Ato Feyisa
Ato Feyisa
m3 423.18 750
Total summery
2. MASONERY WORK
Total summery
3. Concrete work
1 5cm thick lean concrete class C-5 with minimum cement
content of 150kg/m3 under foundation and grade beam m2 91.68 500
e) septic tank m2
4 Reinforcment steel bar according to structural drawing price
include cutting, bending, place in position and tying wire
Total summery
B SUPER STRUCTURE
1. CONCRETE WORK
1 reinforced concrete class C-25 with minimum cement
content of 360kg/m3 filled into formwork and vibrated
around rod reinforcment. Steel bar and formwork measured
separetly
a) In elevation column m3 50.40 3200
b) in floor beam m3
11.46 3200
c) in 17cm thick slab m3 34.97 3200
d) in stair case and landing m3 3.32 3200
e) in cover slab m3
Total summery
Amount
271,605.00
149,616.00
66,096.00
317,385.00
181,526.00
986,228.00
85,880.00
85,880.00
45,838.75
158,132.48
17,929.60
72,720.00
259,080.00
34,311.20
12,204.50
45,990.00
0.00
77,607.51
0.00
126,390.18
104,570.88
954,775.09
161,280.00
36,684.00
111,895.36
10,624.00
13,377.00
28,888.65
71,990.28
6,253.10
50,824.86
34,609.80
45,126.03
571,553.07
Ato Feyisa Ato Feyisa
Formwork Concrete
footing Pad
T D R Unit Discription T D R Unit Discription
4 9.60 4 2.50 Footing Pad
0.65 2.50
24.96 m2 formwork for SF1 0.65 16.25 m3 concrete for SF1
4 7.80 4 2.50
0.65 1.60
20.28 m2 ditto but for SF1 0.65 10.40 m3 concrete for SF1
4 6.52
0.65 4 3.26
16.95 m2 ditto but for SF1 0.40
0.65 3.39 m3 concrete for SF1
2 10.80
0.70 2 2.80
15.12 m2 ditto but for SF2 2.80
2 8.60 0.70 10.98 m3 concrete for SF2
0.70
12.04 m2
ditto but for SF2 2 2.80
1.70
2 6.20 0.70 6.66 m3 concrete for SF2
0.70
8.68 m2
ditto but for SF2 2 3.10
0.40
0.70 1.74 m3 concrete for SF2
1 18.00 2 18.00
0.45 0.45 16.20 m2 ditto but GB3
0.25 2.03 m3 ditto but GB3
8 14.00
8 14.00 0.45 50.40 m2 ditto but GB4
0.45
0.25 12.60 m3
ditto but GB4 131.40 m2
Total formwork for Grade beam
22.73 m 3
concrete volume for grade beam lean concrete
Footing pad
2 1.60 Ground Floor Slab 4 2.50
5.80 2.50 25.00 m2 for SF1
18.56 m2 ditto but ground floor slab b/n axis C-D and 1-2
4 2.50
1 5.40 1.60 16.00 m2 for SF1
1.60
8.64 m2
ditto but b/n axis D-E and 1-2
2 2.80
2 4.25 2.80 15.68 m2 for SF2
5.80
49.30 m2 ditto but b/n axis E-F and 1-2 2 2.80
1.70 9.52 m2 for SF2
1 4.25
5.40 4 3.20
22.95 m2 ditto but b/n axis F-G and 1-2 0.40 5.12 m2 for SF1
2 5.25 2 3.10
5.80 0.40 2.48 m2 for SF2
60.90 m2 ditto but b/n axis B-C and 2-5 For Grade beam
2 15.55
1 5.25 0.25 7.78 m2 on axis A & C
5.40
28.35 m2 ditto but b/n axis C-D and 2-5 1 15.15
0.25 3.79 m2 on axis B
2 1.60
5.80 2 12.63
18.56 m2 ditto but b/n axis D-E and 2-5 0.25 6.31 m2 on axis 2 & 3
32.39 m 3
total for ground floor slab
GF column GF Beam
4 1.80 1 5.60
2.75 0.81 4.54 m2 FB1
19.80 m2 formwork for GF column C1
1 5.50
2 2.10 0.81 4.46 m2 FB2
2.75
11.55 m2 ditto but for C2 1 15.60
0.81 12.64 m2 FB3
2 1.80
2.75 3 16.00
9.90 m2 ditto but for C3 0.81 38.88 m2 FB4
2 2.20 2 13.60
1.95 0.81 22.03 m2 FB5
8.58 m2 ditto but for C4
82.54 m2 Total for FB
2 2.10
1.95 8.19 m2 ditto but for C5 11.46 m3 Total volume of concrete for floor beam
2 0.80 1 5.25
0.25 5.40 28.35 m2
2.75 1.10 m3 concrete for C2
1 1.80
2 0.45 5.40 9.72 m2
0.45
2.75 1.11 m3 concrete for C3 1 5.75
1.80 10.35 m2
2 0.85
0.25 1 1.23
2.75 1.17 m3 concrete for C4 1.80 2.21 m2
2 0.80 1 4.30
0.25 1.30 5.59 m2
2.75 1.10 m3 concrete for C5
1 5.75
6.27 m3 Total volme of concrete for Column 4.30 24.72 m2
1 5.25
5.75 30.19 m2
1 5.75
1.80 10.35 m2
34.97 m3
Total volume of concrete for slab
Ato Feyisa Ato Feyisa
massonery earth work
hard core
T D R Unit Discription T D R Unit Discription
Back fill
2 1.60
5.80
18.56 m2 hard core b/n axis A-cantilever and 1-2
1 1.60
5.00
8.00 m2 ditto but b/n axis 2-3 and A cantilever
2 4.25
5.80
49.30 m2 ditto but b/n axis A-B and 1-2
1 4.25
5.00
21.25 m2 ditto but b/n axis A -B and 3-2
2 5.25
5.80
60.90 m2 ditto but b/n axis B-C and 2-1
1 5.25
5.40
28.35 m2 ditto but b/n axis B-C and 2-3
2 1.60
5.80
18.56 m2 ditto but b/n axis 1-2 and C- cantilever
1 5.40
1.60
8.64 m2 ditto but b/n axis 2-3 and C-cantilever
2 19 massonery wall
0.5
1.9 36.10 m3 massonery wall on axis B
2 3.6
0.5
1.9 6.84 m3 ditto but on axis C
0 6.5
0.3
2.1 0.00 m3 ditto but on axis D
0 6.12
0.3
2.1 0.00 m3 ditto but on axis E
0 3.1
0.3
2.1 0.00 m3 ditto but on axis F & G
0 14.3
0.3
2.1 0.00 m3 ditto but on axis 1
0 16.3
0.3
2.1 0.00 m3 ditto but on axis 2
0 7.6
0.3
2.1 0.00 m3 ditto but on axis 5
0 2
0.3
2.1 0.00 m3 ditto but on axis 6
0 9.65
0.3
2.1 0.00 m3 ditto but on diagonal axis
42.94 m3 total massonery wall.
excavation
Bulk excavation
1 18.5
14.5
1.35 362.14 m3 Total bulk excavation
4 3 Pit excavation
3
2 72.00 m3 ditto but for SF1
4 1.85
3
2 44.40 m3 ditto but for SF1
2 3.3
3.3
2 43.56 m3 ditto but SF2
2 3.3
2.05
2 27.06 m3 ditto but SF2
Trench excavation
4 2.7
0.9
2 19.44 m3 trench excavation for SF1
2 2.6
0.9
2 9.36 m3 ditto but for SF2
2 19
0.9
1.3 44.46 m3 ditto but for beam on cantilever
2 1.3
1
1.3 3.38 m3 ditto but for axis 4&1 b/n A-B
2 2.3
1
1.3 5.98 m3 ditto but for axis 4&1 b/n B-C