Project Quality Plan
Project Quality Plan
Revision No. 00
Date 28-02-2025
Reviewed By
Approved By
1PURPOSE
Document Title TYPICAL PROJECT QUALITY PLAN
Revision No. 00
Date 28-02-2025
2 SCOPE
3 REFERENCES
4 TERMS & DEFINITIONS
5 IMS POLICY
6 ABBREVIATIONS 8
7 MANAGEMENT RESPONSIBILITIES
7.1 Scope
7.2 Project objectives
7.3 Organization
7.5 Resources
7.6 Management Review
8 MANAGEMENT SYSTEM DOCUMENTATION
8.1 Basis of Project Quality Plan 15
9 PROJECT MANAGEMENT 16
9.1 General 16
9.2 Project Documents and drawings Approval 16
9.3 Coordination Meeting with client/main contractor 17
9.4 Acceptance of Minutes 17
9.5 Client Complaint 18
10 PREPARATION, APPROVAL, AND USE OF METHOD STATEMENT: 18 Document
Title TYPICAL PROJECT QUALITY PLAN Document No. GS-PQP-REV00 Revision No.
0 Date 16th January 2022
Doc. No.: GS-PQP-REV00 Page 3 of 40
Document Title TYPICAL PROJECT QUALITY PLAN
Revision No. 00
Date 28-02-2025
Revision No. 00
Date 28-02-2025
14.3 Procedure 26
14.3.1 Audit Schedule 26
14.3.2 Planning and Preparation for Audit 26
15 CONTRACT CHANGES / AMENDMENTS 27
15.1 Scope 27
15.2 Applicable References 27
15.3 Contract Review 27
16 QUALITY RECORDS 28
16.1 Scope 28
16.2 Purpose 28
16.3 Responsibilities 28
16.4 Procedure 29
17 DESIGN CONTROL 29
17.1 Purpose 29
17.2 Scope 30
17.3 Applicable References 30
17.4 Responsibility 30
17.5 Procedure 30
17.6 Approval of Drawings 34
17.7 Design Changes 34
18 DOCUMENT AND DATA CONTROL 34
18.1 Scope 34 Document Title TYPICAL PROJECT QUALITY PLAN Document No. GS-PQP-REV00
Revision No. 0 Date 16th January 2022
Doc. No.: GS-PQP-REV00 Page 5 of 40
Document Title TYPICAL PROJECT QUALITY PLAN
Revision No. 00
Date 28-02-2025