The document contains detailed notes and specifications for roof construction, including the design and arrangement of steel framing and purlins. It emphasizes the importance of adhering to the provided dimensions, consulting with the structural engineer before making modifications, and ensuring that all relevant documents are referenced. Additionally, it highlights that the drawing is subject to change and should not be reproduced without permission.

Uploaded by

Richard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Pep - 141224 - 436414-302!-!main Roof Level Structural Framing General Arrangement

The document contains detailed notes and specifications for roof construction, including the design and arrangement of steel framing and purlins. It emphasizes the importance of adhering to the provided dimensions, consulting with the structural engineer before making modifications, and ensuring that all relevant documents are referenced. Additionally, it highlights that the drawing is subject to change and should not be reproduced without permission.

Uploaded by

Richard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

THIS DRAWING IS COPYRIGHT AND MUST NOT

ROOF CONSTRUCTION NOTES BE REPRODUCED WHOLLY OR IN PART WITHOUT PRIOR


PERMISSION.
6. (1) DENOTES DIRECTION OF SPAN OF
GALVANISED STEEL PURLINS METSEC NOTES:
262.Z.18 @ 1500 CENTRES
1 2 3 5 7 8 9 10 12 1. THIS DRAWING IS TO BE READ IN CONJUNCTION
4200 4200 7000 6000 6000 5625 7800 7800 DENOTES DIRECTION OF SPAN OF WITH ALL RELEVANT DETAILS, DRAWINGS,
(2) GALVANISED STEEL PURLINS METSEC SPECIFICATIONS, REPORTS AND OTHER
202.Z.15 @ 1500 CENTRES DOCUMENTS ISSUED BY THE ARCHITECT AND
OTHER DESIGN TEAM MEMBERS.
B2 B2 B2 B2 B2 B2 B2 B2
A PURLINS TO BE DESIGNED AND DETAILED BY SPECIALIST 2. REPORT ANY DISCREPANCIES IMMEDIATELY AND
T 9.000 m T 9.000 m T 9.000 m MANUFACTURER FOR THE FOLLOWING DESIGN UNIT AWAIT FURTHER INSTRUCTIONS BEFORE
LOADINGS (EXCL. SELF WEIGHT): PROCEEDING WITH ANY ASSOCIATED
(1) CONSTRUCTION WORKS. IF A DETAIL APPEARS
(1) 2 - COMPOSITE CLADDING SYSTEM+PURLINS: 0.40kN/m² UNCLEAR, OR THERE IS ANY DOUBT, THEN
ALLOW HOT ROLLED PB CONTACT PEP FOR FURTHER ADVICE.
4335

1
STEEL SECTION FOR

PB
-CEILLING + SERVICES: 0.30kN/m²
STUD WALL 3. CONTRACTORS ARE NOT TO WORK TO THIS
DEFLECTION HEAD DRAWING UNLESS IT IS AT 'FOR CONSTRUCTION'
- VARIABLE ACTION:
RESTRAINT (1) STATUS, AS THE DESIGN MAY NOT HAVE BEEN
- SNOW MAINTENANCE ACCESS: 0.6kN/m²
7400

FINALISED.
B2 B2
B T 9.398 m 4. DO NOT SCALE FROM THIS DRAWING, WORK TO
GIVEN DIMENSIONS ONLY.
PB PB
1 (2) 2
3065

5. REFER TO PEP DRAWING 436414/_ _ _:


(1) (1) (2) (2) (2)
B14

B14

B14

B14

B14

B14

B14

B15

B14
- 300 FOR COLUMN AND VERTICAL BRACING
(1) B2 GENERAL ARRANGEMENT AND STEELWORK
C T 9.745 m NOTES
1
PB
2175

- 301 FOR FIRST FLOOR AND LOWER ROOF


PB2 STRUCTURAL FRAMING GA
ALLOW HOT ROLLED
B2 B2 STEEL SECTION FOR
D - 303 FOR STRUCTURAL FRAMING ELEVATIONS
T 9.946 m STUD WALL (1) AND SECTIONS
DEFLECTION HEAD

1:10 FALL
6400

1:10 FALL
1:10 FALL
1:10 FALL

RESTRAINT
PB (1)
3650

1 PB2
(1)
E
RIDGE PB1 T 10.282 m PB2 RIDGE
575

B2
F B2
B2 T 10.271 m T 10.271 m
PB1 PB2

1:10 FALL
1:10 FALL
PB

1:10 FALL
PB2
1:10 FALL

(1) (1) ALLOW HOT ROLLED (1)


6100

STEEL SECTION FOR


STUD WALL
DEFLECTION HEAD
1 RESTRAINT PB2
PB (1) (2) (2) (2) (2)
B14

B14

B14

B14

B14

B14
B14

B15
B14

B2 B2 B2
G
T 9.660 m

PB 2
1 PB

CHK
REV
ALLOW HOT ROLLED

BY
AMENDMENTS DATE
STEEL SECTION FOR
(1) (1)
6550

STUD WALL
DEFLECTION HEAD
RESTRAINT FOR COMMENT
1 PB
PB 2

B2 B2 B2 B2 B2 B2 B2 B2
J
T 9.000 m 2950 T 9.000 m T 9.000 m

MAIN ROOF STRUCTURAL FRAMING


THE PROPOSED MAIN STEEL CLIMATIC TEST IT IS ASSUMED THAT GENERAL ARRANGEMENT
FRAME HAS BEEN DESIGNED TO CELLS TO ACHIEVE ALL STEELWORK IS Scale 1 : 100 PEP House
Stoney Lane, Bourne End
ALLOW FOR THE PROVISION OF RESTRAINT FROM OUTSIDE OF THE Hemel Hempstead,
Herts, HP1 2SB
A FURTHER EXTENSION MAIN STEEL CLIMATIC TEST CELLS Tel: 01442 869400
(ADDITIONAL PORTAL FRAMED FRAME AND NOT AND THUS NOT Fax: 01442 869401
Web: www.pepgroup.co.uk

RIDGE
BAY) TO THE WEST OF GRID 1 INTERNAL BLOCK SUBJECT TO ABNORMAL E-Mail: [email protected]
AND EAST OF GRID 12 WALLS TEMPERATURES
2No. M.S. 20mm
THK. END PLATES BEAM SCHEDULE
WORK IN
GL
TOS 10.332 m
Beam Ref. Section PROGRESS
B1 PFC180x75x20
REFER TO PEP DRAWING 2650
436414/300 FOR STEELWORK B2 UB203x133x25
NOTES B3 UB254x146x31
B4 UB254x146x37
B5 UB356x127x33
ALL GRIDS, LEVELS, DIMENSIONS
AND STOREY HEIGHTS ARE TO B6 UB356x171x45
1050

BE CONFIRMED BY ARCHITECT 9.000m B7 UB356x171x51


02 Eaves TOS
B8 UB406x140x39
THE PROPOSED SCHEME AS SHOWN ON B9 UB406x140x46
515

THIS DRAWING IS STILL SUBJECT TO DESIGN B10 UB406x178x54


DEVELOPMENT, AND IS AS COMPLETE AS IS B11 UB406x178x60
POSSIBLE/PRACTICAL AT THE DATE OF B12 UB457x152x52
ISSUE BUT MAYBE SUBJECT TO CHANGE CONTRACT
1020

B13 UB457x191x67
B14 UB533x210x82 NEW VEHICLE EMISSIONS LAB
CDM Regulations 2007: Designers' Notes on Significant Residual Risks B15 UB533x210x92
515

STIFFENER (20mm 1500 1500 B16 RHS300x200x8.0

W OG
THK M.S. PLATE)
PEP/STD/DrgSht/A1/V/REVIT

1. Do not drill, cut or core additional service holes through any B17 RHS400x200x8.0

PR
section of floor or roof without first consulting the Structural B18 SHS350x350x10.0
Engineer. 3000 TITLE

O R
2. Steelwork sub contractor to inspect and approve all cast in MAIN ROOF LEVEL STRUCTURAL

R E
holding down bolt locations prior to casting concrete. Principal
PLAN BRACING SCHEDULE FRAMING GENERAL ARRANGEMENT
contractor to ensure that sufficient time has been allowed for curing M.S. 20mm THK STIFFENER

K S
of concrete bases before erection of steel columns.
P. Bracing Ref. Section
FRAMING DETAIL AT RIDGE PB1 CHS114.3x3.2

IN S
DRAWN CHK'D APR'D
Scale 1 : 20 PB2 CHS139.7x5.0 JG YS

SCALE DATE
As indicated @ A1 24.12.2014
These notes relate solely to information shown on this drawing. Only
significant risks which are considered to be unusual, or unlikely to be
obvious to a competent contractor or other designer will be highlighted.
TYPICAL EAVES HAUNCH DETAIL -1 0 1 2 3 4 5 10m JOB No DRG No REV

This information may be subject to revision as the design develops. Scale 1 : 20


Scale 1:100