The document outlines the HVAC works for a dispensary building in Gurugram, detailing various components such as water chilling units, pumps, heat exchangers, cooling towers, and air handling units. It includes specifications for equipment, installation, testing, and commissioning, along with performance requirements and capacities. The summary also mentions the financial aspects, including subtotals for different parts and applicable taxes.

Uploaded by

ajayvaish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views92 pages

Boq

The document outlines the HVAC works for a dispensary building in Gurugram, detailing various components such as water chilling units, pumps, heat exchangers, cooling towers, and air handling units. It includes specifications for equipment, installation, testing, and commissioning, along with performance requirements and capacities. The summary also mentions the financial aspects, including subtotals for different parts and applicable taxes.

Uploaded by

ajayvaish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 92

DISPENSARY BUILDING AT SECTOR 50, GURUGRAM

SUMMARY OF HVAC WORKS


Sr.No. Description of Item

1 Sub Total Part ‘A’ (Equipment)

2 Sub Total Part ‘B’ (Piping)

3 Sub Total Part ‘C’ (Ducting and Grills)

4 Sub Total Part ‘D’ (Electrical Works)

5 Sub Total Part ‘D’ (Dismantling, Shifting and Reinstallation Work)

Grand Total (Part A+B+C+D) - TAXES EXTRA


GST @ 18%
CESS @ 1%
Grand Total (Part A+B+C+D) - TAXES Incl.
URUGRAM

AMOUNT

-
-
-
-
BOQ OF HVAC SYSTEM

S.No. Description Unit

1.0 Water Chilling Unit & Chiller Plant Manager System


1.1 Water Chilling Unit
Supply, Installation, Testing and Commissioning of water cooled packaged Screw
Water chiller machines each having a capacity of 190 TR at chilled water inlet/outlet
temperature of 12.22°C /6.7°C, suitable for operation on refrigerant R134a each
comprising of the following complete as per
specification and as required

Screw type single/multiple compressor semi hermatic complete with automatic


capacity control, safety switches, speed increasing gears, forced feed lubrication system
etc. as per specifications.
Single suitable capacity squirrel cage induction motor with class 'B' insulation
suitable for operation on 415±10% volts, 50 Hz A.C. supply one for each compressor. The
starter for the motor shall be VFD type
Necessary drive arrangement.
1 Set- Lubrication Device consisting of automatic electric oil pump, oil cooler,
head tank, oil strainer, automatic pressure regulating valve, oil heater, oil heater
thermal switch etc. as per spesifications.
1 No.- Matching shell and tube water cooled condenser of M.S. shell and integrally
finned copper tubes.
1 No.- Matching shell and tube flooded type chiller of M.S. shell and integrally finned
copper tubes.
1 Lot- refrigerant piping fittings, valve and accessories to inter connect
compressor, condenser, chiller and expansion valve.
1 Set- Microprocessor based control pannel complete with accessories as per specifications.

Lot- Refrigerant line accessories comprising of safety valves, angle valve, liquid line
indications, liquid levelcontrol etc.
Lot- water flow switches at inlet and outlet of condenser & chiller, water drain and air purge
valves wherever required.
Lot- Suction line and chiller insulation with minimum 19 mm thick polyvinyl nitrile
rubber insulation finished with 0.63 mm thick G.S.S. cladding complete as required.

Lot- Frame work for mounting the above condenser, chiller, compressor and motor with
base plate complete with antiviberation pads/ springs.
Lot- Initial/First charge of refrigerant gas and compressor oil.
Unit shall be tested at the factory.
As per IGBC requirement, COP of water cooled Screw chilller should not be less than
6.1
The chiller characteristic shall be as follows:
Cooling Capacity : 190 TR
Water in condenser in/out : 32.2 °C / 37.8°C
Chilled water 'In' : 12.22 °C
Chilled water 'Out' : 6.7 °C
Chiller Fouling Factor : 0.0005
Condenser Fouling Factor : 0.001
Efficiency(kW/TR) : < 0.64
NPLV.IP(kW/TR) : < 0.4
CHW Flow : 456 GPM
CDW Flow : 570 GPM
Quantity : (2W+1S) Nos

2 Pumps
2.1 Primary Chilled Water Pumps
Supply, installation, testing and commissioning of End Suction back pull out centrifugal
chilled water pump set factory assembled and tested for rated efficiency with
mounting, supports etc if required. Controllers and all accessories related to pump
operation shall be incorporated. Each capable of delivering specified flow rate complete
with following as per specifications & schedule of equipments.

a. Pump with IP 55 S1 duty TEFC induction motor with class F insulation, IE-3, PN 12
(Minimum required).
b. Pumps shall be suitable for operation on 415+/- 10% Volts/
3ph / 50 Hz/AC power supply.
c. The pump characteristic shall be as follows:
d. Complete set system to be mounted on a common MS
base frame, all required fittings & accessories including coupling, coupling guard,
vibration isolation arrangement by means of rubber type mounting, foundation nuts,
bolts complete as required & as per specification with
following capacities shall follow following duty.

Water flow rate = 456 GPM (1724 LPM) Head = 15 Mtr.


Motor = (As per IGBC requirement, pump power should be equivalent to 22 W/gpm or
2.1.1 equivalent to BEE-3 star rating whichever is stringent) Primary Chilled water pumps as
described above (2 Working + 1Standby).
Nos
2.2 Secondary Variable flow Pumps with Pump mounted VFD and sensorless/
with sensor technology Pumping System

Supply, installation, testing and commissioning of End Suction back pull out centrifugal
chilled water recirculation pumps each capable of delivering specified flow rate
complete with following as per specifications & schedule
of equipments.
a. Pump with IP 55 S1 duty TEFC induction motor with class F insulation, EFF-1,
PN-12 (Minimum required).
b. Pumps shall be suitable for operation on 415+/- 10% Volts/
3ph / 50 Hz/AC power supply.
c. The price will include sensorless/ with sensor technology controller and all accessories
related to parallel sensorless/with sensor technolgy based operation, necessary
software and networking hardware and software for integration and compatibility with
BMS (BACNET/modbus Protocol).

d. All pumps to be provided with pump mounted integrated


VFD's (UL listed, IP-55).
e. Factory Fitted Control box & VFDs in the Panel with Sensorless controlled Operation.
Controller should be supplied separately to maintain the redundancy of variable
control in the system. Controller should be offered
with IP 54 protection.

f. Complete set system to be mounted on a common MS


base frame, all required fittings & accessories including coupling, coupling guard,
vibration isolation arrangement by means of rubber type mounting, foundation nuts,
bolts complete as required & as per specification with following capacities shall follow
following duty.

g The pump characteristic shall be as follows:

Water flow rate = 456 GPM (1724 LPM) Head = 25 Mtr.


Motor Efficiency = (As per IGBC requirement, pump power should be equivalent
to 22 W/gpm or equivalent to BEE-3 star rating whichever is stringent)
2.2.1 Secondary Chilled water pumps as described above
(2 Working + 1Standby).

Nos

3.0 Condenser water Pumps


Supply, installation, testing and commissioning of End Suction back pull out centrifugal
chilled water pump set factory assembled and tested for rated efficiency with
mounting, supports etc if required. Controllers and all accessories related to pump
operation shall be incorporated. Each capable of delivering specified flow rate complete
with following as per specifications & schedule of equipments.

a. Pump with IP 55 S1 duty TEFC induction motor with class F insulation, IE3, PN-
12 (Minimum required).
b. Pumps shall be suitable for operation on 415+/- 10% Volts/
3ph / 50 Hz/AC power supply.
c. The pump characteristic shall be as follows:
Complete set system to be mounted on a common MS
base frame, all required fittings & accessories including coupling, coupling guard,
vibration isolation arrangement by means of rubber type mounting, foundation nuts,
d. bolts complete as required & as per specification with following capacities shall follow
following duty.

Water flow rate = 570 GPM (2155 LPM) Head = 24 Mtr.


Motor Efficiency = (As per IGBC requirement, pump power should be equivalent
to 19 W/gpm or equivalent to BEE-3 star rating whichever is stringent)
3.1 Condenser water pumps as described above
(2 Working + 1Standby).

Nos

4.0 Hot water flow Pumps with Pump mounted VFD and sensorless/ with
sensor technology Pumping System

Supply, installation, testing and commissioning of End Suction back pull out centrifugal
hot water recirculation pumps each capable of delivering specified flow rate
complete with following as per specifications & schedule of equipments.

Pump with IP 55 S1 duty TEFC induction motor with class F insulation, EFF-1, Min. PN-12.

Pumps shall be suitable for operation on 415+/- 10% Volts/


3ph / 50 Hz/AC power supply.
The price will include sensorless/ with sensor technology controller and all accessories
related to parallel sensorless/with sensor technolgy based operation, necessary
software and networking hardware and software for integration and compatibility with
BMS (BACNET/modbus Protocol).

All pumps to be provided with pump mounted integrated


VFD's (UL listed, IP-55).
Factory Fitted Control box & VFDs in the Panel with Sensorless controlled Operation.
Controller should be supplied separately to maintain the redundancy of variable
control in the system. Controller should be offered with IP 54 protection.

Complete set system to be mounted on a common MS


base frame, all required fittings & accessories including coupling, coupling guard,
vibration isolation arrangement by means of rubber type mounting, foundation nuts,
bolts complete as required & as per specification with following capacities shall follow
following duty.

The pump characteristic shall be as follows:


Water flow rate = 229 GPM (868 LPM) Head = 27 Mtr.
Motor Efficiency = (As per IGBC requirement, pump power should be equivalent
to 19 W/gpm or equivalent to BEE-3 star rating whichever is stringent)
Secondary Chilled water pumps as described above
(1 Working + 1Standby).

Nos

4.0 Plate Heat Exchanger (PHE)

Supply, Receiving, storing, loading, unloading shift, fixing in position, Installation,


Testing & Commissioning of single pass PHE for Hot Water System - The plate heat
exchanger consists of a pack of corrugated metal plates with port holes for the passage
of the two fluids (both fluids are water) between which heat transfer will take place.
The plate pack is assembled between a fix frame plate and a movable pressure plate and
compressed by tightening bolts. The plates are fitted with a gasket which seals the
interplate channel and directs the fluids into alternate channels. The plate and the
pressure plate are suspended from an upper carrying bar and located by a lower
guiding bar, both of which are fixed to a support column. The required Capacity & temps
are as follows:

PHE for comfort Heating

Capacity : 300 KW
Water flow rate = 229 GPM (868 LPM)
pressure drop across HX not to exceed 20 ft or 6 meters .
Hot Water inlet/Out temp for Primary Side.: 50/45 Deg C
Hot Water inlet/Out temp for Secondary Side.: 40/45 Deg C
(01 Working + 0 Standby) Nos.

5 Make up water tank

Providing and fixing UV stabilized PVC water storage tanks, for 500 lit. capacity, of
the approved quality including making solid supported base as per instructions and making
all connections to the tank as required to make the
tank functioning in all respects .

Nos.

6 FRP Cooling Tower


Supply, installation, testing and commissioning of FRP cooling tower CTI certified of
2880000 BTU/Hr heat rejection capacity with FRP water basin, PVC fillings with integral
louvers and drift eliminators complete with hot water basin either fitted with spray
nozzles or having self rotating sprinklers, statically and dynamically balanced axial
flow fan provided with VFD direct driven or driven through speed reduction gear box
with TEFC induction motor of class F insulation, efficiency class IE-3, suction screen,
make up- quick fill arrangement, over flow and drain pipe connections with valves
and suitable inspection ladder, access arangement for cooling tower interier,
cement concrete foundation, steel/masonary supporting structure, anti vibration
mountings etc. as per specifications and as required.The cooling tower should be equipped
with the following:
(a) Efficient drift eliminators that reduce drift to maximum of 0.002% of recirculated
Water volume for counter flow towers and 0.005% of recirculated water flow for Cross-flow
towers.
(b) Makeup water meters.
(c) Conductivity controllers and overflow alarms. (2 working+0 standby)

6.1 Heat Rejection capacity 2880000 BTU/Hr. @ 28.3 Deg.C Wb (Ambient)


6.2 Flow Rate : 600 GPM (2268) LPM)
6.3 Motor = (As per IGBC requirement, fan motor power as 40.2gpm/hp)
6.4 Cooling Tower 'IN' Temp. : 37.8 oC
6.5 Cooling Tower 'OUT' Temp.: 32.2 oC Nos

7 Heat Pump
Supply Instalation,Testing, Commissioning of packaged energy efficient Air to Water Heat
Pump made with water resistant materials and capable for outdoor installation.
Supply, Installation, Testing & Commissioning of Micro Processor Controlled, BMS
compatible Air to Water Scroll Heat pump delivering actual capacity as per the
following parameters duly installed at site. The Heat Pump should be complete with
Single/ multiple hermatic scroll compressors , Thermostatic/Electronic Expansion
Valve,recirculation pump, braze plate type (ANSI SS316) primary heat exchanger, CIP
(Clean In Place System), Inbuilt Primary circulation Pump, anitvibration rubber mounts
with factory assembled with Electrical panel mounted on the heat pump including the
disconnect switch suitable for 50 Hz, 3 Phase, 415 volts, AC supply. The vibration
isolators shall be shipped alongwith heat pump from your works. Heat Pump should be
capable of generating Hot Water upto 55ºC.

7.1 Hot Water Inlet Temp = 45 Deg C


7.2 Hot Water Outlet Temp = 50 Deg C
7.3 Air Ambient Temp = 6 Deg C
7.4 Minimum COP required is 3.5 at above mentioned condition
7.5 Refrigerant : R-410A
7.6 Heating Capacity Actual as per above mentioned condition 100 Kw (3W+0S) Nos

8 Air Handling Units


8.1 Supply, Installation, Testing and Commissioning of AHUs factory built, chilled water Double
skin thermal break panel AHU complete 4 / 6 / 8 row cooling coil (As per coil selection
by manufacturer) made of 43 mm thick panels consisting of G.I casing of
thickness 0.6 mm outside and 0.6 mm aluminium inside layer with factory injected
PUF injected between them by injection moulding machine, complete with fan section
with Plug Fan and VFD with specified MMwg static pressure as detailed below,
cooling and heating coil section as mentioned below with aluminum finned copper tubes,
filter section with air filters, drive package with required nos. of TEFC drive motor IE-
3 Efficiency suitable for 415 ±10% volts, 50Hz 3 phase, A.C supply, drain
connection, drain pan necessary vibration isolation arrangement, Mixing Box etc complete
as required as per specifications and drawings capacities as given below,

NOTE
(1) The Air velocity across the filter should not be more then 500 FPM.
(2) CSU- Ceiling Suspended Units | FM- Floor Mounted
(3) All CSU shall be provided with drain Pumps
(4) UV lamps shall be considered for all the AHUs/CSUs.
5) All AHUs shall be with F.A, R.A damper.
6) Chilled water coil should have inlet and outlet temperature as 6°C & 12°C respectively.
7) Hot water coil (wherever required) should have inlet and outlet temperature
as 45°C & 40°C respectively.
8) Suitable Rubber bellow required for chilled water pipes to avoid the direct contact .
9) As per IGBC requirement, Fan power should be equivalent to 0.5 w/cfm or equivalent
to BEE-3 star rating whichever is stringent .

8.1.1 Ceiling Suspended Unit (CSU) & Floor Mounted Unit


Basement-3:
8.1.1.1 CSU -1400 CFM, 3.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.1.2 CSU -900 CFM, 2.5 TR with 80mm S.P. with MERV-7 filters, MERV14 filters with cooling Coil.
Nos
8.1.1.3 CSU -1000 CFM, 2.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos

Basement-2:
8.1.2.1 CSU -1000 CFM, 2.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters withcooling
Coil.
Nos
8.1.2.2 CSU -1850 CFM, 5.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil
Nos

Basement-1:
8.1.3.1 CSU -2000 CFM, 4.3 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with cooling
Coil
Nos
8.1.3.2 CSU -1800 CFM, 3.6 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling & Heating Coil.
Nos
8.1.3.3 CSU -1620 CFM, 4.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.3.4 CSU -3000 CFM, 5.6 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.3.5 CSU -1000 CFM, 2.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.3.6 CSU -800 CFM, 2.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with cooling Coil.
Nos
FM AHU -3000 CFM, 7.6 TR with 130mm S.P. with MERV-7 filters,MERV14 filters, UV
lamp, with cooling & Heating Coil.Additional DX coil for 8.5 TR to be provided
Note:(1) The Hepa Filter will be provided at the Terminal by OT Vendor. (2)Separate Dx
8.1.3.7 ODU to be considered as per BOQ specfications for DX coil (Refer BOQ item No. 9.4)

Nos

Ground Floor:
8.1.4.1 CSU -5500 CFM, 14.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters, UV lamp,with
cooling & Heating Coil.
Nos
8.1.4.2 CSU -1750 CFM, 4.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters Sulphur
Filters with cooling & Heating Coil.
Nos
8.1.4.3 CSU -2260 CFM, 5.8 TR with 80mm S.P. with MERV-7 filters,MERV14 filters, Sulphur
Filters with cooling & Heating Coil.
Nos
8.1.4.4 CSU -3000 CFM, 7.6 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.4.5 CSU -3700 CFM, 8.9 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.4.6 FM AHU -4000 CFM, 9.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters,
Sulphur Filters with cooling & Heating Coil.
Nos
8.1.4.7 Vertical FM AHU -5500 CFM, 14.5 TR with 80mm S.P. with MERV-7
filters,MERV14 filters with cooling Coil.
Nos

1st Floor:
8.1..5.1 CSU -2800 CFM, 7.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1..5.2 CSU -2300 CFM, 6.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1..5.3 FM AHU -6600 CFM, 16.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1..5.4 FM AHU -4500 CFM, 11.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1..5.5 FM AHU -4000 CFM, 10.2 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos

2nd Floor:
8.1.6.1 CSU -3000 CFM, 7.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters, UV lamp, with
cooling Coil.
Nos
8.1.6.2 FM AHU -3100 CFM, 9.7 TR with 80mm S.P. with MERV-7 filters,MERV14 filters, UV
lamp, with cooling & Heating Coil.
Nos
8.1.6.3 FM AHU -4300 CFM, 13.8 TR with 80mm S.P. with MERV-7 filters,MERV14 filters, UV
lamp,with cooling & Heating Coil.
Nos
8.1.6.4 Vertical FM AHU -9050 CFM, 17.0 TR with 80mm S.P. with MERV-7
filters,MERV14 filters, UV lamp, with cooling & Heating Coil.
Nos

3rd Floor:
8.1.7.1 CSU -1450 CFM, 3.6 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.7.2 CSU -1450 CFM, 3.6 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling & Heating Coil.
Nos
8.1.7.3 CSU -1200 CFM, 3.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling & Heating Coil
Nos
8.1.7.4 CSU -2350 CFM, 6.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
8.1.7.5 CSU -2400 CFM, 6.0 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos

8.1.7.6 FM AHU -3750 CFM, 9.5 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling & Heating Coil.
Nos

Service Floor:
8.1.8.1 CSU -2100 CFM, 5.25 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with cooling
Coil
Nos
FM AHU -5200 CFM, 11.5 TR with 130mm S.P. with MERV-7 filters,MERV14 filters, UV
lamp, with cooling & Heating Coil.Additional DX coil for 11 TR to be provided
Note:(1) The Hepa Filter will be provided at the Terminal by OT Vendor.
8.1.8.2 (2) Separate DX ODU to be considered as per BOQ specfications for DX coil (Refer BOQ
item No.9.3 )

Nos

4th Floor:
8.1.9.1 CSU -3450 CFM, 6.6 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with
cooling Coil.
Nos
5th Floor:
8.1.10 CSU -2000 CFM, 4 TR with 80mm S.P. with MERV-7 filters,MERV14 filters with cooling Coil.
Nos

9 Split Air Conditioning Units ( Hi Wall / Ductable type)


Split type Air Conditioning fitted with Hermetically sealed Rotary Compressors operating on
Refrigerant R-407c/ R-410A Non CFC / R-134a environment friendly refrigerant,
suitable for wall /ceiling mounting Conforming to IS (Except power Consumption
Norms) suitable for operation on 230 V +/- 10% n 50 Hz, single phase AC supply
capable of performing 1) Cooling 2) Dehumidifying 3) Air circulating 4) Filtering.
Note: The minimum efficiency as per ASHRAE 90.1-2013 should be higher than 3.3
ISEER

Ductable Split-Nominal Capacity 2.3 TR ( 1 indoor unit of 2.3 TR & 1 outdoor unit of 2.3 TR )
9.1 including MS stand and Bracket for indoor and outdoor unit
Nos.
HI Wall Split Nominal Capacity 2.0 TR ( 1 indoor unit of 2.0 TR & 1 outdoor unit of 2.0 TR )
9.2 including MS stand and Bracket for indoor and outdoor unit.
Nos.
9.3 Nominal Capacity 11.0 TR ( 1 outdoor unit only of 11.0 TR ) including MS stand and Bracket
for outdoor unit
Nos.
9.4 Nominal Capacity 8.5 TR (1 outdoor unit only of 8.5 TR ) including MS stand and Bracket
for indoor and outdoor unit
Nos.

10 FAN COIL UNIT:


Supply, Installation, Testing and commissioning of Chilled water Fan coil unit of double skin
construction with compact cooling coil, multispeed fan motor, the blower shall be
dynamicaly balanced and designed for silent operation, the filters shall be washable
synthetic media type arranged for convenient cleaning and replacement, drain pan with
pump drawing of following capacities.

Basement-3:
10.1.1 Chilled Water FAN COIL UNITS 1.0 TR Nos
10.1.2 Chilled Water FAN COIL UNITS 1.5 TR Nos

Basement-2:
10.2.1 Chilled Water FAN COIL UNITS 1.0 TR Nos

Basement-1:
10.3.1 Chilled Water FAN COIL UNITS 1.0 TR Nos

2nd Floor:
10.4.1 Chilled Water FAN COIL UNITS 1.5 TR (4 Pipe Type) Nos

Service Floor:
10.5.1 Chilled Water FAN COIL UNITS 1.0 TR Nos
10.5.2 Chilled Water FAN COIL UNITS 1.5 TR Nos
10.5.3 Chilled Water FAN COIL UNITS 2.0 TR Nos
10.5.4 Chilled Water FAN COIL UNITS 3.0 TR Nos

4th Floor:
10.6.1 Chilled Water FAN COIL UNITS 1.5 TR Nos
10.6.2 Chilled Water FAN COIL UNITS 3.0 TR Nos

5th Floor:
10.7.1 Chilled Water FAN COIL UNITS 2.0 TR Nos

11 AHU's(FM & CSU), TFAs Controls/Dynamic Balancing Valves


Supply, Installation, Testing and commissioning of complete controls for AHUs comprising
of Electronic, self balancing, pressure independent type dynamic balancing valve with
integrated 2 way modulating control valves in a single body. The actuator shall be
capable of accepting 2-10VDC, 4-20mA electric signal and shall provide similar
transduced feedback output sgnal to control system. The minimum close off pressure of
actuator must be 1.5 times shut off head of pump as per specifications and drawing of
following sizes.

11.1 Water flow rate upto 6 USGPM, 25 MM Nos


11.2 Water flow rate 6-12 USGPM, 32 MM Nos
11.3 Water flow rate 13-30 USGPM, 40 MM Nos
11.4 Water flow rate 31-60 USGPM, 50 MM Nos
11.5 Water flow rate 60-85 USGPM, 65 MM Nos

12 Fan Coil Unit, Chilled water Cassette & Hi Wall Unit Controls
Supply, installation, testing and commissioning of Electronic Pressure
Independant Balancing Cum Two Way Control Valve in a single body equipped
with electronic modulating actuator working on 2-10 V DC, 4- 20 mA electric signal. The
minimum close off Pressure of actuator must be
1.5 times shut off head of pump as per specifications of following range:

Note: As per IGBC requirement, Fan power should be equivalent to 0.2


w/cfm .
12.1 Water Flow Rate 2.4 USGPM,25 MM Nos
12.2 Water Flow Rate 3.6 USGPM,25 MM Nos
12.3 Water Flow Rate 4.8 USGPM,25 MM Nos
12.4 Water Flow Rate 6.0 USGPM,25 MM Nos
12.5 Water Flow Rate 7.2 USGPM,25 MM Nos
12.6 Water Flow Rate 8.4 USGPM,32 MM Nos
13 Electronic Thermostat BMS compatible
Supply of Electronic Heating and Cooling Thermostat ( AC 220 V and DC 24 V) with LCD
display with necessary control cabling for AHUs & FCUs complete as required. The
thermostat shall have provision of setting of space temperature and display of the
same, fixing of suitable transformer complete with interconnecting wiring between 2
way motorized valve and thermostat.

13.1 Supply, Installation & Testing of Fan 3 Speed Thermostats with temperatiure control for
FCUs. With wiring complete as required. All Thermostats for Summer/Winter System of
FCUs Shall be Heat Cool with change over.
Nos
13.2 Supply, Installation & Testing Temperature control with Wiring complete as required
for AHU's. All Thermostats for Summer/Winter System of AHUs Shall
be Heat Cool with change over.

Nos
13.3 Supply of Control unit for Temperature and Humidity control with Sensor for OT AHUs
with wiring and complete as required. All Thermostats for Summer/Winter Systme
of AHUs Shall be Heat Cool with change over.
Nos

14 Humidifier
Supply, Installation, Testing & Commissioning of Immersed resistive heater
type of humidification system

The humidifier system shall have the following:


a. Linear Stainless Steam Distributor made of SS 304 material supported by a
fastening bracket.

b. Steam Hose Pipe of a length of 4m with a Operating temperature range of - 25°C to 105°C.
Hose should be made of thermoplastic rubber with
galvanized steel helix and polyester yarn reinforcement.

c. Condensate Air Water Pipe of a length of 4m.


d. Hot water drain hose of dia 40 mm & 1m long, Operating Temperature range should be -
30°C to +110°C. Pipe should be of the following composition- heat- resistant smooth black
EPDM rubber substrate.
Reinforced with heat-resistant synthetic fabric. Smooth, resistant outer covering.
1 m long

e. Duct Temperature / Humidity Sensor


f. Inlet Water Pipe at the Supply point of 1.5 m.
g. The steam generator shall also have twin sensing electrodes for detection of
water foaming and high limit water level;
h. Antifoam algorithm (AFS) to prevent irregular operation due to the formation
of foam inside the cylinder;

i. Each element shall have 1 PTC to detect and protect against overheating;
j. Electric resistances made in titanium with low thermal resistance for fast
response, stability of production and safety against overheating;
k. Must have a Graphic touch display 4.3”
l. Water level sensor for the precise control of the water level on the entire
conductivity range 0…1500µS/cm, without any change or additional board
m. Humidifier shall be suitable for RO / DM Water or all types of water.
n. Intelligent microprocessor controller with algorithm that automatically adapts
operation to the water quality

o. Steam capacity shall be continuously controlled in the range 0..100% of the


rated production;
p. Humidifier shall have built-in power transformer, no needs of neutral line on
power supply or additional external transformer

q. Embedded conductivity meter for the automatic management of the dilution drains and
subsequent fills according to the supply water quality
r. SSR’s (solid-state relays) for precise modulation of the steam production by
dosing the power fed to the water
s. Humidifier should be of IP20 Rating
t. RS485 serial port ready to communicate on Modbus, Bacnet protocol for
supervisory system. Without any additional devices
u. Thermal shock feature, removing lime scale from the heating elements, extends the
cleaning intervals and makes maintenance quicker
v. Metallic housing with cover removable to allow full front access for easy
maintenance
w. The humidifier shall limit the steam production based on a proportional hi- limit probe that
is self-adjusting according to AHU/duct air flow
x. Electrical section separated by a division wall and including the power circuitry
and the control components, manufactured according to state-of-the-art norms

y. Pre-heating to keep the water warm in order to reduce the time to production
(user-editable pre-heating set point

The humidifier capacity and quantity shall be as follows:

14.1 Humidification Load -4 kg/hr Nos.


14.2 Humidification Load -6 kg/hr Nos.

15 Treated Fresh Air Units


Supply, installation, testing and commissioning of factory fabricated Double Skinned
Chilled Water ceiling suspended horizontal type, fabricated out of extruded aluminium
section with 0.6mm pre-plasticized / pre-coated Galvanised steel sheet outside & 0.8 mm
plain Galvanised steel sheet inside with backward curved blower for ceiling suspended,
blower section and blower motor TEFC type IE 3 grade suitable for 415 volts ± 10%, 50 Hz
± 5% AC supply, cooling coil 6/8 row deep made of Aluminium finned Copper tube with
coil section of copper header and MS adaptor, pre-filter section with non woven synthetic
media in extruded aluminium frame of 10 micron particle size with an efficiency of 90%
with MERV-14, double canvas connections, The AHU panels shall be insulated with 50 mm
thick & 40 +/-3 Kg/m³ density PU foam. Mixing box with aluminium volume control
dampers for fresh air complete as per specifications and drawings.

Note: As per IGBC requirement, Fan power should be equivalent to 0.5


w/cfm .
15.1 3050 CFM, 22 TR with 65mm S.P. (For 4th & 5th Floor placed on terrace level) Nos
15.2 3250 CFM, 23 TR with 65mm S.P. (For 2nd Floor) Nos
15.3 2850 CFM, 20 TR with 65mm S.P. (For Service Floor) Nos
15.4 3100 CFM, 22 TR with 65mm S.P. (For B1) Nos
15.5 1260 CFM, 9 TR with 65mm S.P. (For B2) Nos
15.6 2270 CFM,16.2 TR with 65mm S.P. (For B3) Nos

16 Ventilation Unit with Centrifugal Blowers


Supplying, Installing, Testing and Commissioning of (Forward curved) Centrifugal
SISW Blowers with single skin casing motors, Base frame, drive arrangement, motor IP-
55 protection, 3 phase with all accessories etc. as per
specifications and drawings as required.

16.1 7750 CFM @ 35 mm wg (For Toilet Ex. Placed on Terrace level) Nos
16.2 1000 CFM @ 25 mm wg Nos
16.3 3060 CFM @ 30 mm wg (For Toilet Ex. Placed on Terrace level) Nos
16.4 800 CFM @ 25 mm wg (For Last Rite Area Placed on Terrace level) Nos
16.5 1200 CFM @ 25 mm wg (For Service floor toilet Ex. Placed on Terrace level) Nos
16.6 500 CFM @ 50 mm wg (For Gr. Floor OT)
Note: additional Hepa Filter to be provided at outlet
Nos
16.7 900 CFM @ 50 mm wg (For 2nd Floor ICU)
Note: additional Hepa Filter to be provided at outlet
Nos
16.8 1000 CFM @ 50 mm wg (For 5th Floor IPD)
Note: additional Hepa Filter to be provided at outlet
Nos
16.9 1100 CFM @ 50 mm wg (For 2nd Floor ICU)
Note: additional Hepa Filter to be provided at outlet
Nos

17 Inline Fans
Supplying, Installing, Testing and Commissioning of Inline fans complete with motor,
supporting frame, gravity louvres,etc. as per drawings and
specifications.

17.1 400 CFM @ 15 mm wg Nos


17.2 100 CFM @ 15 mm wg Nos
17.3 1850 CFM @ 20 mm wg Nos
17.4 250 CFM @ 15 mm wg Nos
17.5 300 CFM @ 15 mm wg Nos
17.6 450 CFM @ 20 mm wg Nos
17.7 750 CFM @ 20 mm wg Nos
17.8 700 CFM @ 20 mm wg Nos
17.9 1100 CFM @ 15 mm wg Nos
17.10 120 CFM @ 50 mm wg Nos

18 Inline Fans to provide Fresh Air for AHUs & CSUs


Low noise DIDW Forward/Backwad Curved EC inside the double skin
fan section (Inner and outer thickness of casing should be 0.6 mm thick
GSS and insulated with 25 mm thick PUF). EC smart controller should be
external type one and the same should not be internal part of
motor. Motor should be external rotor type. Air performance ratings
according to AMCA 210-07 and ISO 5801. Fresh air fans with MERV 7
filter.

Smart controller should have below mentioned interface connectivity.


Analog interface for speed control
Full MODBUS interface compliancy
18.1 700 CFM @ 25 mm wg (For Gr. Floor) Nos
18.2 500 CFM @ 25 mm wg (For Gr. Floor) Nos
18.3 520 CFM @ 25 mm wg(For Gr. Floor) Nos
18.4 1950 CFM @ 25 mm wg (For Gr. Floor) Nos
18.5 1450 CFM @ 25 mm wg (For 1st Floor) Nos
18.6 371 CFM @ 25 mm wg (For 3rd Floor) Nos
18.7 240 CFM @ 25 mm wg (For 3rd Floor) Nos

19 VAQ station
VAQ station shall be dynamically calibrated and is capable of receiving demand signal from
CO2 sensors or BMS.Complete with programmable, DDC Advanced Application Controller
that communicates on direct digital control using point 2 point analog controls with CO2
sensors, differential pressure sensor & step down transformer of 24V.

19.1 400 CFM Nos.


19.2 750 CFM Nos.
19.3 1250 CFM Nos.
19.4 2850 CFM Nos.

20 SMOKE SPILL AXIAL FAN


Supply, installation, testing and commissioning of SMOKE SPILL AXIAL FLOW FAN as per
the specifications. The fans shall be AMCA certified for air performance & sound
ratings and shall be selected for maximum efficiency. Fan shall be complete with bird
screen (if required), back draft dampers and as per specifications.

The fan shall be fire rated for minimum 250 Deg C for 2 Hrs, Class-H motors suitable for
415±10% volts, 50 cycles, 3 phase AC supply & fan-motor efficiency exceeding
ASHRAE 90.1-2013 Criteria and static pressure shall be as per indicated. All the Emergency
fans shall be activated in case of fire signal from fire alarm system.

1. The bidder shall submit fan performance curves for all fans.
2. The item should be all complete in line with relevant standards, technical
specifications of the standards and direction of engineer incharge.
3. All the normal operation Fans shall be Vane Axial Type
4. The sound level not exceed 75 dB(A) at 3 m distance for Normal operation fans.

Basement-3:
20.1 2450 CFM @ 25mmWg Nos.
20.2 1150 CFM @ 25mmWg Nos.
20.3 1900 CFM @ 25mmWg Nos.
20.4 1500 CFM @ 25mmWg Nos.
20.5 21350 CFM @ 25mmWg Nos.
20.6 9800 CFM @ 25mmWg Nos.

Basement-2:
20.7 2400 CFM @ 25mmWg Nos.
20.9 24000 CFM @ 25mmWg Nos.
20.10 13100 CFM @ 25mmWg Nos.

Basement-1:
20.11 3950 CFM @ 25mmWg Nos.
20.12 2150 CFM @ 25mmWg Nos.
20.13 3900 CFM @ 25mmWg Nos.
20.14 8850 CFM @ 25mmWg Nos.
20.15 2850 CFM @ 25mmWg Nos.
20.16 6650 CFM @ 25mmWg Nos.
20.17 4000 CFM @ 25mmWg Nos.
20.18 1200 CFM @ 25mmWg Nos.
20.19 11650 CFM @ 30mmWg Nos.
20.20 12400 CFM @ 25mmWg Nos.
Ground Floor:
20.20 3050 CFM @ 25mmWg Nos.
20.21 1550 CFM @ 25mmWg Nos.

1st Floor:
20.22 6200 CFM @ 25mmWg Nos.
20.23 800 CFM @ 25mmWg Nos.
20.24 1900 CFM @ 25mmWg Nos.

2nd Floor:
20.25 700 CFM @ 25mmWg Nos.
20.26 1100 CFM @ 25mmWg Nos.
20.27 5000 CFM @ 25mmWg Nos.

3rd Floor:
20.28 2500 CFM @ 25mmWg Nos.
20.29 3500 CFM @ 25mmWg Nos.
20.30 700 CFM @ 25mmWg Nos.

4th Floor:
20.31 3250 CFM @ 25mmWg Nos.
20.32 800 CFM @ 25mmWg Nos.

5th Floor:
20.33 3250 CFM @ 25mmWg Nos.
20.34 800 CFM @ 25mmWg Nos.
Terrace:
20.35 1200 CFM @ 25mmWg Nos.
20.36 1100 CFM @ 25mmWg Nos.
20.37 1850 CFM @ 25mmWg Nos.

21 AXIAL FLOW FAN


Supply, installation, testing and commissioning of AXIAL FLOW FAN as per the
specifications. The fans shall be AMCA certified for air performance & sound ratings and
shall be selected for maximum efficiency. Fan shall be complete as per specifications with
back draft dampers.

Class-F motors shall be suitable for 415±10% volts, 50 cycles , 3 phase AC supply &
fan-motor efficiency exceeding ASHRAE 90.1-2013 Criteria and static pressure shall be as
indicated. All the Emergency fans shall be activated in case
of fire signal from fire alarm system.
Basement-3:
21.1 2450 CFM @ 25mmWg Nos.
21.2 1150 CFM @ 25mmWg Nos.
21.3 3100 CFM @ 25mmWg Nos.
21.4 21350 CFM @ 25mmWg Nos.
21.5 9800 CFM @ 25mmWg Nos.

Basement-2:
21.6 2400 CFM @ 25mmWg Nos.
21.7 12400 CFM @ 25mmWg Nos.
21.8 24000 CFM @ 25mmWg Nos.
21.9 13100 CFM @ 25mmWg Nos.

Basement-1:
21.10 3950 CFM @ 25mmWg Nos.
21.11 2150 CFM @ 25mmWg Nos.
21.12 3900 CFM @ 25mmWg Nos.
21.13 11700 CFM @ 25mmWg Nos.
21.15 6650 CFM @ 25mmWg Nos.
21.16 3600 CFM @ 25mmWg Nos.
21.17 800 CFM @ 25mmWg Nos.
21.18 1200 CFM @ 30mmWg Nos.
21.19 10500 CFM @ 25mmWg Nos.
21.20 1600 CFM @ 25mmWg Nos.

Ground Floor:
21.20 3050 CFM @ 25mmWg Nos.
21.21 6950 CFM @ 25mmWg Nos.

1st Floor:
21.22 800 CFM @ 25mmWg Nos.
21.23 1900 CFM @ 25mmWg Nos.

2nd Floor:
21.24 700 CFM @ 25mmWg Nos.
21.25 1100 CFM @ 25mmWg Nos.
21.26 5000 CFM @ 25mmWg Nos.

3rd Floor:
21.27 6000 CFM @ 25mmWg Nos.
21.28 700 CFM @ 25mmWg Nos.
4th Floor:
21.29 4450 CFM @ 25mmWg Nos.
21.30 800 CFM @ 25mmWg Nos.

5th Floor:
21.31 3250 CFM @ 25mmWg Nos.
21.32 800 CFM @ 25mmWg Nos.

Terrace:
21.33 1200 CFM @ 25mmWg Nos.
21.34 1100 CFM @ 25mmWg Nos.
21.35 1850 CFM @ 25mmWg Nos.

Pressurization Fans:
a) Lift Well:
i) 10150 CFM @ 30mmWG Nos.
ii) 9650 CFM @ 30mmWG Nos.

b) Lift Lobby:
i) 34750 CFM @ 30mmWG Nos.
ii) 21250 CFM @ 30mmWG Nos.

c) Staircase:
i) 18200 CFM @ 30mmWG Nos.
ii) 17850 CFM @ 30mmWG Nos.

22 Propeller Fans
Supplying & Installing of Propeller fans complete with motor, supporting frame, gravity
louvres,etc. as per drawings and specifications.
20.1 150 CFM Nos
20.2 250 CFM Nos
20.3 500 CFM Nos
20.4 750 CFM Nos
20.5 1000 CFM Nos

23 FAN SECTION
Supply, installation, testing, commissioning of double skin fan section with 50mm thick PUF
insulation fan section consist of Centrifugal Fan, forward curve, with radial tip double
wheel, double inlet, consisting of motor, drive arrangement, aluminium common frame for
fan and motor, cushy foot mounting, aluminium base frame for the unit, VCD on the outlet
of fan, and accessories as per specification and drawing.

23.1 2300 CFM @ 30 mm wg Nos.


23.2 4600 CFM @ 50 mm wg Nos.
23.3 1000 CFM @ 50 mm wg (Note: additional Hepa Filter to be provided at
outlet)
Nos.

24 Air Washer (For Pantry)


Supply of double skin air washer comprising of DIDW GI fan, Bacward curved, complete
with base frame, casing made out of 0.6 mm + 0.6 mm galvanised sheet powder coated
having flanged and bolted panels insulated with 25mm thick injected PUF, wet section &
tank shall be made of 18G 304 A SS with FRP coating. Air-washer shall be complete with
fill of depth 200 mm & face velocity across the fill shall be limited to 500 FPM. The
complete Air-washer shall have an effiency of 90% & shall be complete with motor, belt,
drive with flat belt, GI B Class interconnecting piping, aluminum viscous filter, float valve,
quick fill, overflow and drain connection, spray headers, strainer of fire mesh brass screen
etc. & of the following capacities. The Air-washer shall be complete with 2 Nos.
water circulation pumps including one No. stand by pump. The pump/motor should
have suitable protection cover. Selected for 90% adiabatic efficiency of evaporative
medium.

24.1 4000 CFM capacity with 65 mmwg Nos

25 Chilled Water Split Air Conditioning Units ( Hi Wall type)


Split type Air Conditioning fitted operating on chilled water system, suitable for
wall /ceiling mounting Conforming to IS (Except power Consumption Norms) suitable
for operation on 230 V +/- 10% n 50 Hz, single phase AC supply capable of
performing 1) Cooling 2) Dehumidifying 3) Air circulating 4)
Filtering.

25.1 Nominal Capacity 1.0 TR including Bracket for indoor unit Nos.
25.2 Nominal Capacity 1.5 TR including Bracket for indoor unit Nos.
25.3 Nominal Capacity 2.0 TR including Bracket for indoor unit Nos.
25.4 Nominal Capacity 2.5 TR including Bracket for indoor unit Nos.

26 Chilled Water cassette Type (With Cordless Remote Control)


Supply Installation,Testing and commisioning of Cassette type indoor Units complete
with all necessary fittings and accessories, like Fan, colling coil, filter Refrigerant Piping,
Control Wiring, cordless remote control, drain pump etc. as per specification and drawing.

26.1 400 CFM (1.0 TR) Nos.


26.2 800 CFM (2.0 TR) Nos.

27 Air Curtain
Supply, Installation, Testing and Commissioning of Air curtain as per mentioned
specifications:
Air Curtain-
27.1 L~2000 mm; H~235 mm; W~208 mm; Max. Velocity ~ 23 / 18 m/s; Dual Speed; Al Chassis
with CRC Plates

Accessories/LS MAG Double Flap/Limit Switch Limit Switch; Magnetic Type; for a Double
Flap Push Pull Door
Nos.

Total for Part 'A' _Equipments

Part 'B' : Piping

1 Chilled Water Piping/ Hot Water Piping


1.1 Supply, Installation, Testing and Commissioning of following nominal sizes of M.S. E.R.W.
tube (black steel) heavy class Chilled water piping (with necessary clamps, vibration
isolators and fitttings but excluding valves, strainers, gauges) duly insulated with
Polyurethene Foam (PUF) as per specifications and drawings covered with a layer of
120 gm/sqm polythene sheet (vapour barrier) and finally applying 0.5mm aluminum
sheet cladding complete with type 3, grade I roofing felt strip (as per IS:1322 as amended
upto date) at the joints repairing of damage to building etc. as per specifications and as
required.
The following insulation thickness shall be followed :
a) pipes size upto 150 mm-30 mm insulation thickness
b) pipes size upto 200 mm to 300 mm-50 mm insulation thickness
c) pipes size above 300 mm-75 mm insulation thickness

Note:- The pipes size 150 mm & below shall be M.S. `C' class as per IS:1239 and
pipes size above 150 mm shall be black steel pipe heavy class as per IS:3589, from
minimum 6.0 mm thick M.S. sheet for pipes from 200mm dia upto 400 mm dia.

1.1.1 350 MM Rmt


1.1.2 300 MM Rmt
1.1.3 250 MM Rmt
1.1.4 200 MM Rmt
1.1.5 150 MM Rmt
1.1.6 125 MM Rmt
1.1.7 100 MM Rmt
1.1.8 80 MM Rmt
1.1.9 65 MM Rmt
1.1.1 50 MM Rmt
1.1.11 40 MM Rmt
1.1.12 32 MM Rmt
1.1.13 25 MM Rmt
1.1.14 20 MM Rmt

2 Valves
Supplying, fixing, testing and commissioning of following valves, strainers, gauges in the
chilled water piping duly insulated to the same specification as the connected piping and
for condenser water fitting non insulated adequetly
supported as per specifications.

2.1 Butterfly Valves


Supply, installation, testing and commi-ssioning of butterfly valves along with
flanges as per specifications and drawings. (PN-16)

2.1.1 450 MM Nos


2.1.2 300 MM Nos
2.1.3 250 MM (For condenser water) Nos
2.1.4 200 MM Nos
2.1.5 200 MM (For Future Exp.) Nos
2.1.6 150 MM (For condenser water) Nos
2.1.7 150 MM Nos
2.1.8 125 MM Nos
2.1.9 100 MM Nos
2.1.10 80 MM Nos
2.1.11 65 MM Nos
2.1.12 50 MM Nos

2.2 Motorized Butterfly Valves


Supply, installation, testing and commi-ssioning of Motorised Butterfly Valves with CI
body SS disc nitrile rubber seal & O - ring & PN 16 pressure rating, confirm to BS
5155, IS 13095, with IP-55 actuator, capable of accepting up to 24 VAC and upto 20mA
electric signal and providing similar transduced feed back output to control system as
required & as specified.

2.2.1 200 MM Nos


2.2.2 150 MM (For Condensor Water) Nos
2.2.3 125 MM Nos
2.2.4 100 MM Nos
2.2.5 80 MM Nos

2.3 Ball Valves (With Strainer)


Providing and fixing in position the following Ball Valves with strainer duly
insulated as per specifications:

2.3.1 20 MM Nos
2.3.2 25 MM Nos
2.3.3 32 MM Nos
2.3.4 40 MM Nos

2.4 Ball Valves (Without strainer)


Providing and fixing in position the following Ball Valves without strainer duly
insulated as per specifications:

2.4.1 20 MM Nos
2.4.2 25 MM Nos
2.4.3 32 MM Nos
2.4.4 40 MM Nos

2.5 Balancing Valves


Supply, installation, testing and commi-ssioning of balancing valves along with
flanges as per specifications and drawings. (PN-16)

2.5.1 300 MM Nos


2.5.2 250 MM Nos
2.5.3 150 MM (For condenser water) Nos
2.5.4 125 MM Nos
2.5.5 100 MM Nos
2.5.6 80 MM Nos
2.5.7 65 MM Nos
2.5.8 50 MM Nos
2.5.9 40 MM Nos
2.5.10 32 MM Nos
2.5.11 25 MM Nos

2.6 Non-Return Valves


Supply, installation, testing and commi-ssioning of non return valves dual plate type
along with flanges as per specifications and drawings. (PN-16)

2.6.1 250 MM Nos


2.6.2 150 MM (For condenser water) Nos
2.6.3 125 MM Nos
2.6.4 80 MM Nos
2.6.5 65 MM Nos
2.6.6 50 MM Nos

2.7 Suction Guide


Providing and fixing of suction guide of following sizes in the inlet of chilled
water pumps. (PN-16)
2.7.1 250 MM Nos
2.7.2 150 MM (For condenser water) Nos
2.7.3 125 MM Nos
2.7.4 80 MM Nos
2.7.5 65 MM Nos

2.8 Y - Strainers
Supply, installation, testing and commi-ssioning of Y - strainer along with flanges
connection complete as per specifications and drawings. (PN-16)

2.8.1 80 MM Nos
2.8.2 65 MM Nos
2.8.3 50 MM Nos
2.8.4 40 MM Nos
2.8.5 32 MM Nos
2.8.6 25 MM Nos

2.9 Flexible Pipe connection


Providing of rubber expansion joints with integral rubber flanges and control
unit assembly as per specifications and drawings.
2.9.1 250 MM Nos
2.9.2 150 MM Nos
2.9.3 125 MM Nos
2.9.4 80 MM Nos

3 Pressure Gauges
Pressure Gauge 6" Dial ( 0 To 6 Kg/CM2 ) with approved ball valve. Industrial type pressure
gauges with SS syphon, gun metal / brass valves complete as
required

Nos

4 Thermometers with thermowell


Providing and fixing thermometer Mercury filled V form type complete as per
speci-fications and drawings.
Nos

5 Flow Switches
Providing and fixing water flow switch on chilled water outlet complete as per
specifications and drawings.
Nos

6 Automatic Air Vents


Providing and fixing auto airvent purging valve complete as per specification
and drawings.
Nos

7 Expansion Tank (Closed Type)


Supply, installation, testing & commissioning of Pressurized Expansion Tank, Vacuum
degasser cum Pressurization unit as detailed in specification. High and low pressure alarm
setting shall be selectable by the user. If the system pressure is too low, Vacuum
degasser shall topping up deaerated water into the system until the correct pressure
is achieved. Vacuum Degassing, pressurization and topping up of the chilled water
system to be provided by an integrated pump and expansion tank for Max ambient
temp 35 Deg C and total Static height above the expansion tank 45 meter. The total
Volume checked by vendor.
The system shall consist of following :
1) Vacuum degasser cum Pressurization unit c/w Multistage Pump (1W+1S) with
VFD,vacuum cylinder, gas sensor, pressure sensor, top up connection, digital
controller, strainer, flood protection in the event of a serious leak, system unit duly
tested as per international standard , mounted on a skid.

2) Pressurized Expansion Tank 2000 liter made from top quality steel and finished
with a gleaming red epoxy-powder coating c/w high quality butyl rubber removable
bladder, Nitrogen filling for longer maintenance of pre pressurization

3) Controller : controller for pressurization as well as vacuum degassing with IP 54 rating.


bright LED display showing messages and status of the main operating components,
top up function, flood limiter/shut down function in event of serious leak. in case of any
fault, controller shall display fault code and generate alarm.

7.1 1000 Liters for Chilled water Nos

8 Condenser Water Piping


Supply of black mild steel pipes of Class 'C' with all necessary fittings i.e. bends,
tees, reducers, flanges, supports etc.
Note:- The pipes size 150 mm & below shall be M.S. `C' class as per IS:1239 and pipes
size above 150 mm shall be black steel pipe heavy class as per IS:3589, from
minimum 6.0 mm thick M.S. sheet for pipes from 200mm dia upto 400 mm dia.

8.1 450 MM Rmt


8.2 250 MM Rmt
8.3 200 MM Rmt
8.4 150 MM Rmt
8.5 100 MM Rmt
8.6 50 MM Rmt
8.7 40 MM Rmt

9 Float Valves
Providing and fixing of the following Float valves.
9.1 50 MM Nos

10 Pot Strainer
Supply, Installation and Testing of MS Pot strainer PN -16, Including Flanges, nutbolts,
gaskits and Lifting shifting to terrace complete as required.
10.1 250 MM Nos

11 Drain Piping
G. I. drain piping of 'B' Class complete with fittings, supports, valves and closed cell
elastomeric insulation/nitrite rubber having a ‘K’ valve of 0.027 W/mK at a mean
temperature of 10 degree C and a minimum density of 55 Kg./cubm of 6 mm thickness
as per specifications and drawings.

Providng and fixing pipes with all necessary fittings, supports and insulation.
11.1 25 MM Rmt
11.2 32 MM Rmt
11.3 40 MM Rmt

12 Refrigerant Piping for Split Air Conditioning Units (Hi Wall and Ductable type)

Supply, Installation, testing and commissioning of Interconnecting copper refrigerant


pipe work with (19mm/13mm thick) closed cell elastomeric nitrile rubber tubular
insulation with class 'O' , FM approved including electrical cabling & earthing as per
specification for split air conditioning units and cutting and chasing in wall for
crossing and making good the same if required.All the joints to be sealed with
Star bond R 242 Adhesive, as per specifications and drawings. All piping inside the
building & shaft shall be properly supported with MS hanger and all external piping
shall run in covered cable tray.

RM

13 Drain Piping
Supply & Installation of heavy duty PVC drain pipe with min. wall thickness of 4 mm with
insulation as per specification for split air conditioning units including cutting and chasing
in wall for crossing and making good the same if required.Insulation shall be of
9 mm thick sleeve of nitrile rubber having K valve 0.037 W/mk at a mean temp. of 10°C
and min. density of 55 Kg/m3.The insulation joints shall be properly sealed with rubber
based adhesive to ensure proper bonding.
13.1 25 MM RM
13.2 32 MM RM

Total for Part ‘B’_Piping

Part 'C' : Ducting and Grills

1 GSS Ducting (Factory Fabricated):- Supplying fabrication installation testing and


commissioning of GI. Sheet metal ducting. Zinc coated. Complete with all Standard
Accessories, G.I.. Hardware, Self Adhesive elastomeric foam gasket, Support etc as per
SMACNA specification.It is recommended to provide wire hanging Supports.

1.2 24 SWG Sqm


1.3 22 SWG Sqm
1.4 20 SWG Sqm
1.5 18 SWG Sqm

2 ALUMINUM DUCTING (Factory Fabricated):-Supply fabrication installation testing


and commissioning of Aluminum sheet metal ducting with:a) Sealants, b) Gaskets c)
structural support systems d) nuts & bolts, e) angles.f). Closed cell neoprene gaskets
etc (20 SWG) Aluminum Sheet

2.1 24 SWG Sqm


2.2 22 SWG Sqm
2.3 20 SWG Sqm

3 Flexible Duct
Providing and fixing Fire retardant double wall, insulated dia as given below spiral
flexible duct with G.I. adjustable tie bands for either end of duct complete as pet
specifications and drawings.

3.1 100mm Dia Rmt


3.2 150mm Dia Rmt
3.3 200mm Dia Rmt
3.4 250mm Dia Rmt
3.5 300mm Dia Rmt

4 Acoustic Lining
Supplying, installing & testing of acoustic lining within supply and return air ducts as
per the specifications. Acoustic lining of open cell Nitrile Rubber foam within 160-
180 Kg/m3 density with complete in all respects as per specifications.

4.1 10mm thick for duct Sqm.


5 Providing and Fixing on ducts antimicrobial type UL approved closed cell
elastomeric nitrile rubber insulation having factory laminated aluminium foil with high
water vapour diffusion and low thermal conductivity.Insulation material shall be class 'O'
type fire propogation.Material shall be elastomeric foam based on synthetic rubber
conforming to BS476 Part 6 for fire propogation test and class 1as per BS 476 Part 7
for surface spread of flame test. Aluminum tape shall be applied on all transpose &
longitudinal joints.
Density of material shall be 45+/- 5 kg/cu.m Thermal conductivity shall not exceed
0.035W/mK at amean temperature of 0 Deg. C. Adhesive used for setting the
insulation will be non- flammable, vapour proof adhesive. Insulation material shall
be FM approved.

5.1 25 mm thick insulation. Sqm.


5.2 19 mm thick insulation. Sqm.
5.3 13 mm thick insulation. Sqm.

6 LOUVERS / GRILLES / DIFFUSER ETC.


Note : Shape of diffusers/grills can be rectangular/square/circular/etc. as per approved
design.
6.1 Supply, fabricating, installing and testing of fire resistant double canvas flexible as per
the specifications.
Sqm

Supply, installation, testing & balancing of GI Volume Control Damper (20G) within ducts
6.2 to be provided with suitable links, levers and quadrants as per specifications &
approved shop drawings.
Sqm

Supplying, installing, testing and commissioning of AL powder coated key operated


6.3 volume control damper (24G) of various sizes as per specification & approved shop
drawings.
Sqm

Supplying, installing, testing and balancing of powder coated extruded aluminium


6.4 construction Supply / Return Air Grills of various sizes as per specification &
approved shop drawings.
Sqm

Supplying, installing, testing and balancing of powder coated extruded aluminium


6.5 construction Return/Exhaust Air Diffusers without damper as per specification &
approved shop drawings.
Sqm

6.6 Supplying, installing, testing and balancing of powder coated extruded aluminium
construction Supply Air Diffusers with AL powder coated damper as per specification &
approved shop drawings.
Sqm
Supplying, installing , testing & balancing of powder coated extruded aluminium
6.7 construction Fresh Air Louvers with filters with bird screen complete as per
specification & approved shop drawings.
Sqm

Supplying, installing , testing & balancing of powder coated extruded aluminium


6.8 construction Exhaust Air Louvers with bird screen complete as per specification & approved
shop drawings.
Sqm

Supply, installation, testing and balancing of GI sheet constructed back draft damper /
6.9 gravity Louvers as per specification & approved shop drawings.
Sqm.

7 Supply, installation, testing and commissioning of GI Motorized Dampers minimum 2


hrs. fire rated complete interconnecting wiring ( With FA PA System) at locations
shown in the drawings and as per specifications.

7.1 Smoke and fire damper (GI) Sqm


7.2 Motorized actuators spring return, control panel & temp. sensors. Nos

8 Motorized Volume control Dampers


Supplying, fixing, testing and commissioning of motorized volume control dampers as &
where required of required sizes including control wiring as per specifications and drawings.

8.1 Motorised Volume Control damper GI (18G) Sqm


8.2 Motorised actuator for Motorised Volume Control damper Nos

9 AHU Room Acoustic treatment (Acoustic)


Supplying, installing & testing of acoustic insulation on the walls of AHU room as per the
specifications. Acoustic insulation shall be of open cell Nitrile Rubber foam within 160-
180 Kg/m3 density with complete in all respects as per specifications.

9.1 25 MM thick Sqm.

10 FIRE PAINT FOR SMOKE EXTRACTION DUCT:


Ducting for Fire evacuation shall be fire rated as per following specifications. Duct used for
smoke ventilation and crossing of zone on each floors shall have fire rated coating
compound. Fire rated coating compound used for construction of fire rated
ductwork shall be protected with minimum 0.5mm to 0.7mm nominal thickness tested to
properties as per the requirements of BS 476: 6 & 7, including Class O and fire propagation
- Class 1 surface spread of flame & materials in accordance with building regulations.
Material should also confirms to 2 hours fire rating with self exitingues flame spread
when directly exposed to Flame.

Sqmt

Total for Part ‘C’_Ducting and Grills

Part 'D' : Electrical Works

1.0 Electrical Panel

1.1 Panel-1 (Plant Room Panel)

Incoming(2 Nos):
630 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 630/5A, CL-1, 10VA CTs and 2A control MCB.

Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

800A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Bus Coupler

800 Amp 4-Pole ACB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Outgoings

(a) 3 Nos-3 Pole MCBs 40 A


(a) 3 Nos-3 Pole MCBs 80 A
(c) 6 Nos-3 Pole MCCBs 63 A
(e) 3 Nos-4 Pole MCCBs 400 A
(f) 3 nos.spare -3 Pole MCCBs 630 A
(g) 3 nos.spare -3 Pole MCCBs 250 A
Starters:
DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

2 Nos. 4.0 kW DOL Starter


4 Nos. 5.5 kW DOL Starter
3 Nos. 7.5 kW DOL Starter
3 Nos. 11 kW Star Delta Starter
3 Nos. 15 kW Star Delta Starter
Note:
1) Provision for VFD shall be provided in the starter panels.
Set

1.1.1 Supply of Starters for HEAT PUMP:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

47 kW Star Delta Starter Nos.

1.2 MAIN AHU PANEL

Incoming:
One (1),400A FP MCCB with microprocessor based releases, ON/OFF/Trip indicating
lamps with 2A control MCB.

Metering & Indication:

Multifunction meter and 400/5A, CL-1, 10VA CTs and 2A control MCB.

Sets of phase indicating lamp with control MCBs.

Bus Bar:
500A, TPN aluminium, colour coded bus bars with PVC heat shrink sleeves suitable for
415V, 50Hz

Outgoing:

Eleven(11)Nos. 63A, TPN MCCB


One(1)Nos. 200A, TPN MCCB
All outogings shall have ON/OFF lamp.
MAIN AHU PANEL described as above Sets

1.3 AHU PANEL-1


Note: All AHU Panels shall be placed inside the electrical room on each floor.
Incoming:
32 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 32/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

40A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Outgoings

(a) 5 Nos-4 Pole MCBs 16 A


(b) 2 nos.spare -4 Pole MCBs 16 A

AHU PANEL-1 described as above Set

1.4 Supply of Starter panels (feed from AHU Panel-1):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

1.1 kW DOL Starter Nos


Note:
1) Provision for VFD shall be provided in the starter panels.

1.5 AHU PANEL-2

Incoming:
16 Amp 4-Pole MCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 16/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

32A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Outgoings

(a) 3 Nos-4 Pole MCBs 16 A


(b) 1 nos.spare -4 Pole MCBs 16 A

AHU PANEL-2 described as above Set

1.6 Supply of Starter panels (feed from AHU Panel-2):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

0.75 kW DOL Starter Nos


1.1 kW DOL Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

1.7 AHU PANEL-3

Incoming:
63 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 63/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

100A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

. Outgoings

(a) 8 Nos-4 Pole MCBs 16 A


(b) 1 Nos-4 Pole MCCBs 63 A
(c) 3 nos.spare -4 Pole MCBs 16 A

AHU PANEL-3 described as above Set

1.8 Supply of Starter panels (feed from AHU Panel-3):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

0.75 kW DOL Starter Nos


1.1 kW DOL Starter Nos
1.5 kW DOL Starter Nos
2.2 kW DOL Starter Nos
3.0 kW DOL Starter Nos
10.0 kW Star Delta Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

1.9 AHU PANEL-4

Incoming:
63 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.
Multifunction meter and 63/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

100A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Outgoings

(a) 8 Nos-4 Pole MCBs 16 A


(b) 2 nos.spare -4 Pole MCBs 16 A

AHU PANEL-4 described as above Set

2.0 Supply of Starter panels (feed from AHU Panel-4):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

1.1 kW DOL Starter Nos


2.2 kW DOL Starter Nos
3.0 kW DOL Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

2.1 AHU PANEL-5

Incoming:
63 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 63/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars
100A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Outgoings

(a) 5 Nos-4 Pole MCBs 16 A


(b) 2 nos.spare -4 Pole MCBs 16 A

AHU PANEL-5 described as above Set

2.2 Supply of Starter panels (feed from AHU Panel-5):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

1.5 kW DOL Starter Nos


2.2 kW DOL Starter Nos
3.0 kW DOL Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

2.3 AHU PANEL-6

Incoming:
63 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 63/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

100A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Outgoings

(a) 4 Nos-4 Pole MCBs 16 A


(b) 1 Nos-4 Pole MCBs 40 A
(c) 1 nos.spare -4 Pole MCBs 16 A
(d) 1 nos.spare -4 Pole MCBs 40 A

AHU PANEL-6 described as above Set

2.4 Supply of Starter panels (feed from AHU Panel-6):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

2.2 kW DOL Starter Nos


3.0 kW DOL Starter Nos
7.5 kW DOL Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

2.5 AHU PANEL-7

Incoming:
40 Amp 4-Pole MCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 40/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

63A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Outgoings

(a) 6 Nos-4 Pole MCBs 16 A


(b) 2 nos.spare -4 Pole MCBs 16 A

AHU PANEL-7 described as above Set

2.6 Supply of Starter panels (feed from AHU Panel-7):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

1.1 kW DOL Starter Nos


2.2 kW DOL Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

2.7 AHU PANEL-8

Incoming:
32 Amp 4-Pole MCB, 25kA with thermal magnetic based O/L, S/C and E/F
releases.

Multifunction meter and 32/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

40A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After
deration)

Outgoings

(a) 2 Nos-4 Pole MCBs 16 A


(b) 1 nos.spare -4 Pole MCBs 16 A

AHU PANEL-8 described as above Set

2.8 Supply of Starter panels (feed from AHU Panel-8):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:
DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

2.2 kW DOL Starter Nos


Note:
1) Provision for VFD shall be provided in the starter panels.

2.9 AHU PANEL-9

Incoming:
16 Amp 4-Pole MCB, 25kA with thermal magnetic based O/L, S/C and E/F
releases.

Multifunction meter and 16/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

40A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After
deration)

Outgoings

(a) 2 Nos-4 Pole MCBs 16 A


(b) 1 nos.spare -4 Pole MCBs 16 A

AHU PANEL-9 described as above Set

3.0 Supply of Starter panels (feed from AHU Panel-9):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:
DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

1.1 kW DOL Starter Nos


2.2 kW DOL Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

3.1 AHU PANEL-10

Incoming:
200 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F releases.

Multifunction meter and 200/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

250A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After deration)

Outgoings

(a) 2 Nos-4 Pole MCBs 16 A


(b) 4 Nos-4 Pole MCBs 32 A
(c) 4 Nos-4 Pole MCCBs 63 A
(d) 1 nos.spare -4 Pole MCBs 16 A
(e) 1 nos.spare -4 Pole MCBs 32 A
(f) 1 nos.spare -4 Pole MCCBs 63 A

AHU PANEL-10 described as above Set

3.2 Supply of Starter panels (feed from AHU Panel-10):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:
DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

1.5 kW DOL Starter Nos


5.5 kW DOL Starter Nos
Note:
1) Provision for VFD shall be provided in the starter panels.

3.3 VENTILATION PANEL-1 ( Location : B2 )


This panel shall feed fans of B3,B2 & B1.

Incoming:
400 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F
releases.
Multifunction meter and 400/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

630A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After
deration)

Outgoings

(a) 27 Nos-4 Pole MCBs 16 A


(b) 10 Nos-4 Pole MCBs 32 A
(c) 8 Nos-4 Pole MCCBs 63 A
(d) 5 nos.spare -4 Pole MCBs 16 A
(e) 3 nos.spare -4 Pole MCBs 32 A
(f) 2 nos.spare -4 Pole MCCBs 63 A

VENTILATION PANEL-1 described as above Set

3.4 Supply of Starter panels (feed from VENTILATION Panel-1):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:
DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

0.37 kW DOL Starter Nos


0.5 kW DOL Starter Nos
0.55 kW DOL Starter Nos
0.75 kW DOL Starter Nos
1.1 kW DOL Starter Nos
1.5 kW DOL Starter Nos
2.2 kW DOL Starter Nos
3.0 kW DOL Starter Nos
4.0 kW DOL Starter Nos
5.5 kW DOL Starter Nos
11.0 kW Star Delta Starter Nos

3.5 VENTILATION PANEL-2 ( Location : B1 LT PANEL ROOM)


This panel shall feed fans of Ground , First & Second Floor.

Incoming:
63 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F
releases.

Multifunction meter and 63/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

100A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After
deration)

Outgoings

(a) 17 Nos-4 Pole MCBs 16 A


(b) 5 nos.spare -4 Pole MCBs 16 A

VENTILATION PANEL-2 described as above Set

3.6 Supply of Starter panels (feed from VENTILATION Panel-2):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

0.37 kW DOL Starter Nos


0.55 kW DOL Starter Nos
0.75 kW DOL Starter Nos
1.1 kW DOL Starter Nos
1.5 kW DOL Starter Nos
2.2 kW DOL Starter Nos

3.7 VENTILATION PANEL-3(Outdoor type-IP65)( Location : Terrace)


This panel shall feed fans of Third, Service, Fourth,Fifth Floors & Terrace.

Incoming:
200 Amp 4-Pole MCCB, 25kA with thermal magnetic based O/L, S/C and E/F
releases.
Multifunction meter and 200/5A, CL-1, 10VA CTs and 2A control MCB.
Sets of phase indicating lamps with 2A control MCBs.

Bus Bars

250A, TPN Aluminium, colour coded bus bars suitable for 415V, 50Hz. (After
deration)

Outgoings

(a) 28 Nos-4 Pole MCBs 16 A


(b) 10 Nos-4 Pole MCBs 32 A
(c) 1 Nos-4 Pole MCCBs 63 A
(d) 3 nos.spare -4 Pole MCBs 32 A
(e) 1 nos.spare -4 Pole MCCBs 63 A

VENTILATION PANEL-3 described as above Set

3.8 Supply of Starter panels (feed from VENTILATION Panel-3):


Supply, installation, testing & commissioning of the following starters in a sheet metal
enclosure complete as required and as per site conditions:

DOL/Star Delta Starter of following rating with Auto/ Manual selector switch, MPCB/MCCB,
over load relay, single phasing preventor, ON/OFF/ Trip indication lamps, Ammeters with
CTs, ON/OFF push Buttons, contractor and suitable No. of Potential free contacts for
remote / local operations, indication, interlocking with Fire Alarm panel and Building
Management system. (Starter shall have MPCB/MCCB in the incomer as per type -2
coordination for fuseless type feeders.)

0.37 kW DOL Starter Nos


0.5 kW DOL Starter Nos
0.55 kW DOL Starter Nos
0.75 kW DOL Starter Nos
1.1 kW DOL Starter Nos
1.5 kW DOL Starter Nos
2.2 kW DOL Starter Nos
4.0 kW DOL Starter Nos
5.5 kW DOL Starter Nos
15.0 kW Star Delta Starter Nos
Note:
1) All Outdoor Starter Panels shall be IP65 rating

4.0 Providing & fixing control / transmission cable/wiring with suitable size
termination glands ,given below copper cable in M.S conduit/ cable tray or in suitable
boxing between indoor units and outdoor units.

The cost of M.S conduits shall include all accessories (I.e., clamps, nuts/ bolts, bends,
junction boxes, inspection boxes and outlet boxes etc) concealed or exposed called
for including necessary civil work such as chase cutting &
making good:

a) 2 Core x 1.5 Sqmm (Cu-Flexible cable) RM


b) 2 Core x 2.5 Sqmm (Cu-Flexible Cable) RM
c) 3 Core x 2.5 Sqmm (Cu) RM
d) 3 Core x 4 Sqmm (Cu) RM
e) 3 Core x 6 Sqmm (Cu) RM
f) 3 Core x 10 Sqmm (Cu) RM
g) 3 Core x 16 Sqmm (Cu) RM
h) 3 Core x 35 Sqmm (Al) RM
i) 4 Core x 2.5 Sqmm (Cu) RM
j) 4 Core x 4 Sqmm (Cu) RM
k) 4 Core x 6 Sqmm (Cu) RM
l) 4 Core x 10 Sqmm (Cu) RM
m) 4 Core x 16 Sqmm (Cu) RM
n) 4 Core x 300 Sqmm (Al) RM

5.0 Cable Tray (Perforated Type):


Supply, fabricating and installing following sizes of hot dip galvanized
ladder/perforated type Cable tray including supports, horizontal and vertical bends,
reducers, tees, cross members and other accessories as required and duly suspended
from the ceiling with MS suspenders including painting etc.

a) 450 mm wide x 40 mm deep (1.6 mm) RM


b) 300 mm wide x 40 mm deep (1.6 mm) RM
c) 150 mm wide x 40 mm deep (1.2 mm) RM

Total for Part ‘D’_Electrical Works

PART "E" : Dismantling, Shifting and Reinstallation Work

1 Dismantling, shifting & reinstallation of Existing FRP Cooling Tower


Dismantling, Shifting, reinstallation, testing and commissioning of existing FRP cooling
tower capacity of 300 TR. (Cost of transportation of existing cooling towers to be
included from Dwarka to Gurgaon)

Work shall be done in coordination with engineer incharge.


1.1 300 TR
1.2 Flow Rate : 1200 GPM
1.3 Cooling Tower 'IN' Temp. : 36.1 oC
1.4 Cooling Tower 'OUT' Temp. : 31.8 oC Nos

Total for Dismantling & Reinstalltion Works


Qty. Rate Amount
3

3
3
3
2

1
3
3

1
1

1
1

1
1

RO

RO

5
1

2
3
3
3
1

16
2

20

9
18
16
15
5

26
32
25
RO
4
2
87

49

5
1
4
2
1
1
1
1
1

2
RO
2
1
2

1
3
2
1
1
1
2
1
1
1
1

1
1
1
1
1
1
1

2
1
1
1

1
1
1
1
2
1

1
2
1

1
1
1
2
2
1
1
1
1
1
1
1

1
1
1

1
1
1

1
1
1

1
1

1
1

1
1
1
1
1
1
2
1

1
1
2
1

1
1
1
2
1
1
1
1
1
1

1
1

2
1

1
1
1

1
1

1
1

1
1

RO
1
1

4
1

1
1

1
1

RO
RO
2
RO
RO

1
1

2
10
5
RO

8
1
3

RO
RO
RO
202
63
159
273
604
824
683
527
635
1050
RO

0
0
3
0
1
9
9
16
6
20
26
50

2
5
3
2
2

0
110
19
11

0
110
19
15

0
0
6
9
1
5
7
6
14
23
14

RO
3
6
2
RO
3
0
3
6
2
0

0
5
13
10
14
8

6
12
6

136

128

9
20

0
189
0
28
11
42
25

11
16
105

131
525
399

7373
3486
1313
593

0
420
173

53
37
53
0
0

1260
95
4148
599

252

25

147

263

17

15
43

25

53

28
110

RO
RO

420
1000

-
1

3
1

5
1

1
2
1

2
2
1
2
1
1
1

2
4
2
1

1
3
1
1

2
3
1

1
5
1

1
2

1
1
1

1
1
5

1
2
2
2
4
6
7
2
2
6
4
8

1
5
2
3
3
2
2

1
7
2
3
5
7
2
2
6
3
1

239
273
0
609
840
78
189
473
0
5104
911
37
662
90

84
79
263

You might also like