPECIFIC.

Date
C. REFER TO SHEET XXX
A1.07 & XXX
A1.08 FOR PARTITION TYPES.
3 ALL PARTITIONS ARE "A" UNLESS NOTED OTHERWISE
A3.01
D. REFER TO SHEET A5.01 FOR FINISH LEGEND AND SCHEDULE

REVISIONS
E. ALL DIMENSIONS IN FLOOR PLANS ARE TAKEN FROM FACE OF
MASONRY TO FACE OF MASONRY OR FACE OF STUD TO FACE OF
STUD. CONTRACTOR TO VERIFY DIMENSIONS AND CONTACT
ARCHITECT ABOUT ANY CONFLICTS PRIOR TO BEGINNING
CONSTRUCTION

Description
8
F. A8.01 FOR FLOOR FINISH PLAN AND XXX
REFER TO SHEET XXX A8.02 FOR
G. WALL FINISH PLAN

4"
1X CMU LINTEL OVER

TOILET
MAN DOORS, TYP.
H. INDICATES WALLS WITH SOUND BATTS FULL HEIGH

EQ
7 145

ICC500 SHELTER

WORKSHOP
12" SLAB ABOVE

EQ
OUTDOOR EQUIP. WORKOUT 9
59 NOTES BY SYMBOL " "

146
EXTRACTOR / X
142 DRYER / DECON 147

EQ
SCBA GEAR SHELTER 1. XXXX

No.
1' - 4" 1' - 4"
141 143 144
2. XXXX
58
56 57 60 61 3. XXXX

9' - 11 17/32"
ALL WALLS AT APPARATUS
BAY SHALL BE 12" CMU

EQ
6 10

30% DESIGN SUBMITTAL


8' - 6 23/32"
1' - 4" 1' - 4"
1x CMU LINTEL ABOVE DOOR

CMU MOMENT FRAME

CMU MOMENT FRAME

EQ
3x CMU LINTEL ABOVE WINDOW
5 11

1' - 4"
WF JOISTS @ 11'-0" OC

1' - 4"
APPARATUS BAY

EQ
140

EQ
4 12

EQ
2
A2.02 2

1' - 4"
A2.01

1' - 4"
1/ A4.01

EQ
3 13

1' - 4"
PANTRY PANTRY PANTRY
132 133 134 14
CMU SHEAR WALL

40 47 48 49 52 ISSUE DATE: 05/09/25


AIR LOCK

AIR LOCK

BEAM ABOVE
WF BEAM @
ROOF, HSS
DORM MED STOR. PPE STOR.

@ TOP OF
PARAPET
DORM DORM DORM
118

131
JAN.
128

WF JOISTS
WF JOISTS

@ 10'-0"
114 115 116 117 129 130
@ 10'-0"

OC
35
OC

51 53 54 55
36 37 38 39

WF BEAM @ ROOF, HSS BEAM


46 KITCHEN

ABOVE @ TOP OF PARAPET


DINING
WF BEAM BELOW WALL ABOVE

WF BEAM @ ROOF, HSS BEAM


DORM 34 CORRIDOR

ABOVE @ TOP OF PARAPET


135 136
WF BEAM BELOW WALL ABOVE

113 119

42 43
CORRIDOR

DAY ROOM
BRACED FRAME

44
122

33 127 15
ADA SHOWER LAUNDRY
CORRIDOR

DORM SHOWER
SHOWER
112 126 125 123
120

WF BEAM @ ROOF, HSS BEAM

LANCASTER FIRE STATION NO. 4

BELT LINE ROAD & LANCASTER HUTCHINS ROAD


WF BEAM 124
WF BEAM WF BEAM WF BEAM w/ HSS BEAM ABOVE
16 ABOVE @ TOP OF PARAPET
D

@ TOP OF PARAPET

WF BEAM @ ROOF, HSS BEAM


WF JOISTS @ 20 ALL EXTERIOR WALLS AT LIVING SIDE

ABOVE @ TOP OF PARAPET


WF BEAM BELOW

10'-0" OC OF STATION SHALL BE 8" CMU


STORAGE
WALL ABOVE

WF JOISTS
W

WF JOISTS

@ 11'-0"
WF JOISTS @

32 41 137 10'-0" OC

OC
DORM

LANCASTER, TEXAS 75146


45
111 CORRIDOR TREATMENT
WF BEAM

ALIGN WF JOISTS WITH


BELOW

ABOVE

BRACE FRAME
WALL

121 25 103 TRAINING ROOM

FLOOR PLAN
31 30 27 26 24 23 138

WF BEAM @ ROOF, HSS BEAM

WF BEAM @ ROOF, HSS BEAM


DORM

ABOVE @ TOP OF PARAPET

ABOVE @ TOP OF PARAPET


29
ADA SHOWER 28
2
BRACED FRAME

BRACE FRAME
RISER DORM DORM
BRACED FRAME

106
WF BEAM BELOW

BRACE FRAME
WF JOISTS

107 OFC. SUITE 19


REPORTS
@ 10'-0"

WALL ABOVE

A3.01 RECOMMEND
110 109 108 105 INCREASE THIS WALL
OC

104 TO 8" TO MATCH CMU 22


RECOMMEND OVERHANG DIMENSION TOILET
REDUCES TO 10'-0" MAX. LOBBY
102 3x CMU LINTEL
WF BEAM 100
WF BEAM BELOW WALL ABOVE

18
WF BEAM

17
2
TRAINING TOWER

WF BEAM WF BEAM WF BEAM WF BEAM WF BEAM


CANOPY, DESIGNED BY OTHERS
WF JOISTS @
TOILET
WF BEAM

WF BEAM
WF BEAM

10'-0" OC
WF BEAM
BEAM

21 101
WF

1
139

WF BEAM WF BEAM WF BEAM WF BEAM WF BEAM

WF JOISTS

10"
HSS COLUMN BELOW @ 10'-0"
WF BEAM
WF BEAM

OC

WF BEAM WF BEAM WF BEAM WF BEAM WF BEAM WF BEAM


1 17/32"

WF BEAM
PROVIDE 1X CMU LINTEL
WF BEAM
OVER OPENINGS

HSS STUB COLUMN

WF BEAM BELOW WALL

8" CMU WALL

4/28/2025 10:25:36 AM
3
A2.02 SHEET SIZE 30 x 42

KAI JOB NUMBER: 2023.166

1 1/8 FLOOR PLAN N


DATE:

DRAWN BY:
2025.05.09

Author
A1.01 1/8" = 1'-0" CHECKED BY: Checker
4' 0 4' 8' 16'
GRAPHIC SCALE: 1/8" = 1'-0"
A1.01
© 2021 Komatsu Architecture, Inc.
Issued by
1
A2.02 GENERAL NOTES UPDATE REFERENCES

A. REFER TO SHEET G0.02 FOR SYMBOLS LEGEND

B. NOTES BY SYMBOL ARE SHEET SPECIFIC.

Date
C. REFER TO SHEET XXX
A1.07 & XXX
A1.08 FOR PARTITION TYPES.
3 ALL PARTITIONS ARE "A" UNLESS NOTED OTHERWISE
A3.01
D. REFER TO SHEET A5.01 FOR FINISH LEGEND AND SCHEDULE

REVISIONS
E. ALL DIMENSIONS IN FLOOR PLANS ARE TAKEN FROM FACE OF
MASONRY TO FACE OF MASONRY OR FACE OF STUD TO FACE OF
STUD. CONTRACTOR TO VERIFY DIMENSIONS AND CONTACT
ARCHITECT ABOUT ANY CONFLICTS PRIOR TO BEGINNING
CONSTRUCTION

Description
8
F. A8.01 FOR FLOOR FINISH PLAN AND XXX
REFER TO SHEET XXX A8.02 FOR
G. WALL FINISH PLAN

4"
TOILET H. INDICATES WALLS WITH SOUND BATTS FULL HEIGH

EQ
7 145

WORKSHOP

EQ
OUTDOOR EQUIP. WORKOUT 9
59 NOTES BY SYMBOL " "

146
EXTRACTOR / X
142 DRYER / DECON 147

EQ
SCBA GEAR SHELTER 1. XXXX

No.
1' - 4" 1' - 4"
141 143 144
2. XXXX
58
56 57 60 61 3. XXXX

9' - 11 17/32"
1

EQ
6 10

30% DESIGN SUBMITTAL


8' - 6 23/32"
1' - 4" 1' - 4"

EQ
5 11

1' - 4"
1' - 4"
APPARATUS BAY

EQ
140

EQ
4 12

EQ
2
A2.02 2

1' - 4"
A2.01

1' - 4"
1/ A4.01

EQ
3 13

1' - 4"
PANTRY PANTRY PANTRY
132 133 134 14

40 47 48 49 52 ISSUE DATE: 05/09/25


AIR LOCK

AIR LOCK

DORM DORM DORM DORM MED STOR. PPE STOR.


118

131
JAN.
128

114 115 116 117 129 130


35
51 53 54 55
36 37 38 39 46 KITCHEN DINING
DORM 34 CORRIDOR 135 136
113 119

42 43
CORRIDOR

DAY ROOM
44
122

33 127 15
ADA SHOWER LAUNDRY
CORRIDOR

DORM SHOWER
SHOWER
112 126 125 123
120

LANCASTER FIRE STATION NO. 4

BELT LINE ROAD & LANCASTER HUTCHINS ROAD


124 16
D

20
STORAGE
W

32 41 137
DORM

LANCASTER, TEXAS 75146


45
111 CORRIDOR TREATMENT
121 25 103 TRAINING ROOM

FLOOR PLAN
31 30 27 26 24 23 138
29
ADA SHOWER DORM 28
2 RISER DORM DORM 106
107 OFC. SUITE 19
A3.01 REPORTS
110 109 108 105
104 22
TOILET
LOBBY
102
100
18
17
2
TRAINING TOWER

TOILET
21 101
1
139

4/28/2025 10:25:36 AM
3
A2.02 SHEET SIZE 30 x 42

KAI JOB NUMBER: 2023.166

1 1/8 FLOOR PLAN N


DATE:

DRAWN BY:
2025.05.09

Author
A1.01 1/8" = 1'-0" CHECKED BY: Checker
4' 0 4' 8' 16'
GRAPHIC SCALE: 1/8" = 1'-0"
A1.01
© 2021 Komatsu Architecture, Inc.
Issued by
NOTES BY SYMBOL " X "
1
A2.02 1. XXXX

2. XXXX

Date
3. XXXX

3 1

REVISIONS
A3.01

Description
No.
30% DESIGN SUBMITTAL
2
A2.02 2
A2.01

1/ A4.01

ISSUE DATE: 05/09/25

LANCASTER FIRE STATION NO. 4

BELT LINE ROAD & LANCASTER HUTCHINS ROAD


LANCASTER, TEXAS 75146

ROOF PLAN
2
A3.01
10"

1 17/32"

4/28/2025 10:25:36 AM
KEY PLAN SHEET SIZE 30 x 42
3 KAI JOB NUMBER: 2023.166
A2.02 DATE: 2025.05.09
N DRAWN BY: Author

1 ROOF PLAN 8' 0 8' 16' 32'


CHECKED BY: Checker

A1.02 1/8" = 1'-0"


GRAPHIC SCALE: 1/16" = 1'-0"
A1.02
© 2021 Komatsu Architecture, Inc.
Issued by
NOTES BY SYMBOL " X "
1. XXXX

2. XXXX

Date
3. XXXX

REVISIONS
Description
No.
2
A3.01

30% DESIGN SUBMITTAL


Level 4
25' - 0"

5' - 0"
Level 3
20' - 0"

7' - 6"
Level 2
12' - 6"

12' - 6"
Level 1
0"

3 BUILDING SECTION_N/S
A3.01 3/16" = 1'-0"

ISSUE DATE: 05/09/25

3
A3.01

LANCASTER FIRE STATION NO. 4

BELT LINE ROAD & LANCASTER HUTCHINS ROAD


LANCASTER, TEXAS 75146

BUILDING SECTIONS
Level 4
25' - 0"

Level 3
20' - 0"

Level 2
12' - 6"

Level 1
0"

4/28/2025 10:25:37 AM
2 BUILDING SECTION_E/W
A3.01 3/16" = 1'-0" SHEET SIZE 30 x 42

KAI JOB NUMBER: 2023.166

DATE: 2025.05.09

DRAWN BY: Author

CHECKED BY: Checker

A3.01
© 2021 Komatsu Architecture, Inc.
3.
2.
1.

XXXX
XXXX
XXXX

1
NOTES BY SYMBOL
"
" X

DATE:

LANCASTER FIRE STATION NO. 4


DRAWN BY:
SHEET SIZE
ISSUE DATE:

CHECKED BY:
KAI JOB NUMBER:

BELT LINE ROAD & LANCASTER HUTCHINS ROAD


LANCASTER, TEXAS 75146
05/09/25

A3.02

30% DESIGN SUBMITTAL No. Description Date Issued by


2023.166

Checker
30 x 42

Author
2025.05.09

BUILDING SECTIONS REVISIONS

4/28/2025 10:25:37 AM
© 2021 Komatsu Architecture, Inc.
Issued by
Date
Level 4
25' - 0"

REVISIONS
Level 3
20' - 0"

Description
Level 2
12' - 6"

No.
30% DESIGN SUBMITTAL
Level 1
0"

ISSUE DATE: TBD

LANCASTER FIRE STATION NO. 4

BELT LINE ROAD & LANCASTER HUTCHINS ROAD


LANCASTER, TEXAS 75146

WALL SECTIONS
4/28/2025 10:25:39 AM
SHEET SIZE 30 x 42

KAI JOB NUMBER: 2023.166

DATE: 2025.05.09

6" 0 6" 1' 2' DRAWN BY: Author

CHECKED BY: Checker


GRAPHIC SCALE: 1-1/2" = 1'-0"

A4.01
© 2021 Komatsu Architecture, Inc.

You might also like