0% found this document useful (0 votes)
9 views2 pages

Trc Checklist

The document outlines a comprehensive TRC checklist for ramp services, detailing pre-flight, during flight, and post-flight activities along with their respective countdown times, responsibilities, and cross-check requirements. It includes tasks such as crew briefings, loading instructions, safety checks, and documentation procedures to ensure efficient flight operations. The checklist is structured to facilitate accountability and timely execution of ramp activities to support flight schedules.

Uploaded by

Henry Darlington
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views2 pages

Trc Checklist

The document outlines a comprehensive TRC checklist for ramp services, detailing pre-flight, during flight, and post-flight activities along with their respective countdown times, responsibilities, and cross-check requirements. It includes tasks such as crew briefings, loading instructions, safety checks, and documentation procedures to ensure efficient flight operations. The checklist is structured to facilitate accountability and timely execution of ramp activities to support flight schedules.

Uploaded by

Henry Darlington
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

RAMP SERVICES

TRC CHECKLIST

DATE.............................................................. FLIGHT NO.......................................................


ACTIVITY COUNTDOWN CHECK RESPONSIBILITY
(YES/NO) PARTY
CROSS CHECK
PRE FLIGHT ARRIVAL
Flight editing done - 8hrs Load controller
Attend airline briefing - 3h15mns TRC
Check-in opened - 3hrs PAX TL
Do team briefing for ENHAS ramp staff -3hrs TRC
Sorting staff in position -3hrs TRC
Crew briefing documents e.g. weather, FPL -1hr ETD Load controller/CLC
Serviceable and clean ULDs and baggage carts at -3h15mns RD
sorting area
Trial trim reference -3hrs ATD Load controller
Incoming flight messages, CPM, LDM, PSM -2hrs ETA/ 30min ETA Load controller
GSE organized on the bay -30min ETA TRC
File out going FPL -2hrs STD Load controller
Outgoing cargo ready positioned -40mns ETA Driver
-60mns ETA
Offloading instructions issued -30mns ETA Load controller
Call out inflight caterer -30mns ETA TRC
Meeting staff informed -15mns ETA Deployment officer
Call out fuelling company -15mns ETA TRC
Ramp bus positioned for outgoing crew -60mns ATD TRC/driver
Ramp buses positioned for in pax -10mns ETA TRC/driver
TRC and RAMP Team on stand -15mns ETA TRC
Fire Truck available in the vicinity -15miins ETA TRC
FOD inspection of parking bay -15mns ETA TRC
Final cargo figures received by load control -2hrs ATD Load controller
CAA Marshaller available -2mns ETA TRC
DURING FLIGHT
Loading instructions issued -LIRF - 01hr ETD Load controller
Sufficient drivers (3 narrow body & 4 wide body; 03 TRC
freighter)
Sufficient Loaders (8 narrow body & 9 wide body) to TRC
load/offload
Ensure all ramp staff in safety gear All the time TRC
Give an ok signal to approach A/C after beacons off +2min ATA TRC
Aircraft chocked +2mins ATA TRC
Safety cones in place +2mins ATA TRC
Inspect aircraft fuselage and doors for damages before +2mins ATA TRC
GSE Positioning.

GPU positioned if required + 4mins ATA Driver


Arrival MVT sent + 10 mns latest ATA Load controller
Cleaning starts IMM after disembarkation TRC
Offloading starts +4mns ATA TRC/SAL
First bag +7mins TRC/SAL/driver
Cross check LIRF with cargo manifest TRC/SAL
Verify if loading staff check tags during off loading and TRC/SAL
loading
Offloaded cargo delivered to warehouse +30mns ATA TRC/driver
Loading starts +20mns ATA TRC/SAL
Cleaning finished -40mns ATD TRC
Last bag delivered +25mins ATA TRC/SAL
Boarding starts for special cases -45mns ATD Board master/ pax TL
Final check-in figures received by L/C -30minETD L/C
Boarding the rest of pax starts -30min ETD TRC/Boarding master
VIPs boarded -15min ETD Boarding Master
Baggage reconciliation check -15min ETD LC/SAL/TRC
Loadsheet delivered to cockpit -15min ETD LC

Asset ID: Version No.: Revision No.: Issue Date: Effective Date:
EBB/RS/C006 1 2 17 May 2023 01 June 2023
RAMP SERVICES

TRC CHECKLIST

Pushback tractor and driver positioned -15min ETD TRC


Confirm all pax on board -10min ETD TRC
Loading completed and doors closed -10min ETD TRC
Confirm flight docs delivered on board -07min ETD TRC
Push back briefing done -07min ETD TRC
Headset at A/C side -07min ETD TRC
02 Wing walkers available -07min ETD TRC
Cabin doors closed and steps removed -05min ETD TRC
Conduct Exterior checks for any damages after GSE -5mns ETD TRC
removal before departure
All Safety cones removed after all GSE removal -5mns ETD TRC
Pushback connected -5mns ATD TRC/driver
On time departure/ close doors ATD TRC

POST FLIGHT DEP


Bay cleared +3mns ATD TRC/Driver
Send MVT, LDM, CPM +05min ATD LC/TRC
Debriefing +10min ATD Airline official /TRC
Record details in log book +20mns ATD LC

Operations Supervisor...........................................................................................
Sign........................................................................

Asset ID: Version No.: Revision No.: Issue Date: Effective Date:
EBB/RS/C006 1 2 17 May 2023 01 June 2023

You might also like