Approved GAD - RUB - 400-5 - 100252
Approved GAD - RUB - 400-5 - 100252
C
L OF PROPOSED TRACK
NOTES -
1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN METERS UNLESS STATED OTHERWISE SPECIFIED.
20mm BARREL LENGTH 20mm 2. NO DIMENSIONS SHALL BE SCALED FROM THIS DRAWING ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
EXP.GAP =9350 EXP.GAP 3. PROPOSED WORK SHOWN IN BLACK IN SITE PLAN.
675 4075 3925 675 600mm BOULDER
300 PACKING 4. HEIGHT GAUGE TO BE PROVIDED ON BOTH SIDES OF RUB AT THE ENTRANCE TO RUB.
WALL TOP.240.652m 5. WORK SHALL CONFIRM TO 25T 2008 LOADING STANDARD.
EARTH PRL. 241.189m 6. RCC WORK SHALL BE CARRIED OUT AS PER IRS CONCRETE BRIDGE CODE.
RETAINER TOP OF COPING 240.802m 7. A BOARD INDICATING THAT THIS RUB/SUBWAY IS MEANT FOR PEDESTRIAN,CYCLIST,LIGHT VEHICULAR TRAFFIC
BOTTOM OF COPING 240.652m ONLY,SHOULD BE PLACED AT SITE NEAR HEIGHT GAUGE AT BOTH SIDE OF RUB/SUBWAY.
500 SL
H PFL. 240.427m
SLAB BOTTOM. 239.927m
OP
E2
:1 (g)
8. NO WEEP HOLES SHOULD BE PROVIDED IN THE RCC BOX AND THE RETURN WALLS VIDE RAILWAY BOARD LETTER NO.
2017/CE-IV/RUB/88 DATED:- 24.09.2019.
H
SL 250 9. ALL DIMENSION & LEVEL SHOULD BE VERIFIED AT SITE BEFORE EXECUTION.
HEIGHT H OP HEIGHT WALL TOP. 236.427m
1V:2 E1
GAUGE
10. BACK FILL MATERIAL SHOULD BE PROVIDED AS PER CLAUSE 7.5 OF IRS BRIDGE SUBSTRUCTURE &FOUND.
GAUGE E V:2 CODE.
OP H 600mm BOULDER
6225
SL WING WALL WING WALL PACKING 11. GROUND IMPROVEMENT WILL BE DONE AS IF SILTY CLAY/LOOSE GRAVEL BELOW BOTTOM OF BOX AND RETURN WALL
RETURN WALL 5500 5650 RETURN WALL SHALL BE COMPLETELY REMOVED AND REPLACED WITH WELL GRADED GRAVEL AND ENSURED THAT MIN. SBC SHALL BE
(VH2)
2000
MORE THAN FOUNDING PRESSURE OF BOX OR WALL.
1
1:
BACKFILL SIDE
PE
12. PLATE LOAD TEST SHOULD BE DONE AFTER REPLACEMENT OF SOIL TO ENSURE BY ENGINEER IN CHARGE THAT THE
X
6225
O
8450 REQUIRED SBC IS ACHIEVED PRIOR TO EXECUTION OF RCC BOX.
SL
8450
2550 2550 13. MAINTENANCE OF SUBWAY AND APPROACHES WILL BE DONE BY RAILWAY AS PER BD'S L. NO.2006/CE-IV/MISC-2 (RUB) DTD.
PROP. RDL.234.427m PROP.RDL. 234.427m 03.07.2018.
EXT.RDL.233.808m BACK FILL SIDE 14. MAXIMUM FOUNDING PRESSURE FOR BOX IS 21.00T/M².
SL
(VD2)
TOE WALL 1750 1750 OP
1750
FND LVL OF BOX: 233.777m E 15. PROPOSED RTL IS HIGHER THAN APPROACH ROAD LEVEL; HENCE THERE WILL BE NO WATER LOGGING.
1400
TOE WALL 2:1
300 16. BOX SIZE IS PROPOSED AS PER EPC AGREEMENT.
FND LVL OF WING/RETURN WALL:232.677m (e) (c) (d) 17. APPROVAL OF ROAD AUTHORITY SHALL BE OBTAINED BY CONCERNED AUTHORITY BEFORE EXECUTION OF WORK.
600 900 400 800 18. RCC BOX HAS BEEN PROPOSED AS PER RAILWAY BOARD LETTER NO. 2015/CE-III-BR-STRUCTURE CODE, DATED AS
350
(b)
300mm SOLING 232.677m 19. PROVISION OF PATHWAY IS NOT CONSIDERED IN EPC AGREEMENT.
500
FND. LEVEL OF WING &
CC WEARING COURSE 150mmTHK.
(f)
PROP. RDL.234.427m
RCC BOX SLAB 500mm THICK. 1450
G PCC 150mm THICK. LEVELING COURSE PROP. RDL.234.427m
G
300 300
300 SPECIFICATIONS -
SECTION A-A 232.977m (a)
850
300
(SCALE 1:100) 232.677m 2100 1. GRADE OF CONCRETE FOR RCC BOX :M-35
1750
900 233.577m 2. GRADE OF STEEL :Fe-500D
236.427m
3. MINIMUM CLEAR COVER FOR MAIN REINFORCING BARS :50mm
250
900
C
L OF PROPOSED TRACK 4. CONCRETE GRADE FOR WEARING COURSE :M-25
2550 300
B 232.677m 5. CONCRETE GRADE FOR LEVELING COURSE :M-15
PROW
PROW
SECTION OF TOE WALL SECTION OF RCC RETURN WALL AT 2 - 2 6. GRADE OF CONCRETE FOR CURTAIN WALL/TOE WALL :M-25
3000
3000
3000
PRL. 241.189m
PFL. 240.427m
TOE WALL TOE WALL VH2 VD2 a b c d e f g
PROW
PROW
8450 8450
PROW
6.) IRS BRIDGE SUB-STRUCTURES AND FOUNDATION CODE 2013.
2:1
WING WALL 7.) IRS BRIDGE RULE 2014.
PE
8.) IRS SEISMIC CODE 2017.
8450
(SCALE 1:50)
8450
8450
O
9.) IS 456-2000
0
F 233.808 10.) FOR DETAIL OF RETURN WALL REFER DRAW. NO. GM(W)BB/10524 F
95
FDN LEVEL OF
9
50
11
1750 BOX: 233.777m 11.) FOR DETAIL OF WING WALL REFER SEPARATE DRAWING.
1500
PROW
PROW
(SBC 10.50T/M²) 12.) FOR SITE PLAN & PROPOSED FORMATION LEVEL REFER THE APPROVED PROJECT
500
CROSS SECTION B - B
1500
(SBC 11.50T/M²)
PROW
1. PROPOSED RAIL LEVEL (PRL) : 241.189m
2. PROPOSED FORMATION LEVEL (PFL) : 240.427m
1500
(SCALE - 1:100)
5000mm LEVEL
1
SPAN=4000
5000mm LEVEL PORTION (SBC 20.89T/M²) 3. PROPOSED ALIGNMENT : CURVE(2.200°)
5650
500
500
PORTION 150mm THK. LOOSE GRAVEL 4. ROAD LEVEL (RDL) : 234.427m
A A 229.308
C
4000 WEARING COURSE 5. EXT. ROAD LEVEL (ERDL) : 233.808m
HAUNCH
550X550
150
PROW
PROW
1500
(SBC 24.34T/M²)
500 227.808
500
500
3000
HALF BOTTOM SOFT ROCK
PROW
PROW
1
2:1
1750
E E
1200
E
224.808
OP
SL
300mm SOLING RESIDUAL DEPOSITS
8450
OF SHATTERED AND
700
3000
PROW
PROW
BROKEN BED ROCK
150mm THK.PCC
LEVELLING COURSE 221.808
225
BORE HOLE CH.31137.441
PROW
PROW
KAPADNE
STATION
2 DETAIL-X
2 (SCALE 1:20)
3000
PROW
PROW
1150
1200
1200
1150
300
300
300
300
300
300
B
450
450
2000
D D
25M 25M
PRL. 241.189m
PFL. 240.427m
Signature block
N
KAPADNE SONGIR
m.)
STATION
1M 5.65
9M .40m.
NW
W
CE-C-North
.)
NE
X
4
137 /5 (1/4
SW
.
687 3 (4/2
.
E
m.)
SLOPE 1IN 20
ASHUTOSH KUMAR Digitally signed by ASHUTOSH KUMAR
SE
761 (1/4X
S
.44
5M .15
DYCE-C-DESIGN
.83
.35
4
MERGING [email protected]
.
612 (1/4
OX NO
CH 400/
ER .NO.
.31
MERGING [email protected]
.30
VILLAGE
C JE-C-DES-III-HQ C
OX NO.
.30 /2
.30
R
0M 0m
. G JOR B
(CT ROA
RC OP.R
.00 12.2
B
OX .NO
RC P.RU
IRD
PR
CO P.MA
DYCE/C/II/BSL
C B UB
CT
CT
CB
.31 1/1
O
MP
CH .40
O
CT
CT
BARREL LENGTH=9350mm
234.180
234.373
234.427
234.427
234.427
234.427
234.427
234.427
234.427
234.373
234.123
233.873
233.713
LONGITUDE - 2325316.673
PROP. RD
PR
LVL:-
CT
CT
PSC OP.R
CT
VILLAGE
CT
CT
CT
06:32:21 +05'30'
CT
CT
CT
CT
CODE .588 m
CT
RL:23 54
NA
S.N
PR
SSE-CW-III-BSL
O
LL
RE
RE
:PL31
D)
AF
CH:31000
CT
CT
CH:31100
CT
CT
/2
234.898
234.291
234.291
234.180
233.811
233.819
233.849
233.840
233.808
234.245
234.365
234.467
234.495
234.574
233.951
233.713
233.579
URE LAND
EX. RD
CH:31
W
AGRICULT
RE
RE
B
CH:3
RVB
RVT
RVT
RVB
B
RE
0
00 2
RVT
RVB
1300
RE
RE
800
CH:3
CH:3
LEGENDS -
CODE .206 m
Electri
RL:23 51
S.N
c Line
RVB
RVT
Heigh
RE
RE
RVT
RVB
t-5.6
0700
O
·
1400
URE LAND
PROPOSED RAIL BOUNDARY
:
7
AGRICULT
CH:3
:PL30
0600
-13.851
RE
AGR
RVT
23.186
RE
ICUL
-25.00
-20.00
-15.00
-10.00
-8.925
-3.925
RVB
TURE
20.00
25.00
3.925
8.925
10.00
15.00
CODE .274 m
-5.00
LAND
RL:23 53
RVB
S.N
RVT
CT
0.00
5.00
CT
/4
LOADING
CH:-
RE
RE
RE
CH:3
RE
31161.0 H:-
CT
:
30890.0
CT
3
J2 AT
:PL31
T2
1
RE
RE
RVB
RE
RVT
RE
CT
CT
1600
CENTRAL RAILWAY
7
T1 A 029m
C.NO. =17(RHS)
30780
RE
RE
A
1
/1
CT
CT
CODE .288 m
.002m
RE
T
RE
RL:23 52
R = 795.450 m (2.200°)
RE
S.N
C
02m
29
H:-
CH:-
Electri
T CH
RE
.
M
RE
FAR
CT
CT
AGRIC
LTRY
:
Heigh
ULTU
5
Electri
:PL30
POU Ca = 140 mm RE L
t-5
CODE .723 m
c Line
AND
RL:23 55
SECTION:- BORVIHIR-NARDANA
S.NO
(SCALE 1:100)
Heigh
:-
LTC = 110.000 m
t-6
KM: 31.00
RE
NA
RE
CT
CT
/5
CL = 490.972 m EXECUTING
:
4
RE
LL
:PL31
RE
1
RE
RE
:40
RE
A A
CT
CT
RE
FL
4.8 S = 0.634 m
/3
9
CODE .420 m
OW
RL:23 56
RE
S.N
F1
CT
CT
CT
5.6
O
KA
VIL
Ce = 66.915mm
FL:2??4 300.00
4
:
LA
PROJECT:-
:PL31
1
DN
G
Cd = 69.309mm
?0.026
E(
E
(B
CT
T1 =30780.029 m
RO
RO
/4
1
A
CH: 3
D)
AD
13 12 11 10 9 8 7 6 5 4 3 2 1 0