0% found this document useful (0 votes)
4 views3 pages

MS

The document outlines a work schedule for a contractor's project set for February 7, 2025, detailing various types of permits and certificates required for the job. It includes sections for the permit originator, issuing authority, and emergency response representative to endorse the work steps defined in the method statement (MS). Additionally, there is a breakdown of job steps and required equipment/tools, though specific details are not provided in the excerpt.

Uploaded by

Hussein Hisham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views3 pages

MS

The document outlines a work schedule for a contractor's project set for February 7, 2025, detailing various types of permits and certificates required for the job. It includes sections for the permit originator, issuing authority, and emergency response representative to endorse the work steps defined in the method statement (MS). Additionally, there is a breakdown of job steps and required equipment/tools, though specific details are not provided in the excerpt.

Uploaded by

Hussein Hisham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Contractor’s Company

Date of the work scheduled: 2025-02-07 Name


Antonoil Project/ contract

Facility/Area/Location
SAP Work Order №:

General Work Title:

Equipment Info/№:
· If Applicable: ✔
Type of Permit: CWP. SPWP. HWP. BCWP
Scaffolding
Type of Certificate: CSEC. EXC. RC. Cert.
Type of Isolation: EIC. MIC. N/A.
· PO & PA confirm that the task will be carried out as per the defined steps in this MS
Permit Originator/ Performing
Authority
Name Signature

· IA accepts and endorses steps of work defined in this MS

Issuing Authority Name Signature

· KEBL Emergency Response Representative accepts and endorses steps of work defined in this MS

ER Representative (If applicable) Name Signature

· Breck down the job steps:

Main steps Equipment


№ of the work / Tools
process Required

1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18
19
20
21
22
Project/ contract 1190

N/A

n this MS

You might also like