Corrective Action Plan On PEZA ENGR Annual Inspection 2024 - Electrical - Docx 2

The document is a compliance report addressed to Engr. Jose A. Ibasco regarding actions taken to rectify deficiencies noted during an inspection on January 14, 2025. It outlines specific findings, actions taken, and timeframes for compliance, including submissions of updated electrical plans and necessary permits. The report is prepared by Ronald L. Sibulo, the Pollution Control Officer.

Uploaded by

myline.hermosura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Corrective Action Plan On PEZA ENGR Annual Inspection 2024 - Electrical - Docx 2

The document is a compliance report addressed to Engr. Jose A. Ibasco regarding actions taken to rectify deficiencies noted during an inspection on January 14, 2025. It outlines specific findings, actions taken, and timeframes for compliance, including submissions of updated electrical plans and necessary permits. The report is prepared by Ronald L. Sibulo, the Pollution Control Officer.

Uploaded by

myline.hermosura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Lot 1-6 Block 20 Phase 4 Main Avenue, Cavite Export Processing Zone, Rosario,

Cavite
Tel #: (046) 437 – 0606 ZIP CODE: 4106

February 21, 2025

To: ENGR. JOSE A. IBASCO


Building Official
CEZ, Rosario, Cavite

In compliance with the recommendations in the inspection conducted last


January 14, 2025 with a project title of Annual Inspection 2024, the following
courses of action have been undertaken or planned to be implemented in order
to rectify the deficiencies noted based on the PEZA Engineers inspection report.

FINDINGS ACTION TAKEN TIMEFRAME


Submit updated and consolidated As-built Submitted
Complied
Electrical plan of overall electrical facility. (January 21, 2025)

Submit PM for transformers / AVR signed and Submitted


Complied
sealed by PEE. (February 6, 2025)
Secure necessary permits (EP and EPTO) for
Preen power supply, AC load bank Resistor,
For approval of Quotation March 21, 2025
Dust collector, mounter solder paste, Loader,
ACU.

Notes: 1. Use additional sheet/s if necessary and if the finding/s already rectified attached
picture/s as proof of compliance
2. Project title/name: for annual (Annual Inspection) and for Occupancy/Permit to Operate
(project title as reflected in the as- built plan)

Prepared by:

Ronald L. Sibulo
Pollution Control Officer