Pep - 141224 - 436414-302!-!main Roof Level Structural Framing General Arrangement
Pep - 141224 - 436414-302!-!main Roof Level Structural Framing General Arrangement
1
STEEL SECTION FOR
PB
-CEILLING + SERVICES: 0.30kN/m²
STUD WALL 3. CONTRACTORS ARE NOT TO WORK TO THIS
DEFLECTION HEAD DRAWING UNLESS IT IS AT 'FOR CONSTRUCTION'
- VARIABLE ACTION:
RESTRAINT (1) STATUS, AS THE DESIGN MAY NOT HAVE BEEN
- SNOW MAINTENANCE ACCESS: 0.6kN/m²
7400
FINALISED.
B2 B2
B T 9.398 m 4. DO NOT SCALE FROM THIS DRAWING, WORK TO
GIVEN DIMENSIONS ONLY.
PB PB
1 (2) 2
3065
B14
B14
B14
B14
B14
B14
B15
B14
- 300 FOR COLUMN AND VERTICAL BRACING
(1) B2 GENERAL ARRANGEMENT AND STEELWORK
C T 9.745 m NOTES
1
PB
2175
1:10 FALL
6400
1:10 FALL
1:10 FALL
1:10 FALL
RESTRAINT
PB (1)
3650
1 PB2
(1)
E
RIDGE PB1 T 10.282 m PB2 RIDGE
575
B2
F B2
B2 T 10.271 m T 10.271 m
PB1 PB2
1:10 FALL
1:10 FALL
PB
1:10 FALL
PB2
1:10 FALL
B14
B14
B14
B14
B14
B14
B15
B14
B2 B2 B2
G
T 9.660 m
PB 2
1 PB
CHK
REV
ALLOW HOT ROLLED
BY
AMENDMENTS DATE
STEEL SECTION FOR
(1) (1)
6550
STUD WALL
DEFLECTION HEAD
RESTRAINT FOR COMMENT
1 PB
PB 2
B2 B2 B2 B2 B2 B2 B2 B2
J
T 9.000 m 2950 T 9.000 m T 9.000 m
RIDGE
BAY) TO THE WEST OF GRID 1 INTERNAL BLOCK SUBJECT TO ABNORMAL E-Mail: [email protected]
AND EAST OF GRID 12 WALLS TEMPERATURES
2No. M.S. 20mm
THK. END PLATES BEAM SCHEDULE
WORK IN
GL
TOS 10.332 m
Beam Ref. Section PROGRESS
B1 PFC180x75x20
REFER TO PEP DRAWING 2650
436414/300 FOR STEELWORK B2 UB203x133x25
NOTES B3 UB254x146x31
B4 UB254x146x37
B5 UB356x127x33
ALL GRIDS, LEVELS, DIMENSIONS
AND STOREY HEIGHTS ARE TO B6 UB356x171x45
1050
B13 UB457x191x67
B14 UB533x210x82 NEW VEHICLE EMISSIONS LAB
CDM Regulations 2007: Designers' Notes on Significant Residual Risks B15 UB533x210x92
515
W OG
THK M.S. PLATE)
PEP/STD/DrgSht/A1/V/REVIT
1. Do not drill, cut or core additional service holes through any B17 RHS400x200x8.0
PR
section of floor or roof without first consulting the Structural B18 SHS350x350x10.0
Engineer. 3000 TITLE
O R
2. Steelwork sub contractor to inspect and approve all cast in MAIN ROOF LEVEL STRUCTURAL
R E
holding down bolt locations prior to casting concrete. Principal
PLAN BRACING SCHEDULE FRAMING GENERAL ARRANGEMENT
contractor to ensure that sufficient time has been allowed for curing M.S. 20mm THK STIFFENER
K S
of concrete bases before erection of steel columns.
P. Bracing Ref. Section
FRAMING DETAIL AT RIDGE PB1 CHS114.3x3.2
IN S
DRAWN CHK'D APR'D
Scale 1 : 20 PB2 CHS139.7x5.0 JG YS
SCALE DATE
As indicated @ A1 24.12.2014
These notes relate solely to information shown on this drawing. Only
significant risks which are considered to be unusual, or unlikely to be
obvious to a competent contractor or other designer will be highlighted.
TYPICAL EAVES HAUNCH DETAIL -1 0 1 2 3 4 5 10m JOB No DRG No REV