Backup

The document outlines the transmittals related to the Jafurah Downstream Pipings (JFDP-II) project, including various reports, invoices, and change orders. It provides details on the status of each transmittal, with some marked as closed and others still open. Key documents include weekly progress reports, design package submissions, and various material requisitions.

Uploaded by

ranishpk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views7 pages

Backup

The document outlines the transmittals related to the Jafurah Downstream Pipings (JFDP-II) project, including various reports, invoices, and change orders. It provides details on the status of each transmittal, with some marked as closed and others still open. Key documents include weekly progress reports, design package submissions, and various material requisitions.

Uploaded by

ranishpk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Project Title: Jafurah Downstream Pipings (JFDP-II)

BI Number: BI-10-14245
Contract No. 6601000358

Worley Incoimng Transmittal (MISC)


Note: some MR transmittals date may varry in from distribution date & rceiving date in MR LIST (Due to early un-official receving)
Sl No. Worley TR Number Doc. No. Doc. Name Rev. Type Date Received Time Internal Dist. Response Discipline BQ Ref: OTHER REMARKS STATUS Check
172 -- 30520 10% billing of the contract value for the complete 30% Design pkg. Submission 0 Invoice 3-May-2024 4-May-2024 CLOSED Management
1524 - 2308-PRO-TC-MR-013 RTR PIPES AND FITTINGS (FIRE WATER AND OWS) D TBC 28-Mar-2025 5-Apr-2025 Open PIP OPEN WITH BQ
271 - - - - - - CLOSED CLOSED
143 WOR-TRANSMIT-000287 413011-01303-WPECC-WPR-0018 Weekly Progress Report No. 0018 (Week ending: Mar 29, 2024) 0 WPR 1-Apr-2024 - - MANAGEMENT
297 email - 60% IOC-Mechanical A 60% 20-Jun-2024 20-Jun-2024 CLOSED CLOSED
298 email - 60% IOC- I & C A 60% 20-Jun-2024 20-Jun-2024 CLOSED CLOSED
732 Email for Ahmed Mashema 413011-01303-PVN-0012 Adjusted LUPs at QBGG 2 Change Order 3-Oct-2024 3-Oct-2024 CLOSED Management CLOSED
733 Email for Ahmed Mashema 413011-01303-PVN-0011 Installation of The TRV on Propane, Butane, Pentane and NG A-180 for Above Ground Piping 2 Change Order 3-Oct-2024 3-Oct-2024 CLOSED Management CLOSED
182 WOR-GENCORR-000562 - CRS of DCL and SAEP-303 Check for 60% DCL 13-May-2024 - CLOSED CLOSED
183 WOR-TRANSMIT-000001 413011-01418-PM-TEM-0001 Detailed Design Schedule for Intermediate_Scraper_Trap_TNRTNG 0 Schedule 28-Apr-2025 28-Apr-2025 Open PJC
2 WOR-TRANSMIT-000035 413011-01303.MOM.0004 MOM MOM - - -
1 WOR-TRANSMIT-000036 413011-01303-WPECC-WPR-005 Weekly Progress Report 29-Dec-2023 WPR 2-Jan-2024 ###- - MANAGEMENT
3 WOR-TRANSMIT-000038 PE-401550 PROJECT REPORT (SITE VISIT) A Site Visit 3-Jan-2024 - CLOSED ALL CLOSED
4 WOR-TRANSMIT-000040 ME-REP-0001 SOW for CMP(CORROSION MANAGEMENT PROGRAM AND RISK BASED INSPECTION DETAILED DESIGN) SOW 7-Jan-2024 - -
5 WOR-TRANSMIT-000042 - Saudization Reporting & Required Documentation Saudization 8-Jan-2024 - CLOSED CLOSED
6 WOR-TRANSMIT-000043 413011-01303-WPECC-WPR-006 Weekly Progress Report 05-Jan-2024 WPR 8-Jan-2024 ###- - MANAGEMENT
7 WOR-TRANSMIT-000044 PE-401550 Site Visit Report For Pipelines Corridor Site Visit 8-Jan-2024 - CLOSED PIP CLOSED
8 WOR-TRANSMIT-000060 2308-PRO-MR-005 Scraper Trap & Handiling Facilities 00 MR 9-Jan-2024 10-Jan-2024 CLOSED CLOSED
9 WOR-TRANSMIT-000061 2308-PRO-MR-055 Barred Tee 00 MR 10-Jan-2024 10-Jan-2024 CLOSED CLOSED
10 WOR-TRANSMIT-000074 413011-01303.MOM.0006 MOM-Weekly Engineering Progress 7-Jan-2024 MOM 10-Jan-2024 ###- -
11 WOR-TRANSMIT-000075 2308-PRO-MR-084 MOV Plug Valves 00 MR 10-Jan-2024 10-Jan-2024 CLOSED PIP CLOSED
13 WOR-TRANSMIT-000078 2308-PRO-MR-085 GOV Plug Valves MR 10-Jan-2024 12-Jan-2024 - PIP
12 WOR-TRANSMIT-000080 PE-401550 PROJECT REPORT (SITE VISIT) A Site Visit 10-Jan-2024 - CLOSED ALL CLOSED
14 WOR-TRANSMIT-000081 CO-NONDEL SoW of Manhole Verification and Duct Mandrelling Test A SOW 17-Jan-2024 YES-CHK DATE -
15 WOR-TRANSMIT-000082 2308-PRO-MR-003 Bends MR 13-Jan-2024 17-Jan-2024 CLOSED CLOSED
16 WOR-TRANSMIT-000083 413011-01303-WPECC-WPR-007 Weekly Progress Report 12-Jan-2024 WPR 17-Jan-2024 ### 20-Jan-2024 - MANAGEMENT
17 WOR-TRANSMIT-000084 CP-PL0001 SOW for CP and AC Mitigation B SOW 21-Jan-2024 21-Jan-2024 - ELE
18 WOR-TRANSMIT-000085 2308-PRO-MR-014 Ball Valves 00 MR 21-Jan-2024 21-Jan-2024 CLOSED PIP CLOSED
19 WOR-TRANSMIT-000086 2308-PRO-MR-018 GLOBE Valves 00 MR 21-Jan-2024 21-Jan-2024 CLOSED PIP CLOSED
20 WOR-TRANSMIT-000087 2308-PRO-MR-017 Gate Valve A MR 21-Jan-2024 21-Jan-2024 CLOSED PIP CLOSED
21 WOR-TRANSMIT-000088 2308-PRO-MR-016 Check Valves 00 MR 21-Jan-2024 21-Jan-2024 CLOSED PIP CLOSED
22 WOR-TRANSMIT-000089 2308-PRO-MR-015 Plug Valves 00 MR 21-Jan-2024 21-Jan-2024 CLOSED PIP CLOSED
23 WOR-TRANSMIT-000090 2308-PRO-MR-004 HOT TAP 00 MR 21-Jan-2024 18-Jan-2024 CLOSED MECH-HOT Un-officially received withouth Transmittal on 18-Jan-24 Un-officially received withouth Transmittal on 1
24 WOR-TRANSMIT-000091 2308-PRO-MR-005 Scraper Trap & Handiling Facilities (Revised) 00 MR 21-Jan-2024 18-Jan-2024 CLOSED Un-officially received withouth Transmittal on 18-Jan-24 Un-officially received withouth Transmittal on 1
25 WOR-TRANSMIT-000098 2308-PRO-MR-037 MOV Ball Valves 00 MR 24-Jan-2024 24-Jan-2024 CLOSED PIP CLOSED
26 WOR-TRANSMIT-000099 Inv # 29140 10% billng- Issue of Feed Verification report 0 Invoice 24-Jan-2024 24-Jan-2024 CLOSED Management CLOSED
34 WOR-TRANSMIT-000100 413011-01303-PVN-0001 Approval to Modify Current Budget 0 Change Order 24-Jan-2024 24-Jan-2024 CLOSED Management replied to worley on 8 feb T# 17 replied to worley on 8 feb T# 17
28 WOR-TRANSMIT-000101 413011-01303-WPECC-WPR-008 Weekly Progress Report 19-Jan-2024 0 WPR 23-Jan-2024 ### 24-Jan-2024 - MANAGEMENT
29 WOR-TRANSMIT-000102 2308-PRO-MR-038 GOV Ball Valves 00 MR 24-Jan-2024 25-Jan-2024 CLOSED PIP CLOSED
30 WOR-TRANSMIT-000106 413011-01303-WOR-LTR-0008-2024 Internal Non-Conformance Report # 2308-INCR-001 0 Letter 25-Jan-2024 25-Jan-2024 -
31 WOR-TRANSMIT-000107 2308-PRO-MR-044 MR -PRESSURE RELIEF VALVES 00 MR 25-Jan-2024 27-Jan-2024 CLOSED I&C CLOSED
32 WOR-TRANSMIT-000108 2308-PRO-MR-045 Control Valves 00 MR 28-Jan-2024 30-Jan-2024 CLOSED I&C CLOSED
33 WOR-TRANSMIT-000109 2308-PRO-MR-011 FBE Coating 00 MR 28-Jan-2024 30-Jan-2024 CLOSED PIP CLOSED
62 WOR-TRANSMIT-000110 413011-01303-PVN-0001 Scope Change Order (SCO) Approval to Modify Current Budget updated 0 Change Order 29-Jan-2024 30-Jan-2024 CLOSED Management BQ-W-JFDP-T- 653 CLOSED & RETURNED TO WP CLOSED
35 WOR-TRANSMIT-000113 - 30% Submission of Detailed Design Package (Erview) DCL 29-Jan-2024 ### 30-Jan-2024 CLOSED CLOSED
36 WOR-TRANSMIT-000114 2308-PRO-MR-003 Bends (REVISED) 00 MR 30-Jan-2024 ### 30-Jan-2024 CLOSED CLOSED
37 WOR-TRANSMIT-000115 JE-850047 30% OHPL DD Package 30% 30-Jan-2024 ### 30-Jan-2024 -
38 WOR-TRANSMIT-000116 413011-01303-WPECC-WPR-009 Weekly Progress Report 26-Jan-2024 WPR 30-Jan-2024 ### 30-Jan-2024 CLOSED MANAGEMENT By Mr.Shakir CLOSED
39 WOR-TRANSMIT-000117 2308-PRO-MR-055 Barred Tee (REVISED) 00 MR 31-Jan-2024 31-Jan-2024 CLOSED CLOSED
40 WOR-TRANSMIT-000118 2308-PRO-MR-084 MOV Plug Valves (REVISED) 00 MR 31-Jan-2024 31-Jan-2024 CLOSED PIP CLOSED
41 WOR-TRANSMIT-000124 2308-PRO-MR-005 Scraper Trap & Handiling Facilities (Revised) MR 5-Feb-2024 5-Feb-2024 CLOSED CLOSED
42 WOR-TRANSMIT-000125 KM-22024-24001 SCCM SCOPE CONTROL AND CHANGE MANAGEMENT DRAFT WORKSHOP REPORT SCCM 5-Feb-2024 6-Feb-2024 -
43 WOR-TRANSMIT-000126 413011-01303.MOM.0010 MOM-Weekly Engineering Progress 4-FEB-24 MOM 5-Feb-2024 6-Feb-2024 -
44 WOR-TRANSMIT-000127 2308-PRO-MR-004 Hot Tap Fittings MR 5-Feb-2024 6-Feb-2024 CLOSED MECH-HOT CLOSED
45 WOR-TRANSMIT-000128 413011-01303-WPECC-WPR-010 Weekly Progress Report 02-Feb-2024 WPR 5-Feb-2024 6-Feb-2024 - MANAGEMENT
46 WOR-TRANSMIT-000129 PE-401550 Site Visit Report Juaymah NGL Site Visit 5-Feb-2024 6-Feb-2024 CLOSED ALL CLOSED
47 WOR-TRANSMIT-000133 KM -22024-10001IMP PROJECT INTERFACE PLAN 0 PIP 6-Feb-2024 8-Feb-2024 -
48 WOR-TRANSMIT-000134 2308-PRO-MR-011 FBE Coating 00 MR 6-Feb-2024 8-Feb-2024 CLOSED PIP CLOSED
49 WOR-TRANSMIT-000136 2308-PRO-MR-022 DCS MODIFICATION (EMERSON) 00 MR 7-Feb-2024 8-Feb-2024 CLOSED I&C CLOSED
50 WOR-TRANSMIT-000137 2308-PRO-MR-023 DCS MODIFICATION (Honeywell) 00 MR 7-Feb-2024 8-Feb-2024 CLOSED I&C CLOSED
51 WOR-TRANSMIT-000139 PE-401550 Site Visit Report Jubail Interface-II 0 Site Visit 8-Feb-2024 8-Feb-2024 CLOSED ALL CLOSED
52 WOR-TRANSMIT-000140 2308-PRO-MR-024 ESD MODIFICATION (SCHNEIDER) 00 MR 11-Feb-2024 11-Feb-2024 CLOSED CLOSED
53 WOR-TRANSMIT-000141 2308-PRO-MR-020 CORROSION MONITORING SYSTEM 00 MR 11-Feb-2024 11-Feb-2024 CLOSED I&C CLOSED
54 WOR-TRANSMIT-000142 2308-PRO-MR-029 ANALYZER SKID WITH 3-SIDED SHELTER 00 MR 11-Feb-2024 11-Feb-2024 CLOSED ELE CLOSED
55 WOR-TRANSMIT-000143 2308-PRO-MR-115 GOV Plug Valves 01 MR 11-Feb-2024 11-Feb-2024 CLOSED PIP CLOSED
56 WOR-TRANSMIT-000144 2308-PRO-MR-027 EMERGENCY SHUT-DOWN VALVES (ZV) 00 MR 12-Feb-2024 13-Feb-2024 CLOSED CLOSED
57 WOR-TRANSMIT-000145 2308-PRO-MR-028 DRAIN COLLECTION VESSELS 00 MR 12-Feb-2024 13-Feb-2024 CLOSED MECH CLOSED
58 WOR-TRANSMIT-000146 413011-01303.MOM.0011 Minutes of Meeting MOM 12-Feb-2024 12-Feb-2024 -
59 WOR-TRANSMIT-000148 413011-01303-WPECC-WPR-0011 Weekly Progress Report 09-Feb-2024 WPR 12-Feb-2024 12-Feb-2024 - MANAGEMENT
60 WOR-TRANSMIT-000151 10% billing of contract value for the issuance of Feed Verification Report Invoice 13-Feb-2024 13-Feb-2024 CLOSED Management
65 WOR-TRANSMIT-000153 413011-01303-PVN-0002 Due to Client delay of providing the SPPID database prior the 30% submission and in reference to contract section 6.3.2 Change Order 15-Feb-2024 17-Feb-2024 CLOSED Management CLOSED
91 WOR-TRANSMIT-000154 413011-01303-PVN-0002/CHG-006 Due to Client delay of providing the SPPID database prior the 30% submission and in reference to contract section 6.3.2 Change Order 15-Feb-2024 17-Feb-2024 CLOSED Management
63 WOR-TRANSMIT-000155 413011-01303-PVN-0001/CHG-0005 Additional 08 Cubicle Space to SAPMT untill Nov 25th , 2024 ( 10 Months) Change Order 15-Feb-2024 17-Feb-2024 CLOSED Management CLOSED
64 WOR-TRANSMIT-000156 413011-01303-PVN-0001/CHG-0005 Additional 08 Cubicle Space to SAPMT untill Nov 25th , 2024 ( 10 Months) Change Order 15-Feb-2024 17-Feb-2024 CLOSED Management
66 WOR-TRANSMIT-000159 2308-PRO-MR-030 TRANSFORMER (POLE MOUNTED TYPE) A MR 19-Feb-2024 21-Feb-2024 CLOSED ELE / CVL CLOSED
67 WOR-TRANSMIT-000159 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. A MR 19-Feb-2024 21-Feb-2024 CLOSED MECH CLOSED
68 WOR-TRANSMIT-000159 2308-PRO-MR-044 MR -PRESSURE RELIEF VALVES 00 MR 19-Feb-2024 21-Feb-2024 CLOSED I&C CLOSED
69 WOR-TRANSMIT-000159 2308-PRO-MR-045 Control Valves MR 19-Feb-2024 21-Feb-2024 CLOSED I&C CLOSED
70 WOR-TRANSMIT-000161 413011-01303-WPECC-WPR-0012 Weekly Progress Report 16-Feb-2024 WPR 19-Feb-2024 ### 21-Feb-2024 - MANAGEMENT
71 WOR-TRANSMIT-000163 2308-PRO-MR-016 Check Valves MR 24-Feb-2024 21-Feb-2024 CLOSED PIP since un-offcialy rcv without transmittal by Mr.jose on 20-feb since un-offcialy rcv without transmittal by Mr.j
72 WOR-TRANSMIT-000164 2308-PRO-MR-014 Ball Valves MR 24-Feb-2024 25-Feb-2024 CLOSED PIP CLOSED
73 WOR-TRANSMIT-000164 2308-PRO-MR-015 Plug Valves MR 24-Feb-2024 25-Feb-2024 CLOSED PIP CLOSED
74 WOR-TRANSMIT-000164 2308-PRO-MR-017 Gate Valve 00 MR 24-Feb-2024 25-Feb-2024 CLOSED PIP CLOSED
75 WOR-TRANSMIT-000164 2308-PRO-MR-018 GLOBE Valves MR 24-Feb-2024 25-Feb-2024 CLOSED PIP CLOSED
76 WOR-TRANSMIT-000164 2308-PRO-MR-037 MOV Ball Valves MR 24-Feb-2024 25-Feb-2024 CLOSED PIP CLOSED
77 WOR-TRANSMIT-000164 2308-PRO-MR-113 MOV Ball Valves-Metal MR 24-Feb-2024 25-Feb-2024 CLOSED PIP CLOSED
78 WOR-TRANSMIT-000165 2308-PRO-MR-117 BALL VALVES, METAL SEATED, MANUAL 00 MR 25-Feb-2024 25-Feb-2024 CLOSED PIP CLOSED
79 WOR-TRANSMIT-000167 413011-01303-WPECC-MPR-001 Monthly Progress Report MPR 27-Feb-2024 27-Feb-2024 - MANAGEMENT
80 WOR-TRANSMIT-000168 413011-01303-WPECC-WPR-0013 Weekly Progress Report 23-Feb-2024 WPR 27-Feb-2024 27-Feb-2024 - MANAGEMENT
81 WOR-TRANSMIT-000169 2308-PRO-MR-034 MR - DC SYSTEM A MR 28-Feb-2024 29-Feb-2024 CLOSED ELE CLOSED
82 WOR-TRANSMIT-000169 2308-PRO-MR-038 GOV BALL VALVES, SOFT SEATED 00 MR 28-Feb-2024 29-Feb-2024 CLOSED PIP CLOSED
83 WOR-TRANSMIT-000169 2308-PRO-MR-114 GOV BALL VALVES, METAL SEATED 00 MR 28-Feb-2024 29-Feb-2024 CLOSED PIP CLOSED
84 WOR-TRANSMIT-000171 PE-654321 Radar Mapping Survey Scope of work C Radar Mapping 28-Feb-2024 ### 4-Mar-2024 CLOSED File was corrupt.. Re-sent by worley on 4-Mar-24 File was corrupt.. Re-sent by worley on 4-Mar-24
152 WOR-TRANSMIT-000172 413011-01303-PVN-0003/CHG-007 Change order-Conversion SPI to Microstation Change Order 2-Mar-2024 3-Mar-2024 CLOSED Management
86 WOR-TRANSMIT-000173 2308-PRO-MR-047 BURN PIT FLARE TIP SYSTEM & IGNITION SKID A MR 2-Mar-2024 3-Mar-2024 CLOSED MECH CLOSED
87 WOR-TRANSMIT-000177 413011-01303-WPECC-WPR-0014 Weekly Progress Report 29-Feb-2024 WPR 4-Mar-2024 4-Mar-2024 - MANAGEMENT
88 WOR-TRANSMIT-000179 PE-011006 SCOPE OF WORK-HAZOP A HAZOP 5-Mar-2024 5-Mar-2024 CLOSED CLOSED
89 WOR-TRANSMIT-000180 PE-000001 SCOPE of WORK for GEOTECHNICAL INVESTIGATION B SOW 5-Mar-2024 Replied to Worl - CVL
90 WOR-TRANSMIT-000183 2308-INCR-002 Internal Non Conformance Report 2308-INCR-002 (005) 0 NCR 7-Mar-2024 - -
156 WOR-TRANSMIT-000185 413011-01303-PVN-0004 Additional 11 Cubicles Space Utilized by SAPMT untill Nov 25th , 2024 0 Change Order 7-Mar-2024 7-Mar-2024 CLOSED Management CLOSED & RETURNED TO WP
92 WOR-TRANSMIT-000186 2308-PRO-MR-048 REMOTE TERMINAL UNIT A MR 7-Mar-2024 7-Mar-2024 CLOSED CLOSED
93 WOR-TRANSMIT-000187 - E-Review- ISSUED FOR EARLY IFC A Early IFC 7-Mar-2024 7-Mar-2024 CLOSED CLOSED
94 WOR-TRANSMIT-000190 CO-NONDEL-003 A SOW 10-Mar-2024 - -
95 WOR-TRANSMIT-000192 CS Report for BI-10-14245 (Rev.A) CONSTRUCTABILITY STUDY (CS) REPORT A REPORT 11-Mar-2024 Informed to RJ b -
96 WOR-TRANSMIT-000195 413011-01303-WPECC-WPR-0015 Weekly Progress Report A WPR 11-Mar-2024 - - MANAGEMENT
97 WOR-TRANSMIT-000196 2308-PRO-TC-MR-004 HOT TAP FITTINGS - TECHNICAL CLARIFICATION - RMA Middle East A TBC 12-Mar-2024 - CLOSED MECH-HOT CLOSED
98 WOR-TRANSMIT-000198 - Site Visit Report_BERRI DCO A Site Visit 12-Mar-2024 - CLOSED ALL CLOSED
99 WOR-TRANSMIT-000201 2308-PRO-MR-118 Non-Slam Check Valves A MR 13-Mar-2024 - CLOSED PIP CLOSED
100 WOR-TRANSMIT-000204 - E-Review- ISSUED FOR EARLY IFC Early IFC 14-Mar-2024 - CLOSED CLOSED
101 WOR-TRANSMIT-000205 2308-PRO-TC-MR-005 SCRAPER TRAPS & HANDLING FACILITIES A TBC 14-Mar-2024 - CLOSED CLOSED
102 WOR-TRANSMIT-000206 2308-PRO-TC-MR-084 TBC COMPLIANCE STATEMENT FOR MR-084 MOV PLUG VALVES-FLOW SERVE, OMS SALERI & VALVITALIA A TBC 14-Mar-2024 Sent to PRC CLOSED PIP CLOSED
103 WOR-TRANSMIT-000207 2308-PRO-MR-036 MR - JIB CRANES A MR 14-Mar-2024 - CLOSED CLOSED
104 WOR-TRANSMIT-000208 2308-PRO-MR-113 MOV BALL VALVES, METAL SEATED A MR 14-Mar-2024 - CLOSED PIP CLOSED
105 WOR-TRANSMIT-000211 PE-654321 RADAR MAPPING SUVEY SCOPE OF WORK SOW 14-Mar-2024 - -
106 WOR-TRANSMIT-000212 ME-REP-0001 Scope of Work, Rev.D for RBI and OSI. D SOW 14-Mar-2024 - CLOSED CLOSED
107 WOR-TRANSMIT-000217 2308-PRO-MR-027 EMERGENCY SHUT-DOWN VALVES (ZV) MR 15-Mar-2024 - CLOSED CLOSED
108 WOR-TRANSMIT-000218 2308-PRO-MR-023 DCS MODIFICATIONS (HONEYWELL) MR 15-Mar-2024 - CLOSED I&C CLOSED
109 WOR-TRANSMIT-000219 2308-PRO-MR-022 MR-022 DCS (EMERSON) A MR 17-Mar-2024 - CLOSED I&C CLOSED
110 WOR-TRANSMIT-000220 2308-PRO-MR-024 MR-024 ESD MODIFICATION (SCHNEIDER) A MR 17-Mar-2024 - CLOSED CLOSED
111 WOR-TRANSMIT-000221 2308-PRO-MR-020 CORROSION MONITORING SYSTEM A MR 17-Mar-2024 - CLOSED I&C CLOSED
112 WOR-TRANSMIT-000222 PE-011006 SCOPE OF WORK - HAZOP B SOW 17-Mar-2024 - -
113 WOR-TRANSMIT-000223 2308-PRO-MR-022 QATIF GOSP-1 DCS MODIFICATIONS (EMERSON) 00 MR 18-Mar-2024 - CLOSED I&C CLOSED
114 WOR-TRANSMIT-000224 2308-PRO-MR-020 CORROSION MONITORING SYSTEM 00 MR 18-Mar-2024 - CLOSED I&C CLOSED
115 WOR-TRANSMIT-000225 2308-PRO-MR-024 ESD MODIFICATIONS (SCHNEIDER) 00 MR 18-Mar-2024 - CLOSED CLOSED
116 WOR-TRANSMIT-000228 413011-01303-WPECC-WPR-0016 Weekly Progress Report No. 0016 (Week ending: Mar 15, 2024) 0 WPR 18-Mar-2024 - - MANAGEMENT
117 WOR-TRANSMIT-000229 PE-401550 Site visit report - QATIF GOSP-1 A Site Visit 19-Mar-2024 - CLOSED ALL CLOSED
118 WOR-TRANSMIT-000230 2308-PRO-MR-122 GLOBE VALVES, THREADED & SOCKETWELD ENDS A MR 19-Mar-2024 - CLOSED PIP CLOSED
119 WOR-TRANSMIT-000231 2308-PRO-TC-MR-004 HOT TAP FITTINGS - TECHNICAL CLARIFICATION - RMA Middle East, UBSCO & WELDFIT A TBC 19-Mar-2024 Sent to PRC CLOSED MECH-HOT CLOSED
120 WOR-TRANSMIT-000232 2308-PRO-TC-MR-005 SCRAPER TRAPS & HANDLING FACILITIES- TECHNICAL CLARIFICATION - DLPS, GLAPWELL, INMA & ZAMIL A TBC 19-Mar-2024 Sent to PRC CLOSED CLOSED
122 WOR-TRANSMIT-000241 2308-PRO-MR-030 TRANSFORMER (POLE MOUNTED TYPE) B MR 21-Mar-2024 - CLOSED ELE / CVL CLOSED
123 WOR-TRANSMIT-000242 2308-PRO-MR-028 DRAIN COLLECTION VESSELS 00 MR 21-Mar-2024 - CLOSED MECH CLOSED
121 WOR-TRANSMIT-000255 2308-PRO-TC-MR-011 TBC Compliance Statement for MR-011 FBE COATING 01 TBC 22-Mar-2024 - CLOSED PIP CLOSED

124 WOR-TRANSMIT-000256 - 0 SPS 25-Mar-2024 - CLOSED CLOSED

125 WOR-TRANSMIT-000257 2308-PRO-MR-027-CRS CRS-EMERGENCY SHUT-DOWN VALVES 00 CRS_MR 25-Mar-2024 - CLOSED CLOSED
126 WOR-TRANSMIT-000258 2308-PRO-MR-024-CRS CRS-ESD MODIFICATION(SCHNEIDER) 00 CRS_MR 25-Mar-2024 - CLOSED CLOSED
127 WOR-TRANSMIT-000259 2308-PRO-MR-022-CRS CRS-DCS MODIFICATIONS-EMERSON 00 CRS_MR 25-Mar-2024 - CLOSED I&C CLOSED
128 WOR-TRANSMIT-000260 2308-PRO-TC-MR-055 TBC Compliance Statement for MR-055 BARRED TEE A TBC 25-Mar-2024 - CLOSED CLOSED
129 WOR-TRANSMIT-000264 413011-01303-WPECC-WPR-0017 Weekly Progress Report No. 0017 (Week ending: Mar 22, 2024) A WPR 26-Mar-2024 - - MANAGEMENT
130 WOR-TRANSMIT-000265 2308-PRO-MR-020 MR - CORROSION MONITORING SYSTEM 00 MR 26-Mar-2024 - CLOSED I&C CLOSED
131 WOR-TRANSMIT-000266 2308-PRO-MR-023 JUAYMAH NGLF DCS MODIFICATIONS (HONEYWELL) 00 MR 26-Mar-2024 - CLOSED I&C CLOSED

132 WOR-TRANSMIT-000267 Site Visit Report 0 Site Visit 26-Mar-2024 - - ALL

133 WOR-TRANSMIT-000268 2308-PRO-MR-113 UPDATED MOV BALL VALVES, METAL SEATED 00 MR 26-Mar-2024 - CLOSED PIP CLOSED
134 WOR-TRANSMIT-000271 2308-PRO-MR-117 BALL VALVES, METAL SEATED, MANUAL 00 MR 28-Mar-2024 28-Mar-2024 CLOSED PIP CLOSED
135 WOR-TRANSMIT-000273 R167561001P FLOW ASSURANCE STEADY STATE HYDRAULIC REPORT FOR SALES GAS - DETAILED ENGINEERING PHASE B FLOW ASSURANCE 28-Mar-2024 - -
136 WOR-TRANSMIT-000274 2308-PRO-MR-030 MR - TRANSFORMER (POLE MOUNTED TYPE) 00 MR 29-Mar-2024 - CLOSED ELE / CVL CLOSED
137 WOR-TRANSMIT-000275 ME-REP-0001 Scope of Work, Rev.E for RBI and OSI E SOW 1-Apr-2024 - -
138 WOR-TRANSMIT-000276 SITE VISIT REPORT - TELECOM SITE VISIT REPORT - TELECOM - SAPD BLDG. 1193 IN ABQAIQ A Site Visit 1-Apr-2024 - - ALL
139 WOR-TRANSMIT-000277 413011-01303.MOM.0016 MINUTES OF MEETING - PENTANE +CB PL UNDER BI:10-14245 A MOM 1-Apr-2024 - -
140 WOR-TRANSMIT-000278 2308-PRO-MR-034 MR - DC SYSTEM B MR 1-Apr-2024 - CLOSED ELE CLOSED
141 WOR-TRANSMIT-000279 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM A MR 1-Apr-2024 - CLOSED Telecom CLOSED
142 WOR-TRANSMIT-000280 2308-PRO-MR-114 GOV BALL VALVES, METAL SEATED 00 MR 1-Apr-2024 2-Apr-2024 CLOSED PIP CLOSED
144 WOR-TRANSMIT-000288 2308-PRO-MR-021 MR - FIBER OPTIC CABLES 00 MR 2-Apr-2024 - CLOSED CLOSED
145 WOR-TRANSMIT-000289 2308-PRO-MR-086 MR - SPECTACLE PLATES 00 MR 2-Apr-2024 - CLOSED PIP CLOSED
146 WOR-TRANSMIT-000292 2308-PRO-MR-120 GATE VALVES, THREADED & SOCKETWELD ENDS A MR 2-Apr-2024 - CLOSED PIP CLOSED
147 WOR-TRANSMIT-000294 PE-000000 SITE VISIT REPORT-PIPING - JUAYMAH GAS PLANT Site Visit - Mar 2024 A Site Visit 3-Apr-2024 - CLOSED PIP CLOSED
148 WOR-TRANSMIT-000294 PE-401550 Site visit report - QATIF GOSP-1 - JAFURAH DEVELOPMENT PROGRAM B Site Visit 3-Apr-2024 - - ALL
149 WOR-TRANSMIT-000295 PE-066005 FLOW ASSURANCE BASIS OF DESIGN FOR C2+NGL B FLOW ASSURANCE 3-Apr-2024 - -
150 WOR-TRANSMIT-000302 2308-PRO-MR-054 LIQUID CUSTODY METERING SKID A MR 8-Apr-2024 - CLOSED I&C CLOSED
186 WOR-TRANSMIT-000303 413011-01303-PVN-0006 Scope Change Order - Change in the Butane Flow Rate 0 Change Order 8-Apr-2024 - CLOSED Management Superseded by PVN-0015 Superseded by PVN-0015
187 WOR-TRANSMIT-000304 413011-01303-PVN-0007 SCOPE CHANGE ORDER - SALES GAS CHANGES TO LINE SIZE CHANGE FROM 12" TO 16" 0 Change Order 8-Apr-2024 - CLOSED Management CLOSED
153 WOR-TRANSMIT-000305 413011-01303-WPECC-WPR-0019 Weekly Progress Report No. 0019 (Week ending: Apr 05, 2024) 0 WPR 8-Apr-2024 - - MANAGEMENT
154 WOR-TRANSMIT-000306 Inv # 30371 Inv. 30371 , (5% billng- Issue LLI MR's) issued Apr.07,2024 0 Invoice 8-Apr-2024 Repeated / Cance CLOSED Management CLOSED
155 WOR-TRANSMIT-000307 Inv # 30371 Inv. 30371 , (5% billng- Issue LLI MR's) issued Apr.07,2024 0 Invoice 8-Apr-2024 - CLOSED Management
171 WOR-TRANSMIT-000308 413011-01303-PVN-0005 Scope Change Order - Resolution Of C2+NGL Hydraulic Deficiencies 0 Change Order 8-Apr-2024 - CLOSED Management CLOSED
157 WOR-TRANSMIT-000328 413011-01303-WPECC-WPR-0020 Weekly Progress Report No. 0020 (Week ending: Apr 19, 2024) WPR 23-Apr-2024 - - MANAGEMENT
158 WOR-TRANSMIT-000347 2308-PRO-MR-021 FOC 00 MR 29-Apr-2024 - CLOSED CLOSED
159 WOR-TRANSMIT-000348 2308-PRO-MR-118 CHECK VALVES, NON SLAM 00 MR 29-Apr-2024 - CLOSED PIP CLOSED
160 WOR-TRANSMIT-000349 2308-PRO-MR-048 REMOTE TERMINAL UNIT 00 MR 29-Apr-2024 - CLOSED CLOSED
161 WOR-TRANSMIT-000350 2308-PRO-MR-036 MR - JIB CRANES 00 MR 29-Apr-2024 - CLOSED CLOSED
162 WOR-TRANSMIT-000351 413011-01303-WPECC-WPR-0021 Weekly Progress Report No. 0020 (Week ending: Apr 26, 2024) WPR 30-Apr-2024 - - MANAGEMENT
163 WOR-TRANSMIT-000352 - DCL and SAEP-303 Check for 60% DCL 30-Apr-2024 - CLOSED CLOSED
164 WOR-TRANSMIT-000354 PE-000000 Site Visit Report JNGL-16- April 24 0 Site Visit 1-May-2024 - CLOSED ALL CLOSED
165 WOR-TRANSMIT-000355 2308-PRO-MR-120 GATE VALVES, THREADED & SOCKETWELD ENDS 00 MR 30-Apr-2024 - CLOSED PIP CLOSED
166 WOR-TRANSMIT-000356 2308-PRO-MR-086 MR - SPECTACLE PLATES 00 MR 1-May-2024 - CLOSED PIP CLOSED
167 WOR-TRANSMIT-000357 2308-PRO-TC-MR-003 HOT INDUCTION BENDS TBC 1-May-2024 - CLOSED CLOSED
168 WOR-TRANSMIT-000358 2308-PRO-TC-MR-015 Plug Valves A TBC 1-May-2024 - CLOSED PIP CLOSED
169 WOR-TRANSMIT-000359 RE-401551 SECURITY RISK ASSESSMENT Subcontract(Stage 3 DETAIL DESIGN) A SOW 2-May-2024 2-May-2024 CLOSED CLOSED
170 WOR-TRANSMIT-000360 PE-002100 Scope of Work for Fire Protection (PE Certification) A SOW 2-May-2024 2-May-2024 -
206 WOR-TRANSMIT-000361 413011-01303-PVN-0008 Optional Subcontract - Topography Survey 0 Change Order 2-May-2024 4-May-2024 CLOSED Management CLOSED
173 WOR-TRANSMIT-000365 IFC - 0 Early IFC 4-May-2024 6-May-2024 CLOSED CLOSED
174 WOR-TRANSMIT-000369 2308-PRO-MR-029 ANALYZER SKID WITH 3-SIDED SHELTER 00 MR 6-May-2024 6-May-2024 CLOSED ELE CLOSED
175 WOR-TRANSMIT-000370 2308-PRO-MR-038 GOV BALL VALVES, SOFT SEATED 00 MR 6-May-2024 6-May-2024 CLOSED PIP CLOSED
176 WOR-TRANSMIT-000371 2308-PRO-MR-117 BALL VALVES, METAL SEATED, MANUAL 00 MR 6-May-2024 6-May-2024 CLOSED PIP CLOSED
177 WOR-TRANSMIT-000372 2308-PRO-MR-122 GLOBE VALVES, THREADED & SOCKETWELD ENDS 00 MR 6-May-2024 6-May-2024 CLOSED PIP CLOSED
179 WOR-TRANSMIT-000374 2308-PRO-MR-047 BURN PIT FLARE TIP SYSTEM & IGNITION SKID 00 MR 7-May-2024 7-May-2024 CLOSED MECH CLOSED
180 WOR-TRANSMIT-000375 413011-01303-WPECC-WPR-0022 Weekly Progress Report no. 0022 03-may-2024 WPR 7-May-2024 8-May-2024 - MANAGEMENT
181 WOR-TRANSMIT-000376 SW-011006 SCOPE OF WORK-Fire and Gas Detection Mapping A SOW 7-May-2024 8-May-2024 CLOSED CLOSED
178 WOR-TRANSMIT-000377 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 00 MR 7-May-2024 7-May-2024 CLOSED MECH CLOSED
183 WOR-TRANSMIT-000387 PE-000000 SITE VISIT REPORT-PPIPING - Burn Pit near QBGG Scraper Trap and Berri Gas Plant 6-May-24 0 Site Visit 13-May-2024 13-May-2024 CLOSED PIP CLOSED
184 WOR-TRANSMIT-000388 PE-000000 Site Visit Report - Qatif GOSP-1 for Elec. & Instr. 08-May24 0 Site Visit 13-May-2024 14-May-2024 CLOSED ALL CLOSED
310 WOR-TRANSMIT-000389 413011-01303-PVN-0011 Installation of The TRV on Propane, Butane, Pentane and NG A-180 for Above Ground Piping 0 Change Order 13-May-2024 14-May-2024 CLOSED Management cancelled Email from Santosh- 23-May-24 CANCELLED
348 WOR-TRANSMIT-000390 413011-01303-PVN-0012 Adjusted LUPs at QBGG 0 Change Order 13-May-2024 13-May-2024 CLOSED Management BQ-W-JFDP-T-0478 07-Oct-2024 CLOSED CLOSED
483 WOR-TRANSMIT-000391 413011-01303-PVN-0013 Relocation of Valve Station from 27.1 KM to 23 KM on Ethane Pipeline 0 Change Order 13-May-2024 14-May-2024 CLOSED Management CLOSED
188 WOR-TRANSMIT-000392 413011-01303-WPECC-WPR-0023 Weekly Progress Report No.0023 (week Ending : May, 10, 2024) 0 WPR 13-May-2024 ### 14-May-2024 - MANAGEMENT
189 WOR-TRANSMIT-000393 2308-PRO-MR-047-CRS CRS FOR 2308-PRO-MR-047 A CRS_MR 14-May-2024 - CLOSED CLOSED
190 WOR-TRANSMIT-000394 2308-PRO-TC-MR-005 SCRAPER TRAPS & HANDLING FACILITIES- TECHNICAL CLARIFICATION 0 TBC 14-May-2024 15-May-2024 CLOSED CLOSED
191 WOR-TRANSMIT-000395 2308-PRO-MR-034-CRS CRS MR-034 Rev. A DC SYSTEM with 3-SIDED SHELTER 00 CRS_MR 14-May-2024 - CLOSED ELE CLOSED
192 WOR-TRANSMIT-000396 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM A MR 14-May-2024 - CLOSED Telecom CLOSED
193 WOR-TRANSMIT-000397 - 413011-01303 _ Overall EDSR Register_14-May-24 DCL 14-May-2024 15-May-2024 CLOSED CLOSED
194 WOR-TRANSMIT-000398 - Monthly Saudization Report 2024 Saudization 14-May-2024 15-May-2024 CLOSED Management CLOSED
195 WOR-TRANSMIT-000399 413011-01303.MOM.0025 Minitues of Meeting 14-May-2024 A MOM 15-May-2024 15-May-2024 -
196 WOR-TRANSMIT-000403 2308-PRO-MR-034 MR - DC SYSTEM 00 MR 15-May-2024 15-May-2024 CLOSED ELE CLOSED
197 WOR-TRANSMIT-000404 RE-401551 SECURITY RISK ASSESSMENT Subcontract(Stage 3 DETAIL DESIGN) B SOW 15-May-2024 15-May-2024 -
198 WOR-TRANSMIT-000406 2308-PRO-MR-054 Metering Skid 00 MR 15-May-2024 ### 16-May-2024 CLOSED I&C CLOSED
199 WOR-TRANSMIT-000409 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM 00 MR 17-May-2024 SAHRED BY NOW CLOSED Telecom CLOSED
255 WOR-TRANSMIT-000410 413011-01303-PVN-0009 Pipelines Reroute Inside Juyamah Plant 0 Change Order 17-May-2024 19-May-2024 CLOSED Management Superseded by PVN-0015 Superseded by PVN-0015
309 WOR-TRANSMIT-000411 413011-01303-PVN-0010 Butane Over Pressure Protection SRV 0 Change Order 17-May-2024 19-May-2024 CLOSED Management Superseded by PVN-0015 Superseded by PVN-0015
202 WOR-TRANSMIT-000424 413011-01303-WPECC-WPR-0024 Weekly Progress Report No. 0024 0 WPR 20-May-2024 ### 21-May-2024 - MANAGEMENT
203 WOR-TRANSMIT-000426 PE-000000 Site Visit Report PPIPING - SHJNGL-2 EXISTING BURN PIT @ Km.140.4. OF 36”-C2+NGL P/L 14-May-2024 0 Site Visit 21-May-2024 22-May-2024 CLOSED PIP CLOSED
204 WOR-TRANSMIT-000427 2308-INCR-003 Internal Non Conformance Report-003 0 NCR 21-May-2024 ### 22-May-2024 -
205 WOR-TRANSMIT-000428 PE-000000 SITE VISIT REPORT - QATIF GOSP-1 8-May-2024 0 Site Visit 21-May-2024 ### 22-May-2024 CLOSED ALL CLOSED
200 WOR-TRANSMIT-000429 413011-01303-PVN-0007 Sales Gas Changes to Line Size Change from 12" to 16" 0 Change Order 22-May-2024 - CLOSED Management CLOSED
207 WOR-TRANSMIT-000430 2308-PRO-TC-MR-055 TBC Compliance Statement for MR-055 BARRED TEE 01 TBC 22-May-2024 22-May-2024 -
208 WOR-TRANSMIT-000434 413011-01303.MOM.0024 FLOW ASSURANCE DEPRESSURIZATION STUDY RESULTS A MOM 22-May-2024 22-May-2024 -
209 WOR-TRANSMIT-000435 2308-PRO-MR-118 Check Valves_Non Slam 01 MR 22-May-2024 22-May-2024 CLOSED PIP CLOSED
210 WOR-TRANSMIT-000436 2308-PRO-MR-088 FIRE EXTINGUISHERS A MR 23-May-2024 23-May-2024 CLOSED PIP / MECH CLOSED
211 WOR-TRANSMIT-000439 413011-01303-WPECC-WPR-0025 Weekly Progress Report No. 0025 0 WPR 28-May-2024 28-May-2024 - MANAGEMENT
212 WOR-TRANSMIT-000440 2308-PRO-TC-MR-018 TC for Globe Valves 0 TBC 28-May-2024 28-May-2024 CLOSED PIP CLOSED
213 WOR-TRANSMIT-000441 413011-01303-WOR-LTR-0021-2024 Exhibit-I Approval 0 Letter 29-May-2024 ### 30-May-2024 -
214 WOR-TRANSMIT-000442 SW-011006 SCOPE OF WORK-Fire and Gas Detection Mapping B SOW 30-May-2024 30-May-2024 -
215 WOR-TRANSMIT-000443 R167635P Flow Assurance Steady State Hydraulic Report for Natural Gas Liquids A FLOW ASSURANCE 30-May-2024 30-May-2024 CLOSED PROCESS BQ-W-JFDP-T-0191 CLOSED & RETURNED TO WP CLOSED
216 WOR-TRANSMIT-000443 R167639P Flow Assurance SAEP-27 Exhibit-I, C2+NGL Export Pipeline A FLOW ASSURANCE 30-May-2024 30-May-2024 CLOSED PROCESS BQ-W-JFDP-T-0190 CLOSED & RETURNED TO WP CLOSED
217 WOR-TRANSMIT-000447 2308-PRO-MR-087 SAMPLING CONNECTION A MR 31-May-2024 26-May-2024 CLOSED CLOSED
218 WOR-TRANSMIT-000448 2308-PRO-TC-MR-004 Hot Tap Fittings B TBC 31-May-2024 27-May-2024 CLOSED MECH-HOT unofficially received copy distributed eralier unofficially received copy distributed eralier
219 WOR-TRANSMIT-000449 2308-PRO-TC-MR-125 CASING PIPES A TBC 31-May-2024 26-May-2024 CLOSED PIP CLOSED
220 WOR-TRANSMIT-000450 2308-PRO-TC-MR-001 CARBON STEEL PIPES A TBC 31-May-2024 27-May-2024 CLOSED PIP CLOSED
221 WOR-TRANSMIT-000451 2308-PRO-TC-MR-018 TC for Globe Valves A TBC 31-May-2024 28-May-2024 CLOSED PIP CANCELLED CANCELLED #VALUE!
222 WOR-TRANSMIT-000452 2308-PRO-TC-MR-024 ESD MODIFICATION (SCHNEIDER) A TBC 31-May-2024 1-Jun-2024 CLOSED CLOSED
223 WOR-TRANSMIT-000453 2308-PRO-MR-054-CRS CRS MR-054 Rev. 00 Metering Skid 00 CRS_MR 31-May-2024 1-Jun-2024 CLOSED CLOSED
224 WOR-TRANSMIT-000454 2308-PRO-MR-008 SS FLANGES_BLINDS A MR 31-May-2024 28-May-2024 CLOSED PIP CLOSED
225 WOR-TRANSMIT-000455 2308-PRO-MR-105 2308-PRO-MR-105 Rev. A LTCS FLANGES_BLINDS A MR 31-May-2024 28-May-2024 CLOSED PIP CLOSED
226 WOR-TRANSMIT-000456 2308-PRO-MR-002 LOW TEMPERATURE CARBON STEEL PIPES A MR 31-May-2024 28-May-2024 CLOSED PIP CLOSED
227 WOR-TRANSMIT-000457 2308-PRO-MR-012 STAINLESS STEEL PIPES A MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
228 WOR-TRANSMIT-000458 2308-PRO-MR-102 CS Flanges_Blinds A MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
229 WOR-TRANSMIT-000459 2308-PRO-TC-MR-015 PLUG VALVES B TBC 31-May-2024 29-May-2024 - PIP #VALUE!
230 WOR-TRANSMIT-000460 2308-PRO-TC-MR-021 FIBER OPTIC CABLES A TBC 31-May-2024 29-May-2024 CLOSED CLOSED
231 WOR-TRANSMIT-000461 2308-PRO-MR-087 SAMPLING CONNECTION 00 MR 31-May-2024 29-May-2024 CLOSED CLOSED
232 WOR-TRANSMIT-000462 2308-PRO-MR-002 LOW TEMPERATURE CARBON STEEL PIPES 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
233 WOR-TRANSMIT-000463 2308-PRO-MR-088 FIRE EXTINGUISHERS 00 MR 31-May-2024 29-May-2024 CLOSED PIP / MECH CLOSED
234 WOR-TRANSMIT-000464 2308-PRO-MR-012 STAINLESS STEEL PIPES 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
235 WOR-TRANSMIT-000465 2308-PRO-TC-MR-125 CASING PIPES 0 TBC 31-May-2024 29-May-2024 CLOSED PIP unofficially received copy distributed eralier unofficially received copy distributed eralier
236 WOR-TRANSMIT-000466 2308-PRO-MR-008 SS FLANGES_BLINDS 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
237 WOR-TRANSMIT-000467 2308-PRO-MR-105 LTCS FLANGES_BLINDS 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
238 WOR-TRANSMIT-000468 2308-PRO-MR-102 CS Flanges_Blinds 00 MR 31-May-2024 29-May-2024 CLOSED PIP CLOSED
239 WOR-TRANSMIT-000469 2308-PRO-TC-MR-016 TECHNICAL CLARIFICATION - SWING CHECK VALVE A TBC 31-May-2024 1-Jun-2024 CLOSED PIP CLOSED
240 WOR-TRANSMIT-000470 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL A TBC 31-May-2024 1-Jun-2024 CLOSED PIP CLOSED
241 WOR-TRANSMIT-000471 2308-PRO-TC-MR-023 TECHNICAL CLARIFICATION - DCS MODIFICATION A TBC 31-May-2024 1-Jun-2024 CLOSED I&C CLOSED
242 WOR-TRANSMIT-000472 - 413011-01303_JFR Saudization Monthly Report May-2024 - Saudization 2-Jun-2024 2-Jun-2024 CLOSED Management CLOSED
243 WOR-TRANSMIT-000477 - HAZOP Nodes & Agenda - HAZOP 3-Jun-2024 3-Jun-2024 CLOSED CLOSED
244 WOR-TRANSMIT-000478 2308-PRO-TC-MR-115 Technical Bid Compliance-MR-115-Gov Plug Valves TBC 3-Jun-2024 3-Jun-2024 CLOSED PIP CLOSED
245 WOR-TRANSMIT-000479 2308-PRO-TC-MR-086 TBC FOR SPECTACLE PLATES TBC 3-Jun-2024 2-Jun-2024 -
246 WOR-TRANSMIT-000480 2308-PRO-MR-055-TBE TECHNICAL BID EVALUATION - BARRED TEE - TBE 3-Jun-2024 3-Jun-2024 CLOSED CLOSED
247 WOR-TRANSMIT-000481 2308-PRO-MR-015-TBE TECHNICAL BID EVALUATION - PLUG VALVES – MANUAL TBE 3-Jun-2024 3-Jun-2024 CLOSED PIP CLOSED
248 WOR-TRANSMIT-000482 2308-PRO-TC-MR-005 TECHNICAL CLARIFICATION - SCRAPER TRAPS & HANDLING FACILITIES 0 TBC 3-Jun-2024 3-Jun-2024 CLOSED CLOSED
249 WOR-TRANSMIT-000483 413011-01303-WPECC-WPR-0026 Weekly Progress Report No. 0026 (Week ending : May 31, 2024) 0 WPR 3-Jun-2024 3-Jun-2024 - MANAGEMENT
250 WOR-TRANSMIT-000484 2308-PRO-TC-MR-030 TECHNICAL CLARIFICATION - POLE MOUNTED TRANSFORMER 0 TBC 4-Jun-2024 4-Jun-2024 CLOSED ELE / CVL CLOSED
201 WOR-TRANSMIT-000485 413011-01303-PVN-0007 SCOPE CHANGE ORDER - SALES GAS CHANGES TO LINE SIZE CHANGE FROM 12" TO 16" 1 Change Order 4-Jun-2024 4-Jun-2024 CLOSED Management CLOSED
252 WOR-TRANSMIT-000488 2308-PRO-MR-055-TBE FINAL TBE FOR BARRED TEE B TBE 5-Jun-2024 4-Jun-2024 CLOSED CLOSED
253 WOR-TRANSMIT-000489 2308-PRO-MR-021-TBE FINAL TBE FOR FOC B TBE 5-Jun-2024 4-Jun-2024 -
254 WOR-TRANSMIT-000490 2308-PRO-TC-MR-084 TECHNICAL CLARIFICATION - MOV PLUG VALVES. B TBC 5-Jun-2024 4-Jun-2024 CLOSED PIP CLOSED
185 WOR-TRANSMIT-000491 413011-01303-PVN-0005 Scope Change Order - Resolution Of C2+NGL Hydraulic Deficiencies 1 Change Order 5-Jun-2024 5-Jun-2024 CLOSED Management
256 WOR-TRANSMIT-000492 2308-PRO-TC-MR-014 TECHNICAL CLARIFICATION - BALL VALVES - MANUAL A TBC 5-Jun-2024 5-Jun-2024 CLOSED PIP CLOSED
257 WOR-TRANSMIT-000493 PE-000000 Site Visit Report JNGL-30-May-24 - SRV Site Verification A Site Visit 5-Jun-2024 5-Jun-2024 CLOSED ALL CLOSED
258 WOR-TRANSMIT-000494 2308-PRO-TC-MR-036 TBC For Jib Crane A TBC 5-Jun-2024 5-Jun-2024 CLOSED CLOSED
259 WOR-TRANSMIT-000495 2308-PRO-TC-MR-028 TBC FOR DRAIN COLLECTION VESSELS A TBC 5-Jun-2024 5-Jun-2024 CLOSED CLOSED
260 WOR-TRANSMIT-000497 2308-PRO-MR-040 HORNS AND BEACONS A MR 6-Jun-2024 5-Jun-2024 CLOSED I&C CLOSED
261 WOR-TRANSMIT-000531 2308-PRO-MR-033 Solar Power System A MR 10-Jun-2024 8-Jun-2024 CLOSED ELE CLOSED
262 WOR-TRANSMIT-000532 2308-PRO-MR-031 MR - POWER DISTRIBUTION PANELBOARD RACK, LOW VOLTAGE A MR 10-Jun-2024 8-Jun-2024 CLOSED CLOSED
263 WOR-TRANSMIT-000533 PE-000000 SITE VISIT REPORT-AC Mitigation Required for Ethane Pipeline 3rd & 4th -Jun-2024 A Site Visit 10-Jun-2024 10-Jun-2024 CLOSED ELE CLOSED
264 WOR-TRANSMIT-000534 PE-000000 SITE VISIT REPORT-Electrical Juaymah NGL 30-MAY-2024 A Site Visit 10-Jun-2024 10-Jun-2024 CLOSED ALL CLOSED
265 WOR-TRANSMIT-000534 PE-000000 SITE VISIT REPORT-Jubail Interface-II Surge Relief Skid 05-Jun-2024 A Site Visit 10-Jun-2024 10-Jun-2024 CLOSED ALL CLOSED
266 WOR-TRANSMIT-000535 413011-01303-WPECC-WPR-0027 Weekly Progress Report No. 0027 (Week ending : June 07, 2024) A WPR 10-Jun-2024 10-Jun-2024 CLOSED MANAGEMENT CLOSED
267 WOR-TRANSMIT-000536 RE 167506 FLOW ASSURANCE SAEP-27 EXHIBIT-I - PENTANE + CB B FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 -
268 WOR-TRANSMIT-000536 RE 101830 EXHIBIT-I SURGE ANALYSIS TECHNICAL SPECIFICATION FOR BUTANE PIPELINE B FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 - I&C
269 WOR-TRANSMIT-000536 PE 811070 EXHIBIT-I SURGE ANALYSIS TECHNICAL SPECIFICATION FOR PROPANE PIPELINE A FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 - I&C
270 WOR-TRANSMIT-000536 RE 167535 FLOW ASSURANCE SAEP-27 EXHIBIT-I - NATURAL GASOLINE B FLOW ASSURANCE 11-Jun-2024 11-Jun-2024 -
272 WOR-TRANSMIT-000545 - BQ-Worley response for Pending Issues and Concerns - Issue and Concerns 12-Jun-2024 4-Jun-2024 CLOSED CLOSED
273 WOR-TRANSMIT-000550 2308-PRO-MR-040 HORNS AND BEACONS 00 MR 19-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
274 WOR-TRANSMIT-000551 2308-PRO-MR-033 Solar Power System 00 MR 19-Jun-2024 19-Jun-2024 CLOSED ELE CLOSED
275 WOR-TRANSMIT-000553 2308-PRO-MR-042 TEMPERATURE INSTRUMENTS A MR 20-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
276 WOR-TRANSMIT-000554 2308-PRO-MR-043 GWR LEVEL TRANSMITTER A MR 20-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
277 WOR-TRANSMIT-000555 2308-PRO-MR-061 ORIFICE FLANGE ASSEMBLY A MR 21-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
278 WOR-TRANSMIT-000556 2308-PRO-MR-041 PRESSURE TRANSMITTERS A MR 21-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
279 WOR-TRANSMIT-000557 2308-PRO-MR-060 PRESSURE GAUGES A MR 21-Jun-2024 19-Jun-2024 CLOSED I&C CLOSED
280 WOR-TRANSMIT-000558 2308-PRO-MR-135 WELDOLET A MR 21-Jun-2024 19-Jun-2024 CLOSED CLOSED
281 WOR-TRANSMIT-000559 2308-PRO-MR-062 MAGNETIC LEVEL GAUGES A MR 21-Jun-2024 19-Jun-2024 CLOSED CLOSED
282 WOR-TRANSMIT-000560 2308-PRO-MR-006 MR FOR BW FITTINGS (SS) A MR 21-Jun-2024 19-Jun-2024 CLOSED PIP CLOSED
283 WOR-TRANSMIT-000561 2308-PRO-MR-007 THREADED & SOCKETWELD FITTINGS (SS) A MR 21-Jun-2024 19-Jun-2024 CLOSED PIP CLOSED
284 WOR-TRANSMIT-000562 2308-PRO-MR-104 THREADED & SOCKETWELD FITTINGS (LTCS) A MR 21-Jun-2024 19-Jun-2024 CLOSED PIP CLOSED
285 WOR-TRANSMIT-000563 2308-PRO-MR-103 BW FITTINGS - LTCS A MR 21-Jun-2024 20-Jun-2024 CLOSED PIP CLOSED
286 WOR-TRANSMIT-000564 2308-PRO-MR-101 THREADED & SOCKETWELD FITTINGS (CS) A MR 21-Jun-2024 20-Jun-2024 CLOSED PIP CLOSED
287 WOR-TRANSMIT-000565 2308-PRO-MR-100 BW FITTINGS - CS A MR 21-Jun-2024 20-Jun-2024 CLOSED PIP CLOSED
288 WOR-TRANSMIT-000566 - Planning For Start-Up Workshop Summary Report (PFSU) 0 PFSU 22-Jun-2024 22-Jun-2024 CLOSED CLOSED
289 WOR-TRANSMIT-000567 - Planning For Start-Up Workshop Summary Report (PFSU) A PFSU 22-Jun-2024 22-Jun-2024 CLOSED CLOSED
290 WOR-TRANSMIT-000567 - START-UP EXECUTION PLAN A SEP 22-Jun-2024 22-Jun-2024 CLOSED CLOSED
291 WOR-TRANSMIT-000568 PE-000000 SITE VISIT REPORT RAS TANURAH REFINERY- PLANT 010 06-JUNE-2024 A Site Visit 22-Jun-2024 22-Jun-2024 CLOSED ALL CLOSED
292 WOR-TRANSMIT-000569 06-0163-03-01 Hazop Report 1 HAZOP 23-Jun-2024 ### 24-Jun-2024 CLOSED CLOSED
293 WOR-TRANSMIT-000570 413011-01303-WOR-LTR-0023-2024 Leave Notification Worley PM - Ahmed Letter 24-Jun-2024 24-Jun-2024 CLOSED MANAGEMENT Submitted to PMT CLOSED
294 WOR-TRANSMIT-000571 PE-000000 Site Visit Report NAPD-06- June-2024 A Site Visit 24-Jun-2024 24-Jun-2024 CLOSED ALL CLOSED
295 WOR-TRANSMIT-000572 - 60% IOC-Civil A 60% 24-Jun-2024 24-Jun-2024 CLOSED CLOSED
296 WOR-TRANSMIT-000572 - 60% IOC-Jafurah COMMS Drawings A 60% 24-Jun-2024 24-Jun-2024 CLOSED CLOSED
299 WOR-TRANSMIT-000573 413011-01303-WPECC-WPR-0028 Weekly Progress Report No. 0028 Jun 14, 2024 A WPR 24-Jun-2024 24-Jun-2024 - MANAGEMENT
300 WOR-TRANSMIT-000575 - - - - - CLOSED CLOSED
301 WOR-TRANSMIT-000576 2308-PRO-MR-095 FLOW INSTRUMENTS A MR 24-Jun-2024 23-Jun-2024 CLOSED I&C CLOSED
302 WOR-TRANSMIT-000577 2308-PRO-MR-093 SCRAPER PASSAGE INDICATORS A MR 24-Jun-2024 23-Jun-2024 CLOSED CLOSED
303 WOR-TRANSMIT-000578 - - - - - CLOSED CLOSED
304 WOR-TRANSMIT-000579 2308-PRO-MR-092 FIBER OPTIC LEAK DETECTION SYSTEM A MR 24-Jun-2024 23-Jun-2024 CLOSED I&C / TELECOM CLOSED
305 WOR-TRANSMIT-000580 2308-PRO-MR-091 SCADA MODIFICATION A MR 24-Jun-2024 23-Jun-2024 CLOSED CLOSED
306 WOR-TRANSMIT-000581 2308-PRO-MR-019 LEAK DETECTION SYSTEM (RTTM) A MR 24-Jun-2024 23-Jun-2024 CLOSED CLOSED
307 WOR-TRANSMIT-000582 Electrical Binder Pre-60 60% IOC-Electrical A 60% 25-Jun-2024 25-Jun-2024 -
308 WOR-TRANSMIT-000583 - Piping Material Specification and Wall Thickness Calculation. Specs 25-Jun-2024 25-Jun-2024 CLOSED PIP BQ-PLDF-II-TR-0727 (TO PMT) CLOSED
551 WOR-TRANSMIT-000586 413011-01303-PVN-0015 Juayma Changes 0 Change Order 25-Jun-2024 25-Jun-2024 Revised Management Revised received on 01-Sep-2024 Revised received on 01-Sep-2024
311 WOR-TRANSMIT-000587 413011-01303-PVN-0011 Scope Change Order - Installation of the TRV on Propane, Butane, Pentane and NG A-180 for Above Ground Piping 1 Change Order 25-Jun-2024 25-Jun-2024 CLOSED Management BQ-W-JFDP-T-0477 07-Oct-2024 CLOSED CLOSED
482 WOR-TRANSMIT-000588 413011-01303-PVN-0012 Scope Change Order for Adjusted LUPs at QBGG 1 Change Order 25-Jun-2024 25-Jun-2024 CLOSED Management rejected by BQ CLOSED
312 WOR-TRANSMIT-000589 413011-01303.MOM.0030 MOM for the HAZOP session - Sales Gas Displacement in place of Depressurizing C2+NGL, and Propane. A MOM 26-Jun-2024 27-Jun-2024 -
313 WOR-TRANSMIT-000590 - PE CV & Professional Accreditations ( Zidan Ahmed, Ali Khalid) - CV 27-Jun-2024 27-Jun-2024 CLOSED CLOSED
314 WOR-TRANSMIT-000591 2308-PRO-TC-MR-118 TBC for MR-118, CHECK VALVES, NON SLAM A TBC 27-Jun-2024 25-Jun-2024 CLOSED PIP CLOSED
315 WOR-TRANSMIT-000592 2308-PRO-MR-086-TBE TBE for MR-086, SPECTACLE PLATES 0 TBE 27-Jun-2024 25-Jun-2024 CLOSED PIP CLOSED
316 WOR-TRANSMIT-000593 2308-PRO-MR-004-TBE TBE for MR-004 Hot Tap Fittings 0 TBE 27-Jun-2024 25-Jun-2024 CLOSED MECH-HOT CLOSED
317 WOR-TRANSMIT-000594 2308-PRO-MR-006 MR FOR BW FITTINGS (SS) 00 MR 28-Jun-2024 27-Jun-2024 CLOSED PIP CLOSED
318 WOR-TRANSMIT-000595 2308-PRO-MR-007 MR - THDD AND SW FITTINGS - SS 00 MR 28-Jun-2024 27-Jun-2024 CLOSED PIP CLOSED
319 WOR-TRANSMIT-000596 2308-PRO-MR-100 MR - BW FITTINGS - CS 00 MR 28-Jun-2024 27-Jun-2024 CLOSED PIP CLOSED
320 WOR-TRANSMIT-000597 2308-PRO-MR-060 MR-PRESSURE GAUGES. 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
321 WOR-TRANSMIT-000598 2308-PRO-MR-041 MR-PRESSURE TRANSMITTER 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
322 WOR-TRANSMIT-000599 2308-PRO-MR-042 MR-TEMPERATURE INSTRUMENTS 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
323 WOR-TRANSMIT-000600 2308-PRO-MR-043 MR-GWR LEVEL TRANSMITTER 00 MR 28-Jun-2024 27-Jun-2024 CLOSED I&C CLOSED
324 WOR-TRANSMIT-000601 T650997003WB COATING MAP. B COATING 29-Jun-2024 ### 30-Jun-2024 -
325 WOR-TRANSMIT-000601 T650996078WB CORROSION MANAGEMENT PROGRAM B CORROSION 29-Jun-2024 ### 30-Jun-2024 -
326 WOR-TRANSMIT-000602 - 60% IOC-Process & Flow Assurance A 60% 29-Jun-2024 ### 30-Jun-2024 CLOSED CLOSED
327 WOR-TRANSMIT-000603 413011-01303-WOR-LTR-0024-2024 36” NGL Pipeline Design Capacity Change Letter 30-Jun-2024 30-Jun-2024 - PIP
328 WOR-TRANSMIT-000604 - JFR Saudization Monthly Report 2024 -Jun-24 Saudization 30-Jun-2024 30-Jun-2024 CLOSED Management CLOSED
329 WOR-TRANSMIT-000605 413011-01303-WOR-LTR-0025-2024 Pending Change Orders Approval Letter 30-Jun-2024 ### 1-Jul-2024 -
330 WOR-TRANSMIT-000606 2308-PRO-TC-MR-019 TECHNICAL CLARIFICATION - BALL VALVES -MANUAL A TBC 1-Jul-2024 NOT CLOSED PIP email sent since wrong MR number as per attachment OBSELETE
331 WOR-TRANSMIT-000607 2308-PRO-MR-101 THREADED & SOCKETWELD FITTINGS (CS) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
332 WOR-TRANSMIT-000608 2308-PRO-MR-103 BW FITTINGS (LTCS) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
333 WOR-TRANSMIT-000609 2308-PRO-MR-104 THREADED & SOCKETWELD FITTINGS (LTCS) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
334 WOR-TRANSMIT-000610 2308-PRO-MR-135 WELDOLET 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
335 WOR-TRANSMIT-000611 2308-PRO-MR-093 SCRAPER PASSAGE INDICATORS 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
336 WOR-TRANSMIT-000612 2308-PRO-MR-061 ORIFICE FLANGE ASSEMBLY 00 MR 1-Jul-2024 29-Jun-2024 CLOSED I&C CLOSED
337 WOR-TRANSMIT-000613 2308-PRO-MR-062 MAGNETIC LEVEL GAUGES 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
338 WOR-TRANSMIT-000614 2308-PRO-MR-092 FIBER OPTIC LEAK DETECTION SYSTEM 00 MR 1-Jul-2024 29-Jun-2024 CLOSED I&C / TELECOM CLOSED
339 WOR-TRANSMIT-000615 2308-PRO-MR-095 FLOW INSTRUMENTS 00 MR 1-Jul-2024 29-Jun-2024 CLOSED I&C CLOSED
340 WOR-TRANSMIT-000616 2308-PRO-MR-019 LEAK DETECTION SYSTEM (RTTM) 00 MR 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
341 WOR-TRANSMIT-000617 2308-PRO-TC-MR-024 ESD MODIFICATION (SCHNEIDER) B TBC 1-Jul-2024 29-Jun-2024 CLOSED CLOSED
342 WOR-TRANSMIT-000618 2308-PRO-TC-MR-037 MOV Ball Valves A TBC 1-Jul-2024 29-Jun-2024 CLOSED PIP CLOSED
343 WOR-TRANSMIT-000623 - 60% Fire Protection IOC Package A 60% 2-Jul-2024 2-Jul-2024 CLOSED CLOSED
344 WOR-TRANSMIT-000624 - 60% Piping IOC Package A 60% 2-Jul-2024 2-Jul-2024 CLOSED PIP CLOSED
345 WOR-TRANSMIT-000625 2308-PRO-TC-MR-016 TECHNICAL CLARIFICATION - SWING CHECK VALVE B TBC 2-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
346 WOR-TRANSMIT-000626 2308-PRO-MR-026 FIRE WATER SYSTEM A MR 2-Jul-2024 30-Jun-2024 CLOSED PIP / MECH CLOSED
347 WOR-TRANSMIT-000627 2308-PRO-MR-089 EYEWASH & SAFETY SHOWER A MR 2-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
552 WOR-TRANSMIT-000628 413011-01303-PVN-0015 Scope Change Order - Juayma Changes 1 Change Order 2-Jul-2024 2-Jul-2024 Revised Management Revised received on 01-Sep-2024 Revised received on 01-Sep-2024
349 WOR-TRANSMIT-000629 2308-PRO-MR-106 INSULATION OF PIPING A MR 3-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
350 WOR-TRANSMIT-000630 2308-PRO-MR-109 RTR FITTINGS (8" NPS) A MR 3-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
351 WOR-TRANSMIT-000631 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB) A MR 3-Jul-2024 30-Jun-2024 CLOSED I&C CLOSED
352 WOR-TRANSMIT-000632 2308-PRO-TC-MR-115 TECHNICAL CLARIFICATION - PLUG VALVES - GOV B TBC 3-Jul-2024 30-Jun-2024 CLOSED PIP CLOSED
353 WOR-TRANSMIT-000633 413011-01303-WPECC-WPR-0029 Weekly Progress Report No.0029 (Week ending Jun, 28 2024) A WPR 3-Jul-2024 3-Jul-2024 - MANAGEMENT
354 WOR-TRANSMIT-000634 Inv # 31531 Invoice - 10% Billing of the contract value for the complete IFC drawing for Civil Work-EIFC pkg-1 A Invoice 3-Jul-2024 3-Jul-2024 CLOSED Management
355 WOR-TRANSMIT-000635 2308-PRO-TC-MR-115 TECHNICAL CLARIFICATION - PLUG VALVES - GOV B TBC 3-Jul-2024 30-Jun-2024 CLOSED PIP repeated TR received from Worley, email sent on 4 Jul 24 onREPEATED
356 WOR-TRANSMIT-000636 2308-PRO-MR-094 INSTRUMENT JUNCTION BOX (IJB) A MR 3-Jul-2024 30-Jun-2024 CLOSED I&C CLOSED
357 WOR-TRANSMIT-000637 2308-PRO-MR-097 INSTRUMENT VALVES, TUBING & FITTINGS A MR 3-Jul-2024 2-Jul-2024 CLOSED I&C CLOSED
358 WOR-TRANSMIT-000638 2308-PRO-MR-013 RTR PIPES & FITTINGS (FW OWS) A MR 3-Jul-2024 3-Jul-2024 CLOSED PIP CLOSED
359 WOR-TRANSMIT-000639 2308-PRO-TC-MR-005 TECHNICAL CLARIFICATION -Scraper Traps C TBC 3-Jul-2024 3-Jul-2024 CLOSED CLOSED
360 WOR-TRANSMIT-000640 2308-PRO-TC-MR-030 TRANSFORMER (POLE MOUNTED TYPE) B TBC 3-Jul-2024 3-Jul-2024 CLOSED ELE / CVL CLOSED
361 WOR-TRANSMIT-000641 2308-PRO-TC-MR-106 INSULATION OF PIPING 0 TBC 6-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
362 WOR-TRANSMIT-000642 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB) 00 MR 6-Jul-2024 6-Jul-2024 CLOSED I&C CLOSED
363 WOR-TRANSMIT-000643 2308-PRO-MR-026 FIRE WATER SYSTEM 00 MR 8-Jul-2024 6-Jul-2024 CLOSED PIP / MECH CLOSED
364 WOR-TRANSMIT-000644 2308-PRO-MR-089 EYEWASH & SAFETY SHOWER 00 MR 7-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
365 WOR-TRANSMIT-000645 2308-PRO-MR-091 SCADA MODIFICATION 00 MR 8-Jul-2024 6-Jul-2024 CLOSED CLOSED
366 WOR-TRANSMIT-000646 2308-PRO-MR-094 INSTRUMENT JUNCTION BOX (IJB) 00 MR 8-Jul-2024 6-Jul-2024 CLOSED I&C CLOSED
367 WOR-TRANSMIT-000647 2308-PRO-MR-106 INSULATION OF PIPING 00 MR 8-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
368 WOR-TRANSMIT-000648 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB) 00 MR 8-Jul-2024 6-Jul-2024 CLOSED I&C CLOSED
369 WOR-TRANSMIT-000649 2308-PRO-MR-109 RTR FITTINGS (8" NPS) 00 MR 8-Jul-2024 6-Jul-2024 CLOSED PIP CLOSED
370 WOR-TRANSMIT-000650 2308-PRO-TC-MR-028 2308-MR-028 -TECHNICAL CLARIFICATION for DRAIN COLLECTION VESSELS B TBC 8-Jul-2024 6-Jul-2024 -
371 WOR-TRANSMIT-000651 2308-PRO-TC-MR-027 TBC Compliance Statement for MR-027 EMERGENCY SHUT-DOWN VALVES (ZV). A TBC 8-Jul-2024 7-Jul-2024 CLOSED CLOSED
372 WOR-TRANSMIT-000652 413011-01303-WPECC-WPR-0030 Weekly Progress Report No. 0030 (Jul 05, 2024) 0 WPR 9-Jul-2024 9-Jul-2024 - MANAGEMENT
373 WOR-TRANSMIT-000653 2308-PRO-MR-009 STUD BOLTS A MR 9-Jul-2024 7-Jul-2024 CLOSED CVL CLOSED
374 WOR-TRANSMIT-000654 2308-PRO-MR-010 GASKETS & INSULATING SETS A MR 9-Jul-2024 7-Jul-2024 CLOSED PIP CLOSED
375 WOR-TRANSMIT-000655 2308-PRO-MR-065 FENCING MATERIALS A MR 9-Jul-2024 7-Jul-2024 CLOSED CIVIL CLOSED
376 WOR-TRANSMIT-000656 2308-PRO-MR-066 FENCE GATES A MR 9-Jul-2024 7-Jul-2024 CLOSED CLOSED
377 WOR-TRANSMIT-000657 2308-PRO-TC-MR-120 GATE VALVES, THREADED & SOCKETWELD ENDS A TBC 9-Jul-2024 8-Jul-2024 CLOSED PIP CLOSED
378 WOR-TRANSMIT-000658 2308-PRO-MR-018-TBE Globe Valves A TBE 9-Jul-2024 7-Jul-2024 - PIP
379 WOR-TRANSMIT-000659 2308-PRO-TC-MR-113 MOV Ball Valves Metal Seated A TBC 9-Jul-2024 10-Jul-2024 CLOSED PIP CLOSED
380 WOR-TRANSMIT-000660 2308-PRO-TC-MR-019 WOR-TRANSMIT-000660-HOLD email sent to imtiaz to confirm TBC - - -
381 WOR-TRANSMIT-000661 2308-PRO-TC-MR-034 DC SYSTEM with 3-SIDED SHELTER A TBC 9-Jul-2024 9-Jul-2024 CLOSED ELE CLOSED
382 WOR-TRANSMIT-000662 2308-PRO-MR-013 RTR PIPES & FITTINGS (FW OWS) 00 MR 10-Jul-2024 10-Jul-2024 CLOSED PIP CLOSED
383 WOR-TRANSMIT-000663 2308-PRO-TC-MR-023 DCS MODIFICATION (Honeywell) B TBC 10-Jul-2024 10-Jul-2024 - I&C
384 WOR-TRANSMIT-000664 2308-PRO-TC-MR-036 TBC For Jib Crane A TBC 10-Jul-2024 10-Jul-2024 CLOSED CLOSED
385 WOR-TRANSMIT-000665 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL B TBC 10-Jul-2024 10-Jul-2024 CLOSED PIP CLOSED
386 WOR-TRANSMIT-000666 2308-PRO-MR-097 INSTRUMENT VALVES, TUBING & FITTINGS 00 MR 10-Jul-2024 10-Jul-2024 CLOSED I&C CLOSED
387 WOR-TRANSMIT-000667 413011-01303.MOM.0032 Jafurah Exhibit-I Approvals. 0 MOM 10-Jul-2024 10-Jul-2024 -
388 WOR-TRANSMIT-000669 2308-PRO-MR-061 ORIFICE FLANGE ASSEMBLY 00 MR 10-Jul-2024 10-Jul-2024 CLOSED I&C CLOSED
389 WOR-TRANSMIT-000670 60% E-REVIEW 60% E-REVIEW 0 60% 10-Jul-2024 10-Jul-2024 -
390 WOR-TRANSMIT-000673 RE 167635 BQ-SA- Comment sheet - C2+NGL STEADY STATE HYDRAULIC Report-Responses A FLOW ASSURANCE 11-Jul-2024 11-Jul-2024 - BQ-PLDF-II-TR-0597
391 WOR-TRANSMIT-000675 413011-01303-WOR-LTR-0026 413011-01303-WOR-LTR-0026-2024 Site Access Delay for Subcontractors Letter 11-Jul-2024 11-Jul-2024 -
392 WOR-TRANSMIT-000676 2308-PRO-MR-031 MR - POWER DISTRIBUTION PANELBOARD RACK, LOW VOLTAGE 00 MR 11-Jul-2024 11-Jul-2024 CLOSED CLOSED
393 WOR-TRANSMIT-000677 2308-PRO-MR-041 PRESSURE TRANSMITTERS 00 MR 12-Jul-2024 Friday 13-Jul-2024 CLOSED I&C CLOSED
394 WOR-TRANSMIT-000678 2308-PRO-MR-060 Press Gauges- 00 MR 12-Jul-2024 Friday 13-Jul-2024 CLOSED CLOSED
395 WOR-TRANSMIT-000679 413011-01303-WOR-LTR-0027-2024 Pending change order approval (PVN002&003) Letter 14-Jul-2024 15-Jul-2024 -
396 WOR-TRANSMIT-000680 413011-01303-WOR-LTR-0028-2024 Project Schedule and Cost Impact Due to late Design Changes Letter 14-Jul-2024 15-Jul-2024 -
397 WOR-TRANSMIT-000681 2308-PRO-MR-009 STUD BOLTS 00 MR 14-Jul-2024 13-Jul-2024 CLOSED CVL CLOSED
398 WOR-TRANSMIT-000682 2308-PRO-MR-010 GASKETS & INSULATING SETS 00 MR 14-Jul-2024 13-Jul-2024 CLOSED PIP CLOSED
399 WOR-TRANSMIT-000683 2308-PRO-MR-051 ANCHOR BOLTS A MR 14-Jul-2024 13-Jul-2024 CLOSED CVL CLOSED
400 WOR-TRANSMIT-000684 2308-PRO-MR-110 MOISTURE ANALYZER A MR 14-Jul-2024 13-Jul-2024 CLOSED ELE CLOSED
401 WOR-TRANSMIT-000685 2308-PRO-MR-111 INDUSTRIAL ETHERNET SWITCHES A MR 14-Jul-2024 ### 15-Jul-2024 CLOSED CLOSED
402 WOR-TRANSMIT-000686 2308-PRO-MR-112 OUTDOOR IP TELEPHONE (WEATHER PROOF) A MR 14-Jul-2024 ### 15-Jul-2024 CLOSED CLOSED
403 WOR-TRANSMIT-000687 2308-PRO-MR-063 FIBER PATCH PANELS A MR 14-Jul-2024 ### 15-Jul-2024 CLOSED CLOSED
404 WOR-TRANSMIT-000688 2308-PRO-MR-097 INSTRUMENT VALVES, TUBING & FITTINGS (updated) 00 MR 14-Jul-2024 ### 10-Jul-2024 CLOSED I&C CLOSED
405 WOR-TRANSMIT-000689 2308-PRO-MR-094 INSTRUMENT JUNCTION BOX (IJB)-updated 00 MR 14-Jul-2024 ### 10-Jul-2024 CLOSED I&C CLOSED
406 WOR-TRANSMIT-000690 2308-PRO-MR-126 INSTRUMENT JUNCTION BOX (FFJB)-updated 00 MR 14-Jul-2024 ### 10-Jul-2024 CLOSED I&C CLOSED
407 WOR-TRANSMIT-000691 - BQ-SA- Comment sheet - C2+NGL STEADY STATE HYDRAULIC Report-Responses A FLOW ASSURANCE 15-Jul-2024 15-Jul-2024 CLOSED cancelled same as 0673 CANCELLED
408 WOR-TRANSMIT-000694 413011-01303-WOR-LTR-0029-2024 Response to Slow Progress in Geotechnical Investigation Activities - Letter 16-Jul-2024 16-Jul-2024 - CVL
409 WOR-TRANSMIT-000696 413011-01303 - INVOICE IPC# 08 INTERIM PAYMENT CERTIFICATE # 08 - Payment Certificate 16-Jul-2024 16-Jul-2024 CLOSED Management
410 WOR-TRANSMIT-000697 2308-PRO-TC-MR-084 TECHNICAL CLARIFICATION - MOV PLUG VALVES C TBC 16-Jul-2024 16-Jul-2024 CLOSED PIP CLOSED
411 WOR-TRANSMIT-000700 2308-INCR-005 Internal Non Conformance Report 2308-INCR-005_signed 0 NCR 18-Jul-2024 18-Jul-2024 CLOSED CLOSED
412 WOR-TRANSMIT-000701 413011-01303-WOR-LTR-0030-2024 Response to Delay in Submission of MR Packages on Time - Lack of Dedicated Resources - Letter 18-Jul-2024 18-Jul-2024 -
413 WOR-TRANSMIT-000702 SEC_PL_001 Sketch for SEC 0 Sketch 18-Jul-2024 20-Jul-2024 -
414 WOR-TRANSMIT-000705 - STEADY STATE MODEL FILES & TRANSIENT MODEL FILES. MODEL Files 19-Jul-2024 20-Jul-2024 CLOSED CLOSED
415 WOR-TRANSMIT-000706 2308-PRO-MR-065 FENCING MATERIALS 00 MR 21-Jul-2024 21-Jul-2024 CLOSED CIVIL CLOSED
416 WOR-TRANSMIT-000707 2308-PRO-MR-066 FENCING GATES 00 MR 21-Jul-2024 21-Jul-2024 CLOSED CIVIL CLOSED
417 WOR-TRANSMIT-000708 2308-PRO-MR-098 TRANSMISSION EQUIPMENT AND ACCESSORIES A MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
418 WOR-TRANSMIT-000709 2308-PRO-MR-069 LIGHTING FIXTURES A MR 21-Jul-2024 21-Jul-2024 CLOSED ELE CLOSED
419 WOR-TRANSMIT-000710 2308-PRO-MR-070 LIGHTING POLES A MR 21-Jul-2024 21-Jul-2024 CLOSED ELE / CVL CLOSED
420 WOR-TRANSMIT-000711 2308-PRO-MR-071 LV CABLE (POWER AND CONTROL). A MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
421 WOR-TRANSMIT-000712 2308-PRO-MR-072 MR - GROUNDING CABLE & DEVICES A MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
422 WOR-TRANSMIT-000713 2308-PRO-MR-063 FIBER PATCH PANELS 00 MR 21-Jul-2024 21-Jul-2024 CLOSED CLOSED
423 WOR-TRANSMIT-000714 2308-PRO-TC-MR-122 GLOBE VALVES, THREADED & SOCKETWELD ENDS A TBC 21-Jul-2024 21-Jul-2024 CLOSED PIP CLOSED
424 WOR-TRANSMIT-000715 2308-PRO-MR-086-TBE TBE SUM REPORT - TBE FOR SPECTACLE PLATES B TBE 21-Jul-2024 21-Jul-2024 - PIP
425 WOR-TRANSMIT-000716 413011-01303-WPECC-WPR-0032 Weekly Progress Report No. 0032 (Week ending 19-July-2024) 0 WPR 22-Jul-2024 23-Jul-2024 - MANAGEMENT
426 WOR-TRANSMIT-000717 2308-PRO-MR-014-TBE 2308-PRO-MR-014 - FINAL TBE - BALL VALVES A TBE 23-Jul-2024 23-Jul-2024 CLOSED PIP CLOSED
427 WOR-TRANSMIT-000718 2308-PRO-TC-MR-016 TECHNICAL CLARIFICATION - SWING CHECK VALVE C TBC 23-Jul-2024 23-Jul-2024 CLOSED PIP CLOSED
428 WOR-TRANSMIT-000719 Inv # 31872 10% billing - 60% submission of DD Package for E-Review 0 Invoice 24-Jul-2024 24-Jul-2024 CLOSED Management
429 WOR-TRANSMIT-000720 413011-01303-WPECC-WPR-0031 Weekly Progress Report No. 0032 (Week ending 12-July-2024) 0 WPR 24-Jul-2024 24-Jul-2024 - MANAGEMENT
430 WOR-TRANSMIT-000724 2308-PRO-TC-MR-117 TECHNICAL CLARIFICATION - Ball Valves Metal Seated A TBC 25-Jul-2024 24-Jul-2024 CLOSED PIP CLOSED
431 WOR-TRANSMIT-000725 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL C TBC 25-Jul-2024 24-Jul-2024 CLOSED PIP CLOSED
432 WOR-TRANSMIT-000726 2308-PRO-TC-MR-024 TECHNICAL CLARIFICATION -ESD MODIFICATION (SCHNEIDER) C TBC 25-Jul-2024 24-Jul-2024 -
433 WOR-TRANSMIT-000727 2308-PRO-MR-028-TBE Final TBE For DRAIN COLLECTION VESSELS A TBE 25-Jul-2024 24-Jul-2024 CLOSED CLOSED
434 WOR-TRANSMIT-000728 2308-PRO-MR-005-TBE Final TBE For SCRAPER TRAPS & HANDLING FACILITIES PER TRAPS & HANDLING A TBE 25-Jul-2024 24-Jul-2024 CLOSED CLOSED
435 WOR-TRANSMIT-000729 2308-INCR-005 Internal NCR for MR # 2308-PRO-MR-021 Rev. 00 Fiber Optic Cable (FOC) /TBE 0 NCR 25-Jul-2024 25-Jul-2024 - MANAGEMENT
436 WOR-TRANSMIT-000730 - 3D review Com
Sl No. Worley TR Number Doc. No. Doc. Name Rev. Type Date Received Time Internal Dist. Response Discipline BQ Ref: Target Date Submission SAPMT OTHER REMARKS STATUS Check
of Response to SAPMT RESPONSE
1216 WOR-TRANSMIT-001681 413011-01301-PVN-0036 - IPC # 22 0 Payment Certificate 28-Jan-2025 28-Jan-2025 Superseded Management Given to PCM for sign Superseded
1217 WOR-TRANSMIT-001682 2308-PRO-TC-MR-019 2308-PRO-MR-019-TC - TECHNICAL CLARIFICATION - LEAK DETECTION SYSTEM (RTTM). B TBC 28-Jan-2025 28-Jan-2025 CLOSED CLOSED
1218 WOR-TRANSMIT-001683 2308-PRO-TC-MR-059-1 TECHNICAL CLARIFICATION - OHPL - CABLES B TBC 28-Jan-2025 28-Jan-2025 CLOSED CLOSED
1219 WOR-TRANSMIT-001684 HAZOP CARFs HAZOP CARFs - HAZOP 28-Jan-2025 28-Jan-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1220 WOR-TRANSMIT-001688 2308-PRO-MR-093-deviation EXCEPTION & DEVIATION CLARIFICATION FORM for SPI, - Deviation Form 29-Jan-2025 29-Jan-2025 CLOSED ENGINEERING CLOSED
1221 WOR-TRANSMIT-001689 2308-PRO-MR-117 MR - BALL VALVES, METAL SEATED, MANUAL 02 MR 29-Jan-2025 29-Jan-2025 CLOSED PIP MR SIGNED
1222 WOR-TRANSMIT-001690 413011-01303 - SC-P.O - 4900000431 _ IPC-003 0 Payment Certificate 29-Jan-2025 30-Jan-2025 CLOSED Management BQ-W-JFDP-T-890 CLOSED & RETURNED TO WP CLOSED
1223 WOR-TRANSMIT-001691 2308-PRO-MR-069-NMR-601 NMR-601 Rev.B for MR-069, LIGHTING FIXTURES- CODE-C2 B NMR-601 29-Jan-2025 29-Jan-2025 CLOSED ELE CLOSED
1224 WOR-TRANSMIT-001692 Monthly Progress Certificate 13 0 Payment Certificate 29-Jan-2025 30-Jan-2025 CLOSED Management fwd to subcontract fwd to subcontract
1225 WOR-TRANSMIT-001693 2308-PRO-MR-130 MR - SURGE RELIEF SKIDS 00 MR 29-Jan-2025 29-Jan-2025 CLOSED CLOSED
1226 WOR-TRANSMIT-001694 2308-PRO-MR-105-NMR-601(PFF) MR-105-NMR-601- CODE C2 - NMR 601 - LTCS FLANGES AND BLINDS (PFF) A NMR-601 29-Jan-2025 29-Jan-2025 CLOSED PIP CLOSED
1227 WOR-TRANSMIT-001695 2308-PRO-MR-002-NMR-601 NMR-601 FOR MR-002 LOW TEMPERATURE CARBON STEEL PIPES CODE-C4 B NMR-601 29-Jan-2025 29-Jan-2025 CLOSED PIP CLOSED
1228 WOR-TRANSMIT-001696 2308-PRO-MR-118-NMR-601 MR-118-NMR-601 - NMR 601 - NON-SLAM CHECK VALVES- CODE C1 C NMR-601 29-Jan-2025 30-Jan-2025 CLOSED PIP CLOSED
1229 WOR-TRANSMIT-001697 2308-PRO-MR-055-NMR-601 MR-055-NMR-601 - BARRED TEE CDOE-C2 A NMR-601 29-Jan-2025 30-Jan-2025 CLOSED Comments resubmitted by Worley Comments resubmitted by Worley
1230 WOR-TRANSMIT-001698 2308-PRO-MR-041-NMR-601 NMR-601 FOR MR-041 (PRESSURE TRANSMITTER)-CODE C3. A NMR-601 29-Jan-2025 30-Jan-2025 CLOSED I&C CLOSED & RETURNED TO PRC
1231 WOR-TRANSMIT-001699 2308-PRO-MR-043-NMR-601(PFF) NMR-601 for MR-043 GWR LEVEL TRANSMITTER(PFF). A NMR-601 29-Jan-2025 30-Jan-2025 CLOSED I&C CLOSED
1232 WOR-TRANSMIT-001700 Post 90% MTOs – Telecom Post 90% MTOs – Telecom - 90% 29-Jan-2025 30-Jan-2025 CLOSED Superseded BY T# 1726 Superseded BY T# 1726
1233 WOR-TRANSMIT-001701 Post 90% MTOs – Electrical Post 90% MTOs – Electrical - 90% 29-Jan-2025 30-Jan-2025 CLOSED BQ-W-JFDP-T- 889 CLOSED & RETURNED TO WP CLOSED
1234 WOR-TRANSMIT-001703 2308-PRO-TC-MR-092 TECHNICAL CLARIFICATION -FIBER OPTIC LEAK DETECTION SYSTEM C TBC 29-Jan-2025 30-Jan-2025 CLOSED I&C / TELECOM CLOSED
1235 WOR-TRANSMIT-001704 413011-01303-PVN-0043 Pentane Two Pipeline Design 1 Change Order 30-Jan-2025 30-Jan-2025 CLOSED Management BQ-W-JFDP-T-0905 06-Feb-2025 CLOSED & RETURNED TO WP CLOSED
1236 WOR-TRANSMIT-001705 2308-PRO-TC-MR-063 TECHNICAL CLARIFICATION -FIBER PATCH PANELS C TBC 30-Jan-2025 30-Jan-2025 CLOSED CLOSED
1237 WOR-TRANSMIT-001706 2308-PRO-MR-129 MR - COMMUNICATION BULK MATERIALS (HDPE). 00 MR 30-Jan-2025 30-Jan-2025 REJECTED BQ-W-JFDP-T-0885 CLOSED
1238 WOR-TRANSMIT-001707 2308-PRO-MR-081 MR - TELECOMMUNICATION BULK MATERIALS 00 MR 30-Jan-2025 30-Jan-2025 CLOSED BQ-W-JFDP-T-0884 CLOSED CLOSED
1239 WOR-TRANSMIT-001709 2308-PRO-MR-065-NMR-601 NMR-601 for MR-065, FENCING MATERIALS-CODE C3 A NMR-601 1-Feb-2025 1-Feb-2025 CLOSED CIVIL CLOSED
1240 WOR-TRANSMIT-001710 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 1-Feb-2025 1-Feb-2025 Cancelled MECH CANCELLED
1241 WOR-TRANSMIT-001711 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 1-Feb-2025 1-Feb-2025 CLOSED MECH CLOSED
1242 WOR-TRANSMIT-001712 2308-PRO-MR-052-CRS CRS MR-052 - CRS- STRUCTURAL STEEL 01 CRS_MR 1-Feb-2025 1-Feb-2025 CLOSED CVL BQ-W-JFDP-T-879 CLOSED & RETURNED TO WP CLOSED
1243 WOR-TRANSMIT-001713 2308-PRO-MR-087 MR - SAMPLING CONNECTIONS 02 MR 1-Feb-2025 1-Feb-2025 CLOSED CLOSED
1244 WOR-TRANSMIT-001714 2308-PRO-MR-054 MR - LIQUID CUSTODY METERING SKID Rev.01 01 MR 1-Feb-2025 1-Feb-2025 CLOSED I&C CLOSED
1245 WOR-TRANSMIT-001715 2308-PRO-MR-111 MR - INDUSTRIAL ETHERNET SWITCHES 02 MR 1-Feb-2025 1-Feb-2025 CLOSED TELECOM MR SIGNED & SEND TO PRC ON 10-MAY-2025
1246 WOR-TRANSMIT-001717 Post 90% MTOs – Piping Post 90% MTOs – Piping - 90% 3-Feb-2025 3-Feb-2025 Open PIP OPEN WITH BQ
1247 WOR-TRANSMIT-001718 2308-PRO-MR-064 MR- CIVIL BULK MATERIALS A MR 3-Feb-2025 3-Feb-2025 CLOSED CLOSED
1248 WOR-TRANSMIT-001719 2308-PRO-MR-051 MR- Anchor BOLTS 01 MR 3-Feb-2025 3-Feb-2025 CLOSED CVL CLOSED
1249 WOR-TRANSMIT-001720 2308-PRO-MR-076 MR - PIPING BULK MATERIALS A MR 3-Feb-2025 3-Feb-2025 CLOSED PIP CLOSED
1250 WOR-TRANSMIT-001721 2308-PRO-MR-070-NMR-601 NMR-601 for MR-070, LIGHTING POLES - CODE C2 A NMR-601 3-Feb-2025 3-Feb-2025 CLOSED ELE / CVL CLOSED
1251 WOR-TRANSMIT-001722 2308-PRO-MR-021 MR - FIBER OPTIC CABLES 02 MR 3-Feb-2025 3-Feb-2025 CLOSED CLOSED
1252 WOR-TRANSMIT-001723 2308-PRO-MR-078 MR - ELECTRICAL BULK MATERIALS A MR 3-Feb-2025 4-Feb-2025 CLOSED ELE CLOSED
1253 WOR-TRANSMIT-001724 2308-PRO-TC-MR-017 TECHNICAL CLARIFICATION - GATE VALVES - MANUAL I TBC 4-Feb-2025 4-Feb-2025 CLOSED PIP CLOSED
1254 WOR-TRANSMIT-001724 2308-PRO-MR-017-TBE FINAL TBE - GATE VALVES - MANUAL B TBE 4-Feb-2025 4-Feb-2025 - PIP
1255 WOR-TRANSMIT-001725 2308-PRO-MR-027-TBE FINAL TBE - EMERGENCY SHUT-DOWN VALVES (ZV) B TBE 4-Feb-2025 4-Feb-2025 CLOSED CLOSED
1256 WOR-TRANSMIT-001726 Post 90% MTOs – Telecom Post 90% MTOs – Telecom (update to previously sent MTO). B 90% 4-Feb-2025 4-Feb-2025 Open TELECOM OPEN WITH BQ
1257 WOR-TRANSMIT-001727 2308-PRO-MR-027-TBE FINAL TBE - OHPL CABLES B TBE 4-Feb-2025 4-Feb-2025 - ELE
1258 WOR-TRANSMIT-001728 2308-PRO-MR-034-TBE FINAL TBE - DC Ssystems B TBE 4-Feb-2025 4-Feb-2025 CLOSED CLOSED
1259 WOR-TRANSMIT-001729 2308-PRO-MR-099 MR - OHPL BULK MATERIALS AND ACCESSORIES A MR 5-Feb-2025 5-Feb-2025 CLOSED BQ-W-JFDP-T-1042 CLOSED CLOSED
1260 WOR-TRANSMIT-001730 2308-PRO-MR-079 MR - INSTRUMENT BULK MATERIALS A MR 5-Feb-2025 5-Feb-2025 CLOSED I&C CLOSED
1261 WOR-TRANSMIT-001731 Jafurah Pipeline RF Study - Final report submittal Jafurah Pipeline RF Study - Final report submittal - Tetra 5-Feb-2025 5-Feb-2025 CLOSED PIP BQ-PLDF-II-TR # 1216 CLOSED
1262 WOR-TRANSMIT-001732 CARF for the 2nd HAZOP recommendations CARF for the 2nd HAZOP recommendations - HAZOP 5-Feb-2025 5-Feb-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED

1263 WOR-TRANSMIT-001733 2308-PRO-MR-081 MR - TELECOMMUNICATION BULK MATERIALS 00 MR 5-Feb-2025 6-Feb-2025 CLOSED

1264 WOR-TRANSMIT-001734 2308-PRO-MR-127 MR - CASING PIPE INSULATORS & SEALS A MR 5-Feb-2025 6-Feb-2025 OPEN PIP OPEN WITH BQ
1265 WOR-TRANSMIT-001735 2308-PRO-MR-060-NMR-601 NMR-601 for MTA-060, PRESSURE GAUGES-CODE C3 B NMR-601 5-Feb-2025 6-Feb-2025 CLOSED I&C RESPONDED BY WORLEY
1266 WOR-TRANSMIT-001736 2308-PRO-MR-129 2308-PRO-MR-129 - MR - COMMUNICATION BULK MATERIALS (HDPE) 00 MR 6-Feb-2025 6-Feb-2025 CLOSED TELECOM CLOSED
1267 WOR-TRANSMIT-001737 2308-PRO-MR-005-TBE FINAL TBE-SCRAPER TRAPS AND HANDLING FACILITIES C TBE 6-Feb-2025 6-Feb-2025 OPEN PIP OPEN WITH BQ
1268 WOR-TRANSMIT-001742 2308-PRO-MR-010-NMR-601 NMR-601 FOR MR-010 (GASKETS & INSULATING SETS) - CODE-C1. B NMR-601 6-Feb-2025 6-Feb-2025 CLOSED PIP CLOSED
1269 WOR-TRANSMIT-001743 2308-PRO-MR-095-TBE FINAL TBE - FLOW INSTRUMENTS A TBE 8-Feb-2025 8-Feb-2025 - I&C
1270 WOR-TRANSMIT-001744 2308-PRO-TC-MR-029 TECHNICAL CLARIFICATION - ANALYZER SHELTER. A TBC 8-Feb-2025 8-Feb-2025 CLOSED ELE CLOSED
1271 WOR-TRANSMIT-001745 2308-PRO-TC-MR-080 TECHNICAL CLARIFICATION - COMMUNICATION TOWER AND TETRA RADIO SYSTEM D TBC 8-Feb-2025 8-Feb-2025 CLOSED Telecom CLOSED
1272 WOR-TRANSMIT-001750 2308-PRO-MR-034-TBE 2308-PRO-MR-034-TBE - FINAL TBE - DC SYSTEM C TBE 8-Feb-2025 8-Feb-2025 - ELE
1273 WOR-TRANSMIT-001751 2308-PRO-MR-101-NMR-601 NMR-601 FOR MR-101, THREADED & SOCKETWELD FITTINGS (CS)-CODE C3 A NMR-601 9-Feb-2025 10-Feb-2025 CLOSED PIP CLOSED
1274 WOR-TRANSMIT-001752 Worley response on Geotechnical Report (KR.GTO2 Worley response on Geotechnical Report (KR.GTO24000051) - GeoTech 9-Feb-2025 10-Feb-2025 CLOSED CVL submitted to WP BQ-W-JFDP-T- 935 CLOSED & RETURNED TO WP CLOSED
1275 WOR-TRANSMIT-001753 2308-PRO-MR-101-NMR-601 NMR-601 FOR MR-101, THREADED & SOCKETWELD FITTINGS (CS)-CODE C1 A NMR-601 9-Feb-2025 10-Feb-2025 CLOSED PIP CLOSED
1276 WOR-TRANSMIT-001754 2308-PRO-MR-103-NMR-601 NMR-601 for MR-103 BW FITTINGS-LTCS-CODE C1. A NMR-601 10-Feb-2025 11-Feb-2025 CLOSED PIP CLOSED
1277 WOR-TRANSMIT-001755 2308-PRO-MR-105-NMR-601(PFF) NMR-601 for MR-105 LTCS FLANGES AND BLINDS (PFF)-CODE C1. A NMR-601 10-Feb-2025 11-Feb-2025 CLOSED PIP CLOSED
1278 WOR-TRANSMIT-001756 2308-PRO-MR-115-TBE 2308-PRO-MR-115-TBE - REV B - FINAL TBE B TBE 10-Feb-2025 11-Feb-2025 - PIP
1279 WOR-TRANSMIT-001757 2308-PRO-MR-064 MR - CIVIL BULK MATERIALS 00 MR 10-Feb-2025 11-Feb-2025 CLOSED
1280 WOR-TRANSMIT-001758 2308-PRO-MR-097-NMR-601 NMR-601 for MR-097 INSTRUMENT VALVES, TUBING & FITTINGS-CODE C2. A NMR-601 10-Feb-2025 11-Feb-2025 CLOSED I&C CLOSED
1281 WOR-TRANSMIT-001759 2308-PRO-MR-005-CRS CRS- SCRAPER TRAPS & HANDLING FACILITIES (CLOSED) - CRS_MR 10-Feb-2025 11-Feb-2025 CLOSED MECH-HOT CLOSED
1282 WOR-TRANSMIT-001760 2308-PRO-MR-126-TBE INSTRUMENT JUNCTION BOXES - FOUNATION FIELDBUS JUNCTION BOXES (FFJB)-TBE A TBE 10-Feb-2025 11-Feb-2025 - I&C
1283 WOR-TRANSMIT-001761 2308-PRO-MR-002-NMR-601 NMR-601 REV.B FOR MR-002 LOW TEMPERATURE CARBON STEEL PIPES - CODE-C1 B NMR-601 10-Feb-2025 11-Feb-2025 CLOSED PIP CLOSED
1284 WOR-TRANSMIT-001762 2308-PRO-MR-111-TBE 2308-PRO-MR-111-TBE - FINAL TBE - INDUSTRIAL ETHERNET SWITCHES A TBE 10-Feb-2025 11-Feb-2025 TELECOM TELECOM
1285 WOR-TRANSMIT-001763 2308-PRO-MR-098-TBE FINAL TBE-TRANSMISSION EQUIPMENT & ACCESSORIES A TBE 10-Feb-2025 11-Feb-2025 - ELE
1286 WOR-TRANSMIT-001769 2308-PRO-MR-103-NMR-601 NMR-601 for MR-103 BW FITTINGS-LTCS-CODE C1. A NMR-601 11-Feb-2025 12-Feb-2025 CLOSED PIP supersed T# WOR-TRANSMIT-001754 supersed T# WOR-TRANSMIT-001754
1287 WOR-TRANSMIT-001770 2308-PRO-MR-045-CRS CRS -CONTROL VALVES A CRS_MR 11-Feb-2025 12-Feb-2025 CLOSED I&C closed
1288 WOR-TRANSMIT-001771 2308-PRO-MR-102-NMR-601 NMR-601 FOR MR-102 CS FLANGES AND BLINDS-CODE C1 (ULMA + PFF) A NMR-601 11-Feb-2025 12-Feb-2025 CLOSED PIP CLOSED
1289 WOR-TRANSMIT-001772 2308-PRO-MR-120-TBE FINAL TBE - GATE VALVES, THREADED & SOCKETWELD ENDS C TBE 11-Feb-2025 12-Feb-2025 - PIP
1290 WOR-TRANSMIT-001773 2308-INCR-022 WORLEY RESPONSE - INTERNAL NON-CONFORMANCE REPORT (INCR) - NCR 11-Feb-2025 12-Feb-2025 CLOSED CLOSED
1291 WOR-TRANSMIT-001774 2308-PRO-MR-019 MR - LEAK DETECTION SYSTEM (RTTM 01 MR 11-Feb-2025 12-Feb-2025 CLOSED MR SIGNED & SHARED WITH PRC ON 03-MARCH
1292 WOR-TRANSMIT-001775 2308-PRO-MR-029 MR - ANALYZER SHELTER 02 MR 11-Feb-2025 12-Feb-2025 CLOSED ELE BQ-W-JFDP-T-1121 CLOSED CLOSED
1293 WOR-TRANSMIT-001776 2308-PRO-MR-053 MR - CATHODIC PROTECTION (TEMPORARY & PERMANENT) 00 MR 11-Feb-2025 12-Feb-2025 CLOSED ELE MR SIGNED
1294 WOR-TRANSMIT-001777 2308-PRO-TC-MR-014 TECHNICAL CLARIFICATION - BALL VALVES, SOFT SEATED, MANUAL. F TBC 12-Feb-2025 12-Feb-2025 CLOSED PIP CLOSED 02 FALSE
1295 WOR-TRANSMIT-001778 2308-PRO-TC-MR-059 TECHNICAL CLARIFICATION - OHPL ACCESSORIES A TBC 12-Feb-2025 12-Feb-2025 CLOSED CLOSED
1296 WOR-TRANSMIT-001779 2308-PRO-MR-043 MR - GWR LEVEL TRANSMITTER 01 MR 12-Feb-2025 12-Feb-2025 CLOSED I&C MR SIGNED
1297 WOR-TRANSMIT-001780 2308-PRO-MR-041 MR- PRESSURE TRANSMITTER 01 MR 12-Feb-2025 12-Feb-2025 CLOSED I&C MR SIGNED
1298 WOR-TRANSMIT-001781 2308-PRO-MR-023 JUAYMAH NGLF DCS MODIFICATIONS (HONEYWELL) Note – MR revised as per 90% 01 MR 12-Feb-2025 12-Feb-2025 CLOSED I&C CLOSED
1299 WOR-TRANSMIT-001783 2308-PRO-MR-060 2308-PRO-MR-060 - MR - PRESSURE GAUGES 01 MR 12-Feb-2025 16-Feb-2025 CLOSED I&C BQ-W-JFDP-T-1047 PENDING WITH WORLEY CLOSED
1300 WOR-TRANSMIT-001784 2308-PRO-MR-020 MR - CORROSION MONITORING SYSTEM 02 MR 12-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED & SHARED WITH PRC ON 17-APR-20
1301 WOR-TRANSMIT-001785 2308-PRO-MR-039 MR - GAS DETECTION SYSTEM 01 MR 12-Feb-2025 16-Feb-2025 CLOSED
1302 WOR-TRANSMIT-001786 2308-PRO-TC-MR-038 TECHNICAL CLARIFICATION - GOV BALL VALVES, SOFT SEATED. C TBC 12-Feb-2025 16-Feb-2025 CLOSED PIP CLOSED
1303 WOR-TRANSMIT-001787 2308-PRO-MR-091 MR - SCADA MODIFICATION 01 MR 12-Feb-2025 16-Feb-2025 CLOSED MR SIGNED
1304 WOR-TRANSMIT-001788 2308-PRO-MR-046 MR - INSTRUMENT CABLES 01 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED
1305 WOR-TRANSMIT-001789 2308-PRO-MR-093 MR- SCRAPER PASSAGE INDICATOR. 01 MR 13-Feb-2025 16-Feb-2025 CLOSED MR SIGNED
1306 WOR-TRANSMIT-001790 2308-PRO-MR-126 MR - INSTRUMENT JUNCTION BOXES (FFJB) 01 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED
1307 WOR-TRANSMIT-001791 Jafurah – Hyundai – 3D updated model Jafurah – Hyundai – 3D updated model - 3D Model 13-Feb-2025 13-Feb-2025 CLOSED CLOSED
1308 WOR-TRANSMIT-001792 2308-PRO-MR-044 MR -PRESSURE RELIEF VALVES 02 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C CLOSED
1309 WOR-TRANSMIT-001793 2308-PRO-MR-061 MR - ORIFICE FLANGE ASSEMBLY 01 MR 13-Feb-2025 16-Feb-2025 CLOSED I&C MR SIGNED
1310 WOR-TRANSMIT-001794 2308-PRO-MR-063-TBE FINAL TBE - FIBER PATCH PANELS A TBE 13-Feb-2025 13-Feb-2025 TELECOM TELECOM
1311 WOR-TRANSMIT-001795 413011-01303.MOM.0047 MODIFICATION IN RFG-1 PIPELINE OPERATION PHILOSOPHY/OFF-SPEC ETHANE COMPRESSOR OPERATION. A MOM 13-Feb-2025 16-Feb-2025 Open PIP OPEN WITH BQ
1312 WOR-TRANSMIT-001796 2308-PRO-TC-MR-039 TECHNICAL CLARIFICATION - GAS DETECTION SYSTEM B TBC 13-Feb-2025 16-Feb-2025 CLOSED CLOSED
1313 WOR-TRANSMIT-001798 2308-PRO-MR-122-TBE TBE GLOBE VALVES, THREADED & SOCKETWELD ENDS A TBE 13-Feb-2025 16-Feb-2025 OPEN PIP OPEN WITH BQ
1314 WOR-TRANSMIT-001801 Plant wise Model Review file Plant wise Model Review file - 3D Model 13-Feb-2025 16-Feb-2025 CLOSED CLOSED
1315 WOR-TRANSMIT-001802 Re-Validation of Tetra Radio Study Re-Validation of Tetra Radio Study - REPORT 13-Feb-2025 16-Feb-2025 CLOSED TELECOM / CIVIL BQ-W-JFDP-T-1304 EPM Record No. CS-000946 APPROVED BY SAPMT & RETURNED TO WORLEY CLOSED
1316 WOR-TRANSMIT-001803 2308-PRO-TC-MR-019 2308-PRO-TC-MR-019 - LEAK DETECTION SYSTEM (RTTM). C TBC 15-Feb-2025 16-Feb-2025 CLOSED CLOSED
1317 WOR-TRANSMIT-001804 2308-PRO-TC-MR-117 TECHNICAL CLARIFICATION - BALL VALVES, METAL SEATED, MANUAL C TBC 15-Feb-2025 16-Feb-2025 CLOSED PIP CLOSED
1318 WOR-TRANSMIT-001805 2308-PRO-MR-045 MR -CONTROL VALVES 03 MR 15-Feb-2025 18-Feb-2025 CLOSED I&C CLOSED
1319 WOR-TRANSMIT-001806 DGN Files - 90% Package-Piping DGN Files - 90% Package-Piping - 90% 15-Feb-2025 18-Feb-2025 CHECK PIP
1320 WOR-TRANSMIT-001807 BQ 90% REVIEW COMMENT RESPONSES-1st BATCH BQ 90% REVIEW COMMENT RESPONSES-1st BATCH - 90% 15-Feb-2025 18-Feb-2025 CLOSED BQ-W-JFDP-T-1051 CLOSED & RETURNED TO WP CLOSED
1321 WOR-TRANSMIT-001808 2308-PRO-MR-087 MR - SAMPLING CONNECTIONS 02 MR 16-Feb-2025 16-Feb-2025 CLOSED BQ-W-JFDP-T-1142 RETURNED TO WORLEY CLOSED
1322 WOR-TRANSMIT-001809 2308-PRO-TC-MR-114 TECHNICAL CLARIFICATION - GOV BALL VALVE, METAL SEATED. C TBC 16-Feb-2025 18-Feb-2025 - PIP
1323 WOR-TRANSMIT-001810 2308-PRO-TC-MR-113 TECHNICAL CLARIFICATION - MOV BALL VALVES, METAL SEATED. D TBC 16-Feb-2025 18-Feb-2025 CLOSED PIP CLOSED
1324 WOR-TRANSMIT-001811 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 17-Feb-2025 18-Feb-2025 CLOSED MECH CLOSED
1325 WOR-TRANSMIT-001812 2308-PRO-TC-MR-033 TECHNICAL CLARIFICATION - SOLAR POWER SYSTEM D TBC 17-Feb-2025 18-Feb-2025 CLOSED CLOSED
1326 WOR-TRANSMIT-001814 Change order for CP scope – Fire Water – Based on BQ Response to Change order for CP scope – Fire Water – Based on TQ.0183 Rev. C - Change Order 17-Feb-2025 18-Feb-2025 CLOSED Management CLOSED CLOSED
1327 WOR-TRANSMIT-001816 90% Detail Design – 3D Model Presentation – PIDs 90% Detail Design – 3D Model Presentation – PIDs and FPPs - 90% 17-Feb-2025 18-Feb-2025 Open PROCESS OPEN WITH BQ
1328 WOR-TRANSMIT-001817 BI-10-14245 JAFURAH - NDT MATRIX BI-10-14245 JAFURAH - NDT MATRIX - NDT 17-Feb-2025 18-Feb-2025 Open PIP / QC OPEN WITH BQ
1329 WOR-TRANSMIT-001818 2308-PRO-MR-130 MR - SURGES RELIEF SKIDS 00 MR 18-Feb-2025 18-Feb-2025 CLOSED CLOSED
1330 WOR-TRANSMIT-001819 Monthly Progress Certificate 14 Manhole Verification and Duct Mandrelling Test Payment Certificate-14 0 Payment Certificate 18-Feb-2025 18-Feb-2025 CLOSED Management fwd to subcontract fwd to subcontract
1331 WOR-TRANSMIT-001820 Addendum Geotechnical SOW - Issued For ApprovalAddendum Geotechnical SOW - Issued For Approval - GeoTech 18-Feb-2025 18-Feb-2025 CLOSED CVL CLOSED
1332 WOR-TRANSMIT-001821 30009-A01-TI-4537 (35199) 30009-A01-TI-4537 (35199) - Invoice - 20% billing of Upon (Approval of Final Report). 0 Invoice 18-Feb-2025 18-Feb-2025 CLOSED Management fwd to subcontract fwd to subcontract
1333 WOR-TRANSMIT-001822 2308-PRO-MR-039-TBE FINAL TBE-GAS DETECTION SYSTEM. A TBE 18-Feb-2025 18-Feb-2025 - I&C
1334 WOR-TRANSMIT-001823 2308-PRO-MR-062 MR - MAGNETIC LEVEL GAUGES 01 MR 18-Feb-2025 18-Feb-2025 CLOSED I&C BQ-W-JFDP-T-1036 CLOSED CLOSED
1335 WOR-TRANSMIT-001824 2308-PRO-MR-042 MR-TEMPERATURE INSTRUMENTS 01 MR 18-Feb-2025 23-Feb-2025 CLOSED I&C
1336 WOR-TRANSMIT-001825 2308-PRO-MR-048 MR- REMOTE TERMINAL UNIT 02 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C MR SIGNED & SEND TO PRC ON 10-MAY-2025
1337 WOR-TRANSMIT-001826 2308-PRO-MR-024 MR- JUAYMAH NGLF ESD MODIFICATIONS (SCHNEIDER). 02 MR 19-Feb-2025 23-Feb-2025 CLOSED MR SIGNED
1338 WOR-TRANSMIT-001827 2308-PRO-MR-094 MR-INSTRUMENT JUNCTION BOXES 01 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C MR SIGNED
1339 WOR-TRANSMIT-001828 2308-PRO-MR-097 MR- INSTRUMENT VALVES, TUBING AND FITTINGS 02 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C CLOSED
1340 WOR-TRANSMIT-001830 2308-PRO-MR-019-TBE FINAL TBE - LEAK DETECTION SYSTEM (RTTM) A TBE 19-Feb-2025 19-Feb-2025 - I&C
1341 WOR-TRANSMIT-001831 2308-PRO-MR-040 MR - HORNS & BEACONS 01 MR 19-Feb-2025 23-Feb-2025 CLOSED I&C CLOSED
1342 WOR-TRANSMIT-001832 2308-PRO-MR-013 MR- RTR PIPES AND FITTINGS (FIRE WATER AND OWS). 01 MR 20-Feb-2025 23-Feb-2025 CLOSED PIP RETURNED TO WORLEY ON 06-APR-2025
1343 WOR-TRANSMIT-001833 2308-PRO-TC-MR-037 TECHNICAL CLARIFICATION - MOV BALL VALVES, SOFT SEATED E TBC 20-Feb-2025 23-Feb-2025 CLOSED PIP CLOSED
1344 WOR-TRANSMIT-001834 - Pentane_FA_Early_Submission - FLOW ASSURANCE 20-Feb-2025 23-Feb-2025 Cancelled CANCELLED
1345 WOR-TRANSMIT-001835 2308-PRO-TC-MR-117 TECHNICAL CLARIFICATION - BALL VALVES, METAL SEATED, MANUAL. D TBC 20-Feb-2025 20-Feb-2025 CLOSED PIP CLOSED
1346 WOR-TRANSMIT-001836 Latest 3D model for Riyas Latest 3D model for Riyas - 3D Model 20-Feb-2025 23-Feb-2025 CLOSED CLOSED
1347 WOR-TRANSMIT-001837 2308-PRO-MR-095 MR- FLOW INSTRUMENTS 01 MR 22-Feb-2025 23-Feb-2025 CLOSED I&C MR SIGNED & SHARED WITH PRC ON 03-MAY-20
1348 WOR-TRANSMIT-001839 413011-01303 - SC-P.O - 4900000480 _ IPC-001 0 Payment Certificate 24-Feb-2025 26-Feb-2025 CLOSED Management CLOSED
1349 WOR-TRANSMIT-001840 413011-01303 - HAZOP STUDY - COMMERCIAL BID 413011-01303 - HAZOP STUDY - COMMERCIAL BID EVALUATION TABLE 0 CBE 24-Feb-2025 26-Feb-2025 CLOSED Management closed
1350 WOR-TRANSMIT-001841 2308-PRO-MR-055-NMR-601 NMR-601 for MR-055, BARRED TEE B NMR-601 24-Feb-2025 26-Feb-2025 CLOSED CLOSED
1351 WOR-TRANSMIT-001842 2308-PRO-TC-MR-021 TECHNICAL CLARIFICATION - FIBER OPTIC CABLE C TBC 24-Feb-2025 26-Feb-2025 CLOSED TELECOM BQ-W-JFDP-T-1083 CLOSED & RETURNED TO WP CLOSED
1352 WOR-TRANSMIT-001843 - Burn Pit & Drain Surge Vessel Vents Flammable Gas Dispersion Modelling Report. 0 Report 25-Feb-2025 26-Feb-2025 CLOSED PROCESS RETURN TO WORLEY
1353 WOR-TRANSMIT-001844 2308-PRO-MR-013-TBE FINAL TBE - RTR PIPES AND FITTINGS B TBE 25-Feb-2025 26-Feb-2025 CLOSED PIP CLOSED
1354 WOR-TRANSMIT-001845 2308-PRO-MR-135-NMR-601 NMR-601 for MR-135, WELDOLET-CODE-C2 B NMR-601 25-Feb-2025 26-Feb-2025 CLOSED PIP RETURNED TO PRC
1355 WOR-TRANSMIT-001846 2308-PRO-MR-049 MR - REBAR 01 MR 25-Feb-2025 26-Feb-2025 CLOSED CVL BQ-W-JFDP-T-1008 CLOSED CLOSED
1356 WOR-TRANSMIT-001847 2308-PRO-TC-MR-092 TECHNICAL CLARIFICATION -FIBER OPTIC LEAK DETECTION SYSTEM D TBC 25-Feb-2025 26-Feb-2025 CLOSED I&C / TELECOM CLOSED
1357 WOR-TRANSMIT-001848 2308-PRO-TC-MR-053 CATHODIC PROTECTION (TEMPORARY & PERMANENT). A TBC 25-Feb-2025 5:24 PM 26-Feb-2025 CLOSED ELE CLOSED
1358 WOR-TRANSMIT-001849 CFD Report for P&CSD review via CRM CFD Report for P&CSD review via CRM - CFD Report 25-Feb-2025 5:24 PM 26-Feb-2025 CLOSED PROCESS BQ-W-JFDP-T-1137 25-Feb-2025 24-Apr-2025 SA COMMENTS SENT TO WORLEY ON 22-APR-25CLOSED
1359 WOR-TRANSMIT-001850 2308-PRO-MR-009-NMR-601 NMR-601 FOR MR-009 (STUD BOLTS)-CODE-C3 A NMR-601 25-Feb-2025 5:24 PM 26-Feb-2025 CLOSED CVL RETURNED TO PRC
1360 WOR-TRANSMIT-001851 - Implemented comments of Painting and Coating Schedule - 90% 26-Feb-2025 26-Feb-2025 Open PIP OPEN WITH BQ
1361 WOR-TRANSMIT-001852 2308-PRO-MR-066 MR - FENCE GATES 01 MR 26-Feb-2025 26-Feb-2025 open CVL OPEN WITH BQ
1362 WOR-TRANSMIT-001853 2308-PRO-MR-065-NMR-601 MR-065-NMR-601-CODE-C2 - NMR-601 for MR-065, FENCING MATERIALS. A NMR-601 26-Feb-2025 4:57 PM 1-Mar-2025 CLOSED CIVIL CLOSED
1363 WOR-TRANSMIT-001854 2308-PRO-MR-030 TRANSFORMER (POLE MOUNTED) Rev. 02 02 MR 27-Feb-2025 1-Mar-2025 CLOSED ELE / CVL MR SIGNED
1364 WOR-TRANSMIT-001855 - Commercial Proposal HAZOP Study Subcontract ( Additional Scope #2 ) - HAZOP 27-Feb-2025 1-Mar-2025 CLOSED Management CLOSED
1365 WOR-TRANSMIT-001856 GPR Reports GPR Reports GPR Reports 27-Feb-2025 1-Mar-2025 CLOSED ALL CLOSED
1366 WOR-TRANSMIT-001858 2308-PRO-MR-014-TBE FINAL TBE-BALL VALVES, SOFT SEATED, MANUAL. C TBE 27-Feb-2025 4:30 PM 1-Mar-2025 CLOSED PIP CLOSED
1367 WOR-TRANSMIT-001859 2308-PRO-MR-072-NMR-601 NMR-601 FOR GROUNDING CABLE AND DEVICES-MR-072-NMR-601-CODE C3 A NMR-601 27-Feb-2025 4:50 PM 1-Mar-2025 CLOSED CLOSED
1368 WOR-TRANSMIT-001860 90% DD - 3D Model Workshop - Tags log 90% DD - 3D Model Workshop - Tags log - 3D Model 1-Mar-2025 1-Mar-2025 INFO CLOSED
1369 WOR-TRANSMIT-001861 2308-PRO-MR-033-TBE 2308-PRO-MR-033-TBE - FINAL TBE - SOLAR POWER SYSTEM A TBE 1-Mar-2025 1-Mar-2025 - ELE
1370 WOR-TRANSMIT-001862 2308-PRO-MR-014-TBE FINAL TBE-BALL VALVES, SOFT SEATED, MANUAL. C TBE 2-Mar-2025 2-Mar-2025 - PIP
1371 WOR-TRANSMIT-001863 - Coating Sch-Jafurah 90% eReview comment implementation - 90% 2-Mar-2025 2-Mar-2025 CLOSED CLOSED
1372 WOR-TRANSMIT-001864 Pentane 10” RMNJ-1 Centerline Pentane 10” RMNJ-1 Centerline - Drawings 2-Mar-2025 4-Mar-2025 Open ALL OPEN WITH BQ
1373 WOR-TRANSMIT-001867 2308-PRO-MR-065 2308-PRO-MR-065 Rev. 01 FENCING MATL 01 MR 2-Mar-2025 4-Mar-2025 CLOSED CIVIL MR SIGNED
1374 WOR-TRANSMIT-001868 JAFURAH/RNGLF- PENTANE DESIGN TABLE TOP REVI JAFURAH/RNGLF- PENTANE DESIGN TABLE TOP REVIEW - MOM 2-Mar-2025 4-Mar-2025 Open ALL OPEN WITH BQ
1375 WOR-TRANSMIT-001869 2308-PRO-MR-064-DAT CONCRETE MIX DESIGN - CODE-C2. A Data Sheet 3-Mar-2025 4-Mar-2025 CLOSED CLOSED
1376 WOR-TRANSMIT-001870 Worley response for Post 90% MTOs - Electrical Worley response for Post 90% MTOs - Electrical. - 90% 3-Mar-2025 4-Mar-2025 Open ELE OPEN WITH BQ
1377 WOR-TRANSMIT-001871 3D Models for Riyas and Jafurah 3D Models for Riyas and Jafurah - 3D Model 3-Mar-2025 4-Mar-2025 CLOSED CLOSED
1378 WOR-TRANSMIT-001873 2308-PRO-MR-076-TBE FINAL TBE -PIPING BULK MATERIALS (QUICK CONNECT COUPLER) A TBE 4-Mar-2025 4:55 PM 4-Mar-2025 - PIP
1379 WOR-TRANSMIT-001874 SRA STAGE 3 PACKAGE SRA STAGE 3 PACKAGE – ISSUED FOR REVIEW AND APPROVAL 0 SRA 3-Mar-2025 4-Mar-2025 Open ALL Submitted to PMT (BQ-PLDF-II-TR) OPEN WITH BQ
1380 WOR-TRANSMIT-001875 2308-PRO-MR-089 MR - EYEWASH & SAFETY SHOWER 01 MR 4-Mar-2025 4-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1070 CLOSED CLOSED
1381 WOR-TRANSMIT-001876 2308-PRO-MR-117-TBE 2308-PRO-MR-117-TBE - FINAL TBE - BALL VALVES, SOFT SEATED, MANUAL B TBE 4-Mar-2025 4-Mar-2025 CLOSED PIP CLOSED
1382 WOR-TRANSMIT-001877 2308-PRO-TC-MR-129 TECHNICAL CLARIFICATION -HIGH DENSITY POLYETHYLENE (HDPE) A TBC 4-Mar-2025 4-Mar-2025 - PIP
1383 WOR-TRANSMIT-001878 2308-PRO-MR-008-NMR-601 NMR-601 for MR-008, SS FLANGES AND BLINDS (ULMA)-CODE C3 A NMR-601 4-Mar-2025 5-Mar-2025 CLOSED PIP RETURNED TO PRC
1384 WOR-TRANSMIT-001879 2308-PRO-MR-029-TBE FINAL TBE - ANALYZER SHELTER (GAS CHROMATOGRAPH & MOISTURE A TBE 5-Mar-2025 5-Mar-2025 - ELE
1385 WOR-TRANSMIT-001880 2308-PRO-MR-059-TBE FINAL TBE - OHPL ACCESSORIES A TBE 5-Mar-2025 5-Mar-2025 CLOSED Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1386 WOR-TRANSMIT-001881 2308-PRO-MR-092-TBE FINAL TBE - FIBER OPTIC LEAK DETECION SYSTEM (FOLDS) A TBE 5-Mar-2025 5-Mar-2025 - I&C / TELECOM Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1387 WOR-TRANSMIT-001882 2308-PRO-MR-079-TBE FINAL TBE - INSTRUMENT BULK MATERIALS A TBE 5-Mar-2025 5-Mar-2025 - I&C Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1388 WOR-TRANSMIT-001885 2308-PRO-TC-MR-078 TC FOR ELECTRICAL BULK MATERIAL A TBC 5-Mar-2025 6-Mar-2025 CLOSED ELE CLOSED
1389 WOR-TRANSMIT-001886 2308-PRO-TC-MR-053 TECHNICAL CLARIFICATION - CATHODIC PROTECTION (TEMPORARY & PERMANENT). B TBC 5-Mar-2025 6-Mar-2025 CLOSED ELE CLOSED
1390 WOR-TRANSMIT-001887 Stage-1 forms for SA ISSD check and confirmation Stage-1 forms for SA ISSD check and confirmation - SRA 5-Mar-2025 6-Mar-2025 Open ALL OPEN WITH BQ
1391 WOR-TRANSMIT-001888 2308-PRO-MR-038-TBE FINAL TBE - GOV BALL VALVES, SOFT SEATED. A TBE 5-Mar-2025 4:55 PM 6-Mar-2025 - PIP
1392 WOR-TRANSMIT-001889 2308-PRO-MR-037-TBE FINAL TBE - MOV BALL VALVES, SOFT SEATED. A TBE 5-Mar-2025 5:00 PM 6-Mar-2025 - PIP
1393 WOR-TRANSMIT-001890 2308-PRO-TC-MR-081 TECHNICAL CLARIFICATION - ITELECOMMUNICATION BULK MATERIALS A TBC 6-Mar-2025 6-Mar-2025 CLOSED CLOSED
1394 WOR-TRANSMIT-001891 R167506001 FLOW ASSURANCE - SAEP-27 EXHIBIT-I - PENTANE + CB C FLOW ASSURANCE 6-Mar-2025 8-Mar-2025 OPEN PROCESS OPEN WITH BQ
1395 WOR-TRANSMIT-001892 2308-PRO-TC-MR-053 TECHNICAL CLARIFICATION - CATHODIC PROTECTION (TEMPORARY & PERMANENT) C TBC 6-Mar-2025 8-Mar-2025 CLOSED ELE Folder Updated By Nowsath & Samnash Folder Updated By Nowsath & Samnash
1396 WOR-TRANSMIT-001893 2308-PRO-MR-063 MR - FIBER PATCH PANELS 01 MR 8-Mar-2025 8-Mar-2025 CLOSED MR SIGNED & SHARED WITH PRC. PO PLACED
1397 WOR-TRANSMIT-001894 2308-PRO-TC-MR-047 TECHNICAL CLARIFICATION - BURN PIT FLARE SYSTEM C TBC 8-Mar-2025 8-Mar-2025 CLOSED CLOSED
1398 WOR-TRANSMIT-001895 2308-PRO-MR-113-TBE FINAL TBE - MOV BALL VALVES, METAL SEATED A TBE 8-Mar-2025 8-Mar-2025 CLOSED PIP / I&C CLOSED
1399 WOR-TRANSMIT-001896 2308-PRO-MR-023-NMR-601 MR-023-NMR-601 - NMR-601 for MR-023, DCS MODIFICATION (HONEYWELL)-CODE C2 A NMR-601 9-Mar-2025 9-Mar-2025 CLOSED I&C BQ-PLDF-II-TR-1428 RESPONSE RECEIVED FROM SAPMT
1400 WOR-TRANSMIT-001897 2308-PRO-MR-047 MR - BURN PIT FLARE TIP SYSTEM & IGNITION SKID (as per 90% Detailed Design). 01 MR 9-Mar-2025 9-Mar-2025 CLOSED MECH BQ-W-JFDP-T-1032 CLOSED CLOSED
1401 WOR-TRANSMIT-001898 2308-PRO-MR-098 MR - TRANSMISSION EQUIPMENT & ACCESSORIES 01 MR 9-Mar-2025 9-Mar-2025 CLOSED TELECOM MR SIGNED & SHARED WITH PRC ON 03-MAY-20
1402 WOR-TRANSMIT-001899 2308-PRO-MR-030-NMR-602 NMR-602 FOR MR-030 -TRANSFORMER (POLE MOUNTED TYPE)-CODE C2 A NMR-602 9-Mar-2025 9-Mar-2025 CLOSED ELE / CVL SEND TO PRC
1403 WOR-TRANSMIT-001900 2308-PRO-MR-028 MR- DRAIN COLLECTION VESSELS (updated as per 90% Detailed Design) 02 MR 9-Mar-2025 9-Mar-2025 CLOSED MECH BQ-W-JFDP-T-1106 CLOSED
1404 WOR-TRANSMIT-001901 2308-PRO-MR-008 MR- SS FLANGES AND BLINDS. 02 MR 9-Mar-2025 3:33 PM 10-Mar-2025 CLOSED PIP CLOSED
1405 WOR-TRANSMIT-001902 2308-PRO-MR-002 MR- LOW TEMPERATURE CARBON STEEL PIPES 02 MR 9-Mar-2025 3:33 PM 10-Mar-2025 CLOSED PIP SIGNED & SEND TO PRC ON 10-MAY-2025
1406 WOR-TRANSMIT-001903 2308-PRO-MR-012 MR - STAINLESS STEEL PIPES 01 MR 10-Mar-2025 10-Mar-2025 CLOSED PIP CLOSED
1407 WOR-TRANSMIT-001904 2308-PRO-MR-080 MR-COMMUNICATION TOWER AND TETRA RADIO SYSTEM 01 MR 10-Mar-2025 10-Mar-2025 CLOSED Telecom BQ-W-JFDP-T-1126 CLOSED CLOSED
1408 WOR-TRANSMIT-001905 2308-PRO-MR-114-TBE FINAL TBE - GOV BALL VALVES, METAL SEATED. A TBE 10-Mar-2025 10-Mar-2025 CLOSED PIP / I&C CLOSED
1409 WOR-TRANSMIT-001906 2308-PRO-MR-069-NMR-601 NMR-601 for MR-069, LIGHTING FIXTURES - CODE C2 C NMR-601 10-Mar-2025 10-Mar-2025 CLOSED ELE SEND TO PRC
1410 WOR-TRANSMIT-001907 2308-PRO-MR-071-NMR-601 MR-071-NMR-601 - NMR-601 for MR-071, LV CABLE (POWER & CONTROL)-CODE C2. A NMR-601 10-Mar-2025 10-Mar-2025 CLOSED SEND TO PRC
1411 WOR-TRANSMIT-001908 - 0 Early IFC 10-Mar-2025 10-Mar-2025 Open CVL OPEN WITH BQ
1412 WOR-TRANSMIT-001909 Jafurah - 90% Proof of Implementation Jafurah - 90% Proof of Implementation 0 90% 11-Mar-2025 11-Mar-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1413 WOR-TRANSMIT-001910 2308-PRO-MR-054 MR - LIQUID CUSTODY METERING SKID 01 MR 11-Mar-2025 11-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1031 CLOSED CLOSED
1414 WOR-TRANSMIT-001912 2nd Batch of 90% Proof of Implementation 2nd Batch of 90% Proof of Implementation 0 90% 11-Mar-2025 11-Mar-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1415 WOR-TRANSMIT-001913 3rd Batch of 90% Proof of Implementation 3rd Batch of 90% Proof of Implementation 0 90% 11-Mar-2025 11-Mar-2025 CLOSED Submitted to PMT (BQ-PLDF-II-TR) CLOSED
1416 WOR-TRANSMIT-001914 2308-PRO-MR-079 MR - INSTRUMENT BULK MATERIALS 00 MR 11-Mar-2025 11-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1052 CLOSED CLOSED
1417 WOR-TRANSMIT-001916 2308-PRO-MR-105 MR - LTCS FLANGES AND BLINDS 01 MR 11-Mar-2025 11-Mar-2025 CLOSED PIP CLOSED
1418 WOR-TRANSMIT-001918 Monthly Progress Certificate 14 Monthly Progress Certificate 14 0 Payment Certificate 12-Mar-2025 12-Mar-2025 CLOSED Management Given to PCM for sign CLOSED
1419 WOR-TRANSMIT-001921 90% TCP package along with CSD CRS responses - Re90% TCP package along with CSD CRS responses - Rev B B CP Design Package 12-Mar-2025 12-Mar-2025 CLOSED RESPONDED & RETURNED TO WORLEY CLOSED
1420 WOR-TRANSMIT-001922 4th Batch of 90% proof of implementation 4th Batch of 90% proof of implementation 0 90% 12-Mar-2025 12-Mar-2025 Open ALL OPEN WITH BQ
1421 WOR-TRANSMIT-001924 2308-PRO-MR-129-TBE TBE - FINAL TBE - COMMUNICATION BULK MATERIALS (HDPE). A TBE 12-Mar-2025 12-Mar-2025 -
1422 WOR-TRANSMIT-001926 2308-PRO-MR-006 MR - BW FITTINGS - SS 01 MR 13-Mar-2025 15-Mar-2025 CLOSED PIP CLOSED
1423 WOR-TRANSMIT-001927 2308-PRO-MR-064-TBE FINAL TBE - CIVIL BULK MATERIALS. A TBE 13-Mar-2025 15-Mar-2025 -
1424 WOR-TRANSMIT-001928 413011-01303-PVN-0046 SCOPE CHANGE ORDER - CHANGE IN RMNJ-1 PIPELINE MAOP. 0 Change Order 13-Mar-2025 15-Mar-2025 REJECTED Management BQ-W-JFDP-T-1102 REJECTED & RETURNED TO WP CLOSED
1425 WOR-TRANSMIT-001929 413011-01303-PVN-0047 SCOPE CHANGE ORDER - MISSING MARJAN INCREMENT FLOW FOR RJPRP-1 AND RJBUT-1 0 Change Order 13-Mar-2025 15-Mar-2025 Obselete Management Returned to WP to revise PM name & desig. OBSELETE
1426 WOR-TRANSMIT-001930 413011-01303-PVN-0048 CHANGING THE C2+NGL PUMP CONFIGURATION IN MODEL & REPORTS 0 Change Order 13-Mar-2025 15-Mar-2025 Obselete Management Returned to WP to revise PM name & desig. OBSELETE
1427 WOR-TRANSMIT-001931 2308-PRO-MR-081-TBE FINAL TBE - TELECOMMUNICATION BULK MATERIALS A TBE 13-Mar-2025 15-Mar-2025 CLOSED CLOSED
1428 WOR-TRANSMIT-001933 2308-PRO-MR-023 JUAYMAH NGLF DCS MODIFICATIONS (HONEYWELL). 01 MR 15-Mar-2025 15-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1053 MR SIGNED & SHARED WITH PRC ON 05-MAY-20CLOSED
1429 WOR-TRANSMIT-001934 413011-01303-PVN-0049 SCOPE CHANGE ORDER - LATE CHANGE TO SALES GAS & OFF-SPEC ETHANE FLOWRATES. 0 Change Order 15-Mar-2025 15-Mar-2025 Obselete Management Returned to WP to revise PM name & desig. OBSELETE
1430 WOR-TRANSMIT-001936 P000000W_ABQAIQ DCO SAPD B1193 Site visit Report - ABQAIQ DCO/SAPD BLDG. 1193 & BLDG. 10-490 0 Site Visit 17-Mar-2025 17-Mar-2025 Open ALL OPEN WITH BQ
1431 WOR-TRANSMIT-001937 2308-PRO-MR-076 MR - PIPING BULK MATERIALS 00 MR 17-Mar-2025 17-Mar-2025 OPEN PIP OPEN WITH BQ
1432 WOR-TRANSMIT-001938 2308-PRO-MR-026 MR- FIRE WATER SYSTEM 02 MR 17-Mar-2025 17-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1206 COMMENTED & RETURNED TO WORLEY CLOSED
1433 WOR-TRANSMIT-001939 2308-PRO-MR-088 MR- FIRE EXTINGUISHERS 01 MR 17-Mar-2025 17-Mar-2025 CLOSED MR SIGNED
1434 WOR-TRANSMIT-001941 413011-01303-PVN-0045 413011-01303-PVN-0045 - SCOPE CHANGE ORDER - EXTENSION OF SAPMT & BQ OFFICES 0 Change Order 17-Mar-2025 17-Mar-2025 Obselete Management OBSELETE
1435 WOR-TRANSMIT-001942 413011-01303-PVN-0047 SCOPE CHANGE ORDER - MISSING MARJAN INCREMENT FLOW FOR RJPRP-1 AND RJBUT-1 0 Change Order 17-Mar-2025 17-Mar-2025 CLOSED Management REJECTEDBQ-W-JFDP-T-1247 REPLIED TO WORLEY CLOSED
1436 WOR-TRANSMIT-001943 413011-01303-PVN-0048 CHANGING THE C2+NGL PUMP CONFIGRAUTION IN MODEL & REPORTS. 0 Change Order 17-Mar-2025 17-Mar-2025 CLOSED Management RETURNED TO WORLEY CLOSED
1437 WOR-TRANSMIT-001944 413011-01303-PVN-0049 SCOPE CHANGE ORDER - LATE CHANGE TO SALES GAS & OFF-SPEC ETHANE FLOWRATES. 0 Change Order 17-Mar-2025 17-Mar-2025 CLOSED Management BQ-W-JFDP-T-1089 10-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1438 WOR-TRANSMIT-001945 413011-01303-PVN-0050 SCOPE CHANGE ORDER - UPDATE INSTRUMENT TAG NUMBERS 0 Change Order 17-Mar-2025 17-Mar-2025 REJECTED Management REJECTED with Letter by Ali Shared for EM & PCM sign
1439 WOR-TRANSMIT-001946 2308-PRO-MR-105-NMR-601 NMR-601 Rev.B for MR-105, LTCS FLANGES AND BLINDS-CODE-C1 B NMR-601 17-Mar-2025 17-Mar-2025 CLOSED PIP SEND TO PRC
1440 WOR-TRANSMIT-001947 2308-PRO-MR-099-CRS 2308-PRO-MR-099-CRS - CRS - OHPL BULK MATERIALS AND ACCESSORIES A CRS_MR 18-Mar-2025 18-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1042 & T-1143 CLOSED CLOSED
1441 WOR-TRANSMIT-001948 2308-PRO-MR-060-CRS 2308-PRO-MR-060-CRS - CRS - PRESSURE GAUGES 01 CRS_MR 18-Mar-2025 18-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1047 CLOSED CLOSED
1442 WOR-TRANSMIT-001949 TE-464001 AC MITIGATION STUDY REPORT B AC MITIGATION 17-Mar-2025 17-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1207 CSD COMMENTS SEND TO WORLEY CLOSED
1443 WOR-TRANSMIT-001950 2308-PRO-TC-MR-047 TBC COMPLIANCE STATEMENT - BURN PITS D TBC 18-Mar-2025 18-Mar-2025 CLOSED CLOSED
1444 WOR-TRANSMIT-001951 2308-PRO-MR-086 MR - SPECTACLE PLATES 02 MR 18-Mar-2025 19-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1098 CLOSED & RETURNED TO WP CLOSED
1445 WOR-TRANSMIT-001952 2308-PRO-MR-007 MR - THDD AND SW FITTINGS - SS 02 MR 18-Mar-2025 19-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1205 RETURNED TO WORLEY CLOSED
1446 WOR-TRANSMIT-001953 2308-PRO-MR-081-TBE TBE - TELECOMMUNICATION BULK MATERIALS. B TBE 18-Mar-2025 19-Mar-2025 -
1447 WOR-TRANSMIT-001954 2308-PRO-MR-101 MR -THDD AND SW FITTINGS - CS 01 MR 18-Mar-2025 19-Mar-2025 CLOSED PIP CLOSED
1448 WOR-TRANSMIT-001955 KR.GTO24000051 Detailed Geotechnical Site Investigation for BI-10-14245, Jafurah Downstream Pipelines Phase II. 4 GeoTech 18-Mar-2025 19-Mar-2025 CLOSED CVL Comments sent to WP COMMENTS SHARED WITH WP
1449 WOR-TRANSMIT-001956 413011-01303-WOR-LTR-0063-2025 Geotechnical Investigation Endorsement Geotechnical File No. 2023/260A. - LETTER 18-Mar-2025 19-Mar-2025 OPEN CVL
1450 WOR-TRANSMIT-001957 - Worley response to BQ Comments- 90% E-Review Package OHPL - 90% 18-Mar-2025 19-Mar-2025 CLOSED BQ-W-JFDP-T-1040 CLOSED & RETURNED TO WP CLOSED
1451 WOR-TRANSMIT-001958 Jafura Pipeline_Post 90% Stress Reports Jafura Pipeline_Post 90% Stress Reports - Stress Report 19-Mar-2025 19-Mar-2025 CLOSED PIP CRS sent-BQ-W-JFDP-T- 1041 CLOSED & RETURNED TO WP CLOSED
1452 WOR-TRANSMIT-001959 2308-PRO-MR-055 MR - BARRED TEE 02 MR 20-Mar-2025 20-Mar-2025 CLOSED BQ-W-JFDP-T-1075 PR SIGNED AND SEND TO PRC ON 24-APR-25 CLOSED
1453 WOR-TRANSMIT-001960 Not Rcvd WOR-TRANSMIT-001960 not issued to BQ. System did not generate it. - - - - - CLOSED CLOSED
1454 WOR-TRANSMIT-001961 SC-P.O - 4900000480_ IPC-002 - Payment Certificate 20-Mar-2025 20-Mar-2025 CLOSED Management sent to subcontract sent to subcontract
1455 WOR-TRANSMIT-001962 2308-PRO-MR-103 2308-PRO-MR-103 Rev. 02 BW Fittings - LTCS 02 MR 20-Mar-2025 20-Mar-2025 CLOSED PIP CLOSED
1456 WOR-TRANSMIT-001963 2308-PRO-MR-117-TBE 2308-PRO-MR-117-TBE - FINAL TBE - BALL VALVES, SOFT SEATED, MANUAL C TBE 20-Mar-2025 20-Mar-2025 OPEN PIP
1457 WOR-TRANSMIT-001964 Jafurah Rebars As per Facilities Jafurah Rebars As per Facilities 0 REBARS 20-Mar-2025 22-Mar-2025 Open CVL OPEN WITH BQ
1458 WOR-TRANSMIT-001965 2308-PRO-MR-036-NMR-601 NMR-601 for MR-036 JIB CRANE-Code-C2 A NMR-601 20-Mar-2025 22-Mar-2025 CLOSED SEND TO PRC
1459 WOR-TRANSMIT-001966 KR.GTO24000051 Detailed Geotechnical Site Investigation for BI-10-14245, Jafurah Downstream Pipelines Phase II. 4 GeoTech 20-Mar-2025 20-Mar-2025 CLOSED CVL BQ-W-JFDP-T-1090 CLOSED & RETURNED TO WP CLOSED
1460 WOR-TRANSMIT-001967 2308-PRO-MR-130 MR - SURGES RELIEF SKIDS 01 MR 20-Mar-2025 22-Mar-2025 CLOSED MECH CLOSED & INFORMED PRC
1461 WOR-TRANSMIT-001970 413011-01303-PVN-0045 EXTENSION OF SAPMT & BQ OFFICES 0 Change Order 22-Mar-2025 22-Mar-2025 Superseded Management
1462 WOR-TRANSMIT-001971 2308-PRO-MR-054 LIQUID CUSTODY METERING SKID. 01 MR 22-Mar-2025 22-Mar-2025 CLOSED I&C BQ-W-JFDP-T-1177 RETURNED TO WORLEY CLOSED
1463 WOR-TRANSMIT-001972 INTERIM PAYMENT CERTIFICATE # 12 INTERIM PAYMENT CERTIFICATE # 12 - ISSUE OF ALL MR's - Payment Certificate 23-Mar-2025 24-Mar-2025 CLOSED Management RETURNED TO WP CLOSED
1464 WOR-TRANSMIT-001973 413011-01303-PVN-0033 SCOPE CHANGE ORDER - NETWORK DESIGN FOR IT AND NON-IT SEVICES 2 Change Order 23-Mar-2025 24-Mar-2025 CLOSED Management BQ-W-JFDP-T-1089 10-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1465 WOR-TRANSMIT-001974 413011-01303 - SC-P.O - 4900000456 _ IPC-003 0 Payment Certificate 23-Mar-2025 24-Mar-2025 CLOSED Management BQ-W-JFDP-T-1234 CLOSED
1466 WOR-TRANSMIT-001976 413011-01303-WOR-LTR-0064-2025 413011-01303-WOR-LTR-0064-2025 - IFC PATH FORWARD 0 LTR 24-Mar-2025 24-Mar-2025 CLOSED Management
1467 WOR-TRANSMIT-001977 413011-01303-PVN-0051 SCOPE CHANGE ORDER - GDS MAPPING REPORT IMPLEMENTATION 0 Change Order 24-Mar-2025 24-Mar-2025 CLOSED Management BQ-W-JFDP-T-1250 RETURNED TO WORLEY CLOSED
1468 WOR-TRANSMIT-001978 413011-01303-PVN-0052 SCOPE CHANGE ORDER - BAR BENDING SCHEDULE DRAWINGS 0 Change Order 24-Mar-2025 24-Mar-2025 Superseded Management Shared for EM & PCM sign Shared for EM & PCM sign
1469 WOR-TRANSMIT-001980 2308-PRO-MR-055-NMR-601 2308-MR-055-NMR-601 - NMR-601 for MR-055, BARRED TEE - CODE-C1 B NMR-601 24-Mar-2025 24-Mar-2025 CLOSED SEND TO PRC
1470 WOR-TRANSMIT-001981 30009-A01-TI-5035 (35923) 413011-01303 - 30009-A01-TI-5035 (35923) - Billing 30% (Advance Payment). - Invoice 24-Mar-2025 24-Mar-2025 CLOSED Management Forwareded to Subcon Part of Payment Certificate # 16 Forwareded to Subcon Part of Payment Certificat
1471 WOR-TRANSMIT-001982 2308-PRO-MR-047-TBE 2308-PRO-MR-47-TBE - FINAL TBE - BURN PIT FLARE TIP SYSTEM & IGNITION SKID A TBE 24-Mar-2025 24-Mar-2025 - MECH
1472 WOR-TRANSMIT-001983 2308-PRO-MR-033 MR- SOLAR POWER SYSTEM. 01 MR 25-Mar-2025 25-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1085 CLOSED CLOSED
1473 WOR-TRANSMIT-001984 2308-PRO-MR-051 MR - ANCHOR BOLTS 01 MR 25-Mar-2025 25-Mar-2025 CLOSED CVL MR SIGNED
1474 WOR-TRANSMIT-001985 2308-PRO-MR-104 MR - THDD AND SW FITTINGS - LTCS 02 MR 25-Mar-2025 25-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1212 RETURNED TO WORLEY CLOSED
1475 WOR-TRANSMIT-001986 SC-P.O - 4900000561_IPC - 413011-01303 - SC-P 413011-01303 - SC-P.O - 4900000561_IPC - 413011-01303 - SC-P.O - 4900000561_IPC. 0 Invoice 25-Mar-2025 25-Mar-2025 CLOSED Management BQ-W-JFDP-T-1150 SIGNED & RETURNED TO WP CLOSED
1476 WOR-TRANSMIT-001987 2308-PRO-MR-034 MR - DC SYSTEM 02 MR 25-Mar-2025 25-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1099 CLOSED & RETURNED TO WP CLOSED
1477 WOR-TRANSMIT-001988 Crossing sketch for scraper area UG design - Riyas Crossing sketch for scraper area UG design - Riyas 0 Sketch 25-Mar-2025 25-Mar-2025 OPEN INFERFACE
1478 WOR-TRANSMIT-001989 2308-PRO-MR-010 MR - GASKETS AND INSULATING SETS 01 MR 25-Mar-2025 25-Mar-2025 OPEN PIP OPEN WITH BQ
1479 WOR-TRANSMIT-001990 2308-PRO-MR-089 MR - EYEWASH & SAFETY SHOWER 01 MR 25-Mar-2025 25-Mar-2025 CLOSED PIP BQ-W-JFDP-T-1070 CLOSED CLOSED
1480 WOR-TRANSMIT-001991 2308-PRO-MR-106 MR - INSULATION OF PIPING 01 MR 25-Mar-2025 26-Mar-2025 OPEN PIP OPEN WITH BQ
1481 WOR-TRANSMIT-001995 2308-PRO-MR-062-CRS Worley response to BQ-Comments (CRS) For MR-062, MAGNETIC LEVEL GAUGES 01 CRS_MR 25-Mar-2025 26-Mar-2025 CLOSED I&C MR SIGNED AND INFORMED TO PRC ON 13-APR
1482 WOR-TRANSMIT-001996 2308-PRO-MR-021 MR - FIBER OPTIC CABLES 03 MR 25-Mar-2025 26-Mar-2025 CLOSED BQ-W-JFDP-T-1055 CLOSED CLOSED
1483 WOR-TRANSMIT-001997 2308-PRO-MR-009 MR - STUD BOLTS (Updated as per 90% Detail Design) 01 MR 25-Mar-2025 26-Mar-2025 Open CVL OPEN WITH BQ
1484 WOR-TRANSMIT-001998 2308-PRO-MR-070 MR - LIGHTING POLES (Updated as per 90% Detailed Design documents) 01 MR 25-Mar-2025 26-Mar-2025 CLOSED ELE / CVL BQ-W-JFDP-T-1059 RETURNED TO WORLEY ON 27-MAR-25 CLOSED
1485 WOR-TRANSMIT-001999 2308-PRO-MR-035 MR - CORROSION INHIBITOR INJECTION SKID. 01 MR 26-Mar-2025 26-Mar-2025 CLOSED MECH MR SIGNED
1486 WOR-TRANSMIT-002000 2308-PRO-MR-031 MR - POWER DISTRIBUTION PANELBOARD RACK, LOW VOLTAGE 01 MR 26-Mar-2025 26-Mar-2025 CLOSED BQ-W-JFDP-T-1093 RETURNED TO WORLEY ON 13-APR-25 CLOSED
1487 WOR-TRANSMIT-002001 2308-PRO-MR-135 MR - WELDOLET (Updated as per 90% Detail Design). 01 MR 26-Mar-2025 26-Mar-2025 CLOSED PIP RETURNED TO WORLEY CLOSED

1488 WOR-TRANSMIT-002002 90% Electrical Package ETAP Study 90% Electrical Package (ETAP STUDY) – Worley responses to comments By SAPMT. - 90% 26-Mar-2025 26-Mar-2025 CLOSED ELE BQ-W-JFDP-T-1221 BQ-PLDF-II-TR-1113A 12-May-2025 CLOSED
1489 WOR-TRANSMIT-002003 MR-097_Rev. 02 Worley response to BQ-Comments (CRS) For MR-097 Rev-02, INSTRUMENT VALVES, TUBING & FITTINGS 02 CRS_MR 27-Mar-2025 12-Apr-2025 CLOSED I&C BQ-W-JFDP-T-1033 06-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1490 WOR-TRANSMIT-002004 Post 90% Stress Reports Worley response to BQ-W-JFDP-T-1041 BQ-Comments (CRS) for Post 90% Stress Reports - Stress Report 27-Mar-2025 17-Apr-2025 CLOSED BQ-W-JFDP-T-1226 24-Apr-2025 BQ-PLDF-II-TR-1490 12-May-2025 SUBMITTED TO SAPMT ON 24-APR-25 (EPM # CS-001153) CLOSED CLOSED
1491 WOR-TRANSMIT-002005 2308-PRO-MR-069 MR - LIGHTING FIXTURES 01 MR 27-Mar-2025 17-Apr-2025 CLOSED ELE BQ-W-JFDP-T-1116 24-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1492 WOR-TRANSMIT-002006 2308-PRO-MR-104-TBE FINAL TBE - THDD AND SW FITTINGS - LTCS B TBE 27-Mar-2025 12-Apr-2025 CLOSED PIP 06-Apr-2025 SUPERSEDED
1493 WOR-TRANSMIT-002007 Site Visit Report Site Visit Report For JUAYMAH Off Lines And Hot Tap Tie-In At Butane Spheroids Report 27-Mar-2025 12-Apr-2025 Open MECH-HOT 06-Apr-2025 OPEN WITH BQ
1494 WOR-TRANSMIT-002008 2308-PRO-MR-001 MR- CARBON STEEL PIPES (Note: MR updated as per 90% Detailed Design Documents.) 01 MR 27-Mar-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 CLOSED
1495 WOR-TRANSMIT-002009 413011-01303-PVN-0002 - IPC # 02 Change Orders - Interim Payment Certificate # 02 - PIDs Microstation to SPPID Conversion - PVN-0002 0 Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1071 RETURNED TO WP CLOSED
1496 WOR-TRANSMIT-002010 413011-01303-PVN-0003 - IPC # 03 Change Orders - Interim Payment Certificate # 03 - Conversion SPI to Microstation - PVN-0003 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1071 RETURNED TO WP CLOSED
1497 WOR-TRANSMIT-002011 413011-01303-PVN-0005 - IPC # 04 Change Orders - Interim Payment Certificate # 04 - PVN-0005 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1088 RETURNED TO WP CLOSED

1498 WOR-TRANSMIT-002012 413011-01303-PVN-0007 - IPC # 01 Change Orders - Interim Payment Certificate # 01 - PVN-0007 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1088 06-Apr-2025 RETURNED TO WP CLOSED

1499 WOR-TRANSMIT-002013 413011-01301-PVN-0011 - IPC # 06 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1130 06-Apr-2025 CLOSED & RETURNED TO WP CLOSED

1500 WOR-TRANSMIT-002014 413011-01301-PVN-0012 - IPC # 07 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 07 - ADJUSTED LUPs AT QBGG - PVN-0012 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management 03-Apr-2025 CLOSED & RETURNED TO WP CLOSED

1501 WOR-TRANSMIT-002015 413011-01301-PVN-0013 - IPC # 08 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1088 Sent to PCM, EM & PM RETURNED TO WP CLOSED
1502 WOR-TRANSMIT-002016 413011-01301-PVN-0014 - IPC # 09 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 09 - OHPL UPGRADING POLES AND ROUTE ADJUSTMENT - PVN-0014 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1151 27-Apr-2025 SIGNED & RETURNED TO WP CLOSED
1503 WOR-TRANSMIT-002017 413011-01301-PVN-0015 - IPC # 10 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 10 - JUAYMA CHANGES - PVN-0015 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1124 03-Apr-2025 APPROVED CLOSED & RETURNED TO WP CLOSED
1504 WOR-TRANSMIT-002018 413011-01301-PVN-0018 - IPC # 11 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 11 - SALES GAS DISPLACEMENT - PVN-0018 - Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1124 24-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1505 WOR-TRANSMIT-002019 413011-01301-PVN-0019 - IPC # 12 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1256 03-Apr-2025 CLOSED

1506 WOR-TRANSMIT-002020 413011-01301-PVN-0020 - IPC # 13 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 13 - ETHANE FUTURE LOOP PROVISION SIZE CHANGE - 0020 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management 03-Apr-2025 CLOSED

1507 WOR-TRANSMIT-002021 413011-01301-PVN-0021 - IPC # 14 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 14 - CHANGE IN THE BURN PIT SIZING (RADIATION ZONE) - PVN-0021 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1256 03-Apr-2025 CLOSED

1508 WOR-TRANSMIT-002022 413011-01301-PVN-0022 - IPC # 15 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 15 - C2+NGL FLOW INCREASE - PVN-0022 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1256 03-Apr-2025 CLOSED
1509 WOR-TRANSMIT-002023 413011-01303-PVN-0027 - IPC # 16 CHANGE ORDERS - PENTANE INJECTION TO AH LINES, CONCEPT SELECTION ASSESSMENT - Payment Certificate 27-Mar-2025 17-Apr-2025 open Management Hard Copy to EM on 31-May-2025 SIGNED & RETURNED TO WP
1510 WOR-TRANSMIT-002024 413011-01303-PVN-0028 - IPC # 17 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 17 - PENTANE INJECTION TO AH LINES, DETAILED DESIGN 3 Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1351 Returned to WP CLOSED
1511 WOR-TRANSMIT-002025 413011-01301-PVN-0029 - IPC # 18 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 18, NG-A 180 SURGE MITIGATION STUDY AT RTT - PVN-0029 1 Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management RETURNED TO WP CLOSED

1512 WOR-TRANSMIT-002026 413011-01301-PVN-0030 - IPC # 19 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management Sent to PCM, EM & PM RETURNED TO WP CLOSED

1513 WOR-TRANSMIT-002027 413011-01303-PVN-0031 - IPC # 20 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 20, OFF SPECS TIE-IN & ADDITIONAL SPECTACLE BLINDS FOR FUTURE - PVN-0031 1 Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1264 REJECTED & RETURNED TO WORLEY CLOSED
1514 WOR-TRANSMIT-002028 413011-01301-PVN-0033 - IPC # 21 CHANGE ORDERS - INTERIM PAYMENT CERTIFICATE # 21, NETWORK DESIGN FOR IT AND NON-IT SERVICES - PVN-0033 - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management BQ-W-JFDP-T-1128 03-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1515 WOR-TRANSMIT-002029 413011-01301-PVN-0036 - IPC # 22 - Payment Certificate 27-Mar-2025 17-Apr-2025 CLOSED Management BQ-W-JFDP-T-1124 CLOSED & RETURNED TO WP CLOSED
1516 WOR-TRANSMIT-002030 2308-PRO-MR-100 BW FITTINGS - CS 01 MR 28-Mar-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 closed
1517 WOR-TRANSMIT-002031 2308-PRO-MR-071 MR - LV CABLE (POWER & CONTROL) 01 MR 28-Mar-2025 17-Apr-2025 CLOSED BQ-W-JFDP-T-1119 24-Apr-2025 MR SIGNED & SHARED WITH PRC ON 23-APR-20CLOSED
1518 WOR-TRANSMIT-002032 SC-P.O - 4900000455 _ IPC - Payment Certificate 27-Mar-2025 12-Apr-2025 CLOSED Management CLOSED CLOSED
1519 WOR-TRANSMIT-002033 2308-PRO-MR-013-TBE FINAL TBE - RTR PIPES AND FITTINGS (FIRE WATER AND OWS) C TBE 28-Mar-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 CLOSED
1520 WOR-TRANSMIT-002034 2308-PRO-MR-125 MR - Casing Pipes 01 MR 31-Mar-2025 17-Apr-2025 CLOSED PIP BQ-W-JFDP-T-1254 24-Apr-2025 RETURNED TO WORLEY ON 17-MAY-25 CLOSED
1521 WOR-TRANSMIT-002035 2308-PRO-MR-118 MR - CHECK VALES, NON-SLAM (Updated as per 90% Detail Design). 03 MR 1-Apr-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 SIGNED & SEND TO PRC ON 17-APR-2025
1522 WOR-TRANSMIT-002036 2308-PRO-MR-109 MR - RTR FITTINGS (8" NPS) (Updated as per 90% Detail Design). 02 MR 1-Apr-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025 MR SIGNED BY PRC ON 20/APRIL/2025
1523 WOR-TRANSMIT-002037 2308-PRO-MR-003 MR - HOT-INDUCTION PIPE BENDS. (Updated as per 90% Detail Design) 02 MR 2-Apr-2025 17-Apr-2025 CLOSED PIP 24-Apr-2025
1525 WOR-TRANSMIT-002038 MR-044 Final summary & Sizing Sheets-MR-044 PRESSURE RELIEF VALVES - Calculation 27-Mar-2025 12-Apr-2025 CLOSED I&C 06-Apr-2025 INFORMED PRC TO SEND TO VENDOR CLOSED
1526 WOR-TRANSMIT-002039 Pipelines KMZ as per Topographical survey Pipelines KMZ as per Topographical survey - KMZ FILE 4-Apr-2025 5-Apr-2025 OPEN PIP 10-Apr-2025 OPEN WITH BQ
1527 WOR-TRANSMIT-002040 Detailed design Pipeline Route - Shape files Detailed design Pipeline Route - Shape files - SHAPE FILE 4-Apr-2025 5-Apr-2025 OPEN PIP 11-Apr-2025 OPEN WITH BQ
1528 WOR-TRANSMIT-002041 2308-PRO-MR-092 MR - LEAK DETECTION SYSTEM (FOLDS) 01 MR 4-Apr-2025 5-Apr-2025 CLOSED I&C / TELECOM BQ-W-JFDP-T-1073 11-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1529 WOR-TRANSMIT-002042 2308-PRO-MR-102 MR - CS Flanges & Blinds 01 MR 10-Apr-2025 10-Apr-2025 CLOSED PIP 17-Apr-2025 CLOSED
1530 WOR-TRANSMIT-002043 GPR Change Order for Pentane GPR Change Order for Pentane - Change Order 6-Apr-2025 12-Apr-2025 Rejected Management BQ-W-JFDP-T-1092 13-Apr-2025 REJECTED & RETURNED TO WP CLOSED
1531 WOR-TRANSMIT-002045 2308-PRO-MR-065-NMR-601 NMR-601 for MR-065, FENCING MATERIALS-CODE C3 B NMR-601 10-Apr-2025 10-Apr-2025 CLOSED CIVIL BQ-W-JFDP-T-1016 17-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1532 WOR-TRANSMIT-002046 2308-PRO-MR-072 MR - GROUNDING CABLE & DEVICES 01 MR 7-Apr-2025 7-Apr-2025 CLOSED BQ-W-JFDP-T-1108 14-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1533 WOR-TRANSMIT-002047 2308-PRO-MR-031-CRS Worley response - POWER PANEL RACK 01 CRS_MR 7-Apr-2025 7-Apr-2025 CLOSED BQ-W-JFDP-T-1093 14-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1534 WOR-TRANSMIT-002048 PENTANE PIPELINE HAZOP REPORT PENTANE PIPELINE HAZOP REPORT 2 Hazop Report 7-Apr-2025 7-Apr-2025 CLOSED PROCESS BQ-W-JFDP-T-1190 14-Apr-2025 BQ-PLDF-II-TR-1427 RETURNED TO WORLEY CLOSED
1535 WOR-TRANSMIT-002049 2308-PRO-MR-033-CRS Worley Response - MR- Solar Power System 01 CRS_MR 7-Apr-2025 7-Apr-2025 CLOSED BQ-W-JFDP-T-1085 14-Apr-2025 CLOSED & RETURNED TO WP CLOSED
1536 WOR-TRANSMIT-002050 2308-PRO-MR-031-NMR-601 NMR-601 For MR-031, POWER PANEL RACK A NMR-601 7-Apr-2025 7-Apr-2025 CLOSED 14-Apr-2025 SEND TO PRC ON 07-APR-2025
1537 WOR-TRANSMIT-002052 2308-PRO-MR-011 MR - FBE COATING AND DOUBLE JOINTING (Updated as per 90% Detail Design) 01 MR 7-Apr-2025 7-Apr-2025 CLOSED PIP BQ-W-JFDP-T-1180 14-Apr-2025 CRS SENT TO WORLEY CLOSED
1538 WOR-TRANSMIT-002053 BQ 90% REVIEW COMMENT RESPONSES-2nd BATCHBQ 90% REVIEW COMMENT RESPONSES-2nd BATCH - 90% 8-Apr-2025 8-Apr-2025 OPEN ALL 15-Apr-2025 OPEN WITH BQ
1539 WOR-TRANSMIT-002055 2308-PRO-MR-105-NMR-601 NMR 601 - LTCS FLANGES AND BLINDS - CODE-C1 B NMR-601 8-Apr-2025 8-Apr-2025 CLOSED PIP 15-Apr-2025 SEND TO PRC ON 08/Apr/2025
1540 WOR-TRANSMIT-002056 2308-PRO-MR-059-NMR-601 NMR-601 For MR-059, OHPL POLES-CODE C2 A NMR-601 8-Apr-2025 8-Apr-2025 CLOSED ELE / CVL 15-Apr-2025 CLOSED
1541 WOR-TRANSMIT-002057 2308-PRO-MR-030-NMR-602 NMR-602 For MR-030, TRANSFORMER (POLE MOUNTED TYPE) 01 NMR-602 8-Apr-2025 8-Apr-2025 CLOSED ELE / CVL 15-Apr-2025 CLOSED
1542 WOR-TRANSMIT-002058 2308-PRO-MR-053-NMR-601 NMR-601 For MR-053, CATHODIC PROTECTION (TEMPORARY & PERMANENT)-CODE-C2 A NMR-601 8-Apr-2025 8-Apr-2025 CLOSED ELE 15-Apr-2025 CLOSED
1543 WOR-TRANSMIT-002059 2308-PRO-MR-044 MR -PRESSURE RELIEF VALVES 02 MR 9-Apr-2025 9-Apr-2025 CLOSED I&C 16-Apr-2025 MR SIGNED & Shared with PRC on 31-May-25
1544 WOR-TRANSMIT-002060 2308-PRO-MR-112 MR - OUTDOOR IP TELEPHONE (WEATHER PROOF) 01 MR 9-Apr-2025 9-Apr-2025 CLOSED 16-Apr-2025 MR SIGNED & SHARED WITH PRC. PO PLACED
1545 WOR-TRANSMIT-002061 TOPO change order for pentane line Topo Survey for New 10 inch pentane pipeline. - Change Order 9-Apr-2025 9-Apr-2025 CLOSED Management sent to subcontract 16-Apr-2025
1546 WOR-TRANSMIT-002062 2308-PRO-MR-070 MR - LIGHTING POLES 01 MR 9-Apr-2025 9-Apr-2025 CLOSED ELE / CVL 16-Apr-2025 MR SIGNED
1547 WOR-TRANSMIT-002063 PIPELINES LOCATION CLASSIFICATION REPORT - REPORT 9-Apr-2025 9-Apr-2025 OPEN PIP 16-Apr-2025 OPEN WITH BQ
1548 WOR-TRANSMIT-002064 - POPULATION DENSITY INDEX FOR OUR ENTIRE PIPELINE ROUTE - INDEX 12-Apr-2025 12-Apr-2025 OPEN PIP 19
Project CN:
Project Title: Jafurah Downstream Pipings (JFDP-II)
BI Number: BI-10-14245
Contract No. 6601000358

Outgoing Transmittal To Worley


Sl No. BQ TR Number Sent Date Type Doc. No. Rev. Doc. Name Response Remarks Delay by REMARKS
WORLEY RESPONSE
68 BQ-W-JFDP-T-0068 2-May-2024 MR 2308-PRO-MR-080 A COMMUNICATION TOWER AND TETRA RADIO SYSTEM
348 BQ-W-JFDP-T-0322 28-Aug-2024 TBC 2308-PRO-TC-MR-080 0 VENDOR OFFERS FOR MR-080 COMMUNICATION TOWER AND TETRA
RADIO SYSTEM
466 BQ-W-JFDP-T-0439 26-Sep-2024 TBC 2308-PRO-TC-MR-080 1 TBC Compliance Statement for MR-080 COMMUNICATION TOWER
AND TETRA RADIO SYSTEM (Rev-01)
746 BQ-W-JFDP-T-0719 15-Dec-2024 TBC 2308-PRO-TC-MR-080 2 Compliance Statement for MR-080 COMMUNICATION TOWER AND
TETRA RADIO SYSTEM (Rev-02)
842 BQ-W-JFDP-T-0815 18-Jan-2025 TBC 2308-PRO-TC-MR-080 3 TBC Compliance Statement for MR-080 COMMUNICATION TOWER
AND TETRA RADIO SYSTEM (Rev-03)
1089 BQ-W-JFDP-T-1060 27-Mar-2025 CRS_MR 2308-PRO-MR-080-CRS 1 BQ-Comments (CRS) For MR-070 Rev-01, TETRA RADIO
1092 BQ-W-JFDP-T-1063 27-Mar-2025 TBC 2308-PRO-TC-MR-080 4 TBC Compliance Statement for MR-080 COMMUNICATION TOWER
AND TETRA RADIO SYSTEM (Rev-04)
1155 BQ-W-JFDP-T-1126 19-Apr-2025 CRS_MR 2308-PRO-MR-080-CRS 01 CRS TO MR-COMMUNICATION TOWER & TETRA RADIO SYSTEM CLOSED WOR-TRANSMIT-002149
1198 BQ-W-JFDP-T-1169 30-Apr-2025 TBC 2308-PRO-TC-MR-080 5 TBC Compliance Statement for MR-080 COMMUNICATION TOWER CLOSED WOR-TRANSMIT-002263
AND TETRA RADIO SYSTEM (Rev-05) [Vendor ICS, NOKIA, ASAM,
NASCO, PIONEER]

1381 BQ-W-JFDP-T-1352 2-Jun-2025 MR 2308-PRO-MR-080 A BQ RESPONSE TO MR-080 - COMMUNICATION TOWER AND TETRA OPEN PENDING WITH WORLEY 21 Days
RADIO SYSTEM
1389 BQ-W-JFDP-T-1360 3-Jun-2025 TBC 2308-PRO-TC-MR-080 6 TBC Compliance Statement for MR-080 Communication Tower & CLOSED WOR-TRANSMIT-002323
Tetra Radio System (Rev-06)
[Vendor: ASAM / GAS VECTOR / ICS / NASCO / NOKIA / UNIQUE
PIONEER]