0% found this document useful (0 votes)
2 views11 pages

3 Product Installation[1]

The document provides installation and operational guidelines for the SONOACE KA ultrasound diagnostic equipment, emphasizing environmental requirements and safety precautions during setup. It details the steps for unpacking, assembling, and connecting components, as well as instructions for changing input/output voltage and performing system tests. Additionally, it includes troubleshooting advice and contact information for customer service if issues arise during testing.

Uploaded by

marcosmedison
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
2 views11 pages

3 Product Installation[1]

The document provides installation and operational guidelines for the SONOACE KA ultrasound diagnostic equipment, emphasizing environmental requirements and safety precautions during setup. It details the steps for unpacking, assembling, and connecting components, as well as instructions for changing input/output voltage and performing system tests. Additionally, it includes troubleshooting advice and contact information for customer service if issues arise during testing.

Uploaded by

marcosmedison
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 11
SONOACE KA 341 Environmental Requirements 46 32 Unpocking a7 38 Product Installation 49 ‘3-4 Changing Product Input/Output Voltage 52 35 Power On/Off 53 36 Performance Test on CS Bet [Environmental Requirements When instaling: 1) Aveid huricity. 2) Avcid drect sunlight. 3) Avcid places wth extreme terrperature variations. 4) Optra conditions for the system are temperatures of 10-35°C and huriidty of 30-75%, 5) Avcid heat souroes. 6) Avcid dusty and urventiatedareas. 7) Avcid places where the system is Ikely tobe exposed to vibration orimpacts. 8) Avcid places where the system is Ikely tobe exposed to charrical substances or gases. (2. CAUTION ) Placing the system near generators, X-Ray machines, or broadcast cables may resut in soreen nase and ‘abnormal visual images. Using the power source with other electric devioes may also induce noise. + Chapter 3 Product Installation» 46 D108 es “The package contains three bores fer the utrasound diagnostic equipment, the monitor, and acoessaries. 3-2-1 Opening Product Box 1) Cutorremove the package tapes. 2) Cut or remove the external package strapping. 3) Gently take the main box apart. Take out the probe box and keep it in a safe place. 4) Teke out the accessories bax and keep it. 5) Stare the packaging materials for future transportation ofthe product [Figure 3-1 Opening Product Box] 3-2-2 Opening the 15” Monitor Box 1) Cutor remove the package tapes. 2) Gently itp the 15% monitor and place itonaflatand safe plane. + Chapter Product Installations 47 3-2-3 Accessories ‘This product contains a box of accessories. 1) Catar remove the package tapes. 2) Take the acoessories autand keep them in a sae place. 3) The power cord and ground cable are required for connecting tis system. Ow [Figure 3.2 Accessories} MEDISON + Chapter Produrtnstalltion» 48 a & 150% rescue 3-3-1 Assembling the Monitor Follow the instruction to Assemble the monitor. You must remove the back ‘cover in order to Assemble the monitor. 41) Required items: 1 large screwdriver (+) 4 small screwdriver (+) Disasserrbiing the Rear upper cover Use the sorew (+) to remove the screns (1) ~®, Remove screws @-@) as shown below. Use the sail screndiver (4) 10 remove the twoscrens (and 3) + Chapter 3 Product stallion 49 MEDISON Assemble the monitor. Tighten up the sorew in the neck of monitor Assemble the monitor cables. + Chapter 3 Produc Installation + 50 SOK 3-3-2 Connecting probes Be sureto connect or disconnect prcbes when the power is off to ensure the safety of the system and ‘the probes. 1) Connect probes tothe probe parts onthe front panel ofthe system, A reximum of two probes (three probes qpional) can be connected at ane time. 2) Tum the connector ocking handle clocnise aft inserting the probe into the probe port. 3) Whenthe systemis powered on, the probe last inuseis automaticaly activated + Clupter3 ProductInsalltions 51 Ca EDSON 3-4 | ren het sd lies “This section contains instructions for changing the input/output voltage forthe product app (Op Vetoge Selacor @ Output Voltage Selector ‘The system input voltage may be ‘The system output voltage may be selected as 100-120V or 200-240V. sdecied as 100-120V or 200-240V. This votage is foruse by thepiner and/or VCR. The output voltage ‘selected regardless of the input votage [Figure 33 AC-DC Power Module} (2. WARNING ) ‘Always discomect the system fiom the wall ouflet prior to making any changes to the inputfoutput voltage of the sysiem. (A CAUTION The system is designed to use 100-120VAC and 200-240VVAC. Printer and VCR may be connected to the ‘system outlet for power source. + Chapter Product Installation» 52 i “The poner switch ofthis products a contact switch Press the power svtchto init the system operation. You may also press the power switch while the systemisin cperation tum theponer oft (A caution) Please check that the voltage for peripheral devioes matches the voltage of the power outlets prior to ‘comecting power to petipheral devices. [Figure 3-4 Power Switch) + Chapter Preuct Installation 53, Ca EDSON [3-6 |Performance Test 3-6-1 Initialization and Moritor Tests 3-6-2 1) Ifthe system has not been turned onyet, please use a hospital poner cord of 10 arrperes or higher. 2) insert printer paper and video tape appropriate forthe system speofications, 3) Connect probes securely to the two probe connectors. 4) Tum the system power on. Ono the power is tumedn, installation wilintite according to thebuit- inprogram. 5) Ate the system inifalzation process, selMtest willbe carried out (for about 3-5 minutes) andthe 2D Mode Digplay will be shown on the screen. 6) You may view the current system version fram the maritor by sdecting the System Setup menu 7) You may apply other 2D images by selecting other probes. 8) Check the folowing fram the monitor: @ Adiustbrightness and oortrast of the monitor fom minimum levels tomaximum levels to see there are any dstationsin the display. ® Check that the image appears in the centre ofthe monitor. Also check the vertical and horizontal resolutions. @ Check for problems distortions at each oomer. Functional Tests 3-6-3 1) After successful completion ofntiaizetion and monitor test, please check the folowing: ( Check that the image appearsin the correct coordinates othe monitor. ® Check that allarrpson control pana light up propa. @ Check that toggle switches, sides and trackball work property. 2) ary of them appears tohave problems, perform the “iniiazation" procedures one mare time. User Interface Tests 3-6-4 ‘You may run User Interface Tests to check functionality of the operating system user interface. The Contra Panel functions may also be adjusted from the monitor soreen, You may run ather tests ‘simultaneously while running this test. For more details on each key and functionality, refer tothe ‘SonoAce X4 Operation Manual. 2D Image Tests 41) Tumthe power off. Once the system has oorrpetaly shutoff ter 10-20 seconds, un the power on again. 2) Select Curved Array Probe. 3) Apply 2D phantem image. 4) Sette Power level to 100% 5) Adjust the TGC Gain to produce a 2D image with minimum noise and perform the test. Note: Attenuation of the image an the far side must not be set to minimum. + Chapter Product Intalltion= 54, D108 6) Adjust the vertical and horizontal images and adiust the phantam position appropriately. 7) Once phantom has been placed appropriately, make axial and lateral image adjusiments to keep the imege wih minimum rise, 8) When phantom imageadustrrentis complete, adjustthe foa.sng on al hes within all phantom structures, 9) Use various menu keysto produce optimal images for each condition, 2D mode: Direction, Appication, M line, Density, Focus +, = 2, TH, DEPTH, FOCAL POS, TS! OPT, ZOOM, POWER, TGC, DUAL. @M Mbde: Direcfon, Applicaton, Density Format, M, THI, DEPTH, FOCAL POS ZOOM, POWER, T&C 10) Yourmay adjust various menu keys o achieve optimal images for PW Made as wellas 2D images. @ PW Doppler: PWD, ANGLE, Simutaneous, SV Size +, VOLUME, FILTER, SWEEP, BASELINE, ‘SCALE, INVERT Freehand 3D Test 41) Tunthepone aff. Cnoe the gystemhas completely shutof after 10-20 seconds, tu the poweron again. 2) Select Curved Array Probe. 3) Press the 3D button to produce 3D images. 4) Adjust X, Y, Z, Rect. L, Mag, and Th. L to produce desired images. 5) After building a desired image, press the Freeze button to view the produced 3D image on the monitor screen. 6) Press the 2D button to retum to normal mode. Image Saving Test 4) Tumtheponer of. Cnoe the gystemhas completely shutof after 10-20 seconds, un the poweron again. 2) Selecta probe. 3) Press the STORE button o save the image. 4) Press the END EXAM bution, 5) Select the REVIEW meruin SONOVIEW to view the saved image. End of Testing 1) Once all tests have been performed, you may start using the system. 2) Ifthere seems to beany problem during the tests, please restartthe system and run the tests again. 3) Ifproblems persis, please cortact the Madison Custamer Service Centre. pier 3 Protect trsttatin 55

You might also like