18 Wappendix
18 Wappendix
data and bansmission lines &reprovided in the Tabla A.1, A.2, A3 and k 4 respectively.
The cost coefficients of IEEE-30 bus system are slightly modified to incorporate nonsmooth fuel cost functions with ramp rate coefficients as given in Table A.5. The data is
on 100 MVA base. For all analysis on this system V,-, V,IPI,Olmm and $i-
13
14
15
I
1
1
0.00
6.20
8.20
1
I
om^
1.60
2.50
24
1
1
28
29
30
I
1
1
0.00
2.40
10.6
I
1
/
0.00
0.90
1.90
Table AS. Modified Generating units raflicienb with Ramp rate limib
an.
No.
1
2
3
4
5
6
~~rnlll
50
63.750
82.875
93.750
157.500
176.625
25
43
20
15
13
14
P~.UI
63.750
82.875
93.750
157.500
176.625
200
43
63
49
30
28
35
ah
bi
dl
0
0
0
0
0
0
0.010
0.020
0.070
0.090
0.025
0.025
3.060
87.5
0.0
-457
32
0
-745
35
60
45
30
0
0
0
0
0
0
0
0
0
0
40
30
0
0
0
0
0
0
0
0
0
0
0.08
0.09
0
0
0
282
0
0
615
0
0
0
0
0
0
0
0.000
8.920
3.700
0.000
7.700
0.300
0.600
0.095
0.025
3.000
3.000
URI DRI
l'd
135 65 85
65
12
22
35
25
20
30
12
08
06
08
15
16
09
16
Appendix - B
DATA FOR INDIAN UTILITY62 BUS TEST SYSTEM
The Indian utility- 62 bus test system is sbom in figure B.I. The system data is
taken from reference [I 141. The generator cost and emission coefficients, load, sites of
the buses and transmission line data are given in the Tables B.1, B.2, 8.3 and B.4
respctivcly. The cost coefficients of Indian utility 62 bus system are slightly modified
to inwrporate non-smooth fud wst functions with m p rate coefficients are given in
Table B.S. The data is on 100 MVA base. For all analysis on this system Vim, V,-,
...
Table BS. Modifled Generating units ewMdents with Ramp rate limits
Gen.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
P d ~ Prrux
100
120
100
50
8
50
63.750
82.875
93.750
157.500
176.625
150
300
50
63.750
82.875
93.750
157.500
176.625
100
200
I5
50
25
50
63.750
82.875
93.750
157.500
176.625
0
20
I5
15
50
400
500
300
438
250
400
25
63.750
82.875
93.750
157.500
176.625
200
300
400
63.750
82.875
93.750
157.500
176.625
200
500
600
40
I50
75
63.750
82.875
93.750
157.500
176.625
200
95
220
80
80
230
500
600
ai
0.0097
0.0055
0.0055
0.0065
0.0025
0
0
0
0
0
0
0.0080
0.0060
0
0
0
0
0
0
0.0075
0.0085
0.0090
0.0045
0.0025
0
0
0
0
0
0
0.0045
0.0065
0.0045
0.0025
0.0045
0.0080
0.0070
6.800 119
90
4.000
4.000
45
25
3.000
0.850
0
5.280 0.891
0
0
15.296 -930
6.107 -68
0
0
12.264-1272
3.500 110
4.800
85
5.439
21
0
0
15.790 -940
6.330 -53
0
0
12.770 -1312
6.000
88
6.000
55
5.200
90
1.600
65
0.850
78
49
2.550
0
0
7.137 -381
3.060 0.815
0
0
6.520 669
85
1.600
4.700
80
1.400
90
0.850
10
1.600
25
5.500
90
75
6.000
di
90
79
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
50
0
0
0
58
0
0
0
0
0
0
0
92
0
0
0
0
0
0.72
0.05
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.52
0
0
0
0.02
0
0
0
0
0
0
0
0.75
0
0
0
0
0
P"d
0 250
0 300
0 300
0
0 20
0 120
337
0
0
893
0
0 300
0
0 130
368
0
0
943
0
0 600
0 500
0 30
0 100
0 50
0 I20
210
0
0
482
0
0 50
0 125
0 55
0 55
0150
0 550
0
URI DR
95 150
138 180
100 200
5
80
12
90
100 150
70 100
400 500
200 300
10 15
55 85
25 25
80 90
40 45
95 105
25 40
25 40
80 100
100 150
Appendix - C
DATA FOR INDIAN UTILITY146 BUS TEST SYSTEM
The Indian utility 146 bus test system is shown in figure C.1.The system data is
taken from reference [I 141.The generator real and reactive power limits, load, sits of
the buses and transmission lines data are given in the tables C.1,C.2,C.3 and C.4
respectively. The data is on 100 MVA base. For all analysis on this system v,"'", Vim,
+,mand 9,-
for bus i an considerad to be 0.9 p.u., 1.1 p.u., -45 degree and +45 degree
respectively.
Table C.1. Generator Real and Reactive Power Limits
- Bus
Pi"
Pi"'
QM
QiM
62
0
100
0
10
25
0
0
0
0
0
50
0
0
248
5.
6.
7.
8.
9.
10.
11.
12.
13.
4
0
0
100
0
0
0
0
0
0
0
50
60
0
0
300
100
500
100
100
200
100
100
100
100
300
360
200
200
50
420
50
M
100
50
50
M
50
I 50
240
100
100
'
131
( 37. 1 LOMPH 4
1 74. 1 AUjRKOlL
11 1.
1 K.KURUCHI I
132
Fig. C.1. One line diagram Indian UtIUty - 146 bus System