030-D0 –R0
- Mention all the parameters in this report again instead of referring to the storm water report.
-What is the source for the catchment areas for SLPA side and CPCDP side? Please attach any supporting
documents or reports
Only the plot to manholes connections are to be done by SLPA. The design and construction of the main
SLPA drain should be done by CHEC. Therefore, UCD should design and clearly indicate the path and
levels.
- SLPA has given as built drawings for their core-locs. Based on those drawings UCD should lay out
the SLPA drain considering
o Minimum disturbance and minimum removal of existing core-locs
Furthermore, as discussed during the joint site visit with CECB, CPCC, CHEC and UCD on 4 th April 2025,
the following were pointed out;
Therefore, you are requested to pay due attention to the as built drawings of core-locs and propose a