BI Number: BI-10-14245
Contract No. 6601000358
125 WOR-TRANSMIT-000257 2308-PRO-MR-027-CRS CRS-EMERGENCY SHUT-DOWN VALVES 00 CRS_MR 25-Mar-2024 - CLOSED CLOSED
126 WOR-TRANSMIT-000258 2308-PRO-MR-024-CRS CRS-ESD MODIFICATION(SCHNEIDER) 00 CRS_MR 25-Mar-2024 - CLOSED CLOSED
127 WOR-TRANSMIT-000259 2308-PRO-MR-022-CRS CRS-DCS MODIFICATIONS-EMERSON 00 CRS_MR 25-Mar-2024 - CLOSED I&C CLOSED
128 WOR-TRANSMIT-000260 2308-PRO-TC-MR-055 TBC Compliance Statement for MR-055 BARRED TEE A TBC 25-Mar-2024 - CLOSED CLOSED
129 WOR-TRANSMIT-000264 413011-01303-WPECC-WPR-0017 Weekly Progress Report No. 0017 (Week ending: Mar 22, 2024) A WPR 26-Mar-2024 - - MANAGEMENT
130 WOR-TRANSMIT-000265 2308-PRO-MR-020 MR - CORROSION MONITORING SYSTEM 00 MR 26-Mar-2024 - CLOSED I&C CLOSED
131 WOR-TRANSMIT-000266 2308-PRO-MR-023 JUAYMAH NGLF DCS MODIFICATIONS (HONEYWELL) 00 MR 26-Mar-2024 - CLOSED I&C CLOSED
133 WOR-TRANSMIT-000268 2308-PRO-MR-113 UPDATED MOV BALL VALVES, METAL SEATED 00 MR 26-Mar-2024 - CLOSED PIP CLOSED
134 WOR-TRANSMIT-000271 2308-PRO-MR-117 BALL VALVES, METAL SEATED, MANUAL 00 MR 28-Mar-2024 28-Mar-2024 CLOSED PIP CLOSED
135 WOR-TRANSMIT-000273 R167561001P FLOW ASSURANCE STEADY STATE HYDRAULIC REPORT FOR SALES GAS - DETAILED ENGINEERING PHASE B FLOW ASSURANCE 28-Mar-2024 - -
136 WOR-TRANSMIT-000274 2308-PRO-MR-030 MR - TRANSFORMER (POLE MOUNTED TYPE) 00 MR 29-Mar-2024 - CLOSED ELE / CVL CLOSED
137 WOR-TRANSMIT-000275 ME-REP-0001 Scope of Work, Rev.E for RBI and OSI E SOW 1-Apr-2024 - -
138 WOR-TRANSMIT-000276 SITE VISIT REPORT - TELECOM SITE VISIT REPORT - TELECOM - SAPD BLDG. 1193 IN ABQAIQ A Site Visit 1-Apr-2024 - - ALL
139 WOR-TRANSMIT-000277 413011-01303.MOM.0016 MINUTES OF MEETING - PENTANE +CB PL UNDER BI:10-14245 A MOM 1-Apr-2024 - -
140 WOR-TRANSMIT-000278 2308-PRO-MR-034 MR - DC SYSTEM B MR 1-Apr-2024 - CLOSED ELE CLOSED
141 WOR-TRANSMIT-000279 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM A MR 1-Apr-2024 - CLOSED Telecom CLOSED
142 WOR-TRANSMIT-000280 2308-PRO-MR-114 GOV BALL VALVES, METAL SEATED 00 MR 1-Apr-2024 2-Apr-2024 CLOSED PIP CLOSED
144 WOR-TRANSMIT-000288 2308-PRO-MR-021 MR - FIBER OPTIC CABLES 00 MR 2-Apr-2024 - CLOSED CLOSED
145 WOR-TRANSMIT-000289 2308-PRO-MR-086 MR - SPECTACLE PLATES 00 MR 2-Apr-2024 - CLOSED PIP CLOSED
146 WOR-TRANSMIT-000292 2308-PRO-MR-120 GATE VALVES, THREADED & SOCKETWELD ENDS A MR 2-Apr-2024 - CLOSED PIP CLOSED
147 WOR-TRANSMIT-000294 PE-000000 SITE VISIT REPORT-PIPING - JUAYMAH GAS PLANT Site Visit - Mar 2024 A Site Visit 3-Apr-2024 - CLOSED PIP CLOSED
148 WOR-TRANSMIT-000294 PE-401550 Site visit report - QATIF GOSP-1 - JAFURAH DEVELOPMENT PROGRAM B Site Visit 3-Apr-2024 - - ALL
149 WOR-TRANSMIT-000295 PE-066005 FLOW ASSURANCE BASIS OF DESIGN FOR C2+NGL B FLOW ASSURANCE 3-Apr-2024 - -
150 WOR-TRANSMIT-000302 2308-PRO-MR-054 LIQUID CUSTODY METERING SKID A MR 8-Apr-2024 - CLOSED I&C CLOSED
186 WOR-TRANSMIT-000303 413011-01303-PVN-0006 Scope Change Order - Change in the Butane Flow Rate 0 Change Order 8-Apr-2024 - CLOSED Management Superseded by PVN-0015 Superseded by PVN-0015
187 WOR-TRANSMIT-000304 413011-01303-PVN-0007 SCOPE CHANGE ORDER - SALES GAS CHANGES TO LINE SIZE CHANGE FROM 12" TO 16" 0 Change Order 8-Apr-2024 - CLOSED Management CLOSED
153 WOR-TRANSMIT-000305 413011-01303-WPECC-WPR-0019 Weekly Progress Report No. 0019 (Week ending: Apr 05, 2024) 0 WPR 8-Apr-2024 - - MANAGEMENT
154 WOR-TRANSMIT-000306 Inv # 30371 Inv. 30371 , (5% billng- Issue LLI MR's) issued Apr.07,2024 0 Invoice 8-Apr-2024 Repeated / Cance CLOSED Management CLOSED
155 WOR-TRANSMIT-000307 Inv # 30371 Inv. 30371 , (5% billng- Issue LLI MR's) issued Apr.07,2024 0 Invoice 8-Apr-2024 - CLOSED Management
171 WOR-TRANSMIT-000308 413011-01303-PVN-0005 Scope Change Order - Resolution Of C2+NGL Hydraulic Deficiencies 0 Change Order 8-Apr-2024 - CLOSED Management CLOSED
157 WOR-TRANSMIT-000328 413011-01303-WPECC-WPR-0020 Weekly Progress Report No. 0020 (Week ending: Apr 19, 2024) WPR 23-Apr-2024 - - MANAGEMENT
158 WOR-TRANSMIT-000347 2308-PRO-MR-021 FOC 00 MR 29-Apr-2024 - CLOSED CLOSED
159 WOR-TRANSMIT-000348 2308-PRO-MR-118 CHECK VALVES, NON SLAM 00 MR 29-Apr-2024 - CLOSED PIP CLOSED
160 WOR-TRANSMIT-000349 2308-PRO-MR-048 REMOTE TERMINAL UNIT 00 MR 29-Apr-2024 - CLOSED CLOSED
161 WOR-TRANSMIT-000350 2308-PRO-MR-036 MR - JIB CRANES 00 MR 29-Apr-2024 - CLOSED CLOSED
162 WOR-TRANSMIT-000351 413011-01303-WPECC-WPR-0021 Weekly Progress Report No. 0020 (Week ending: Apr 26, 2024) WPR 30-Apr-2024 - - MANAGEMENT
163 WOR-TRANSMIT-000352 - DCL and SAEP-303 Check for 60% DCL 30-Apr-2024 - CLOSED CLOSED
164 WOR-TRANSMIT-000354 PE-000000 Site Visit Report JNGL-16- April 24 0 Site Visit 1-May-2024 - CLOSED ALL CLOSED
165 WOR-TRANSMIT-000355 2308-PRO-MR-120 GATE VALVES, THREADED & SOCKETWELD ENDS 00 MR 30-Apr-2024 - CLOSED PIP CLOSED
166 WOR-TRANSMIT-000356 2308-PRO-MR-086 MR - SPECTACLE PLATES 00 MR 1-May-2024 - CLOSED PIP CLOSED
167 WOR-TRANSMIT-000357 2308-PRO-TC-MR-003 HOT INDUCTION BENDS TBC 1-May-2024 - CLOSED CLOSED
168 WOR-TRANSMIT-000358 2308-PRO-TC-MR-015 Plug Valves A TBC 1-May-2024 - CLOSED PIP CLOSED
169 WOR-TRANSMIT-000359 RE-401551 SECURITY RISK ASSESSMENT Subcontract(Stage 3 DETAIL DESIGN) A SOW 2-May-2024 2-May-2024 CLOSED CLOSED
170 WOR-TRANSMIT-000360 PE-002100 Scope of Work for Fire Protection (PE Certification) A SOW 2-May-2024 2-May-2024 -
206 WOR-TRANSMIT-000361 413011-01303-PVN-0008 Optional Subcontract - Topography Survey 0 Change Order 2-May-2024 4-May-2024 CLOSED Management CLOSED
173 WOR-TRANSMIT-000365 IFC - 0 Early IFC 4-May-2024 6-May-2024 CLOSED CLOSED
174 WOR-TRANSMIT-000369 2308-PRO-MR-029 ANALYZER SKID WITH 3-SIDED SHELTER 00 MR 6-May-2024 6-May-2024 CLOSED ELE CLOSED
175 WOR-TRANSMIT-000370 2308-PRO-MR-038 GOV BALL VALVES, SOFT SEATED 00 MR 6-May-2024 6-May-2024 CLOSED PIP CLOSED
176 WOR-TRANSMIT-000371 2308-PRO-MR-117 BALL VALVES, METAL SEATED, MANUAL 00 MR 6-May-2024 6-May-2024 CLOSED PIP CLOSED
177 WOR-TRANSMIT-000372 2308-PRO-MR-122 GLOBE VALVES, THREADED & SOCKETWELD ENDS 00 MR 6-May-2024 6-May-2024 CLOSED PIP CLOSED
179 WOR-TRANSMIT-000374 2308-PRO-MR-047 BURN PIT FLARE TIP SYSTEM & IGNITION SKID 00 MR 7-May-2024 7-May-2024 CLOSED MECH CLOSED
180 WOR-TRANSMIT-000375 413011-01303-WPECC-WPR-0022 Weekly Progress Report no. 0022 03-may-2024 WPR 7-May-2024 8-May-2024 - MANAGEMENT
181 WOR-TRANSMIT-000376 SW-011006 SCOPE OF WORK-Fire and Gas Detection Mapping A SOW 7-May-2024 8-May-2024 CLOSED CLOSED
178 WOR-TRANSMIT-000377 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 00 MR 7-May-2024 7-May-2024 CLOSED MECH CLOSED
183 WOR-TRANSMIT-000387 PE-000000 SITE VISIT REPORT-PPIPING - Burn Pit near QBGG Scraper Trap and Berri Gas Plant 6-May-24 0 Site Visit 13-May-2024 13-May-2024 CLOSED PIP CLOSED
184 WOR-TRANSMIT-000388 PE-000000 Site Visit Report - Qatif GOSP-1 for Elec. & Instr. 08-May24 0 Site Visit 13-May-2024 14-May-2024 CLOSED ALL CLOSED
310 WOR-TRANSMIT-000389 413011-01303-PVN-0011 Installation of The TRV on Propane, Butane, Pentane and NG A-180 for Above Ground Piping 0 Change Order 13-May-2024 14-May-2024 CLOSED Management cancelled Email from Santosh- 23-May-24 CANCELLED
348 WOR-TRANSMIT-000390 413011-01303-PVN-0012 Adjusted LUPs at QBGG 0 Change Order 13-May-2024 13-May-2024 CLOSED Management BQ-W-JFDP-T-0478 07-Oct-2024 CLOSED CLOSED
483 WOR-TRANSMIT-000391 413011-01303-PVN-0013 Relocation of Valve Station from 27.1 KM to 23 KM on Ethane Pipeline 0 Change Order 13-May-2024 14-May-2024 CLOSED Management CLOSED
188 WOR-TRANSMIT-000392 413011-01303-WPECC-WPR-0023 Weekly Progress Report No.0023 (week Ending : May, 10, 2024) 0 WPR 13-May-2024 ### 14-May-2024 - MANAGEMENT
189 WOR-TRANSMIT-000393 2308-PRO-MR-047-CRS CRS FOR 2308-PRO-MR-047 A CRS_MR 14-May-2024 - CLOSED CLOSED
190 WOR-TRANSMIT-000394 2308-PRO-TC-MR-005 SCRAPER TRAPS & HANDLING FACILITIES- TECHNICAL CLARIFICATION 0 TBC 14-May-2024 15-May-2024 CLOSED CLOSED
191 WOR-TRANSMIT-000395 2308-PRO-MR-034-CRS CRS MR-034 Rev. A DC SYSTEM with 3-SIDED SHELTER 00 CRS_MR 14-May-2024 - CLOSED ELE CLOSED
192 WOR-TRANSMIT-000396 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM A MR 14-May-2024 - CLOSED Telecom CLOSED
193 WOR-TRANSMIT-000397 - 413011-01303 _ Overall EDSR Register_14-May-24 DCL 14-May-2024 15-May-2024 CLOSED CLOSED
194 WOR-TRANSMIT-000398 - Monthly Saudization Report 2024 Saudization 14-May-2024 15-May-2024 CLOSED Management CLOSED
195 WOR-TRANSMIT-000399 413011-01303.MOM.0025 Minitues of Meeting 14-May-2024 A MOM 15-May-2024 15-May-2024 -
196 WOR-TRANSMIT-000403 2308-PRO-MR-034 MR - DC SYSTEM 00 MR 15-May-2024 15-May-2024 CLOSED ELE CLOSED
197 WOR-TRANSMIT-000404 RE-401551 SECURITY RISK ASSESSMENT Subcontract(Stage 3 DETAIL DESIGN) B SOW 15-May-2024 15-May-2024 -
198 WOR-TRANSMIT-000406 2308-PRO-MR-054 Metering Skid 00 MR 15-May-2024 ### 16-May-2024 CLOSED I&C CLOSED
199 WOR-TRANSMIT-000409 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM 00 MR 17-May-2024 SAHRED BY NOW CLOSED Telecom CLOSED
255 WOR-TRANSMIT-000410 413011-01303-PVN-0009 Pipelines Reroute Inside Juyamah Plant 0 Change Order 17-May-2024 19-May-2024 CLOSED Management Superseded by PVN-0015 Superseded by PVN-0015
309 WOR-TRANSMIT-000411 413011-01303-PVN-0010 Butane Over Pressure Protection SRV 0 Change Order 17-May-2024 19-May-2024 CLOSED Management Superseded by PVN-0015 Superseded by PVN-0015
202 WOR-TRANSMIT-000424 413011-01303-WPECC-WPR-0024 Weekly Progress Report No. 0024 0 WPR 20-May-2024 ### 21-May-2024 - MANAGEMENT
203 WOR-TRANSMIT-000426 PE-000000 Site Visit Report PPIPING - SHJNGL-2 EXISTING BURN PIT @ Km.140.4. OF 36”-C2+NGL P/L 14-May-2024 0 Site Visit 21-May-2024 22-May-2024 CLOSED PIP CLOSED
204 WOR-TRANSMIT-000427 2308-INCR-003 Internal Non Conformance Report-003 0 NCR 21-May-2024 ### 22-May-2024 -
205 WOR-TRANSMIT-000428 PE-000000 SITE VISIT REPORT - QATIF GOSP-1 8-May-2024 0 Site Visit 21-May-2024 ### 22-May-2024 CLOSED ALL CLOSED
200 WOR-TRANSMIT-000429 413011-01303-PVN-0007 Sales Gas Changes to Line Size Change from 12" to 16" 0 Change Order 22-May-2024 - CLOSED Management CLOSED
207 WOR-TRANSMIT-000430 2308-PRO-TC-MR-055 TBC Compliance Statement for MR-055 BARRED TEE 01 TBC 22-May-2024 22-May-2024 -
208 WOR-TRANSMIT-000434 413011-01303.MOM.0024 FLOW ASSURANCE DEPRESSURIZATION STUDY RESULTS A MOM 22-May-2024 22-May-2024 -
209 WOR-TRANSMIT-000435 2308-PRO-MR-118 Check Valves_Non Slam 01 MR 22-May-2024 22-May-2024 CLOSED PIP CLOSED
210 WOR-TRANSMIT-000436 2308-PRO-MR-088 FIRE EXTINGUISHERS A MR 23-May-2024 23-May-2024 CLOSED PIP / MECH CLOSED
211 WOR-TRANSMIT-000439 413011-01303-WPECC-WPR-0025 Weekly Progress Report No. 0025 0 WPR 28-May-2024 28-May-2024 - MANAGEMENT
212 WOR-TRANSMIT-000440 2308-PRO-TC-MR-018 TC for Globe Valves 0 TBC 28-May-2024 28-May-2024 CLOSED PIP CLOSED
213 WOR-TRANSMIT-000441 413011-01303-WOR-LTR-0021-2024 Exhibit-I Approval 0 Letter 29-May-2024 ### 30-May-2024 -
214 WOR-TRANSMIT-000442 SW-011006 SCOPE OF WORK-Fire and Gas Detection Mapping B SOW 30-May-2024 30-May-2024 -
215 WOR-TRANSMIT-000443 R167635P Flow Assurance Steady State Hydraulic Report for Natural Gas Liquids A FLOW ASSURANCE 30-May-2024 30-May-2024 CLOSED PROCESS BQ-W-JFDP-T-0191 CLOSED & RETURNED TO WP CLOSED
216 WOR-TRANSMIT-000443 R167639P Flow Assurance SAEP-27 Exhibit-I, C2+NGL Export Pipeline A FLOW ASSURANCE 30-May-2024 30-May-2024 CLOSED PROCESS BQ-W-JFDP-T-0190 CLOSED & RETURNED TO WP CLOSED
217 WOR-TRANSMIT-000447 2308-PRO-MR-087 SAMPLING CONNECTION A MR 31-May-2024 26-May-2024 CLOSED CLOSED
218 WOR-TRANSMIT-000448 2308-PRO-TC-MR-004 Hot Tap Fittings B TBC 31-May-2024 27-May-2024 CLOSED MECH-HOT unofficially received copy distributed eralier unofficially received copy distributed eralier
219 WOR-TRANSMIT-000449 2308-PRO-TC-MR-125 CASING PIPES A TBC 31-May-2024 26-May-2024 CLOSED PIP CLOSED
220 WOR-TRANSMIT-000450 2308-PRO-TC-MR-001 CARBON STEEL PIPES A TBC 31-May-2024 27-May-2024 CLOSED PIP CLOSED
221 WOR-TRANSMIT-000451 2308-PRO-TC-MR-018 TC for Globe Valves A TBC 31-May-2024 28-May-2024 CLOSED PIP CANCELLED CANCELLED #VALUE!
222 WOR-TRANSMIT-000452 2308-PRO-TC-MR-024 ESD MODIFICATION (SCHNEIDER) A TBC 31-May-2024 1-Jun-2024 CLOSED CLOSED
223 WOR-TRANSMIT-000453 2308-PRO-MR-054-CRS CRS MR-054 Rev. 00 Metering Skid 00 CRS_MR 31-May-2024 1-Jun-2024 CLOSED CLOSED
224 WOR-TRANSMIT-000454 2308-PRO-MR-008 SS FLANGES_BLINDS A MR 31-May-2024 28-May-2024 CLOSED PIP CLOSED
225 WOR-TRANSMIT-000455 2308-PRO-MR-105 2308-PRO-MR-105 Rev. A LTCS FLANGES_BLINDS A MR 31-May-2024 28-May-2024 CLOSED PIP CLOSED
226 WOR-TRANSMIT-000456 2308-PRO-MR-002 LOW TEMPERATURE CARBON STEEL PIPES A MR 31-May-2024 28-May-2024 CLOSED PIP CLOSED
227 WOR-TRANSMIT-000457 2308-PRO-MR-012 STAINLESS STEEL PIPES A MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
228 WOR-TRANSMIT-000458 2308-PRO-MR-102 CS Flanges_Blinds A MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
229 WOR-TRANSMIT-000459 2308-PRO-TC-MR-015 PLUG VALVES B TBC 31-May-2024 29-May-2024 - PIP #VALUE!
230 WOR-TRANSMIT-000460 2308-PRO-TC-MR-021 FIBER OPTIC CABLES A TBC 31-May-2024 29-May-2024 CLOSED CLOSED
231 WOR-TRANSMIT-000461 2308-PRO-MR-087 SAMPLING CONNECTION 00 MR 31-May-2024 29-May-2024 CLOSED CLOSED
232 WOR-TRANSMIT-000462 2308-PRO-MR-002 LOW TEMPERATURE CARBON STEEL PIPES 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
233 WOR-TRANSMIT-000463 2308-PRO-MR-088 FIRE EXTINGUISHERS 00 MR 31-May-2024 29-May-2024 CLOSED PIP / MECH CLOSED
234 WOR-TRANSMIT-000464 2308-PRO-MR-012 STAINLESS STEEL PIPES 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
235 WOR-TRANSMIT-000465 2308-PRO-TC-MR-125 CASING PIPES 0 TBC 31-May-2024 29-May-2024 CLOSED PIP unofficially received copy distributed eralier unofficially received copy distributed eralier
236 WOR-TRANSMIT-000466 2308-PRO-MR-008 SS FLANGES_BLINDS 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
237 WOR-TRANSMIT-000467 2308-PRO-MR-105 LTCS FLANGES_BLINDS 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
238 WOR-TRANSMIT-000468 2308-PRO-MR-102 CS Flanges_Blinds 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
239 WOR-TRANSMIT-000469 2308-PRO-TC-MR-016 TECHNICAL CLARIFICATION - SWING CHECK VALVE A TBC 31-May-2024 1-Jun-2024 CLOSED PIP CLOSED
240 WOR-TRANSMIT-000470 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL A TBC 31-May-2024 1-Jun-2024 CLOSED PIP CLOSED
241 WOR-TRANSMIT-000471 2308-PRO-TC-MR-023 TECHNICAL CLARIFICATION - DCS MODIFICATION A TBC 31-May-2024 1-Jun-2024 CLOSED I&C CLOSED
242 WOR-TRANSMIT-000472 - 413011-01303_JFR Saudization Monthly Report May-2024 - Saudization 2-Jun-2024 2-Jun-2024 CLOSED Management CLOSED
243 WOR-TRANSMIT-000477 - HAZOP Nodes & Agenda - HAZOP 3-Jun-2024 3-Jun-2024 CLOSED CLOSED
244 WOR-TRANSMIT-000478 2308-PRO-TC-MR-115 Technical Bid Compliance-MR-115-Gov Plug Valves TBC 3-Jun-2024 3-Jun-2024 CLOSED PIP CLOSED
245 WOR-TRANSMIT-000479 2308-PRO-TC-MR-086 TBC FOR SPECTACLE PLATES TBC 3-Jun-2024 2-Jun-2024 -
246 WOR-TRANSMIT-000480 2308-PRO-MR-055-TBE TECHNICAL BID EVALUATION - BARRED TEE - TBE 3-Jun-2024 3-Jun-2024 CLOSED CLOSED
247 WOR-TRANSMIT-000481 2308-PRO-MR-015-TBE TECHNICAL BID EVALUATION - PLUG VALVES – MANUAL TBE 3-Jun-2024 3-Jun-2024 CLOSED PIP CLOSED
248 WOR-TRANSMIT-000482 2308-PRO-TC-MR-005 TECHNICAL CLARIFICATION - SCRAPER TRAPS & HANDLING FACILITIES 0 TBC 3-Jun-2024 3-Jun-2024 CLOSED CLOSED
249 WOR-TRANSMIT-000483 413011-01303-WPECC-WPR-0026 Weekly Progress Report No. 0026 (Week ending : May 31, 2024) 0 WPR 3-Jun-2024 3-Jun-2024 - MANAGEMENT
250 WOR-TRANSMIT-000484 2308-PRO-TC-MR-030 TECHNICAL CLARIFICATION - POLE MOUNTED TRANSFORMER 0 TBC 4-Jun-2024 4-Jun-2024 CLOSED ELE / CVL CLOSED
201 WOR-TRANSMIT-000485 413011-01303-PVN-0007 SCOPE CHANGE ORDER - SALES GAS CHANGES TO LINE SIZE CHANGE FROM 12" TO 16" 1 Change Order 4-Jun-2024 4-Jun-2024 CLOSED Management CLOSED
252 WOR-TRANSMIT-000488 2308-PRO-MR-055-TBE FINAL TBE FOR BARRED TEE B TBE 5-Jun-2024 4-Jun-2024 CLOSED CLOSED
253 WOR-TRANSMIT-000489 2308-PRO-MR-021-TBE FINAL TBE FOR FOC B TBE 5-Jun-2024 4-Jun-2024 -
254 WOR-TRANSMIT-000490 2308-PRO-TC-MR-084 TECHNICAL CLARIFICATION - MOV PLUG VALVES. B TBC 5-Jun-2024 4-Jun-2024 CLOSED PIP CLOSED
185 WOR-TRANSMIT-000491 413011-01303-PVN-0005 Scope Change Order - Resolution Of C2+NGL Hydraulic Deficiencies 1 Change Order 5-Jun-2024 5-Jun-2024 CLOSED Management
256 WOR-TRANSMIT-000492 2308-PRO-TC-MR-014 TECHNICAL CLARIFICATION - BALL VALVES - MANUAL A TBC 5-Jun-2024 5-Jun-2024 CLOSED PIP CLOSED
257 WOR-TRANSMIT-000493 PE-000000 Site Visit Report JNGL-30-May-24 - SRV Site Verification A Site Visit 5-Jun-2024 5-Jun-2024 CLOSED ALL CLOSED
258 WOR-TRANSMIT-000494 2308-PRO-TC-MR-036 TBC For Jib Crane A TBC 5-Jun-2024 5-Jun-2024 CLOSED CLOSED
259 WOR-TRANSMIT-000495 2308-PRO-TC-MR-028 TBC FOR DRAIN COLLECTION VESSELS A TBC 5-Jun-2024 5-Jun-2024 CLOSED CLOSED
260 WOR-TRANSMIT-000497 2308-PRO-MR-040 HORNS AND BEACONS A MR 6-Jun-2024 5-Jun-2024 CLOSED I&C CLOSED
261 WOR-TRANSMIT-000531 2308-PRO-MR-033 Solar Power System A MR 10-Jun-2024 8-Jun-2024 CLOSED ELE CLOSED
262 WOR-TRANSMIT-000532 2308-PRO-MR-031 MR - POWER DISTRIBUTION PANELBOARD RACK, LOW VOLTAGE A MR 10-Jun-2024 8-Jun-2024 CLOSED CLOSED
263 WOR-TRANSMIT-000533 PE-000000 SITE VISIT REPORT-AC Mitigation Required for Ethane Pipeline 3rd & 4th -Jun-2024 A Site Visit 10-Jun-2024 10-Jun-2024 CLOSED ELE CLOSED
264 WOR-TRANSMIT-000534 PE-000000 SITE VISIT REPORT-Electrical Juaymah NGL 30-MAY-2024 A Site Visit 10-Jun-2024 10-Jun-2024 CLOSED ALL CLOSED
265 WOR-TRANSMIT-000534 PE-000000 SITE VISIT REPORT-Jubail Interface-II Surge Relief Skid 05-Jun-2024 A Site Visit 10-Jun-2024 10-Jun-2024 CLOSED ALL CLOSED
266 WOR-TRANSMIT-000535 413011-01303-WPECC-WPR-0027 Weekly Progress Report No. 0027 (Week ending : June 07, 2024) A WPR 10-Jun-2024 10-Jun-2024 CLOSED MANAGEMENT CLOSED
267 WOR-TRANSMIT-000536 RE 167506 FLOW ASSURANCE SAEP-27 EXHIBIT-I - PENTANE + CB B FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 -
268 WOR-TRANSMIT-000536 RE 101830 EXHIBIT-I SURGE ANALYSIS TECHNICAL SPECIFICATION FOR BUTANE PIPELINE B FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 - I&C
269 WOR-TRANSMIT-000536 PE 811070 EXHIBIT-I SURGE ANALYSIS TECHNICAL SPECIFICATION FOR PROPANE PIPELINE A FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 - I&C
270 WOR-TRANSMIT-000536 RE 167535 FLOW ASSURANCE SAEP-27 EXHIBIT-I - NATURAL GASOLINE B FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 -
272 WOR-TRANSMIT-000545 - BQ-Worley response for Pending Issues and Concerns - Issue and Concerns 12-Jun-2024 4-Jun-2024 CLOSED CLOSED
273 WOR-TRANSMIT-000550 2308-PRO-MR-040 HORNS AND BEACONS 00 MR 19-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
274 WOR-TRANSMIT-000551 2308-PRO-MR-033 Solar Power System 00 MR 19-Jun-2024 19-Jun-2024 CLOSED ELE CLOSED
275 WOR-TRANSMIT-000553 2308-PRO-MR-042 TEMPERATURE INSTRUMENTS A MR 20-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
276 WOR-TRANSMIT-000554 2308-PRO-MR-043 GWR LEVEL TRANSMITTER A MR 20-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
277 WOR-TRANSMIT-000555 2308-PRO-MR-061 ORIFICE FLANGE ASSEMBLY A MR 21-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
278 WOR-TRANSMIT-000556 2308-PRO-MR-041 PRESSURE TRANSMITTERS A MR 21-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
279 WOR-TRANSMIT-000557 2308-PRO-MR-060 PRESSURE GAUGES A MR 21-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
280 WOR-TRANSMIT-000558 2308-PRO-MR-135 WELDOLET A MR 21-Jun-2024 19-Jun-2024 CLOSED CLOSED
281 WOR-TRANSMIT-000559 2308-PRO-MR-062 MAGNETIC LEVEL GAUGES A MR 21-Jun-2024 19-Jun-2024 CLOSED CLOSED
282 WOR-TRANSMIT-000560 2308-PRO-MR-006 MR FOR BW FITTINGS (SS) A MR 21-Jun-2024 19-Jun-2024 CLOSED PIP CLOSED
283 WOR-TRANSMIT-000561 2308-PRO-MR-007 THREADED & SOCKETWELD FITTINGS (SS) A MR 21-Jun-2024 19-Jun-2024 CLOSED PIP CLOSED
284 WOR-TRANSMIT-000562 2308-PRO-MR-104 THREADED & SOCKETWELD FITTINGS (LTCS) A MR 21-Jun-2024 19-Jun-2024 CLOSED PIP CLOSED
285 WOR-TRANSMIT-000563 2308-PRO-MR-103 BW FITTINGS - LTCS A MR 21-Jun-2024 20-Jun-2024 CLOSED PIP CLOSED
286 WOR-TRANSMIT-000564 2308-PRO-MR-101 THREADED & SOCKETWELD FITTINGS (CS) A MR 21-Jun-2024 20-Jun-2024 CLOSED PIP CLOSED
287 WOR-TRANSMIT-000565 2308-PRO-MR-100 BW FITTINGS - CS A MR 21-Jun-2024 20-Jun-2024 CLOSED PIP CLOSED
288 WOR-TRANSMIT-000566 - Planning For Start-Up Workshop Summary Report (PFSU) 0 PFSU 22-Jun-2024 22-Jun-2024 CLOSED CLOSED
289 WOR-TRANSMIT-000567 - Planning For Start-Up Workshop Summary Report (PFSU) A PFSU 22-Jun-2024 22-Jun-2024 CLOSED CLOSED
290 WOR-TRANSMIT-000567 - START-UP EXECUTION PLAN A SEP 22-Jun-2024 22-Jun-2024 CLOSED CLOSED
291 WOR-TRANSMIT-000568 PE-000000 SITE VISIT REPORT RAS TANURAH REFINERY- PLANT 010 06-JUNE-2024 A Site Visit 22-Jun-2024 22-Jun-2024 CLOSED ALL CLOSED
292 WOR-TRANSMIT-000569 06-0163-03-01 Hazop Report 1 HAZOP 23-Jun-2024 ### 24-Jun-2024 CLOSED CLOSED
293 WOR-TRANSMIT-000570 413011-01303-WOR-LTR-0023-2024 Leave Notification Worley PM - Ahmed Letter 24-Jun-2024 24-Jun-2024 CLOSED MANAGEMENT Submitted to PMT CLOSED
294 WOR-TRANSMIT-000571 PE-000000 Site Visit Report NAPD-06- June-2024 A Site Visit 24-Jun-2024 24-Jun-2024 CLOSED ALL CLOSED
295 WOR-TRANSMIT-000572 - 60% IOC-Civil A 60% 24-Jun-2024 24-Jun-2024 CLOSED CLOSED
296 WOR-TRANSMIT-000572 - 60% IOC-Jafurah COMMS Drawings A 60% 24-Jun-2024 24-Jun-2024 CLOSED CLOSED
299 WOR-TRANSMIT-000573 413011-01303-WPECC-WPR-0028 Weekly Progress Report No. 0028 Jun 14, 2024 A WPR 24-Jun-2024 24-Jun-2024 - MANAGEMENT
300 WOR-TRANSMIT-000575 - - - - - CLOSED CLOSED
301 WOR-TRANSMIT-000576 2308-PRO-MR-095 FLOW INSTRUMENTS A MR 24-Jun-2024 23-Jun-2024 CLOSED I&C CLOSED
302 WOR-TRANSMIT-000577 2308-PRO-MR-093 SCRAPER PASSAGE INDICATORS A MR 24-Jun-2024 23-Jun-2024 CLOSED CLOSED
303 WOR-TRANSMIT-000578 - - - - - CLOSED CLOSED
304 WOR-TRANSMIT-000579 2308-PRO-MR-092 FIBER OPTIC LEAK DETECTION SYSTEM A MR 24-Jun-2024 23-Jun-2024 CLOSED I&C / TELECOM CLOSED
305 WOR-TRANSMIT-000580 2308-PRO-MR-091 SCADA MODIFICATION A MR 24-Jun-2024 23-Jun-2024 CLOSED CLOSED
306 WOR-TRANSMIT-000581 2308-PRO-MR-019 LEAK DETECTION SYSTEM (RTTM) A MR 24-Jun-2024 23-Jun-2024 CLOSED CLOSED
307 WOR-TRANSMIT-000582 Electrical Binder Pre-60 60% IOC-Electrical A 60% 25-Jun-2024 25-Jun-2024 -
308 WOR-TRANSMIT-000583 - Piping Material Specification and Wall Thickness Calculation. Specs 25-Jun-2024 25-Jun-2024 CLOSED PIP BQ-PLDF-II-TR-0727 (TO PMT) CLOSED
551 WOR-TRANSMIT-000586 413011-01303-PVN-0015 Juayma Changes 0 Change Order 25-Jun-2024 25-Jun-2024 Revised Management Revised received on 01-Sep-2024 Revised received on 01-Sep-2024
311 WOR-TRANSMIT-000587 413011-01303-PVN-0011 Scope Change Order - Installation of the TRV on Propane, Butane, Pentane and NG A-180 for Above Ground Piping 1 Change Order 25-Jun-2024 25-Jun-2024 CLOSED Management BQ-W-JFDP-T-0477 07-Oct-2024 CLOSED CLOSED
482 WOR-TRANSMIT-000588 413011-01303-PVN-0012 Scope Change Order for Adjusted LUPs at QBGG 1 Change Order 25-Jun-2024 25-Jun-2024 CLOSED Management rejected by BQ CLOSED
312 WOR-TRANSMIT-000589 413011-01303.MOM.0030 MOM for the HAZOP session - Sales Gas Displacement in place of Depressurizing C2+NGL, and Propane. A MOM 26-Jun-2024 27-Jun-2024 -
313 WOR-TRANSMIT-000590 - PE CV & Professional Accreditations ( Zidan Ahmed, Ali Khalid) - CV 27-Jun-2024 27-Jun-2024 CLOSED CLOSED
314 WOR-TRANSMIT-000591 2308-PRO-TC-MR-118 TBC for MR-118, CHECK VALVES, NON SLAM A TBC 27-Jun-2024 25-Jun-2024 CLOSED PIP CLOSED
315 WOR-TRANSMIT-000592 2308-PRO-MR-086-TBE TBE for MR-086, SPECTACLE PLATES 0 TBE 27-Jun-2024 25-Jun-2024 CLOSED PIP CLOSED
316 WOR-TRANSMIT-000593 2308-PRO-MR-004-TBE TBE for MR-004 Hot Tap Fittings 0 TBE 27-Jun-2024 25-Jun-2024 CLOSED MECH-HOT CLOSED
317 WOR-TRANSMIT-000594 2308-PRO-MR-006 MR FOR BW FITTINGS (SS) 00 MR 28-Jun-2024 27-Jun-2024 CLOSED PIP CLOSED
318 WOR-TRANSMIT-000595 2308-PRO-MR-007 MR - THDD AND SW FITTINGS - SS 00 MR 28-Jun-2024 27-Jun-2024 CLOSED PIP CLOSED
319 WOR-TRANSMIT-000596 2308-PRO-MR-100 MR - BW FITTINGS - CS 00 MR 28-Jun-2024 27-Jun-2024 CLOSED PIP CLOSED
320 WOR-TRANSMIT-000597 2308-PRO-MR-060 MR-PRESSURE GAUGES. 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
321 WOR-TRANSMIT-000598 2308-PRO-MR-041 MR-PRESSURE TRANSMITTER 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
322 WOR-TRANSMIT-000599 2308-PRO-MR-042 MR-TEMPERATURE INSTRUMENTS 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
323 WOR-TRANSMIT-000600 2308-PRO-MR-043 MR-GWR LEVEL TRANSMITTER 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
324 WOR-TRANSMIT-000601 T650997003WB COATING MAP. B COATING 29-Jun-2024 ### 30-Jun-2024 -
325 WOR-TRANSMIT-000601 T650996078WB CORROSION MANAGEMENT PROGRAM B CORROSION 29-Jun-2024 ### 30-Jun-2024 -
326 WOR-TRANSMIT-000602 - 60% IOC-Process & Flow Assurance A 60% 29-Jun-2024 ### 30-Jun-2024 CLOSED CLOSED
327 WOR-TRANSMIT-000603 413011-01303-WOR-LTR-0024-2024 36” NGL Pipeline Design Capacity Change Letter 30-Jun-2024 30-Jun-2024 - PIP
328 WOR-TRANSMIT-000604 - JFR Saudization Monthly Report 2024 -Jun-24 Saudization 30-Jun-2024 30-Jun-2024 CLOSED Management CLOSED
329 WOR-TRANSMIT-000605 413011-01303-WOR-LTR-0025-2024 Pending Change Orders Approval Letter 30-Jun-2024 ### 1-Jul-2024 -
330 WOR-TRANSMIT-000606 2308-PRO-TC-MR-019 TECHNICAL CLARIFICATION - BALL VALVES -MANUAL A TBC 1-Jul-2024 NOT CLOSED PIP email sent since wrong MR number as per attachment OBSELETE
331 WOR-TRANSMIT-000607 2308-PRO-MR-101 THREADED & SOCKETWELD FITTINGS (CS) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
332 WOR-TRANSMIT-000608 2308-PRO-MR-103 BW FITTINGS (LTCS) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
333 WOR-TRANSMIT-000609 2308-PRO-MR-104 THREADED & SOCKETWELD FITTINGS (LTCS) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
334 WOR-TRANSMIT-000610 2308-PRO-MR-135 WELDOLET 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
335 WOR-TRANSMIT-000611 2308-PRO-MR-093 SCRAPER PASSAGE INDICATORS 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
336 WOR-TRANSMIT-000612 2308-PRO-MR-061 ORIFICE FLANGE ASSEMBLY 00 MR 1-Jul-2024 29-Jun-2024 CLOSED I&C CLOSED
337 WOR-TRANSMIT-000613 2308-PRO-MR-062 MAGNETIC LEVEL GAUGES 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
338 WOR-TRANSMIT-000614 2308-PRO-MR-092 FIBER OPTIC LEAK DETECTION SYSTEM 00 MR 1-Jul-2024 29-Jun-2024 CLOSED I&C / TELECOM CLOSED
339 WOR-TRANSMIT-000615 2308-PRO-MR-095 FLOW INSTRUMENTS 00 MR 1-Jul-2024 29-Jun-2024 CLOSED I&C CLOSED
340 WOR-TRANSMIT-000616 2308-PRO-MR-019 LEAK DETECTION SYSTEM (RTTM) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
341 WOR-TRANSMIT-000617 2308-PRO-TC-MR-024 ESD MODIFICATION (SCHNEIDER) B TBC 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
342 WOR-TRANSMIT-000618 2308-PRO-TC-MR-037 MOV Ball Valves A TBC 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
343 WOR-TRANSMIT-000623 - 60% Fire Protection IOC Package A 60% 2-Jul-2024 2-Jul-2024 CLOSED CLOSED
344 WOR-TRANSMIT-000624 - 60% Piping IOC Package A 60% 2-Jul-2024 2-Jul-2024 CLOSED PIP CLOSED
345 WOR-TRANSMIT-000625 2308-PRO-TC-MR-016 TECHNICAL CLARIFICATION - SWING CHECK VALVE B TBC 2-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
346 WOR-TRANSMIT-000626 2308-PRO-MR-026 FIRE WATER SYSTEM A MR 2-Jul-2024 30-Jun-2024 CLOSED PIP / MECH CLOSED
347 WOR-TRANSMIT-000627 2308-PRO-MR-089 EYEWASH & SAFETY SHOWER A MR 2-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
552 WOR-TRANSMIT-000628 413011-01303-PVN-0015 Scope Change Order - Juayma Changes 1 Change Order 2-Jul-2024 2-Jul-2024 Revised Management Revised received on 01-Sep-2024 Revised received on 01-Sep-2024
349 WOR-TRANSMIT-000629 2308-PRO-MR-106 INSULATION OF PIPING A MR 3-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
350 WOR-TRANSMIT-000630 2308-PRO-MR-109 RTR FITTINGS (8" NPS) A MR 3-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
351 WOR-TRANSMIT-000631 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB) A MR 3-Jul-2024 30-Jun-2024 CLOSED I&C CLOSED
352 WOR-TRANSMIT-000632 2308-PRO-TC-MR-115 TECHNICAL CLARIFICATION - PLUG VALVES - GOV B TBC 3-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
353 WOR-TRANSMIT-000633 413011-01303-WPECC-WPR-0029 Weekly Progress Report No.0029 (Week ending Jun, 28 2024) A WPR 3-Jul-2024 3-Jul-2024 - MANAGEMENT
354 WOR-TRANSMIT-000634 Inv # 31531 Invoice - 10% Billing of the contract value for the complete IFC drawing for Civil Work-EIFC pkg-1 A Invoice 3-Jul-2024 3-Jul-2024 CLOSED Management
355 WOR-TRANSMIT-000635 2308-PRO-TC-MR-115 TECHNICAL CLARIFICATION - PLUG VALVES - GOV B TBC 3-Jul-2024 30-Jun-2024 CLOSED PIP repeated TR received from Worley, email sent on 4 Jul 24 onREPEATED
356 WOR-TRANSMIT-000636 2308-PRO-MR-094 INSTRUMENT JUNCTION BOX (IJB) A MR 3-Jul-2024 30-Jun-2024 CLOSED I&C CLOSED
357 WOR-TRANSMIT-000637 2308-PRO-MR-097 INSTRUMENT VALVES, TUBING & FITTINGS A MR 3-Jul-2024 2-Jul-2024 CLOSED I&C CLOSED
358 WOR-TRANSMIT-000638 2308-PRO-MR-013 RTR PIPES & FITTINGS (FW OWS) A MR 3-Jul-2024 3-Jul-2024 CLOSED PIP CLOSED
359 WOR-TRANSMIT-000639 2308-PRO-TC-MR-005 TECHNICAL CLARIFICATION -Scraper Traps C TBC 3-Jul-2024 3-Jul-2024 CLOSED CLOSED
360 WOR-TRANSMIT-000640 2308-PRO-TC-MR-030 TRANSFORMER (POLE MOUNTED TYPE) B TBC 3-Jul-2024 3-Jul-2024 CLOSED ELE / CVL CLOSED
361 WOR-TRANSMIT-000641 2308-PRO-TC-MR-106 INSULATION OF PIPING 0 TBC 6-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
362 WOR-TRANSMIT-000642 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB) 00 MR 6-Jul-2024 6-Jul-2024 CLOSED I&C CLOSED
363 WOR-TRANSMIT-000643 2308-PRO-MR-026 FIRE WATER SYSTEM 00 MR 8-Jul-2024 6-Jul-2024 CLOSED PIP / MECH CLOSED
364 WOR-TRANSMIT-000644 2308-PRO-MR-089 EYEWASH & SAFETY SHOWER 00 MR 7-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
365 WOR-TRANSMIT-000645 2308-PRO-MR-091 SCADA MODIFICATION 00 MR 8-Jul-2024 6-Jul-2024 CLOSED CLOSED
366 WOR-TRANSMIT-000646 2308-PRO-MR-094 INSTRUMENT JUNCTION BOX (IJB) 00 MR 8-Jul-2024 6-Jul-2024 CLOSED I&C CLOSED
367 WOR-TRANSMIT-000647 2308-PRO-MR-106 INSULATION OF PIPING 00 MR 8-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
368 WOR-TRANSMIT-000648 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB) 00 MR 8-Jul-2024 6-Jul-2024 CLOSED I&C CLOSED
369 WOR-TRANSMIT-000649 2308-PRO-MR-109 RTR FITTINGS (8" NPS) 00 MR 8-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
370 WOR-TRANSMIT-000650 2308-PRO-TC-MR-028 2308-MR-028 -TECHNICAL CLARIFICATION for DRAIN COLLECTION VESSELS B TBC 8-Jul-2024 6-Jul-2024 -
371 WOR-TRANSMIT-000651 2308-PRO-TC-MR-027 TBC Compliance Statement for MR-027 EMERGENCY SHUT-DOWN VALVES (ZV). A TBC 8-Jul-2024 7-Jul-2024 CLOSED CLOSED
372 WOR-TRANSMIT-000652 413011-01303-WPECC-WPR-0030 Weekly Progress Report No. 0030 (Jul 05, 2024) 0 WPR 9-Jul-2024 9-Jul-2024 - MANAGEMENT
373 WOR-TRANSMIT-000653 2308-PRO-MR-009 STUD BOLTS A MR 9-Jul-2024 7-Jul-2024 CLOSED CVL CLOSED
374 WOR-TRANSMIT-000654 2308-PRO-MR-010 GASKETS & INSULATING SETS A MR 9-Jul-2024 7-Jul-2024 CLOSED PIP CLOSED
375 WOR-TRANSMIT-000655 2308-PRO-MR-065 FENCING MATERIALS A MR 9-Jul-2024 7-Jul-2024 CLOSED CIVIL CLOSED
376 WOR-TRANSMIT-000656 2308-PRO-MR-066 FENCE GATES A MR 9-Jul-2024 7-Jul-2024 CLOSED CLOSED
377 WOR-TRANSMIT-000657 2308-PRO-TC-MR-120 GATE VALVES, THREADED & SOCKETWELD ENDS A TBC 9-Jul-2024 8-Jul-2024 CLOSED PIP CLOSED
378 WOR-TRANSMIT-000658 2308-PRO-MR-018-TBE Globe Valves A TBE 9-Jul-2024 7-Jul-2024 - PIP
379 WOR-TRANSMIT-000659 2308-PRO-TC-MR-113 MOV Ball Valves Metal Seated A TBC 9-Jul-2024 10-Jul-2024 CLOSED PIP CLOSED
380 WOR-TRANSMIT-000660 2308-PRO-TC-MR-019 WOR-TRANSMIT-000660-HOLD email sent to imtiaz to confirm TBC - - -
381 WOR-TRANSMIT-000661 2308-PRO-TC-MR-034 DC SYSTEM with 3-SIDED SHELTER A TBC 9-Jul-2024 9-Jul-2024 CLOSED ELE CLOSED
382 WOR-TRANSMIT-000662 2308-PRO-MR-013 RTR PIPES & FITTINGS (FW OWS) 00 MR 10-Jul-2024 10-Jul-2024 CLOSED PIP CLOSED
383 WOR-TRANSMIT-000663 2308-PRO-TC-MR-023 DCS MODIFICATION (Honeywell) B TBC 10-Jul-2024 10-Jul-2024 - I&C
384 WOR-TRANSMIT-000664 2308-PRO-TC-MR-036 TBC For Jib Crane A TBC 10-Jul-2024 10-Jul-2024 CLOSED CLOSED
385 WOR-TRANSMIT-000665 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL B TBC 10-Jul-2024 10-Jul-2024 CLOSED PIP CLOSED
386 WOR-TRANSMIT-000666 2308-PRO-MR-097 INSTRUMENT VALVES, TUBING & FITTINGS 00 MR 10-Jul-2024 10-Jul-2024 CLOSED I&C CLOSED
387 WOR-TRANSMIT-000667 413011-01303.MOM.0032 Jafurah Exhibit-I Approvals. 0 MOM 10-Jul-2024 10-Jul-2024 -
388 WOR-TRANSMIT-000669 2308-PRO-MR-061 ORIFICE FLANGE ASSEMBLY 00 MR 10-Jul-2024 10-Jul-2024 CLOSED I&C CLOSED
389 WOR-TRANSMIT-000670 60% E-REVIEW 60% E-REVIEW 0 60% 10-Jul-2024 10-Jul-2024 -
390 WOR-TRANSMIT-000673 RE 167635 BQ-SA- Comment sheet - C2+NGL STEADY STATE HYDRAULIC Report-Responses A FLOW ASSURANCE 11-Jul-2024 11-Jul-2024 - BQ-PLDF-II-TR-0597
391 WOR-TRANSMIT-000675 413011-01303-WOR-LTR-0026 413011-01303-WOR-LTR-0026-2024 Site Access Delay for Subcontractors Letter 11-Jul-2024 11-Jul-2024 -
392 WOR-TRANSMIT-000676 2308-PRO-MR-031 MR - POWER DISTRIBUTION PANELBOARD RACK, LOW VOLTAGE 00 MR 11-Jul-2024 11-Jul-2024 CLOSED CLOSED
393 WOR-TRANSMIT-000677 2308-PRO-MR-041 PRESSURE TRANSMITTERS 00 MR 12-Jul-2024 Friday 13-Jul-2024 CLOSED I&C CLOSED
394 WOR-TRANSMIT-000678 2308-PRO-MR-060 Press Gauges- 00 MR 12-Jul-2024 Friday 13-Jul-2024 CLOSED CLOSED
395 WOR-TRANSMIT-000679 413011-01303-WOR-LTR-0027-2024 Pending change order approval (PVN002&003) Letter 14-Jul-2024 15-Jul-2024 -
396 WOR-TRANSMIT-000680 413011-01303-WOR-LTR-0028-2024 Project Schedule and Cost Impact Due to late Design Changes Letter 14-Jul-2024 15-Jul-2024 -
397 WOR-TRANSMIT-000681 2308-PRO-MR-009 STUD BOLTS 00 MR 14-Jul-2024 13-Jul-2024 CLOSED CVL CLOSED
398 WOR-TRANSMIT-000682 2308-PRO-MR-010 GASKETS & INSULATING SETS 00 MR 14-Jul-2024 13-Jul-2024 CLOSED PIP CLOSED
399 WOR-TRANSMIT-000683 2308-PRO-MR-051 ANCHOR BOLTS A MR 14-Jul-2024 13-Jul-2024 CLOSED CVL CLOSED
400 WOR-TRANSMIT-000684 2308-PRO-MR-110 MOISTURE ANALYZER A MR 14-Jul-2024 13-Jul-2024 CLOSED ELE CLOSED
401 WOR-TRANSMIT-000685 2308-PRO-MR-111 INDUSTRIAL ETHERNET SWITCHES A MR 14-Jul-2024 ### 15-Jul-2024 CLOSED CLOSED
402 WOR-TRANSMIT-000686 2308-PRO-MR-112 OUTDOOR IP TELEPHONE (WEATHER PROOF) A MR 14-Jul-2024 ### 15-Jul-2024 CLOSED CLOSED
403 WOR-TRANSMIT-000687 2308-PRO-MR-063 FIBER PATCH PANELS A MR 14-Jul-2024 ### 15-Jul-2024 CLOSED CLOSED
404 WOR-TRANSMIT-000688 2308-PRO-MR-097 INSTRUMENT VALVES, TUBING & FITTINGS (updated) 00 MR 14-Jul-2024 ### 10-Jul-2024 CLOSED I&C CLOSED
405 WOR-TRANSMIT-000689 2308-PRO-MR-094 INSTRUMENT JUNCTION BOX (IJB)-updated 00 MR 14-Jul-2024 ### 10-Jul-2024 CLOSED I&C CLOSED
406 WOR-TRANSMIT-000690 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB)-updated 00 MR 14-Jul-2024 ### 10-Jul-2024 CLOSED I&C CLOSED
407 WOR-TRANSMIT-000691 - BQ-SA- Comment sheet - C2+NGL STEADY STATE HYDRAULIC Report-Responses A FLOW ASSURANCE 15-Jul-2024 15-Jul-2024 CLOSED cancelled same as 0673 CANCELLED
408 WOR-TRANSMIT-000694 413011-01303-WOR-LTR-0029-2024 Response to Slow Progress in Geotechnical Investigation Activities - Letter 16-Jul-2024 16-Jul-2024 - CVL
409 WOR-TRANSMIT-000696 413011-01303 - INVOICE IPC# 08 INTERIM PAYMENT CERTIFICATE # 08 - Payment Certificate 16-Jul-2024 16-Jul-2024 CLOSED Management
410 WOR-TRANSMIT-000697 2308-PRO-TC-MR-084 TECHNICAL CLARIFICATION - MOV PLUG VALVES C TBC 16-Jul-2024 16-Jul-2024 CLOSED PIP CLOSED
411 WOR-TRANSMIT-000700 2308-INCR-005 Internal Non Conformance Report 2308-INCR-005_signed 0 NCR 18-Jul-2024 18-Jul-2024 CLOSED CLOSED
412 WOR-TRANSMIT-000701 413011-01303-WOR-LTR-0030-2024 Response to Delay in Submission of MR Packages on Time - Lack of Dedicated Resources - Letter 18-Jul-2024 18-Jul-2024 -
413 WOR-TRANSMIT-000702 SEC_PL_001 Sketch for SEC 0 Sketch 18-Jul-2024 20-Jul-2024 -
414 WOR-TRANSMIT-000705 - STEADY STATE MODEL FILES & TRANSIENT MODEL FILES. MODEL Files 19-Jul-2024 20-Jul-2024 CLOSED CLOSED
415 WOR-TRANSMIT-000706 2308-PRO-MR-065 FENCING MATERIALS 00 MR 21-Jul-2024 21-Jul-2024 CLOSED CIVIL CLOSED
416 WOR-TRANSMIT-000707 2308-PRO-MR-066 FENCING GATES 00 MR 21-Jul-2024 21-Jul-2024 CLOSED CIVIL CLOSED
417 WOR-TRANSMIT-000708 2308-PRO-MR-098 TRANSMISSION EQUIPMENT AND ACCESSORIES A MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
418 WOR-TRANSMIT-000709 2308-PRO-MR-069 LIGHTING FIXTURES A MR 21-Jul-2024 21-Jul-2024 CLOSED ELE CLOSED
419 WOR-TRANSMIT-000710 2308-PRO-MR-070 LIGHTING POLES A MR 21-Jul-2024 21-Jul-2024 CLOSED ELE / CVL CLOSED
420 WOR-TRANSMIT-000711 2308-PRO-MR-071 LV CABLE (POWER AND CONTROL). A MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
421 WOR-TRANSMIT-000712 2308-PRO-MR-072 MR - GROUNDING CABLE & DEVICES A MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
422 WOR-TRANSMIT-000713 2308-PRO-MR-063 FIBER PATCH PANELS 00 MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
423 WOR-TRANSMIT-000714 2308-PRO-TC-MR-122 GLOBE VALVES, THREADED & SOCKETWELD ENDS A TBC 21-Jul-2024 21-Jul-2024 CLOSED PIP CLOSED
424 WOR-TRANSMIT-000715 2308-PRO-MR-086-TBE TBE SUM REPORT - TBE FOR SPECTACLE PLATES B TBE 21-Jul-2024 21-Jul-2024 - PIP
425 WOR-TRANSMIT-000716 413011-01303-WPECC-WPR-0032 Weekly Progress Report No. 0032 (Week ending 19-July-2024) 0 WPR 22-Jul-2024 23-Jul-2024 - MANAGEMENT
426 WOR-TRANSMIT-000717 2308-PRO-MR-014-TBE 2308-PRO-MR-014 - FINAL TBE - BALL VALVES A TBE 23-Jul-2024 23-Jul-2024 CLOSED PIP CLOSED
427 WOR-TRANSMIT-000718 2308-PRO-TC-MR-016 TECHNICAL CLARIFICATION - SWING CHECK VALVE C TBC 23-Jul-2024 23-Jul-2024 CLOSED PIP CLOSED
428 WOR-TRANSMIT-000719 Inv # 31872 10% billing - 60% submission of DD Package for E-Review 0 Invoice 24-Jul-2024 24-Jul-2024 CLOSED Management
429 WOR-TRANSMIT-000720 413011-01303-WPECC-WPR-0031 Weekly Progress Report No. 0032 (Week ending 12-July-2024) 0 WPR 24-Jul-2024 24-Jul-2024 - MANAGEMENT
430 WOR-TRANSMIT-000724 2308-PRO-TC-MR-117 TECHNICAL CLARIFICATION - Ball Valves Metal Seated A TBC 25-Jul-2024 24-Jul-2024 CLOSED PIP CLOSED
431 WOR-TRANSMIT-000725 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL C TBC 25-Jul-2024 24-Jul-2024 CLOSED PIP CLOSED
432 WOR-TRANSMIT-000726 2308-PRO-TC-MR-024 TECHNICAL CLARIFICATION -ESD MODIFICATION (SCHNEIDER) C TBC 25-Jul-2024 24-Jul-2024 -
433 WOR-TRANSMIT-000727 2308-PRO-MR-028-TBE Final TBE For DRAIN COLLECTION VESSELS A TBE 25-Jul-2024 24-Jul-2024 CLOSED CLOSED
434 WOR-TRANSMIT-000728 2308-PRO-MR-005-TBE Final TBE For SCRAPER TRAPS & HANDLING FACILITIES PER TRAPS & HANDLING A TBE 25-Jul-2024 24-Jul-2024 CLOSED CLOSED
435 WOR-TRANSMIT-000729 2308-INCR-005 Internal NCR for MR # 2308-PRO-MR-021 Rev. 00 Fiber Optic Cable (FOC) /TBE 0 NCR 25-Jul-2024 25-Jul-2024 - MANAGEMENT
436 WOR-TRANSMIT-000730 - 3D review Com
Sl No. Worley TR Number Doc. No. Doc. Name Rev. Type Date Received Time Internal Dist. Response Discipline BQ Ref: Target Date Submission SAPMT OTHER REMARKS STATUS Check
of Response to SAPMT RESPONSE
1216 WOR-TRANSMIT-001681 413011-01301-PVN-0036 - IPC # 22 0 Payment Certificate 28-Jan-2025 28-Jan-2025 Superseded Management Given to PCM for sign Superseded
1217 WOR-TRANSMIT-001682 2308-PRO-TC-MR-019 2308-PRO-MR-019-TC - TECHNICAL CLARIFICATION - LEAK DETECTION SYSTEM (RTTM). B TBC 28-Jan-2025 28-Jan-2025 CLOSED CLOSED
1218 WOR-TRANSMIT-001683 2308-PRO-TC-MR-059-1 TECHNICAL CLARIFICATION - OHPL - CABLES B TBC 28-Jan-2025 28-Jan-2025 CLOSED CLOSED
1219 WOR-TRANSMIT-001684 HAZOP CARFs HAZOP CARFs - HAZOP 28-Jan-2025 28-Jan-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1220 WOR-TRANSMIT-001688 2308-PRO-MR-093-deviation EXCEPTION & DEVIATION CLARIFICATION FORM for SPI, - Deviation Form 29-Jan-2025 29-Jan-2025 CLOSED ENGINEERING CLOSED
1221 WOR-TRANSMIT-001689 2308-PRO-MR-117 MR - BALL VALVES, METAL SEATED, MANUAL 02 MR 29-Jan-2025 29-Jan-2025 CLOSED PIP MR SIGNED
1222 WOR-TRANSMIT-001690 413011-01303 - SC-P.O - 4900000431 _ IPC-003 0 Payment Certificate 29-Jan-2025 30-Jan-2025 CLOSED Management BQ-W-JFDP-T-890 CLOSED & RETURNED TO WP CLOSED
1223 WOR-TRANSMIT-001691 2308-PRO-MR-069-NMR-601 NMR-601 Rev.B for MR-069, LIGHTING FIXTURES- CODE-C2 B NMR-601 29-Jan-2025 29-Jan-2025 CLOSED ELE CLOSED
1224 WOR-TRANSMIT-001692 Monthly Progress Certificate 13 0 Payment Certificate 29-Jan-2025 30-Jan-2025 CLOSED Management fwd to subcontract fwd to subcontract
1225 WOR-TRANSMIT-001693 2308-PRO-MR-130 MR - SURGE RELIEF SKIDS 00 MR 29-Jan-2025 29-Jan-2025 CLOSED CLOSED
1226 WOR-TRANSMIT-001694 2308-PRO-MR-105-NMR-601(PFF) MR-105-NMR-601- CODE C2 - NMR 601 - LTCS FLANGES AND BLINDS (PFF) A NMR-601 29-Jan-2025 29-Jan-2025 CLOSED PIP CLOSED
1227 WOR-TRANSMIT-001695 2308-PRO-MR-002-NMR-601 NMR-601 FOR MR-002 LOW TEMPERATURE CARBON STEEL PIPES CODE-C4 B NMR-601 29-Jan-2025 29-Jan-2025 CLOSED PIP CLOSED
1228 WOR-TRANSMIT-001696 2308-PRO-MR-118-NMR-601 MR-118-NMR-601 - NMR 601 - NON-SLAM CHECK VALVES- CODE C1 C NMR-601 29-Jan-2025 30-Jan-2025 CLOSED PIP CLOSED
1229 WOR-TRANSMIT-001697 2308-PRO-MR-055-NMR-601 MR-055-NMR-601 - BARRED TEE CDOE-C2 A NMR-601 29-Jan-2025 30-Jan-2025 CLOSED Comments resubmitted by Worley Comments resubmitted by Worley
1230 WOR-TRANSMIT-001698 2308-PRO-MR-041-NMR-601 NMR-601 FOR MR-041 (PRESSURE TRANSMITTER)-CODE C3. A NMR-601 29-Jan-2025 30-Jan-2025 CLOSED I&C CLOSED & RETURNED TO PRC
1231 WOR-TRANSMIT-001699 2308-PRO-MR-043-NMR-601(PFF) NMR-601 for MR-043 GWR LEVEL TRANSMITTER(PFF). A NMR-601 29-Jan-2025 30-Jan-2025 CLOSED I&C CLOSED
1232 WOR-TRANSMIT-001700 Post 90% MTOs – Telecom Post 90% MTOs – Telecom - 90% 29-Jan-2025 30-Jan-2025 CLOSED Superseded BY T# 1726 Superseded BY T# 1726
1233 WOR-TRANSMIT-001701 Post 90% MTOs – Electrical Post 90% MTOs – Electrical - 90% 29-Jan-2025 30-Jan-2025 CLOSED BQ-W-JFDP-T- 889 CLOSED & RETURNED TO WP CLOSED
1234 WOR-TRANSMIT-001703 2308-PRO-TC-MR-092 TECHNICAL CLARIFICATION -FIBER OPTIC LEAK DETECTION SYSTEM C TBC 29-Jan-2025 30-Jan-2025 CLOSED I&C / TELECOM CLOSED
1235 WOR-TRANSMIT-001704 413011-01303-PVN-0043 Pentane Two Pipeline Design 1 Change Order 30-Jan-2025 30-Jan-2025 CLOSED Management BQ-W-JFDP-T-0905 06-Feb-2025 CLOSED & RETURNED TO WP CLOSED
1236 WOR-TRANSMIT-001705 2308-PRO-TC-MR-063 TECHNICAL CLARIFICATION -FIBER PATCH PANELS C TBC 30-Jan-2025 30-Jan-2025 CLOSED CLOSED
1237 WOR-TRANSMIT-001706 2308-PRO-MR-129 MR - COMMUNICATION BULK MATERIALS (HDPE). 00 MR 30-Jan-2025 30-Jan-2025 REJECTED BQ-W-JFDP-T-0885 CLOSED
1238 WOR-TRANSMIT-001707 2308-PRO-MR-081 MR - TELECOMMUNICATION BULK MATERIALS 00 MR 30-Jan-2025 30-Jan-2025 CLOSED BQ-W-JFDP-T-0884 CLOSED CLOSED
1239 WOR-TRANSMIT-001709 2308-PRO-MR-065-NMR-601 NMR-601 for MR-065, FENCING MATERIALS-CODE C3 A NMR-601 1-Feb-2025 1-Feb-2025 CLOSED CIVIL CLOSED
1240 WOR-TRANSMIT-001710 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 1-Feb-2025 1-Feb-2025 Cancelled MECH CANCELLED
1241 WOR-TRANSMIT-001711 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 1-Feb-2025 1-Feb-2025 CLOSED MECH CLOSED
1242 WOR-TRANSMIT-001712 2308-PRO-MR-052-CRS CRS MR-052 - CRS- STRUCTURAL STEEL 01 CRS_MR 1-Feb-2025 1-Feb-2025 CLOSED CVL BQ-W-JFDP-T-879 CLOSED & RETURNED TO WP CLOSED
1243 WOR-TRANSMIT-001713 2308-PRO-MR-087 MR - SAMPLING CONNECTIONS 02 MR 1-Feb-2025 1-Feb-2025 CLOSED CLOSED
1244 WOR-TRANSMIT-001714 2308-PRO-MR-054 MR - LIQUID CUSTODY METERING SKID Rev.01 01 MR 1-Feb-2025 1-Feb-2025 CLOSED I&C CLOSED
1245 WOR-TRANSMIT-001715 2308-PRO-MR-111 MR - INDUSTRIAL ETHERNET SWITCHES 02 MR 1-Feb-2025 1-Feb-2025 CLOSED TELECOM MR SIGNED & SEND TO PRC ON 10-MAY-2025
1246 WOR-TRANSMIT-001717 Post 90% MTOs – Piping Post 90% MTOs – Piping - 90% 3-Feb-2025 3-Feb-2025 Open PIP OPEN WITH BQ
1247 WOR-TRANSMIT-001718 2308-PRO-MR-064 MR- CIVIL BULK MATERIALS A MR 3-Feb-2025 3-Feb-2025 CLOSED CLOSED
1248 WOR-TRANSMIT-001719 2308-PRO-MR-051 MR- Anchor BOLTS 01 MR 3-Feb-2025 3-Feb-2025 CLOSED CVL CLOSED
1249 WOR-TRANSMIT-001720 2308-PRO-MR-076 MR - PIPING BULK MATERIALS A MR 3-Feb-2025 3-Feb-2025 CLOSED PIP CLOSED
1250 WOR-TRANSMIT-001721 2308-PRO-MR-070-NMR-601 NMR-601 for MR-070, LIGHTING POLES - CODE C2 A NMR-601 3-Feb-2025 3-Feb-2025 CLOSED ELE / CVL CLOSED
1251 WOR-TRANSMIT-001722 2308-PRO-MR-021 MR - FIBER OPTIC CABLES 02 MR 3-Feb-2025 3-Feb-2025 CLOSED CLOSED
1252 WOR-TRANSMIT-001723 2308-PRO-MR-078 MR - ELECTRICAL BULK MATERIALS A MR 3-Feb-2025 4-Feb-2025 CLOSED ELE CLOSED
1253 WOR-TRANSMIT-001724 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL I TBC 4-Feb-2025 4-Feb-2025 CLOSED PIP CLOSED
1254 WOR-TRANSMIT-001724 2308-PRO-MR-017-TBE FINAL TBE - GATE VALVES - MANUAL B TBE 4-Feb-2025 4-Feb-2025 - PIP
1255 WOR-TRANSMIT-001725 2308-PRO-MR-027-TBE FINAL TBE - EMERGENCY SHUT-DOWN VALVES (ZV) B TBE 4-Feb-2025 4-Feb-2025 CLOSED CLOSED
1256 WOR-TRANSMIT-001726 Post 90% MTOs – Telecom Post 90% MTOs – Telecom (update to previously sent MTO). B 90% 4-Feb-2025 4-Feb-2025 Open TELECOM OPEN WITH BQ
1257 WOR-TRANSMIT-001727 2308-PRO-MR-027-TBE FINAL TBE - OHPL CABLES B TBE 4-Feb-2025 4-Feb-2025 - ELE
1258 WOR-TRANSMIT-001728 2308-PRO-MR-034-TBE FINAL TBE - DC Ssystems B TBE 4-Feb-2025 4-Feb-2025 CLOSED CLOSED
1259 WOR-TRANSMIT-001729 2308-PRO-MR-099 MR - OHPL BULK MATERIALS AND ACCESSORIES A MR 5-Feb-2025 5-Feb-2025 CLOSED BQ-W-JFDP-T-1042 CLOSED CLOSED
1260 WOR-TRANSMIT-001730 2308-PRO-MR-079 MR - INSTRUMENT BULK MATERIALS A MR 5-Feb-2025 5-Feb-2025 CLOSED I&C CLOSED
1261 WOR-TRANSMIT-001731 Jafurah Pipeline RF Study - Final report submittal Jafurah Pipeline RF Study - Final report submittal - Tetra 5-Feb-2025 5-Feb-2025 CLOSED PIP BQ-PLDF-II-TR # 1216 CLOSED
1262 WOR-TRANSMIT-001732 CARF for the 2nd HAZOP recommendations CARF for the 2nd HAZOP recommendations - HAZOP 5-Feb-2025 5-Feb-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1264 WOR-TRANSMIT-001734 2308-PRO-MR-127 MR - CASING PIPE INSULATORS & SEALS A MR 5-Feb-2025 6-Feb-2025 OPEN PIP OPEN WITH BQ
1265 WOR-TRANSMIT-001735 2308-PRO-MR-060-NMR-601 NMR-601 for MTA-060, PRESSURE GAUGES-CODE C3 B NMR-601 5-Feb-2025 6-Feb-2025 CLOSED I&C RESPONDED BY WORLEY
1266 WOR-TRANSMIT-001736 2308-PRO-MR-129 2308-PRO-MR-129 - MR - COMMUNICATION BULK MATERIALS (HDPE) 00 MR 6-Feb-2025 6-Feb-2025 CLOSED TELECOM CLOSED
1267 WOR-TRANSMIT-001737 2308-PRO-MR-005-TBE FINAL TBE-SCRAPER TRAPS AND HANDLING FACILITIES C TBE 6-Feb-2025 6-Feb-2025 OPEN PIP OPEN WITH BQ
1268 WOR-TRANSMIT-001742 2308-PRO-MR-010-NMR-601 NMR-601 FOR MR-010 (GASKETS & INSULATING SETS) - CODE-C1. B NMR-601 6-Feb-2025 6-Feb-2025 CLOSED PIP CLOSED
1269 WOR-TRANSMIT-001743 2308-PRO-MR-095-TBE FINAL TBE - FLOW INSTRUMENTS A TBE 8-Feb-2025 8-Feb-2025 - I&C
1270 WOR-TRANSMIT-001744 2308-PRO-TC-MR-029 TECHNICAL CLARIFICATION - ANALYZER SHELTER. A TBC 8-Feb-2025 8-Feb-2025 CLOSED ELE CLOSED
1271 WOR-TRANSMIT-001745 2308-PRO-TC-MR-080 TECHNICAL CLARIFICATION - COMMUNICATION TOWER AND TETRA RADIO SYSTEM D TBC 8-Feb-2025 8-Feb-2025 CLOSED Telecom CLOSED
1272 WOR-TRANSMIT-001750 2308-PRO-MR-034-TBE 2308-PRO-MR-034-TBE - FINAL TBE - DC SYSTEM C TBE 8-Feb-2025 8-Feb-2025 - ELE
1273 WOR-TRANSMIT-001751 2308-PRO-MR-101-NMR-601 NMR-601 FOR MR-101, THREADED & SOCKETWELD FITTINGS (CS)-CODE C3 A NMR-601 9-Feb-2025 10-Feb-2025 CLOSED PIP CLOSED
1274 WOR-TRANSMIT-001752 Worley response on Geotechnical Report (KR.GTO2 Worley response on Geotechnical Report (KR.GTO24000051) - GeoTech 9-Feb-2025 10-Feb-2025 CLOSED CVL submitted to WP BQ-W-JFDP-T- 935 CLOSED & RETURNED TO WP CLOSED
1275 WOR-TRANSMIT-001753 2308-PRO-MR-101-NMR-601 NMR-601 FOR MR-101, THREADED & SOCKETWELD FITTINGS (CS)-CODE C1 A NMR-601 9-Feb-2025 10-Feb-2025 CLOSED PIP CLOSED
1276 WOR-TRANSMIT-001754 2308-PRO-MR-103-NMR-601 NMR-601 for MR-103 BW FITTINGS-LTCS-CODE C1. A NMR-601 10-Feb-2025 11-Feb-2025 CLOSED PIP CLOSED
1277 WOR-TRANSMIT-001755 2308-PRO-MR-105-NMR-601(PFF) NMR-601 for MR-105 LTCS FLANGES AND BLINDS (PFF)-CODE C1. A NMR-601 10-Feb-2025 11-Feb-2025 CLOSED PIP CLOSED
1278 WOR-TRANSMIT-001756 2308-PRO-MR-115-TBE 2308-PRO-MR-115-TBE - REV B - FINAL TBE B TBE 10-Feb-2025 11-Feb-2025 - PIP
1279 WOR-TRANSMIT-001757 2308-PRO-MR-064 MR - CIVIL BULK MATERIALS 00 MR 10-Feb-2025 11-Feb-2025 CLOSED
1280 WOR-TRANSMIT-001758 2308-PRO-MR-097-NMR-601 NMR-601 for MR-097 INSTRUMENT VALVES, TUBING & FITTINGS-CODE C2. A NMR-601 10-Feb-2025 11-Feb-2025 CLOSED I&C CLOSED
1281 WOR-TRANSMIT-001759 2308-PRO-MR-005-CRS CRS- SCRAPER TRAPS & HANDLING FACILITIES (CLOSED) - CRS_MR 10-Feb-2025 11-Feb-2025 CLOSED MECH-HOT CLOSED
1282 WOR-TRANSMIT-001760 2308-PRO-MR-126-TBE INSTRUMENT JUNCTION BOXES - FOUNATION FIELDBUS JUNCTION BOXES (FFJB)-TBE A TBE 10-Feb-2025 11-Feb-2025 - I&C
1283 WOR-TRANSMIT-001761 2308-PRO-MR-002-NMR-601 NMR-601 REV.B FOR MR-002 LOW TEMPERATURE CARBON STEEL PIPES - CODE-C1 B NMR-601 10-Feb-2025 11-Feb-2025 CLOSED PIP CLOSED
1284 WOR-TRANSMIT-001762 2308-PRO-MR-111-TBE 2308-PRO-MR-111-TBE - FINAL TBE - INDUSTRIAL ETHERNET SWITCHES A TBE 10-Feb-2025 11-Feb-2025 TELECOM TELECOM
1285 WOR-TRANSMIT-001763 2308-PRO-MR-098-TBE FINAL TBE-TRANSMISSION EQUIPMENT & ACCESSORIES A TBE 10-Feb-2025 11-Feb-2025 - ELE
1286 WOR-TRANSMIT-001769 2308-PRO-MR-103-NMR-601 NMR-601 for MR-103 BW FITTINGS-LTCS-CODE C1. A NMR-601 11-Feb-2025 12-Feb-2025 CLOSED PIP supersed T# WOR-TRANSMIT-001754 supersed T# WOR-TRANSMIT-001754
1287 WOR-TRANSMIT-001770 2308-PRO-MR-045-CRS CRS -CONTROL VALVES A CRS_MR 11-Feb-2025 12-Feb-2025 CLOSED I&C closed
1288 WOR-TRANSMIT-001771 2308-PRO-MR-102-NMR-601 NMR-601 FOR MR-102 CS FLANGES AND BLINDS-CODE C1 (ULMA + PFF) A NMR-601 11-Feb-2025 12-Feb-2025 CLOSED PIP CLOSED
1289 WOR-TRANSMIT-001772 2308-PRO-MR-120-TBE FINAL TBE - GATE VALVES, THREADED & SOCKETWELD ENDS C TBE 11-Feb-2025 12-Feb-2025 - PIP
1290 WOR-TRANSMIT-001773 2308-INCR-022 WORLEY RESPONSE - INTERNAL NON-CONFORMANCE REPORT (INCR) - NCR 11-Feb-2025 12-Feb-2025 CLOSED CLOSED
1291 WOR-TRANSMIT-001774 2308-PRO-MR-019 MR - LEAK DETECTION SYSTEM (RTTM 01 MR 11-Feb-2025 12-Feb-2025 CLOSED MR SIGNED & SHARED WITH PRC ON 03-MARCH
1292 WOR-TRANSMIT-001775 2308-PRO-MR-029 MR - ANALYZER SHELTER 02 MR 11-Feb-2025 12-Feb-2025 CLOSED ELE BQ-W-JFDP-T-1121 CLOSED CLOSED
1293 WOR-TRANSMIT-001776 2308-PRO-MR-053 MR - CATHODIC PROTECTION (TEMPORARY & PERMANENT) 00 MR 11-Feb-2025 12-Feb-2025 CLOSED ELE MR SIGNED
1294 WOR-TRANSMIT-001777 2308-PRO-TC-MR-014 TECHNICAL CLARIFICATION - BALL VALVES, SOFT SEATED, MANUAL. F TBC 12-Feb-2025 12-Feb-2025 CLOSED PIP CLOSED 02 FALSE
1295 WOR-TRANSMIT-001778 2308-PRO-TC-MR-059 TECHNICAL CLARIFICATION - OHPL ACCESSORIES A TBC 12-Feb-2025 12-Feb-2025 CLOSED CLOSED
1296 WOR-TRANSMIT-001779 2308-PRO-MR-043 MR - GWR LEVEL TRANSMITTER 01 MR 12-Feb-2025 12-Feb-2025 CLOSED I&C MR SIGNED
1297 WOR-TRANSMIT-001780 2308-PRO-MR-041 MR- PRESSURE TRANSMITTER 01 MR 12-Feb-2025 12-Feb-2025 CLOSED I&C MR SIGNED
1298 WOR-TRANSMIT-001781 2308-PRO-MR-023 JUAYMAH NGLF DCS MODIFICATIONS (HONEYWELL) Note – MR revised as per 90% 01 MR 12-Feb-2025 12-Feb-2025 CLOSED I&C CLOSED
1299 WOR-TRANSMIT-001783 2308-PRO-MR-060 2308-PRO-MR-060 - MR - PRESSURE GAUGES 01 MR 12-Feb-2025 16-Feb-2025 CLOSED I&C BQ-W-JFDP-T-1047 PENDING WITH WORLEY CLOSED
1300 WOR-TRANSMIT-001784 2308-PRO-MR-020 MR - CORROSION MONITORING SYSTEM 02 MR 12-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED & SHARED WITH PRC ON 17-APR-20
1301 WOR-TRANSMIT-001785 2308-PRO-MR-039 MR - GAS DETECTION SYSTEM 01 MR 12-Feb-2025 16-Feb-2025 CLOSED
1302 WOR-TRANSMIT-001786 2308-PRO-TC-MR-038 TECHNICAL CLARIFICATION - GOV BALL VALVES, SOFT SEATED. C TBC 12-Feb-2025 16-Feb-2025 CLOSED PIP CLOSED
1303 WOR-TRANSMIT-001787 2308-PRO-MR-091 MR - SCADA MODIFICATION 01 MR 12-Feb-2025 16-Feb-2025 CLOSED MR SIGNED
1304 WOR-TRANSMIT-001788 2308-PRO-MR-046 MR - INSTRUMENT CABLES 01 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED
1305 WOR-TRANSMIT-001789 2308-PRO-MR-093 MR- SCRAPER PASSAGE INDICATOR. 01 MR 13-Feb-2025 16-Feb-2025 CLOSED MR SIGNED
1306 WOR-TRANSMIT-001790 2308-PRO-MR-126 MR - INSTRUMENT JUNCTION BOXES (FFJB) 01 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED
1307 WOR-TRANSMIT-001791 Jafurah – Hyundai – 3D updated model Jafurah – Hyundai – 3D updated model - 3D Model 13-Feb-2025 13-Feb-2025 CLOSED CLOSED
1308 WOR-TRANSMIT-001792 2308-PRO-MR-044 MR -PRESSURE RELIEF VALVES 02 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C CLOSED
1309 WOR-TRANSMIT-001793 2308-PRO-MR-061 MR - ORIFICE FLANGE ASSEMBLY 01 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED
1310 WOR-TRANSMIT-001794 2308-PRO-MR-063-TBE FINAL TBE - FIBER PATCH PANELS A TBE 13-Feb-2025 13-Feb-2025 TELECOM TELECOM
1311 WOR-TRANSMIT-001795 413011-01303.MOM.0047 MODIFICATION IN RFG-1 PIPELINE OPERATION PHILOSOPHY/OFF-SPEC ETHANE COMPRESSOR OPERATION. A MOM 13-Feb-2025 16-Feb-2025 Open PIP OPEN WITH BQ
1312 WOR-TRANSMIT-001796 2308-PRO-TC-MR-039 TECHNICAL CLARIFICATION - GAS DETECTION SYSTEM B TBC 13-Feb-2025 16-Feb-2025 CLOSED CLOSED
1313 WOR-TRANSMIT-001798 2308-PRO-MR-122-TBE TBE GLOBE VALVES, THREADED & SOCKETWELD ENDS A TBE 13-Feb-2025 16-Feb-2025 OPEN PIP OPEN WITH BQ
1314 WOR-TRANSMIT-001801 Plant wise Model Review file Plant wise Model Review file - 3D Model 13-Feb-2025 16-Feb-2025 CLOSED CLOSED
1315 WOR-TRANSMIT-001802 Re-Validation of Tetra Radio Study Re-Validation of Tetra Radio Study - REPORT 13-Feb-2025 16-Feb-2025 CLOSED TELECOM / CIVIL BQ-W-JFDP-T-1304 EPM Record No. CS-000946 APPROVED BY SAPMT & RETURNED TO WORLEY CLOSED
1316 WOR-TRANSMIT-001803 2308-PRO-TC-MR-019 2308-PRO-TC-MR-019 - LEAK DETECTION SYSTEM (RTTM). C TBC 15-Feb-2025 16-Feb-2025 CLOSED CLOSED
1317 WOR-TRANSMIT-001804 2308-PRO-TC-MR-117 TECHNICAL CLARIFICATION - BALL VALVES, METAL SEATED, MANUAL C TBC 15-Feb-2025 16-Feb-2025 CLOSED PIP CLOSED
1318 WOR-TRANSMIT-001805 2308-PRO-MR-045 MR -CONTROL VALVES 03 MR 15-Feb-2025 18-Feb-2025 CLOSED I&C CLOSED
1319 WOR-TRANSMIT-001806 DGN Files - 90% Package-Piping DGN Files - 90% Package-Piping - 90% 15-Feb-2025 18-Feb-2025 CHECK PIP
1320 WOR-TRANSMIT-001807 BQ 90% REVIEW COMMENT RESPONSES-1st BATCH BQ 90% REVIEW COMMENT RESPONSES-1st BATCH - 90% 15-Feb-2025 18-Feb-2025 CLOSED BQ-W-JFDP-T-1051 CLOSED & RETURNED TO WP CLOSED
1321 WOR-TRANSMIT-001808 2308-PRO-MR-087 MR - SAMPLING CONNECTIONS 02 MR 16-Feb-2025 16-Feb-2025 CLOSED BQ-W-JFDP-T-1142 RETURNED TO WORLEY CLOSED
1322 WOR-TRANSMIT-001809 2308-PRO-TC-MR-114 TECHNICAL CLARIFICATION - GOV BALL VALVE, METAL SEATED. C TBC 16-Feb-2025 18-Feb-2025 - PIP
1323 WOR-TRANSMIT-001810 2308-PRO-TC-MR-113 TECHNICAL CLARIFICATION - MOV BALL VALVES, METAL SEATED. D TBC 16-Feb-2025 18-Feb-2025 CLOSED PIP CLOSED
1324 WOR-TRANSMIT-001811 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 17-Feb-2025 18-Feb-2025 CLOSED MECH CLOSED
1325 WOR-TRANSMIT-001812 2308-PRO-TC-MR-033 TECHNICAL CLARIFICATION - SOLAR POWER SYSTEM D TBC 17-Feb-2025 18-Feb-2025 CLOSED CLOSED
1326 WOR-TRANSMIT-001814 Change order for CP scope – Fire Water – Based on BQ Response to Change order for CP scope – Fire Water – Based on TQ.0183 Rev. C - Change Order 17-Feb-2025 18-Feb-2025 CLOSED Management CLOSED CLOSED
1327 WOR-TRANSMIT-001816 90% Detail Design – 3D Model Presentation – PIDs 90% Detail Design – 3D Model Presentation – PIDs and FPPs - 90% 17-Feb-2025 18-Feb-2025 Open PROCESS OPEN WITH BQ
1328 WOR-TRANSMIT-001817 BI-10-14245 JAFURAH - NDT MATRIX BI-10-14245 JAFURAH - NDT MATRIX - NDT 17-Feb-2025 18-Feb-2025 Open PIP / QC OPEN WITH BQ
1329 WOR-TRANSMIT-001818 2308-PRO-MR-130 MR - SURGES RELIEF SKIDS 00 MR 18-Feb-2025 18-Feb-2025 CLOSED CLOSED
1330 WOR-TRANSMIT-001819 Monthly Progress Certificate 14 Manhole Verification and Duct Mandrelling Test Payment Certificate-14 0 Payment Certificate 18-Feb-2025 18-Feb-2025 CLOSED Management fwd to subcontract fwd to subcontract
1331 WOR-TRANSMIT-001820 Addendum Geotechnical SOW - Issued For ApprovalAddendum Geotechnical SOW - Issued For Approval - GeoTech 18-Feb-2025 18-Feb-2025 CLOSED CVL CLOSED
1332 WOR-TRANSMIT-001821 30009-A01-TI-4537 (35199) 30009-A01-TI-4537 (35199) - Invoice - 20% billing of Upon (Approval of Final Report). 0 Invoice 18-Feb-2025 18-Feb-2025 CLOSED Management fwd to subcontract fwd to subcontract
1333 WOR-TRANSMIT-001822 2308-PRO-MR-039-TBE FINAL TBE-GAS DETECTION SYSTEM. A TBE 18-Feb-2025 18-Feb-2025 - I&C
1334 WOR-TRANSMIT-001823 2308-PRO-MR-062 MR - MAGNETIC LEVEL GAUGES 01 MR 18-Feb-2025 18-Feb-2025 CLOSED I&C BQ-W-JFDP-T-1036 CLOSED CLOSED
1335 WOR-TRANSMIT-001824 2308-PRO-MR-042 MR-TEMPERATURE INSTRUMENTS 01 MR 18-Feb-2025 23-Feb-2025 CLOSED I&C
1336 WOR-TRANSMIT-001825 2308-PRO-MR-048 MR- REMOTE TERMINAL UNIT 02 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C MR SIGNED & SEND TO PRC ON 10-MAY-2025
1337 WOR-TRANSMIT-001826 2308-PRO-MR-024 MR- JUAYMAH NGLF ESD MODIFICATIONS (SCHNEIDER). 02 MR 19-Feb-2025 23-Feb-2025 CLOSED MR SIGNED
1338 WOR-TRANSMIT-001827 2308-PRO-MR-094 MR-INSTRUMENT JUNCTION BOXES 01 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C MR SIGNED
1339 WOR-TRANSMIT-001828 2308-PRO-MR-097 MR- INSTRUMENT VALVES, TUBING AND FITTINGS 02 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C CLOSED
1340 WOR-TRANSMIT-001830 2308-PRO-MR-019-TBE FINAL TBE - LEAK DETECTION SYSTEM (RTTM) A TBE 19-Feb-2025 19-Feb-2025 - I&C
1341 WOR-TRANSMIT-001831 2308-PRO-MR-040 MR - HORNS & BEACONS 01 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C CLOSED
1342 WOR-TRANSMIT-001832 2308-PRO-MR-013 MR- RTR PIPES AND FITTINGS (FIRE WATER AND OWS). 01 MR 20-Feb-2025 23-Feb-2025 CLOSED PIP RETURNED TO WORLEY ON 06-APR-2025
1343 WOR-TRANSMIT-001833 2308-PRO-TC-MR-037 TECHNICAL CLARIFICATION - MOV BALL VALVES, SOFT SEATED E TBC 20-Feb-2025 23-Feb-2025 CLOSED PIP CLOSED
1344 WOR-TRANSMIT-001834 - Pentane_FA_Early_Submission - FLOW ASSURANCE 20-Feb-2025 23-Feb-2025 Cancelled CANCELLED
1345 WOR-TRANSMIT-001835 2308-PRO-TC-MR-117 TECHNICAL CLARIFICATION - BALL VALVES, METAL SEATED, MANUAL. D TBC 20-Feb-2025 20-Feb-2025 CLOSED PIP CLOSED
1346 WOR-TRANSMIT-001836 Latest 3D model for Riyas Latest 3D model for Riyas - 3D Model 20-Feb-2025 23-Feb-2025 CLOSED CLOSED
1347 WOR-TRANSMIT-001837 2308-PRO-MR-095 MR- FLOW INSTRUMENTS 01 MR 22-Feb-2025 23-Feb-2025 CLOSED I&C MR SIGNED & SHARED WITH PRC ON 03-MAY-20
1348 WOR-TRANSMIT-001839 413011-01303 - SC-P.O - 4900000480 _ IPC-001 0 Payment Certificate 24-Feb-2025 26-Feb-2025 CLOSED Management CLOSED
1349 WOR-TRANSMIT-001840 413011-01303 - HAZOP STUDY - COMMERCIAL BID 413011-01303 - HAZOP STUDY - COMMERCIAL BID EVALUATION TABLE 0 CBE 24-Feb-2025 26-Feb-2025 CLOSED Management closed
1350 WOR-TRANSMIT-001841 2308-PRO-MR-055-NMR-601 NMR-601 for MR-055, BARRED TEE B NMR-601 24-Feb-2025 26-Feb-2025 CLOSED CLOSED
1351 WOR-TRANSMIT-001842 2308-PRO-TC-MR-021 TECHNICAL CLARIFICATION - FIBER OPTIC CABLE C TBC 24-Feb-2025 26-Feb-2025 CLOSED TELECOM BQ-W-JFDP-T-1083 CLOSED & RETURNED TO WP CLOSED
1352 WOR-TRANSMIT-001843 - Burn Pit & Drain Surge Vessel Vents Flammable Gas Dispersion Modelling Report. 0 Report 25-Feb-2025 26-Feb-2025 CLOSED PROCESS RETURN TO WORLEY
1353 WOR-TRANSMIT-001844 2308-PRO-MR-013-TBE FINAL TBE - RTR PIPES AND FITTINGS B TBE 25-Feb-2025 26-Feb-2025 CLOSED PIP CLOSED
1354 WOR-TRANSMIT-001845 2308-PRO-MR-135-NMR-601 NMR-601 for MR-135, WELDOLET-CODE-C2 B NMR-601 25-Feb-2025 26-Feb-2025 CLOSED PIP RETURNED TO PRC
1355 WOR-TRANSMIT-001846 2308-PRO-MR-049 MR - REBAR 01 MR 25-Feb-2025 26-Feb-2025 CLOSED CVL BQ-W-JFDP-T-1008 CLOSED CLOSED
1356 WOR-TRANSMIT-001847 2308-PRO-TC-MR-092 TECHNICAL CLARIFICATION -FIBER OPTIC LEAK DETECTION SYSTEM D TBC 25-Feb-2025 26-Feb-2025 CLOSED I&C / TELECOM CLOSED
1357 WOR-TRANSMIT-001848 2308-PRO-TC-MR-053 CATHODIC PROTECTION (TEMPORARY & PERMANENT). A TBC 25-Feb-2025 5:24 PM 26-Feb-2025 CLOSED ELE CLOSED
1358 WOR-TRANSMIT-001849 CFD Report for P&CSD review via CRM CFD Report for P&CSD review via CRM - CFD Report 25-Feb-2025 5:24 PM 26-Feb-2025 CLOSED PROCESS BQ-W-JFDP-T-1137 25-Feb-2025 24-Apr-2025 SA COMMENTS SENT TO WORLEY ON 22-APR-25CLOSED
1359 WOR-TRANSMIT-001850 2308-PRO-MR-009-NMR-601 NMR-601 FOR MR-009 (STUD BOLTS)-CODE-C3 A NMR-601 25-Feb-2025 5:24 PM 26-Feb-2025 CLOSED CVL RETURNED TO PRC
1360 WOR-TRANSMIT-001851 - Implemented comments of Painting and Coating Schedule - 90% 26-Feb-2025 26-Feb-2025 Open PIP OPEN WITH BQ
1361 WOR-TRANSMIT-001852 2308-PRO-MR-066 MR - FENCE GATES 01 MR 26-Feb-2025 26-Feb-2025 open CVL OPEN WITH BQ
1362 WOR-TRANSMIT-001853 2308-PRO-MR-065-NMR-601 MR-065-NMR-601-CODE-C2 - NMR-601 for MR-065, FENCING MATERIALS. A NMR-601 26-Feb-2025 4:57 PM 1-Mar-2025 CLOSED CIVIL CLOSED
1363 WOR-TRANSMIT-001854 2308-PRO-MR-030 TRANSFORMER (POLE MOUNTED) Rev. 02 02 MR 27-Feb-2025 1-Mar-2025 CLOSED ELE / CVL MR SIGNED
1364 WOR-TRANSMIT-001855 - Commercial Proposal HAZOP Study Subcontract ( Additional Scope #2 ) - HAZOP 27-Feb-2025 1-Mar-2025 CLOSED Management CLOSED
1365 WOR-TRANSMIT-001856 GPR Reports GPR Reports GPR Reports 27-Feb-2025 1-Mar-2025 CLOSED ALL CLOSED
1366 WOR-TRANSMIT-001858 2308-PRO-MR-014-TBE FINAL TBE-BALL VALVES, SOFT SEATED, MANUAL. C TBE 27-Feb-2025 4:30 PM 1-Mar-2025 CLOSED PIP CLOSED
1367 WOR-TRANSMIT-001859 2308-PRO-MR-072-NMR-601 NMR-601 FOR GROUNDING CABLE AND DEVICES-MR-072-NMR-601-CODE C3 A NMR-601 27-Feb-2025 4:50 PM 1-Mar-2025 CLOSED CLOSED
1368 WOR-TRANSMIT-001860 90% DD - 3D Model Workshop - Tags log 90% DD - 3D Model Workshop - Tags log - 3D Model 1-Mar-2025 1-Mar-2025 INFO CLOSED
1369 WOR-TRANSMIT-001861 2308-PRO-MR-033-TBE 2308-PRO-MR-033-TBE - FINAL TBE - SOLAR POWER SYSTEM A TBE 1-Mar-2025 1-Mar-2025 - ELE
1370 WOR-TRANSMIT-001862 2308-PRO-MR-014-TBE FINAL TBE-BALL VALVES, SOFT SEATED, MANUAL. C TBE 2-Mar-2025 2-Mar-2025 - PIP
1371 WOR-TRANSMIT-001863 - Coating Sch-Jafurah 90% eReview comment implementation - 90% 2-Mar-2025 2-Mar-2025 CLOSED CLOSED
1372 WOR-TRANSMIT-001864 Pentane 10” RMNJ-1 Centerline Pentane 10” RMNJ-1 Centerline - Drawings 2-Mar-2025 4-Mar-2025 Open ALL OPEN WITH BQ
1373 WOR-TRANSMIT-001867 2308-PRO-MR-065 2308-PRO-MR-065 Rev. 01 FENCING MATL 01 MR 2-Mar-2025 4-Mar-2025 CLOSED CIVIL MR SIGNED
1374 WOR-TRANSMIT-001868 JAFURAH/RNGLF- PENTANE DESIGN TABLE TOP REVI JAFURAH/RNGLF- PENTANE DESIGN TABLE TOP REVIEW - MOM 2-Mar-2025 4-Mar-2025 Open ALL OPEN WITH BQ
1375 WOR-TRANSMIT-001869 2308-PRO-MR-064-DAT CONCRETE MIX DESIGN - CODE-C2. A Data Sheet 3-Mar-2025 4-Mar-2025 CLOSED CLOSED
1376 WOR-TRANSMIT-001870 Worley response for Post 90% MTOs - Electrical Worley response for Post 90% MTOs - Electrical. - 90% 3-Mar-2025 4-Mar-2025 Open ELE OPEN WITH BQ
1377 WOR-TRANSMIT-001871 3D Models for Riyas and Jafurah 3D Models for Riyas and Jafurah - 3D Model 3-Mar-2025 4-Mar-2025 CLOSED CLOSED
1378 WOR-TRANSMIT-001873 2308-PRO-MR-076-TBE FINAL TBE -PIPING BULK MATERIALS (QUICK CONNECT COUPLER) A TBE 4-Mar-2025 4:55 PM 4-Mar-2025 - PIP
1379 WOR-TRANSMIT-001874 SRA STAGE 3 PACKAGE SRA STAGE 3 PACKAGE – ISSUED FOR REVIEW AND APPROVAL 0 SRA 3-Mar-2025 4-Mar-2025 Open ALL Submitted to PMT (BQ-PLDF-II-TR) OPEN WITH BQ
1380 WOR-TRANSMIT-001875 2308-PRO-MR-089 MR - EYEWASH & SAFETY SHOWER 01 MR 4-Mar-2025 4-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1070 CLOSED CLOSED
1381 WOR-TRANSMIT-001876 2308-PRO-MR-117-TBE 2308-PRO-MR-117-TBE - FINAL TBE - BALL VALVES, SOFT SEATED, MANUAL B TBE 4-Mar-2025 4-Mar-2025 CLOSED PIP CLOSED
1382 WOR-TRANSMIT-001877 2308-PRO-TC-MR-129 TECHNICAL CLARIFICATION -HIGH DENSITY POLYETHYLENE (HDPE) A TBC 4-Mar-2025 4-Mar-2025 - PIP
1383 WOR-TRANSMIT-001878 2308-PRO-MR-008-NMR-601 NMR-601 for MR-008, SS FLANGES AND BLINDS (ULMA)-CODE C3 A NMR-601 4-Mar-2025 5-Mar-2025 CLOSED PIP RETURNED TO PRC
1384 WOR-TRANSMIT-001879 2308-PRO-MR-029-TBE FINAL TBE - ANALYZER SHELTER (GAS CHROMATOGRAPH & MOISTURE A TBE 5-Mar-2025 5-Mar-2025 - ELE
1385 WOR-TRANSMIT-001880 2308-PRO-MR-059-TBE FINAL TBE - OHPL ACCESSORIES A TBE 5-Mar-2025 5-Mar-2025 CLOSED Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1386 WOR-TRANSMIT-001881 2308-PRO-MR-092-TBE FINAL TBE - FIBER OPTIC LEAK DETECION SYSTEM (FOLDS) A TBE 5-Mar-2025 5-Mar-2025 - I&C / TELECOM Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1387 WOR-TRANSMIT-001882 2308-PRO-MR-079-TBE FINAL TBE - INSTRUMENT BULK MATERIALS A TBE 5-Mar-2025 5-Mar-2025 - I&C Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1388 WOR-TRANSMIT-001885 2308-PRO-TC-MR-078 TC FOR ELECTRICAL BULK MATERIAL A TBC 5-Mar-2025 6-Mar-2025 CLOSED ELE CLOSED
1389 WOR-TRANSMIT-001886 2308-PRO-TC-MR-053 TECHNICAL CLARIFICATION - CATHODIC PROTECTION (TEMPORARY & PERMANENT). B TBC 5-Mar-2025 6-Mar-2025 CLOSED ELE CLOSED
1390 WOR-TRANSMIT-001887 Stage-1 forms for SA ISSD check and confirmation Stage-1 forms for SA ISSD check and confirmation - SRA 5-Mar-2025 6-Mar-2025 Open ALL OPEN WITH BQ
1391 WOR-TRANSMIT-001888 2308-PRO-MR-038-TBE FINAL TBE - GOV BALL VALVES, SOFT SEATED. A TBE 5-Mar-2025 4:55 PM 6-Mar-2025 - PIP
1392 WOR-TRANSMIT-001889 2308-PRO-MR-037-TBE FINAL TBE - MOV BALL VALVES, SOFT SEATED. A TBE 5-Mar-2025 5:00 PM 6-Mar-2025 - PIP
1393 WOR-TRANSMIT-001890 2308-PRO-TC-MR-081 TECHNICAL CLARIFICATION - ITELECOMMUNICATION BULK MATERIALS A TBC 6-Mar-2025 6-Mar-2025 CLOSED CLOSED
1394 WOR-TRANSMIT-001891 R167506001 FLOW ASSURANCE - SAEP-27 EXHIBIT-I - PENTANE + CB C FLOW ASSURANCE 6-Mar-2025 8-Mar-2025 OPEN PROCESS OPEN WITH BQ
1395 WOR-TRANSMIT-001892 2308-PRO-TC-MR-053 TECHNICAL CLARIFICATION - CATHODIC PROTECTION (TEMPORARY & PERMANENT) C TBC 6-Mar-2025 8-Mar-2025 CLOSED ELE Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1396 WOR-TRANSMIT-001893 2308-PRO-MR-063 MR - FIBER PATCH PANELS 01 MR 8-Mar-2025 8-Mar-2025 CLOSED MR SIGNED & SHARED WITH PRC. PO PLACED
1397 WOR-TRANSMIT-001894 2308-PRO-TC-MR-047 TECHNICAL CLARIFICATION - BURN PIT FLARE SYSTEM C TBC 8-Mar-2025 8-Mar-2025 CLOSED CLOSED
1398 WOR-TRANSMIT-001895 2308-PRO-MR-113-TBE FINAL TBE - MOV BALL VALVES, METAL SEATED A TBE 8-Mar-2025 8-Mar-2025 CLOSED PIP / I&C CLOSED
1399 WOR-TRANSMIT-001896 2308-PRO-MR-023-NMR-601 MR-023-NMR-601 - NMR-601 for MR-023, DCS MODIFICATION (HONEYWELL)-CODE C2 A NMR-601 9-Mar-2025 9-Mar-2025 CLOSED I&C BQ-PLDF-II-TR-1428 RESPONSE RECEIVED FROM SAPMT
1400 WOR-TRANSMIT-001897 2308-PRO-MR-047 MR - BURN PIT FLARE TIP SYSTEM & IGNITION SKID (as per 90% Detailed Design). 01 MR 9-Mar-2025 9-Mar-2025 CLOSED MECH BQ-W-JFDP-T-1032 CLOSED CLOSED
1401 WOR-TRANSMIT-001898 2308-PRO-MR-098 MR - TRANSMISSION EQUIPMENT & ACCESSORIES 01 MR 9-Mar-2025 9-Mar-2025 CLOSED TELECOM MR SIGNED & SHARED WITH PRC ON 03-MAY-20
1402 WOR-TRANSMIT-001899 2308-PRO-MR-030-NMR-602 NMR-602 FOR MR-030 -TRANSFORMER (POLE MOUNTED TYPE)-CODE C2 A NMR-602 9-Mar-2025 9-Mar-2025 CLOSED ELE / CVL SEND TO PRC
1403 WOR-TRANSMIT-001900 2308-PRO-MR-028 MR- DRAIN COLLECTION VESSELS (updated as per 90% Detailed Design) 02 MR 9-Mar-2025 9-Mar-2025 CLOSED MECH BQ-W-JFDP-T-1106 CLOSED
1404 WOR-TRANSMIT-001901 2308-PRO-MR-008 MR- SS FLANGES AND BLINDS. 02 MR 9-Mar-2025 3:33 PM 10-Mar-2025 CLOSED PIP CLOSED
1405 WOR-TRANSMIT-001902 2308-PRO-MR-002 MR- LOW TEMPERATURE CARBON STEEL PIPES 02 MR 9-Mar-2025 3:33 PM 10-Mar-2025 CLOSED PIP SIGNED & SEND TO PRC ON 10-MAY-2025
1406 WOR-TRANSMIT-001903 2308-PRO-MR-012 MR - STAINLESS STEEL PIPES 01 MR 10-Mar-2025 10-Mar-2025 CLOSED PIP CLOSED
1407 WOR-TRANSMIT-001904 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM 01 MR 10-Mar-2025 10-Mar-2025 CLOSED Telecom BQ-W-JFDP-T-1126 CLOSED CLOSED
1408 WOR-TRANSMIT-001905 2308-PRO-MR-114-TBE FINAL TBE - GOV BALL VALVES, METAL SEATED. A TBE 10-Mar-2025 10-Mar-2025 CLOSED PIP / I&C CLOSED
1409 WOR-TRANSMIT-001906 2308-PRO-MR-069-NMR-601 NMR-601 for MR-069, LIGHTING FIXTURES - CODE C2 C NMR-601 10-Mar-2025 10-Mar-2025 CLOSED ELE SEND TO PRC
1410 WOR-TRANSMIT-001907 2308-PRO-MR-071-NMR-601 MR-071-NMR-601 - NMR-601 for MR-071, LV CABLE (POWER & CONTROL)-CODE C2. A NMR-601 10-Mar-2025 10-Mar-2025 CLOSED SEND TO PRC
1411 WOR-TRANSMIT-001908 - 0 Early IFC 10-Mar-2025 10-Mar-2025 Open CVL OPEN WITH BQ
1412 WOR-TRANSMIT-001909 Jafurah - 90% Proof of Implementation Jafurah - 90% Proof of Implementation 0 90% 11-Mar-2025 11-Mar-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1413 WOR-TRANSMIT-001910 2308-PRO-MR-054 MR - LIQUID CUSTODY METERING SKID 01 MR 11-Mar-2025 11-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1031 CLOSED CLOSED
1414 WOR-TRANSMIT-001912 2nd Batch of 90% Proof of Implementation 2nd Batch of 90% Proof of Implementation 0 90% 11-Mar-2025 11-Mar-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1415 WOR-TRANSMIT-001913 3rd Batch of 90% Proof of Implementation 3rd Batch of 90% Proof of Implementation 0 90% 11-Mar-2025 11-Mar-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1416 WOR-TRANSMIT-001914 2308-PRO-MR-079 MR - INSTRUMENT BULK MATERIALS 00 MR 11-Mar-2025 11-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1052 CLOSED CLOSED
1417 WOR-TRANSMIT-001916 2308-PRO-MR-105 MR - LTCS FLANGES AND BLINDS 01 MR 11-Mar-2025 11-Mar-2025 CLOSED PIP CLOSED
1418 WOR-TRANSMIT-001918 Monthly Progress Certificate 14 Monthly Progress Certificate 14 0 Payment Certificate 12-Mar-2025 12-Mar-2025 CLOSED Management Given to PCM for sign CLOSED
1419 WOR-TRANSMIT-001921 90% TCP package along with CSD CRS responses - Re90% TCP package along with CSD CRS responses - Rev B B CP Design Package 12-Mar-2025 12-Mar-2025 CLOSED RESPONDED & RETURNED TO WORLEY CLOSED
1420 WOR-TRANSMIT-001922 4th Batch of 90% proof of implementation 4th Batch of 90% proof of implementation 0 90% 12-Mar-2025 12-Mar-2025 Open ALL OPEN WITH BQ
1421 WOR-TRANSMIT-001924 2308-PRO-MR-129-TBE TBE - FINAL TBE - COMMUNICATION BULK MATERIALS (HDPE). A TBE 12-Mar-2025 12-Mar-2025 -
1422 WOR-TRANSMIT-001926 2308-PRO-MR-006 MR - BW FITTINGS - SS 01 MR 13-Mar-2025 15-Mar-2025 CLOSED PIP CLOSED
1423 WOR-TRANSMIT-001927 2308-PRO-MR-064-TBE FINAL TBE - CIVIL BULK MATERIALS. A TBE 13-Mar-2025 15-Mar-2025 -
1424 WOR-TRANSMIT-001928 413011-01303-PVN-0046 SCOPE CHANGE ORDER - CHANGE IN RMNJ-1 PIPELINE MAOP. 0 Change Order 13-Mar-2025 15-Mar-2025 REJECTED Management BQ-W-JFDP-T-1102 REJECTED & RETURNED TO WP CLOSED
1425 WOR-TRANSMIT-001929 413011-01303-PVN-0047 SCOPE CHANGE ORDER - MISSING MARJAN INCREMENT FLOW FOR RJPRP-1 AND RJBUT-1 0 Change Order 13-Mar-2025 15-Mar-2025 Obselete Management Returned to WP to revise PM name & desig. OBSELETE
1426 WOR-TRANSMIT-001930 413011-01303-PVN-0048 CHANGING THE C2+NGL PUMP CONFIGURATION IN MODEL & REPORTS 0 Change Order 13-Mar-2025 15-Mar-2025 Obselete Management Returned to WP to revise PM name & desig. OBSELETE
1427 WOR-TRANSMIT-001931 2308-PRO-MR-081-TBE FINAL TBE - TELECOMMUNICATION BULK MATERIALS A TBE 13-Mar-2025 15-Mar-2025 CLOSED CLOSED
1428 WOR-TRANSMIT-001933 2308-PRO-MR-023 JUAYMAH NGLF DCS MODIFICATIONS (HONEYWELL). 01 MR 15-Mar-2025 15-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1053 MR SIGNED & SHARED WITH PRC ON 05-MAY-20CLOSED
1429 WOR-TRANSMIT-001934 413011-01303-PVN-0049 SCOPE CHANGE ORDER - LATE CHANGE TO SALES GAS & OFF-SPEC ETHANE FLOWRATES. 0 Change Order 15-Mar-2025 15-Mar-2025 Obselete Management Returned to WP to revise PM name & desig. OBSELETE
1430 WOR-TRANSMIT-001936 P000000W_ABQAIQ DCO SAPD B1193 Site visit Report - ABQAIQ DCO/SAPD BLDG. 1193 & BLDG. 10-490 0 Site Visit 17-Mar-2025 17-Mar-2025 Open ALL OPEN WITH BQ
1431 WOR-TRANSMIT-001937 2308-PRO-MR-076 MR - PIPING BULK MATERIALS 00 MR 17-Mar-2025 17-Mar-2025 OPEN PIP OPEN WITH BQ
1432 WOR-TRANSMIT-001938 2308-PRO-MR-026 MR- FIRE WATER SYSTEM 02 MR 17-Mar-2025 17-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1206 COMMENTED & RETURNED TO WORLEY CLOSED
1433 WOR-TRANSMIT-001939 2308-PRO-MR-088 MR- FIRE EXTINGUISHERS 01 MR 17-Mar-2025 17-Mar-2025 CLOSED MR SIGNED
1434 WOR-TRANSMIT-001941 413011-01303-PVN-0045 413011-01303-PVN-0045 - SCOPE CHANGE ORDER - EXTENSION OF SAPMT & BQ OFFICES 0 Change Order 17-Mar-2025 17-Mar-2025 Obselete Management OBSELETE
1435 WOR-TRANSMIT-001942 413011-01303-PVN-0047 SCOPE CHANGE ORDER - MISSING MARJAN INCREMENT FLOW FOR RJPRP-1 AND RJBUT-1 0 Change Order 17-Mar-2025 17-Mar-2025 CLOSED Management REJECTEDBQ-W-JFDP-T-1247 REPLIED TO WORLEY CLOSED
1436 WOR-TRANSMIT-001943 413011-01303-PVN-0048 CHANGING THE C2+NGL PUMP CONFIGRAUTION IN MODEL & REPORTS. 0 Change Order 17-Mar-2025 17-Mar-2025 CLOSED Management RETURNED TO WORLEY CLOSED
1437 WOR-TRANSMIT-001944 413011-01303-PVN-0049 SCOPE CHANGE ORDER - LATE CHANGE TO SALES GAS & OFF-SPEC ETHANE FLOWRATES. 0 Change Order 17-Mar-2025 17-Mar-2025 CLOSED Management BQ-W-JFDP-T-1089 10-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1438 WOR-TRANSMIT-001945 413011-01303-PVN-0050 SCOPE CHANGE ORDER - UPDATE INSTRUMENT TAG NUMBERS 0 Change Order 17-Mar-2025 17-Mar-2025 REJECTED Management REJECTED with Letter by Ali Shared for EM & PCM sign
1439 WOR-TRANSMIT-001946 2308-PRO-MR-105-NMR-601 NMR-601 Rev.B for MR-105, LTCS FLANGES AND BLINDS-CODE-C1 B NMR-601 17-Mar-2025 17-Mar-2025 CLOSED PIP SEND TO PRC
1440 WOR-TRANSMIT-001947 2308-PRO-MR-099-CRS 2308-PRO-MR-099-CRS - CRS - OHPL BULK MATERIALS AND ACCESSORIES A CRS_MR 18-Mar-2025 18-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1042 & T-1143 CLOSED CLOSED
1441 WOR-TRANSMIT-001948 2308-PRO-MR-060-CRS 2308-PRO-MR-060-CRS - CRS - PRESSURE GAUGES 01 CRS_MR 18-Mar-2025 18-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1047 CLOSED CLOSED
1442 WOR-TRANSMIT-001949 TE-464001 AC MITIGATION STUDY REPORT B AC MITIGATION 17-Mar-2025 17-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1207 CSD COMMENTS SEND TO WORLEY CLOSED
1443 WOR-TRANSMIT-001950 2308-PRO-TC-MR-047 TBC COMPLIANCE STATEMENT - BURN PITS D TBC 18-Mar-2025 18-Mar-2025 CLOSED CLOSED
1444 WOR-TRANSMIT-001951 2308-PRO-MR-086 MR - SPECTACLE PLATES 02 MR 18-Mar-2025 19-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1098 CLOSED & RETURNED TO WP CLOSED
1445 WOR-TRANSMIT-001952 2308-PRO-MR-007 MR - THDD AND SW FITTINGS - SS 02 MR 18-Mar-2025 19-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1205 RETURNED TO WORLEY CLOSED
1446 WOR-TRANSMIT-001953 2308-PRO-MR-081-TBE TBE - TELECOMMUNICATION BULK MATERIALS. B TBE 18-Mar-2025 19-Mar-2025 -
1447 WOR-TRANSMIT-001954 2308-PRO-MR-101 MR -THDD AND SW FITTINGS - CS 01 MR 18-Mar-2025 19-Mar-2025 CLOSED PIP CLOSED
1448 WOR-TRANSMIT-001955 KR.GTO24000051 Detailed Geotechnical Site Investigation for BI-10-14245, Jafurah Downstream Pipelines Phase II. 4 GeoTech 18-Mar-2025 19-Mar-2025 CLOSED CVL Comments sent to WP COMMENTS SHARED WITH WP
1449 WOR-TRANSMIT-001956 413011-01303-WOR-LTR-0063-2025 Geotechnical Investigation Endorsement Geotechnical File No. 2023/260A. - LETTER 18-Mar-2025 19-Mar-2025 OPEN CVL
1450 WOR-TRANSMIT-001957 - Worley response to BQ Comments- 90% E-Review Package OHPL - 90% 18-Mar-2025 19-Mar-2025 CLOSED BQ-W-JFDP-T-1040 CLOSED & RETURNED TO WP CLOSED
1451 WOR-TRANSMIT-001958 Jafura Pipeline_Post 90% Stress Reports Jafura Pipeline_Post 90% Stress Reports - Stress Report 19-Mar-2025 19-Mar-2025 CLOSED PIP CRS sent-BQ-W-JFDP-T- 1041 CLOSED & RETURNED TO WP CLOSED
1452 WOR-TRANSMIT-001959 2308-PRO-MR-055 MR - BARRED TEE 02 MR 20-Mar-2025 20-Mar-2025 CLOSED BQ-W-JFDP-T-1075 PR SIGNED AND SEND TO PRC ON 24-APR-25 CLOSED
1453 WOR-TRANSMIT-001960 Not Rcvd WOR-TRANSMIT-001960 not issued to BQ. System did not generate it. - - - - - CLOSED CLOSED
1454 WOR-TRANSMIT-001961 SC-P.O - 4900000480_ IPC-002 - Payment Certificate 20-Mar-2025 20-Mar-2025 CLOSED Management sent to subcontract sent to subcontract
1455 WOR-TRANSMIT-001962 2308-PRO-MR-103 2308-PRO-MR-103 Rev. 02 BW Fittings - LTCS 02 MR 20-Mar-2025 20-Mar-2025 CLOSED PIP CLOSED
1456 WOR-TRANSMIT-001963 2308-PRO-MR-117-TBE 2308-PRO-MR-117-TBE - FINAL TBE - BALL VALVES, SOFT SEATED, MANUAL C TBE 20-Mar-2025 20-Mar-2025 OPEN PIP
1457 WOR-TRANSMIT-001964 Jafurah Rebars As per Facilities Jafurah Rebars As per Facilities 0 REBARS 20-Mar-2025 22-Mar-2025 Open CVL OPEN WITH BQ
1458 WOR-TRANSMIT-001965 2308-PRO-MR-036-NMR-601 NMR-601 for MR-036 JIB CRANE-Code-C2 A NMR-601 20-Mar-2025 22-Mar-2025 CLOSED SEND TO PRC
1459 WOR-TRANSMIT-001966 KR.GTO24000051 Detailed Geotechnical Site Investigation for BI-10-14245, Jafurah Downstream Pipelines Phase II. 4 GeoTech 20-Mar-2025 20-Mar-2025 CLOSED CVL BQ-W-JFDP-T-1090 CLOSED & RETURNED TO WP CLOSED
1460 WOR-TRANSMIT-001967 2308-PRO-MR-130 MR - SURGES RELIEF SKIDS 01 MR 20-Mar-2025 22-Mar-2025 CLOSED MECH CLOSED & INFORMED PRC
1461 WOR-TRANSMIT-001970 413011-01303-PVN-0045 EXTENSION OF SAPMT & BQ OFFICES 0 Change Order 22-Mar-2025 22-Mar-2025 Superseded Management
1462 WOR-TRANSMIT-001971 2308-PRO-MR-054 LIQUID CUSTODY METERING SKID. 01 MR 22-Mar-2025 22-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1177 RETURNED TO WORLEY CLOSED
1463 WOR-TRANSMIT-001972 INTERIM PAYMENT CERTIFICATE # 12 INTERIM PAYMENT CERTIFICATE # 12 - ISSUE OF ALL MR's - Payment Certificate 23-Mar-2025 24-Mar-2025 CLOSED Management RETURNED TO WP CLOSED
1464 WOR-TRANSMIT-001973 413011-01303-PVN-0033 SCOPE CHANGE ORDER - NETWORK DESIGN FOR IT AND NON-IT SEVICES 2 Change Order 23-Mar-2025 24-Mar-2025 CLOSED Management BQ-W-JFDP-T-1089 10-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1465 WOR-TRANSMIT-001974 413011-01303 - SC-P.O - 4900000456 _ IPC-003 0 Payment Certificate 23-Mar-2025 24-Mar-2025 CLOSED Management BQ-W-JFDP-T-1234 CLOSED
1466 WOR-TRANSMIT-001976 413011-01303-WOR-LTR-0064-2025 413011-01303-WOR-LTR-0064-2025 - IFC PATH FORWARD 0 LTR 24-Mar-2025 24-Mar-2025 CLOSED Management
1467 WOR-TRANSMIT-001977 413011-01303-PVN-0051 SCOPE CHANGE ORDER - GDS MAPPING REPORT IMPLEMENTATION 0 Change Order 24-Mar-2025 24-Mar-2025 CLOSED Management BQ-W-JFDP-T-1250 RETURNED TO WORLEY CLOSED
1468 WOR-TRANSMIT-001978 413011-01303-PVN-0052 SCOPE CHANGE ORDER - BAR BENDING SCHEDULE DRAWINGS 0 Change Order 24-Mar-2025 24-Mar-2025 Superseded Management Shared for EM & PCM sign Shared for EM & PCM sign
1469 WOR-TRANSMIT-001980 2308-PRO-MR-055-NMR-601 2308-MR-055-NMR-601 - NMR-601 for MR-055, BARRED TEE - CODE-C1 B NMR-601 24-Mar-2025 24-Mar-2025 CLOSED SEND TO PRC
1470 WOR-TRANSMIT-001981 30009-A01-TI-5035 (35923) 413011-01303 - 30009-A01-TI-5035 (35923) - Billing 30% (Advance Payment). - Invoice 24-Mar-2025 24-Mar-2025 CLOSED Management Forwareded to Subcon Part of Payment Certificate # 16 Forwareded to Subcon Part of Payment Certificat
1471 WOR-TRANSMIT-001982 2308-PRO-MR-047-TBE 2308-PRO-MR-47-TBE - FINAL TBE - BURN PIT FLARE TIP SYSTEM & IGNITION SKID A TBE 24-Mar-2025 24-Mar-2025 - MECH
1472 WOR-TRANSMIT-001983 2308-PRO-MR-033 MR- SOLAR POWER SYSTEM. 01 MR 25-Mar-2025 25-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1085 CLOSED CLOSED
1473 WOR-TRANSMIT-001984 2308-PRO-MR-051 MR - ANCHOR BOLTS 01 MR 25-Mar-2025 25-Mar-2025 CLOSED CVL MR SIGNED
1474 WOR-TRANSMIT-001985 2308-PRO-MR-104 MR - THDD AND SW FITTINGS - LTCS 02 MR 25-Mar-2025 25-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1212 RETURNED TO WORLEY CLOSED
1475 WOR-TRANSMIT-001986 SC-P.O - 4900000561_IPC - 413011-01303 - SC-P 413011-01303 - SC-P.O - 4900000561_IPC - 413011-01303 - SC-P.O - 4900000561_IPC. 0 Invoice 25-Mar-2025 25-Mar-2025 CLOSED Management BQ-W-JFDP-T-1150 SIGNED & RETURNED TO WP CLOSED
1476 WOR-TRANSMIT-001987 2308-PRO-MR-034 MR - DC SYSTEM 02 MR 25-Mar-2025 25-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1099 CLOSED & RETURNED TO WP CLOSED
1477 WOR-TRANSMIT-001988 Crossing sketch for scraper area UG design - Riyas Crossing sketch for scraper area UG design - Riyas 0 Sketch 25-Mar-2025 25-Mar-2025 OPEN INFERFACE
1478 WOR-TRANSMIT-001989 2308-PRO-MR-010 MR - GASKETS AND INSULATING SETS 01 MR 25-Mar-2025 25-Mar-2025 OPEN PIP OPEN WITH BQ
1479 WOR-TRANSMIT-001990 2308-PRO-MR-089 MR - EYEWASH & SAFETY SHOWER 01 MR 25-Mar-2025 25-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1070 CLOSED CLOSED
1480 WOR-TRANSMIT-001991 2308-PRO-MR-106 MR - INSULATION OF PIPING 01 MR 25-Mar-2025 26-Mar-2025 OPEN PIP OPEN WITH BQ
1481 WOR-TRANSMIT-001995 2308-PRO-MR-062-CRS Worley response to BQ-Comments (CRS) For MR-062, MAGNETIC LEVEL GAUGES 01 CRS_MR 25-Mar-2025 26-Mar-2025 CLOSED I&C MR SIGNED AND INFORMED TO PRC ON 13-APR
1482 WOR-TRANSMIT-001996 2308-PRO-MR-021 MR - FIBER OPTIC CABLES 03 MR 25-Mar-2025 26-Mar-2025 CLOSED BQ-W-JFDP-T-1055 CLOSED CLOSED
1483 WOR-TRANSMIT-001997 2308-PRO-MR-009 MR - STUD BOLTS (Updated as per 90% Detail Design) 01 MR 25-Mar-2025 26-Mar-2025 Open CVL OPEN WITH BQ
1484 WOR-TRANSMIT-001998 2308-PRO-MR-070 MR - LIGHTING POLES (Updated as per 90% Detailed Design documents) 01 MR 25-Mar-2025 26-Mar-2025 CLOSED ELE / CVL BQ-W-JFDP-T-1059 RETURNED TO WORLEY ON 27-MAR-25 CLOSED
1485 WOR-TRANSMIT-001999 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 26-Mar-2025 26-Mar-2025 CLOSED MECH MR SIGNED
1486 WOR-TRANSMIT-002000 2308-PRO-MR-031 MR - POWER DISTRIBUTION PANELBOARD RACK, LOW VOLTAGE 01 MR 26-Mar-2025 26-Mar-2025 CLOSED BQ-W-JFDP-T-1093 RETURNED TO WORLEY ON 13-APR-25 CLOSED
1487 WOR-TRANSMIT-002001 2308-PRO-MR-135 MR - WELDOLET (Updated as per 90% Detail Design). 01 MR 26-Mar-2025 26-Mar-2025 CLOSED PIP RETURNED TO WORLEY CLOSED
1488 WOR-TRANSMIT-002002 90% Electrical Package ETAP Study 90% Electrical Package (ETAP STUDY) – Worley responses to comments By SAPMT. - 90% 26-Mar-2025 26-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1221 BQ-PLDF-II-TR-1113A 12-May-2025 CLOSED
1489 WOR-TRANSMIT-002003 MR-097_Rev. 02 Worley response to BQ-Comments (CRS) For MR-097 Rev-02, INSTRUMENT VALVES, TUBING & FITTINGS 02 CRS_MR 27-Mar-2025 12-Apr-2025 CLOSED I&C BQ-W-JFDP-T-1033 06-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1490 WOR-TRANSMIT-002004 Post 90% Stress Reports Worley response to BQ-W-JFDP-T-1041 BQ-Comments (CRS) for Post 90% Stress Reports - Stress Report 27-Mar-2025 17-Apr-2025 CLOSED BQ-W-JFDP-T-1226 24-Apr-2025 BQ-PLDF-II-TR-1490 12-May-2025 SUBMITTED TO SAPMT ON 24-APR-25 (EPM # CS-001153) CLOSED CLOSED
1491 WOR-TRANSMIT-002005 2308-PRO-MR-069 MR - LIGHTING FIXTURES 01 MR 27-Mar-2025 17-Apr-2025 CLOSED ELE BQ-W-JFDP-T-1116 24-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1492 WOR-TRANSMIT-002006 2308-PRO-MR-104-TBE FINAL TBE - THDD AND SW FITTINGS - LTCS B TBE 27-Mar-2025 12-Apr-2025 CLOSED PIP 06-Apr-2025 SUPERSEDED
1493 WOR-TRANSMIT-002007 Site Visit Report Site Visit Report For JUAYMAH Off Lines And Hot Tap Tie-In At Butane Spheroids Report 27-Mar-2025 12-Apr-2025 Open MECH-HOT 06-Apr-2025 OPEN WITH BQ
1494 WOR-TRANSMIT-002008 2308-PRO-MR-001 MR- CARBON STEEL PIPES (Note: MR updated as per 90% Detailed Design Documents.) 01 MR 27-Mar-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 CLOSED
1495 WOR-TRANSMIT-002009 413011-01303-PVN-0002 - IPC # 02 Change Orders - Interim Payment Certificate # 02 - PIDs Microstation to SPPID Conversion - PVN-0002 0 Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1071 RETURNED TO WP CLOSED
1496 WOR-TRANSMIT-002010 413011-01303-PVN-0003 - IPC # 03 Change Orders - Interim Payment Certificate # 03 - Conversion SPI to Microstation - PVN-0003 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1071 RETURNED TO WP CLOSED
1497 WOR-TRANSMIT-002011 413011-01303-PVN-0005 - IPC # 04 Change Orders - Interim Payment Certificate # 04 - PVN-0005 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1088 RETURNED TO WP CLOSED
1498 WOR-TRANSMIT-002012 413011-01303-PVN-0007 - IPC # 01 Change Orders - Interim Payment Certificate # 01 - PVN-0007 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1088 06-Apr-2025 RETURNED TO WP CLOSED
1499 WOR-TRANSMIT-002013 413011-01301-PVN-0011 - IPC # 06 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1130 06-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1500 WOR-TRANSMIT-002014 413011-01301-PVN-0012 - IPC # 07 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 07 - ADJUSTED LUPs AT QBGG - PVN-0012 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management 03-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1501 WOR-TRANSMIT-002015 413011-01301-PVN-0013 - IPC # 08 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1088 Sent to PCM, EM & PM RETURNED TO WP CLOSED
1502 WOR-TRANSMIT-002016 413011-01301-PVN-0014 - IPC # 09 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 09 - OHPL UPGRADING POLES AND ROUTE ADJUSTMENT - PVN-0014 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1151 27-Apr-2025 SIGNED & RETURNED TO WP CLOSED
1503 WOR-TRANSMIT-002017 413011-01301-PVN-0015 - IPC # 10 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 10 - JUAYMA CHANGES - PVN-0015 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1124 03-Apr-2025 APPROVED CLOSED & RETURNED TO WP CLOSED
1504 WOR-TRANSMIT-002018 413011-01301-PVN-0018 - IPC # 11 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 11 - SALES GAS DISPLACEMENT - PVN-0018 - Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1124 24-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1505 WOR-TRANSMIT-002019 413011-01301-PVN-0019 - IPC # 12 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1256 03-Apr-2025 CLOSED
1506 WOR-TRANSMIT-002020 413011-01301-PVN-0020 - IPC # 13 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 13 - ETHANE FUTURE LOOP PROVISION SIZE CHANGE - 0020 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management 03-Apr-2025 CLOSED
1507 WOR-TRANSMIT-002021 413011-01301-PVN-0021 - IPC # 14 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 14 - CHANGE IN THE BURN PIT SIZING (RADIATION ZONE) - PVN-0021 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1256 03-Apr-2025 CLOSED
1508 WOR-TRANSMIT-002022 413011-01301-PVN-0022 - IPC # 15 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 15 - C2+NGL FLOW INCREASE - PVN-0022 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1256 03-Apr-2025 CLOSED
1509 WOR-TRANSMIT-002023 413011-01303-PVN-0027 - IPC # 16 CHANGE ORDERS - PENTANE INJECTION TO AH LINES, CONCEPT SELECTION ASSESSMENT - Payment Certificate 27-Mar-2025 17-Apr-2025 open Management Hard Copy to EM on 31-May-2025 SIGNED & RETURNED TO WP
1510 WOR-TRANSMIT-002024 413011-01303-PVN-0028 - IPC # 17 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 17 - PENTANE INJECTION TO AH LINES, DETAILED DESIGN 3 Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1351 Returned to WP CLOSED
1511 WOR-TRANSMIT-002025 413011-01301-PVN-0029 - IPC # 18 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 18, NG-A 180 SURGE MITIGATION STUDY AT RTT - PVN-0029 1 Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management RETURNED TO WP CLOSED
1512 WOR-TRANSMIT-002026 413011-01301-PVN-0030 - IPC # 19 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management Sent to PCM, EM & PM RETURNED TO WP CLOSED
1513 WOR-TRANSMIT-002027 413011-01303-PVN-0031 - IPC # 20 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 20, OFF SPECS TIE-IN & ADDITIONAL SPECTACLE BLINDS FOR FUTURE - PVN-0031 1 Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1264 REJECTED & RETURNED TO WORLEY CLOSED
1514 WOR-TRANSMIT-002028 413011-01301-PVN-0033 - IPC # 21 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 21, NETWORK DESIGN FOR IT AND NON-IT SERVICES - PVN-0033 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1128 03-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1515 WOR-TRANSMIT-002029 413011-01301-PVN-0036 - IPC # 22 - Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1124 CLOSED & RETURNED TO WP CLOSED
1516 WOR-TRANSMIT-002030 2308-PRO-MR-100 BW FITTINGS - CS 01 MR 28-Mar-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 closed
1517 WOR-TRANSMIT-002031 2308-PRO-MR-071 MR - LV CABLE (POWER & CONTROL) 01 MR 28-Mar-2025 17-Apr-2025 CLOSED BQ-W-JFDP-T-1119 24-Apr-2025 MR SIGNED & SHARED WITH PRC ON 23-APR-20CLOSED
1518 WOR-TRANSMIT-002032 SC-P.O - 4900000455 _ IPC - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management CLOSED CLOSED
1519 WOR-TRANSMIT-002033 2308-PRO-MR-013-TBE FINAL TBE - RTR PIPES AND FITTINGS (FIRE WATER AND OWS) C TBE 28-Mar-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 CLOSED
1520 WOR-TRANSMIT-002034 2308-PRO-MR-125 MR - Casing Pipes 01 MR 31-Mar-2025 17-Apr-2025 CLOSED PIP BQ-W-JFDP-T-1254 24-Apr-2025 RETURNED TO WORLEY ON 17-MAY-25 CLOSED
1521 WOR-TRANSMIT-002035 2308-PRO-MR-118 MR - CHECK VALES, NON-SLAM (Updated as per 90% Detail Design). 03 MR 1-Apr-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 SIGNED & SEND TO PRC ON 17-APR-2025
1522 WOR-TRANSMIT-002036 2308-PRO-MR-109 MR - RTR FITTINGS (8" NPS) (Updated as per 90% Detail Design). 02 MR 1-Apr-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 MR SIGNED BY PRC ON 20/APRIL/2025
1523 WOR-TRANSMIT-002037 2308-PRO-MR-003 MR - HOT-INDUCTION PIPE BENDS. (Updated as per 90% Detail Design) 02 MR 2-Apr-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025
1525 WOR-TRANSMIT-002038 MR-044 Final summary & Sizing Sheets-MR-044 PRESSURE RELIEF VALVES - Calculation 27-Mar-2025 12-Apr-2025 CLOSED I&C 06-Apr-2025 INFORMED PRC TO SEND TO VENDOR CLOSED
1526 WOR-TRANSMIT-002039 Pipelines KMZ as per Topographical survey Pipelines KMZ as per Topographical survey - KMZ FILE 4-Apr-2025 5-Apr-2025 OPEN PIP 10-Apr-2025 OPEN WITH BQ
1527 WOR-TRANSMIT-002040 Detailed design Pipeline Route - Shape files Detailed design Pipeline Route - Shape files - SHAPE FILE 4-Apr-2025 5-Apr-2025 OPEN PIP 11-Apr-2025 OPEN WITH BQ
1528 WOR-TRANSMIT-002041 2308-PRO-MR-092 MR - LEAK DETECTION SYSTEM (FOLDS) 01 MR 4-Apr-2025 5-Apr-2025 CLOSED I&C / TELECOM BQ-W-JFDP-T-1073 11-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1529 WOR-TRANSMIT-002042 2308-PRO-MR-102 MR - CS Flanges & Blinds 01 MR 10-Apr-2025 10-Apr-2025 CLOSED PIP 17-Apr-2025 CLOSED
1530 WOR-TRANSMIT-002043 GPR Change Order for Pentane GPR Change Order for Pentane - Change Order 6-Apr-2025 12-Apr-2025 Rejected Management BQ-W-JFDP-T-1092 13-Apr-2025 REJECTED & RETURNED TO WP CLOSED
1531 WOR-TRANSMIT-002045 2308-PRO-MR-065-NMR-601 NMR-601 for MR-065, FENCING MATERIALS-CODE C3 B NMR-601 10-Apr-2025 10-Apr-2025 CLOSED CIVIL BQ-W-JFDP-T-1016 17-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1532 WOR-TRANSMIT-002046 2308-PRO-MR-072 MR - GROUNDING CABLE & DEVICES 01 MR 7-Apr-2025 7-Apr-2025 CLOSED BQ-W-JFDP-T-1108 14-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1533 WOR-TRANSMIT-002047 2308-PRO-MR-031-CRS Worley response - POWER PANEL RACK 01 CRS_MR 7-Apr-2025 7-Apr-2025 CLOSED BQ-W-JFDP-T-1093 14-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1534 WOR-TRANSMIT-002048 PENTANE PIPELINE HAZOP REPORT PENTANE PIPELINE HAZOP REPORT 2 Hazop Report 7-Apr-2025 7-Apr-2025 CLOSED PROCESS BQ-W-JFDP-T-1190 14-Apr-2025 BQ-PLDF-II-TR-1427 RETURNED TO WORLEY CLOSED
1535 WOR-TRANSMIT-002049 2308-PRO-MR-033-CRS Worley Response - MR- Solar Power System 01 CRS_MR 7-Apr-2025 7-Apr-2025 CLOSED BQ-W-JFDP-T-1085 14-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1536 WOR-TRANSMIT-002050 2308-PRO-MR-031-NMR-601 NMR-601 For MR-031, POWER PANEL RACK A NMR-601 7-Apr-2025 7-Apr-2025 CLOSED 14-Apr-2025 SEND TO PRC ON 07-APR-2025
1537 WOR-TRANSMIT-002052 2308-PRO-MR-011 MR - FBE COATING AND DOUBLE JOINTING (Updated as per 90% Detail Design) 01 MR 7-Apr-2025 7-Apr-2025 CLOSED PIP BQ-W-JFDP-T-1180 14-Apr-2025 CRS SENT TO WORLEY CLOSED
1538 WOR-TRANSMIT-002053 BQ 90% REVIEW COMMENT RESPONSES-2nd BATCHBQ 90% REVIEW COMMENT RESPONSES-2nd BATCH - 90% 8-Apr-2025 8-Apr-2025 OPEN ALL 15-Apr-2025 OPEN WITH BQ
1539 WOR-TRANSMIT-002055 2308-PRO-MR-105-NMR-601 NMR 601 - LTCS FLANGES AND BLINDS - CODE-C1 B NMR-601 8-Apr-2025 8-Apr-2025 CLOSED PIP 15-Apr-2025 SEND TO PRC ON 08/Apr/2025
1540 WOR-TRANSMIT-002056 2308-PRO-MR-059-NMR-601 NMR-601 For MR-059, OHPL POLES-CODE C2 A NMR-601 8-Apr-2025 8-Apr-2025 CLOSED ELE / CVL 15-Apr-2025 CLOSED
1541 WOR-TRANSMIT-002057 2308-PRO-MR-030-NMR-602 NMR-602 For MR-030, TRANSFORMER (POLE MOUNTED TYPE) 01 NMR-602 8-Apr-2025 8-Apr-2025 CLOSED ELE / CVL 15-Apr-2025 CLOSED
1542 WOR-TRANSMIT-002058 2308-PRO-MR-053-NMR-601 NMR-601 For MR-053, CATHODIC PROTECTION (TEMPORARY & PERMANENT)-CODE-C2 A NMR-601 8-Apr-2025 8-Apr-2025 CLOSED ELE 15-Apr-2025 CLOSED
1543 WOR-TRANSMIT-002059 2308-PRO-MR-044 MR -PRESSURE RELIEF VALVES 02 MR 9-Apr-2025 9-Apr-2025 CLOSED I&C 16-Apr-2025 MR SIGNED & Shared with PRC on 31-May-25
1544 WOR-TRANSMIT-002060 2308-PRO-MR-112 MR - OUTDOOR IP TELEPHONE (WEATHER PROOF) 01 MR 9-Apr-2025 9-Apr-2025 CLOSED 16-Apr-2025 MR SIGNED & SHARED WITH PRC. PO PLACED
1545 WOR-TRANSMIT-002061 TOPO change order for pentane line Topo Survey for New 10 inch pentane pipeline. - Change Order 9-Apr-2025 9-Apr-2025 CLOSED Management sent to subcontract 16-Apr-2025
1546 WOR-TRANSMIT-002062 2308-PRO-MR-070 MR - LIGHTING POLES 01 MR 9-Apr-2025 9-Apr-2025 CLOSED ELE / CVL 16-Apr-2025 MR SIGNED
1547 WOR-TRANSMIT-002063 PIPELINES LOCATION CLASSIFICATION REPORT - REPORT 9-Apr-2025 9-Apr-2025 OPEN PIP 16-Apr-2025 OPEN WITH BQ
1548 WOR-TRANSMIT-002064 - POPULATION DENSITY INDEX FOR OUR ENTIRE PIPELINE ROUTE - INDEX 12-Apr-2025 12-Apr-2025 OPEN PIP 19
Project CN:
Project Title: Jafurah Downstream Pipings (JFDP-II)
BI Number: BI-10-14245
Contract No. 6601000358
1381 BQ-W-JFDP-T-1352 2-Jun-2025 MR 2308-PRO-MR-080 A BQ RESPONSE TO MR-080 - COMMUNICATION TOWER AND TETRA OPEN PENDING WITH WORLEY 21 Days
RADIO SYSTEM
1389 BQ-W-JFDP-T-1360 3-Jun-2025 TBC 2308-PRO-TC-MR-080 6 TBC Compliance Statement for MR-080 Communication Tower & CLOSED WOR-TRANSMIT-002323
Tetra Radio System (Rev-06)
[Vendor: ASAM / GAS VECTOR / ICS / NASCO / NOKIA / UNIQUE
PIONEER]