CUSTOMER DETAILS
Name: ROSELINE MORDEKAY MUNDHE
Application fee paid (TZS): FREE/HAIUZWI Receipt No: NOT APPLICABLE Date: 09-February-2025
INSTALLATION INSPECTION
a) Visual inspection: GOOD Earthing method: TT SYSTEM
RCD | Residual
e) Earth leakage current protection device installed: Type: Rating (V): 220
Current Device
h) I certify that the installation detail in this card has been inspected in accordance with Electricity Act No. 10 of 2008 and that to the
best of my knowledge and the installation summarized in the drawings/schedules attached complies with those regulations current
at the date for the work.
1. Not to alter or temper with the index of any meter or other instrument used on or in connection with any installation for recording
2. Not to fraudulently abstract, consume or use electricity contrary to the manner agreed herein. Errors resulting from tempering of
meters will be regarded as fraud and may result in prosecution in addition to penalty charges.
3. To install power stabilizer device(s) for the purpose of safeguarding the sensitive appliances of the capacity which is equivalent to
4. To install residual currency device (RCD) so as to protect against earth leakage. Also to install Circuit Breaker to protect against
5. To install any other additional device(s) to protect the home electrical appliances against over current or short circuit.
6. Not to convert the uses of electricity to other uses contrary to use that is specified in the application and agreement form.
7. To strictly maintain the power factor of 0.95 for lighting and 0.9 power factor for other loads. That a factor of 2.9 will be multiplied
to the consumed energy as a surcharge against poor power factor whenever the billing power factor fall below 0.9
8. Any person who moves into a premise where TANESCO is providing supply should report to TANESCO offices within hours to
regularize the contract, failure to do that, will result in supply be disconnected and legal proceedings instituted
9. Any customer who intends to move out of a premise where TANESCO is providing supply should report to TANESCO offices
within 48 hours to cancel the existing contract. Failure to do so will result in the customer assuming all charge that may be
10. Without prejudice to the generality of the above to comply in all respects with the provisions of any statutes and any other
obligations imposed by law or by any by-law applicable on electricity supply within Tanzania mainland.
11. The customer accepts the responsibility for the safe keeping of TANESCO's properties installed on the customer's premises,
especially the integrity of the meter and the associated seals, the breach of which will amount to statutory penalties and payment
of associated costs.
12. TANESCO reserve the rights to disconnect a customer in the event of any breach of these conditions
AGREEMENT
I the undersigned occupant of the above premise(s) have read, understood and accepted all conditions of power supply including
the above and hereby undertake with the company to take a supply of electricity at the above premise(s) in accordance with the
company's general conditions of supply for the purpose detailed above and agree to pay for such supply at the company's
09-February-2025