Pending List From Worley

The document lists various technical documents and reports related to a project, including 3D models, electrical packages, and review comments, with specific dates and types. Each entry includes a unique TR number, sent date, document type, and sometimes a revision number. The status of responses to these documents is noted as 'OPEN' indicating ongoing discussions or reviews.

Uploaded by

ranishpk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views12 pages

Pending List From Worley

The document lists various technical documents and reports related to a project, including 3D models, electrical packages, and review comments, with specific dates and types. Each entry includes a unique TR number, sent date, document type, and sometimes a revision number. The status of responses to these documents is noted as 'OPEN' indicating ongoing discussions or reviews.

Uploaded by

ranishpk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

BQ TR Number Sent Date Type Doc. No. Rev.

BQ-W-JFDP-T-1269 20-May-2025 3D Model - -

BQ-W-JFDP-T-1303 26-May-2025 3D Model JFGPESA_20240305_10-14 -


BQ-W-JFDP-T-1330 31-May-2025 3D Model_TR Updated 3D Model -
BQ-W-JFDP-T-1355 3-Jun-2025 90% Pentane - -
BQ-W-JFDP-T-1221 12-May-2025 90%_ETAP 90% Electrical Package ETAP Study -

BQ-W-JFDP-T-1302 26-May-2025 90%_Pentane 90% Review Comments Pentane -

BQ-W-JFDP-T-1335 1-Jun-2025 90%_Pentane 90% Review Comments Pentane -

BQ-W-JFDP-T-1336 1-Jun-2025 90%_Pentane 90% Review Comments Pentane -


BQ-W-JFDP-T-1193 7-May-2025 90%_Pentane Pentane 90% DD Marked-Up Docs -
BQ-W-JFDP-T-1209 11-May-2025 90%_Pentane Pentane 90% DD Marked-Up Docs -
BQ-W-JFDP-T-1356 3-Jun-2025 AC Mitigation EED Comments -
BQ-W-JFDP-T-1320 28-May-2025 ADV IFC PACK - -
BQ-W-JFDP-T-1321 28-May-2025 ADV IFC PACK - -
BQ-W-JFDP-T-1286 21-May-2025 ADV IFC PACK Process IFC Documents 00
BQ-W-JFDP-T-1276 20-May-2025 Calc 2308-PRO-MR-042-CALC 1
BQ-W-JFDP-T-1366 3-Jun-2025 Change Order 413011-01303-PVN-0048

BQ-W-JFDP-T-1165 30-Apr-2025 CP Design Pack 90% TCP package A

BQ-W-JFDP-T-1305 26-May-2025 CP Design Pack CSD Response to TCP 90% Pkg Rev. 02 -
BQ-W-JFDP-T-1145 24-Apr-2025 CRS - -
BQ-W-JFDP-T-1149 26-Apr-2025 CRS - -

BQ-W-JFDP-T-1188 5-May-2025 CRS PE-000002-CRS A


BQ-W-JFDP-T-1120 17-Apr-2025 CRS_MR 2308-PRO-MR-004-CRS 02
BQ-W-JFDP-T-1180 4-May-2025 CRS_MR 2308-PRO-MR-011-CRS 01

BQ-W-JFDP-T-1072 6-Apr-2025 CRS_MR 2308-PRO-MR-013-CRS 01

BQ-W-JFDP-T-1121 19-Apr-2025 CRS_MR 2308-PRO-MR-029-CRS 02

BQ-W-JFDP-T-1177 4-May-2025 CRS_MR 2308-PRO-MR-054-CRS 01

BQ-W-JFDP-T-1325 29-May-2025 CRS_MR 2308-PRO-MR-069-CRS 02


BQ-W-JFDP-T-1317 28-May-2025 CRS_MR 2308-PRO-MR-092-CRS 01
BQ-W-JFDP-T-1143 23-Apr-2025 CRS_MR 2308-PRO-MR-099-CRS A
BQ-W-JFDP-T-1226 13-May-2025 CRS_Stress Repo
Post 90% Stress Reports -
BQ-W-JFDP-T-1372 10-Jun-2025 Datasheet_TR - -
BQ-W-JFDP-T-1203 10-May-2025 DOC - -
BQ-W-JFDP-T-1152 26-Apr-2025 DRAWINGS Jafurah PKG # 5 Electrical Drawings -
BQ-W-JFDP-T-1292 24-May-2025 HAZOP REPORTPentane Hazop Update -
BQ-W-JFDP-T-1191 6-May-2025 IFC PACKAGE 509- Civil Common Dwgs IFC Comments -

BQ-W-JFDP-T-1391 12-Jun-2025 IFC PACKAGE BQ Comments on IFC Package -

BQ-W-JFDP-T-1329 31-May-2025 IFC PACKAGE Electrical Comments -


BQ-W-JFDP-T-1368 3-Jun-2025 IFC PACKAGE IFC DRAWINGS
BQ-W-JFDP-T-1361 3-Jun-2025 IFC PACKAGE IFC DRAWINGS CRS 6

BQ-W-JFDP-T-1239 14-May-2025 IFC PACKAGE Jafurah - 509 - 36 JFRNGL- IFC -

BQ-W-JFDP-T-1178 4-May-2025 IFC PACKAGE Jafurah-580 - 42 RJBETH-1 IFC -


BQ-W-JFDP-T-1328 31-May-2025 IFC PACKAGE Mechanical Comments -
BQ-W-JFDP-T-1285 21-May-2025 IFC PACKAGE T204439001 00
BQ-W-JFDP-T-1171 1-May-2025 Interface 887-P-E1L-EA-057056 -
BQ-W-JFDP-T-1202 10-May-2025 IO LIST - -
BQ-W-JFDP-T-1374 10-Jun-2025 IRD - -
BQ-W-JFDP-T-1141 23-Apr-2025 Model Files BQ-W-JFDP-T-1141_Model AG in Scraper Area -
BQ-W-JFDP-T-1352 2-Jun-2025 MR 2308-PRO-MR-080 A

BQ-W-JFDP-T-1357 3-Jun-2025 MTO 2308-PRO-MTO-129 -


BQ-W-JFDP-T-1397 15-Jun-2025 NDT C454935001 -
C454936001
C454937001
C454938001
C454939001
C454940001
C454941001
C454942001

BQ-W-JFDP-T-1398 16-Jun-2025 NMR-601 2308-PRO-MR-005-NMR-601 A


BQ-W-JFDP-T-1392 14-Jun-2025 NMR-601 2308-PRO-MR-014-NMR-601 A
BQ-W-JFDP-T-1389 12-Jun-2025 NMR-601 2308-PRO-MR-016-OK-NMR-601 A

BQ-W-JFDP-T-1313 27-May-2025 NMR-601 2308-PRO-MR-021-NMR-601 B


BQ-W-JFDP-T-1369 10-Jun-2025 NMR-601 2308-PRO-MR-039-NMR-601 01
BQ-W-JFDP-T-1390 12-Jun-2025 NMR-601 2308-PRO-MR-043-NMR-601 B
BQ-W-JFDP-T-1381 11-Jun-2025 NMR-601 2308-PRO-MR-048-NMR-601 01
BQ-W-JFDP-T-1383 11-Jun-2025 NMR-601 2308-PRO-MR-120-NMR-601 A

BQ-W-JFDP-T-1393 14-Jun-2025 NMR-601 2308-PRO-MR-126-NMR-601 A


BQ-W-JFDP-T-1362 3-Jun-2025 NMR-602 2308-PRO-MR-053-NMR-602 01

BQ-W-JFDP-T-1384 11-Jun-2025 NMR-602 2308-PRO-MR-109-NMR-602 2


BQ-W-JFDP-T-1255 18-May-2025 No Deviation - -

BQ-W-JFDP-T-1326 29-May-2025 No Deviation - -


BQ-W-JFDP-T-1386 11-Jun-2025 P&ID_TR Updated P&ID -
BQ-W-JFDP-T-1308 27-May-2025 PMS_CRS RE-755238 A
BQ-W-JFDP-T-1350 2-Jun-2025 Report - -
BQ-W-JFDP-T-1312 27-May-2025 Report KR.GTO24000051 -
BQ-W-JFDP-T-1252 17-May-2025 Request for ConAI-TR_RN2P2-BINQURAYA_RN2PL-L-00045 -
BQ-W-JFDP-T-1181 4-May-2025 SLD SAP-0719-B-1005 A

BQ-W-JFDP-T-1309 27-May-2025 SPI_TR 10651- 00-ICT-PD-0001 03


BQ-W-JFDP-T-1218 12-May-2025 TBC 2308-PRO-TC-MR-006 3

BQ-W-JFDP-T-1306 26-May-2025 TBC 2308-PRO-TC-MR-026 2


BQ-W-JFDP-T-1394 14-Jun-2025 TBC 2308-PRO-TC-MR-044 4

BQ-W-JFDP-T-1132 20-Apr-2025 TBC 2308-PRO-TC-MR-094 2


BQ-W-JFDP-T-1158 27-Apr-2025 TBC 2308-PRO-TC-MR-099 A

BQ-W-JFDP-T-1339 1-Jun-2025 TBC 2308-PRO-TC-MR-101 2

BQ-W-JFDP-T-1287 21-May-2025 TBC 2308-PRO-TC-MR-103 2

BQ-W-JFDP-T-1327 29-May-2025 TBC 2308-PRO-TC-MR-105 3

BQ-W-JFDP-T-1379 10-Jun-2025 TBE 2308-PRO-MR-008-TBE C


BQ-W-JFDP-T-1273 20-May-2025 Telecom Drawin- -
BQ-W-JFDP-T-1238 14-May-2025 TQ PAN-PIP-NDP-5165 -
Doc. Name Response

3D Model dated 19-May-2025 & clash pictures for Jafurah Scraper OPEN

L&T Phase-1 3D Model for Scraper Area OPEN


Updated 3D Model received from TR OPEN
BQ Comments for 90% Pentane Piping Documents open
SAPMT Response to 90% Electrical Package - ETAP STUDY on Worley OPEN
Response to SAPMT Comments
BQ Comments on 90% Review Pentane Package [Civil, Electrical & OPEN
Mechanical Hot Tap]
SAPMT Reply to PENTANE 90% DD e-Review Comments Responses OPEN

BQ Comments on Pentane 90% I&C Package OPEN


SAPMT Comments for Pentane 90% Design Documents - Part-1 OPEN
SAPMT Comments for Pentane 90% Design Documents - Part-2 OPEN
AC Mitigation Study Report comments by EED open
BQ Comments on Civil Drawings Index Q OPEN
BQ Comments on Telecom Documents OPEN
CRS for Process Documents Related to Advance IFC Package OPEN
(Revised) Wake Frequency Calculation (WFC) for MR-042 OPEN
BQ Response to Change Order PVN-0048 - Changing the C2+NGL Pump OPEN
Configuration in Model & Reports.
BQ Response to 90% TCP package along with CSD CRS responses - Rev OPEN
B
CSD Response to Cathodic Protection Package 90% (TCP) Rev-B OPEN
BQ 90% REVIEW COMMENT RESPONSES-3rd BATCH-PIPING OPEN
BQ 90% REVIEW COMMENT RESPONSES-3rd BATCH-HOT TAPPING OPEN

SAPMT comments to Fire & Gas Mapping Report OPEN


CRS FOR MR -HOT TAP FITTINGS OPEN
BQ COMMENTS FOR MR 011_FBE COATING AND DOUBLE JOINTING OPEN
(Updated as per 90% Detail Design)
BQ-Comments (CRS) for MR-013 Rev-03, RTR Pipe & Fittings (Fire & oily OPEN
water)
BQ RESPONSE TO WORLEY CRS FOR MR-029, ANALYZER WITH SHELTER OPEN

BQ-Comments (CRS) For MR-054, LIQUID CUSTODY METERING SKID OPEN


Rev-01
BQ Response to MR-069 Lighting Fixtures OPEN
MR-092- LEAK DETECTION SYSTEM (FOLDS) - CRS OPEN
BQ RESPONSE TO CRS-OHPL BULK MATERIALS OPEN
SAPMT Response to Post 90% Stress Reports. OPEN
Shipping Pump Curves & Datasheets from TR (RN2P2) OPEN
Revalidation of Hydrotest Manifold OPEN
JAFURAH PKG # 5 ELECTRICAL DRAWINGS OPEN
Hazop Report for Pentane Case by TR RN2P2 PKG 2 OPEN
Jafurah - 509 IFC Civil Common Drawings for review (30 Drawings) OPEN

BQ Comments on IFC Package - Civil OPEN


BQ Comments on IFC Package - Process
Electrical Comments on IFC with Stamp OPEN
BQ Comments on IFC Package (Piping) OPEN
BQ Comments on IFC Package (Process / Hot Tapping / I&C) OPEN

Jafurah - 509 - 36 JFRNGL- IFC (60 Drawings) OPEN


Additional IFC Civil Drawings [20 Nos]
Civil Comments on IFC Drawings (Jafurah-580 - 42 RJBETH-1 IFC) OPEN
Mechanical Comments on IFC with Stamp OPEN
BQ COMMENTS ON CIVIL / STRUCTURE DESIGN CALCULATION OPEN
ELECTRICAL SLD (EA-057056) SS-005 888-005-SR-0001 OPEN
IO List received from TR OPEN
Input Required Document for MR-019-Leak Detection System OPEN
BQ-W-JFDP-T-1141_Model AG in Scraper Area OPEN
BQ RESPONSE TO MR-080 - COMMUNICATION TOWER AND TETRA OPEN
RADIO SYSTEM
MTO FOR MTA-129 COMMUNICATION BULK MATERIAL open
NDT MATRIX SPECIFICATION - JFRNGL-1 PIPELINE - (36”-C2+NGL) OPEN
NDT MATRIX SPECIFICATION - RJBETH-1 PIPELINE - (ETHANE)
NDT MATRIX SPECIFICATION - RJPRP-1 PIPELINE - (PROPANE)
NDT MATRIX SPECIFICATION - RJBUT-1 PIPELINE - (BUTANE)
NDT MATRIX SPECIFICATION - RJT-1 PIPELINE - (PENTANE + COLOR
BODIES)
NDT MATRIX SPECIFICATION - RKJNGL-1 PIPELINE - (24”-C2+NGL)
NDT MATRIX SPECIFICATION - RFG-1 PIPELINE - (SALES GAS)
NDT MATRIX SPECIFICATION - RRTNG-1 PIPELINE - (NG A-180)

NMR-601_MR-005 SCRAPPER TRAPS OPEN


NMR-601 FOR MR-014 BALL VALVE SOFT SEATED OPEN
NMR-601 for MR-016 Check Valves for Second PO Outside Kingdom OPEN

NMR-601 FOR MR-021 FIBER OPTIC CABLES OPEN


NMR-601_MR-039, GAS DETECTION SYSTEM OPEN
NMR-601 for MR-043 GWR LEVEL TRANSMITTER OPEN
NMR-601_MR-048 REMOTE TERMINAL UNIT OPEN
NMR-601 FOR MR-120 GATE VALVES, THREADED & SOCKETWELD ENDS OPEN

NMR-601 FOR MR-126 Foundation Field Bus Junction Box OPEN


NMR-602 - MR-053 CATHODIC PROTECTION (TEMPORARY & OPEN
PERMANENT)(Rev-01)
NMR-602 - MR-109 RTR FITTING OPEN
Manufacturer No Deviation & Confirmation Letter to MR 037 For OPEN
Worley Signature & Stamp
Manufacturer No Deviation & Confirmation Letter OPEN
Updated PID for the utilities in RNGLF received from TR OPEN
PMS for 10 inch pentane 515 OPEN
Planning For Start-Up (PFSU) Report_Pentane Change OPEN
SAPMT Response to Geotechnical Report _Rev-6 OPEN
Request for Confirmation for Pentane Anti Surge Skid Location OPEN
ELECTRIC POWER DISTRIBUTION DIAGRAM 2308-PRO-MR-048 MR FOR OPEN
REMOTE TERMINAL UNIT
SPI Execution Plan [RIYAS Tagging philosophy] from TR OPEN
Vendor Offers for MR-006 - BW FITTINGS (SS) (90% DD) Responded by BQ E
[Vendor:IMCO / PSTE / IPP / THAIBENKAN]
Vendor Offers for MR-026 Fire Water System (90% DD) OPEN
Vendor Offers for MR-044 Pressure Relief Valves [PZV] (90% DD) OPEN
[Vendor: KANOO / EMERSON / DARVICO / BINZAGR]

VENDOR OFFER FOR MR-094 INSTRUMENT JUNCTION BOXES OPEN


VENDOR OFFERS FOR MR-099 OHPL BULK MATERIALS AND OPEN
ACCESSORIES
TBC Compliance Statement forMR-101 THREADED & SOCKETWELD open
FITTINGS (CS) (90% DD) (Rev-01)
[Vendor: PSTE / MEGA]

Vendor Offers for MR-103 - BW FITTINGS (LTCS) (90% DD) Forwarded for BQ I
[Vendor: IMCO / PSTE / IPP / THAIBENKAN]
TBC Compliance Statement for MR-105 LTCS Flanges & Blinds (90% DD) OPEN
(Rev-01)
BQ Response to TBE for MR-008 - SS FLANGES AND BLINDS OPEN
Riyas Telecom Drawings for Review & Input OPEN
TQ_Jubail Interface-II Alignment with BI-10-14245-0002 ( PAN-PPL AN- OPEN
PIP-NDP-5165 )
Remarks Delay by Discipline
WORLEY RESPONSE
PENDING WITH WORLEY 28 Days Interface

PENDING WITH WORLEY 22 Days Interface


PENDING WITH WORLEY 17 Days Interface
PENDING WITH WORLEY 14 Days Engineering
PENDING WITH WORLEY 36 Days Engineering

PENDING WITH WORLEY 22 Days Engineering

PENDING WITH WORLEY 16 Days Engineering

PENDING WITH WORLEY 16 Days Engineering


PENDING WITH WORLEY 41 Days Engineering
PENDING WITH WORLEY 37 Days Engineering
PENDING WITH WORLEY 14 Days
PENDING WITH WORLEY 20 Days Engineering
PENDING WITH WORLEY 20 Days Engineering
PENDING WITH WORLEY 27 Days Engineering
PENDING WITH WORLEY 28 Days Engineering
PENDING WITH WORLEY 14 Days

PENDING WITH WORLEY 48 Days

PENDING WITH WORLEY 22 Days


PENDING WITH WORLEY 54 Days Engineering
PENDING WITH WORLEY 52 Days Engineering

PENDING WITH WORLEY 43 Days Engineering


PENDING WITH WORLEY 61 Days Engineering
PENDING WITH WORLEY 44 Days Engineering

PENDING WITH WORLEY 72 Days Engineering

PENDING WITH WORLEY 59 Days Engineering

PENDING WITH WORLEY 44 Days Engineering

PENDING WITH WORLEY 19 Days Engineering


PENDING WITH WORLEY 20 Days Engineering
PENDING WITH WORLEY 55 Days Engineering
PENDING WITH WORLEY 35 Days Engineering
PENDING WITH WORLEY 7 Days Interface
PENDING WITH WORLEY 38 Days
PENDING WITH WORLEY 52 Days Interface
PENDING WITH WORLEY 24 Days Interface
PENDING WITH WORLEY 42 Days Engineering

PENDING WITH WORLEY 5 Days Engineering

PENDING WITH WORLEY 17 Days Engineering


PENDING WITH WORLEY 14 Days Engineering
PENDING WITH WORLEY 14 Days Engineering

PENDING WITH WORLEY 34 Days Engineering

PENDING WITH WORLEY 44 Days Engineering


PENDING WITH WORLEY 17 Days Engineering
PENDING WITH WORLEY 27 Days Engineering
PENDING WITH WORLEY 47 Days Interface
PENDING WITH WORLEY 38 Days Interface
PENDING WITH WORLEY 7 Days Engineering
PENDING WITH WORLEY 55 Days Interface
PENDING WITH WORLEY 15 Days

PENDING WITH WORLEY 14 Days


PENDING WITH WORLEY 2 Days Engineering

PENDING WITH WORLEY 1 Days Engineering


PENDING WITH WORLEY 3 Days Procurement
PENDING WITH WORLEY 5 Days Procurement

PENDING WITH WORLEY 21 Days Procurement


PENDING WITH WORLEY 7 Days Procurement
PENDING WITH WORLEY 5 Days Procurement
PENDING WITH WORLEY 6 Days Procurement
PENDING WITH WORLEY 6 Days Procurement

PENDING WITH WORLEY 3 Days Procurement


PENDING WITH WORLEY 14 Days Procurement

PENDING WITH WORLEY 6 Days Procurement


PENDING WITH WORLEY 30 Days Procurement

PENDING WITH WORLEY 19 Days Procurement


PENDING WITH WORLEY 6 Days Interface
PENDING WITH WORLEY 21 Days Engineering
PENDING WITH WORLEY 15 Days
PENDING WITH WORLEY 21 Days
PENDING WITH WORLEY 31 Days
PENDING WITH WORLEY 44 Days

PENDING WITH WORLEY 21 Days Interface


PENDING WITH WORLEY 36 Days Procurement

PENDING WITH WORLEY 22 Days Procurement


PENDING WITH WORLEY 3 Days Procurement

PENDING WITH WORLEY 58 Days Procurement


PENDING WITH WORLEY 51 Days Procurement

PENDING WITH WORLEY with TC 16 Days Procurement

PENDING WITH WORLEY 27 Days Procurement

PENDING WITH WORLEY with TC 19 Days Procurement

PENDING WITH WORLEY 7 Days Procurement


PENDING WITH WORLEY 28 Days Interface
PENDING WITH WORLEY 34 Days Interface
REMARKS
Revised Offer is awaiting from PRC after Engineeirng Comments

This is Revised Offer with 90% DD

This is Revised Offer with 90% DD

This is Revised Offer with 90% DD