P&ID Legend and Symbols 8

The document outlines the API 682 4th Edition Seal Plans 11/52/61 and 11/52/62, detailing specifications for cooling water supply and return lines, as well as seal chamber configurations. It includes a comment response sheet addressing various reviewer comments related to the piping plans for the GSH Refinery project. The responses clarify the requirements for cooling water and updates to the drawings based on typical arrangements and standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views3 pages

P&ID Legend and Symbols 8

The document outlines the API 682 4th Edition Seal Plans 11/52/61 and 11/52/62, detailing specifications for cooling water supply and return lines, as well as seal chamber configurations. It includes a comment response sheet addressing various reviewer comments related to the piping plans for the GSH Refinery project. The responses clarify the requirements for cooling water and updates to the drawings based on typical arrangements and standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

API 682 4th Ed. SEAL PLAN 11/52/61 (OVERHUNG) API 682 4th Ed.

API 682 4th Ed. SEAL PLAN 11/52/61 (BETWEEN BEARING)


- REFERENCE LIST : 1) API 682 4th Ed. ANNEX G.

1. FOR API 682 4th Ed. SEAL PLAN 61.


2. HIGH POINT.
FREE DRAINING ## # 3. COOLING WATER SUPPLY (CWS) AND COOLING WATER RETURN (CWR) LINE
or or
LO D VF HFL CONNECTION TO HEADER SHALL BE FINALIZED BY EPC CONTRACTOR DURING
NOTE 2 DETAIL ENGINEERING PHASE.
FREE DRAINING # # #
or or NOTE 2 NOTE 2
LO D VF HFL

FREE DRAINING

FREE DRAINING

FREE DRAINING
RO LO
1
LO 3/4" RO RO 3/4" LO
RO 3 1
2
RO RO
4 2

H
PT PI
1 H H
PI PT PT PI
2 MOTOR 1
DRIVE
END SIDE

NOTE 1 H
LG LT LI
PLUGGED 1 1 NOTE 1 NOTE 1
QUENCH L H H
LI LT LG PLUGGED PLUGGED LG LT LI
2 2 QUENCH QUENCH 1 1
SEAL L L
CHAMBER SEAL SEAL
CHAMBER CHAMBER
PLUGGED SG #
DRAIN 3/4" 1 CWR PLUGGED PLUGGED
NOTE 1 SG SG #
NOTE 3 DRAIN DRAIN
2 3/4" 3/4" 1 CWR
NOTE 1 NOTE 1
NOTE 3

#
CWS
#
NOTE 3
CWS
VENDOR NOTE 3
EPC CONTRACTOR
VENDOR
EPC CONTRACTOR

API 682 4th Ed. SEAL PLAN 11/52/62 (BETWEEN BEARING)

FREE DRAINING ## #
or or
LO D VF HFL

NOTE 2 NOTE 2

FREE DRAINING
FREE DRAINING

PCV
1
# ##
or or
LLS UW PN

LO 3/4" RO RO 3/4" LO
3 1

RO RO
4 2

H H
PI PT PT PI
2 1
PERTAMINA
KILANG PERTAMINA
INTERNASIONAL
MOTOR
H DRIVE H
LI LT LG END SIDE LG LT LI
2 2 1 1
L L
SEAL SEAL
CHAMBER CHAMBER

SG SG #
2 3/4" 3/4" 1 CWR
NOTE 3

#
CWS
VENDOR NOTE 3
EPC CONTRACTOR

#
OWS
COMMENT RESPONSE SHEET ( CRS )
FEED DEVELOPMENT FOR GSH REFINERY UNIT III PLAJU DAN REFINERY
UNIT VI BALONGAN

Doc. No : V2301-000-M60-GEB-C0008 Doc. Title : P&ID of Legend and Symbols 8

Submitted Date: Response Date:


Revision A Issued Purpose : IFR Review Code : B
06/05/2024 16/08/2024
Submitted Date: Response Date:
Revision B Issued Purpose : IFA Review Code : B
16/08/2024 02/09/2024
Submitted Date: Response Date:
Revision Issued Purpose : Review Code :
Select date Select date
LEGEND :

A : Approved B : Approved with Comments C: Major Comment

COMMENTS:
No. Reviewer Page No. Owner Comment Consultant Reply/Clarification Rev. Status
Does piping plan 11 require cooling
water? Or this typical arrangement is It is double mechanical seal plan.
1. Mr Fakhri
Sheet 1 of 1 for dual seal plan? Rekind to explain Please refer to API 682 4th Ed. ANNEX. B Closed
Ilham Faza
in CRS. G. for detail of seal plan.
Typical for all pump type.
Mr Nickmatul Add note
Incorporated. The NOTE has been
2. Akbar Sheet 1 of 1 cws and cwr line connection to B Closed
added.
Harahap header shall detailed in DED
Please be noted that it is typical legend
and symbols drawing for pump seal
Mr Afrizal plan. For typical drawing, it will be
3. Sheet 1 of 1 Update to butterfly. B Closed
Manaf indicated as current drawing. The type of
valve will be decided depend on the size
of valve.
Mr Afrizal Please be noted that it is typical legend
4. Sheet 1 of 1 Update to butterfly. B Closed
Manaf and symbols drawing for pump seal
COMMENT RESPONSE SHEET ( CRS )
FEED DEVELOPMENT FOR GSH REFINERY UNIT III PLAJU DAN REFINERY
UNIT VI BALONGAN

No. Reviewer Page No. Owner Comment Consultant Reply/Clarification Rev. Status
plan. For typical drawing, it will be
indicated as current drawing. The type of
valve will be decided depend on the size
of valve.