0% found this document useful (0 votes)
2 views6 pages

Sho001 Nap Ifc M1 S2 XX CLC MD 0008 00 02

The document provides a design calculation for Storm Tank 1 volume verification for project SHO001, detailing the collected storm water volumes from various areas including the mall roof, tower roof, hardscape, and landscape. The total calculated volume for Storm Tank 1 is 5716.49 m3, while the bid requirement is 8000 m3, with the design providing a total of 8200 m3 across six tanks. References for runoff coefficients and rainfall intensity are also included.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views6 pages

Sho001 Nap Ifc M1 S2 XX CLC MD 0008 00 02

The document provides a design calculation for Storm Tank 1 volume verification for project SHO001, detailing the collected storm water volumes from various areas including the mall roof, tower roof, hardscape, and landscape. The total calculated volume for Storm Tank 1 is 5716.49 m3, while the bid requirement is 8000 m3, with the design providing a total of 8200 m3 across six tanks. References for runoff coefficients and rainfall intensity are also included.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Design calculation sheet

Project SHO001 (S19145-0100D) Date : 02-02-2024 Computed by: A.B./S.M.


Calculation for Storm Tank 1 volume verification applicable for Checked by: M.P./N.M.
Page : 1 of 6
Subject :
module-1_Sub module-2
Phase-IFC Approved by: N.E.

Drainage from below listed areas are collected to storm water tanks located at Basement 2.

1 Mall Roof (Including tower façade)


2 Tower Roof
3 Hardscape (Including mall façade)
4 Landscape(softscape)

1 Calculation for collected storm water volume from mall roof area and 50% tower vertical façade under mall roof

For Tank 1
Mall roof area on tank 1 97908 Sq.mts.
Riser tag for roof storm drain
SD 1-2, SD-1-1,SD 5-4, SD 2-1, SD-2-2, SD 2-
3, SD 2-4, SD 2-5, SD 3-1,SD 3-2, SD 3-3, SD
4-4, SD-4-1, SD-5-2, SD 5-3, SD 7-1, SD7-2,
SD 8-1, SD 8-2, SD 4-2, SD 7-3, SD 8-3, SD
4-3, SD 4-5, SD 4-6, SD 9-2, SD 9-5, SD 2-
7, SD 9-6, SD 5-1, SD 5-1A, SD-8-6, SD-9-4,
SD-9-3 ,SD-8-4 ,SD-8-5, SD-13-01

Rainfall intensity considering 50yrs return period and 24 hr. duration 2.23 mm/hr.
Runoff coefficient 0.9 (ASCE, 1969) (McCuen Page 284) &
ASPE Vol.2 (2015) (Page 47)
Rainfall water runoff flow 54.6 L/s
196.7 m3/hr.
total volume required for storage of mall roof on tank 1 4720.2 m3/day

PRC-EN-04 (F1) Rev 2 Page 1/6


Design calculation sheet
Project SHO001 (S19145-0100D) Date : 02-02-2024 Computed by: A.B./S.M.
Calculation for Storm Tank 1 volume verification applicable for Page : 2 of 6 Checked by: M.P./N.M.
Subject : module-1_Sub module-2 Phase-IFC Approved by: N.E.

2 Volume From tower roof area (from tower interface drawings )

Area Volume (m3) Connected to storm tank


Tower 5 630 Storm tank 1

3 Volume required from Hardscape including 50% vertical mall façade area (Inputs from W&E)

Outfall Total Outflow (m3/s) Volume (m3) Connected to storm tank


O-1 0.073 173 Storm tank 1

PRC-EN-04 (F1) Rev 2 Page 2/6


Design calculation sheet
Project SHO001 (S19145-0100D) Date : 02-02-2024 Computed by: A.B./S.M.
Subject : Calculation for Storm Tank 1 volume verification applicable for module-1_Sub module-2 Page : 3 of 6 Checked by: M.P./N.M.
Phase-IFC Approved by: N.E.

4 Landscape (softscape) area connected to storm tanks

Area connected to tank 1 sq. mt Riser tag

AREA HS1 388


AREA HS2 1697 LSD-05-3A
AREA HS 3 980
AREA 49 50.0
AREA 43 50.0
AREA 50 143.3
AREA 51 163.3 LSD-01-22
AREA 53 30.0
AREA 64 40.0
AREA 52 27.9
AREA 53 180.0
AREA 54 139.3
AREA 55 30.3
AREA 56 147.5 LSD-01-17
AREA 57 94.0
AREA 71 90.0
AREA 58 64.2
AREA 59 620.8
AREA 57A 14.8
AREA 60 168.8
AREA 61 161.3
AREA 62 51.7
AREA 63 48.9
AREA 63A 48.5
AREA 64 195.5 LSD-01-18
AREA 65 87.5
AREA 66 194.0
AREA 67 247.2
AREA 68 80.9
AREA 69 43.1
AREA 72 300.0
AREA 70 73.0
AREA 10 122
AREA 11 71 LSD-01-21
AREA 12 341
AREA 4 1240 LSD-01-03
AREA 6 83
LSD-01-23
AREA 8 515
AREA 108 60.9
AREA 108A 85.0
AREA 109 24.3
LSD-05-04
AREA 109A 12.7
AREA 110 17.3
AREA 111 165.3
AREA 91 159.8
AREA 92 10.9
AREA 93 132.0
AREA 94 89.8
AREA 95 73.6
AREA 96 262.4 LSD-05-02
AREA 98 15.8
AREA 100 15.2
AREA 102 60.4
AREA 103 62.6
AREA 104 68.1
AREA 81 16.4
AREA 83 64.1
AREA 84 50.5
AREA 85 48.0
AREA 86 39.0 LSD-05-05
AREA 87 43.0
AREA 88 25.4
AREA 89 115.7
AREA 90 48.8
AREA 77 15.3
AREA 78 84.8 LSD-05-01
AREA 79 15.3
AREA 46 279.0
AREA 47 70.7
LSD-02-01A
AREA 78 85.0
AREA 48 5.3
AREA 15 71
AREA 19 242 LSD-01-19
AREA 20 40
AREA 112 16.0
AREA 76 73.0
LSD-05-4A
AREA 114 115.5
AREA 115 126.1
Total 12028.4

Total landscape area connected to tank 1 12028.4 Sq.m.

Rainfall intensity considering 50yrs return period and 24 hr. duration 2.23 mm/hr.

0.3 (ASCE, 1969) (McCuen Page 284) &


Runoff Coefficient ASPE Vol.2 (2015)
Rainfall water runoff flow 2.2 L/s
8.1 m3/hr.

total volume required for storage of landscape on tank 1 193.3 m3/day

PRC-EN-04 (F1) Rev 2 Page 3/6


Design calculation sheet
Project no: SHO001 (S19145-0100D) Date : 02-02-2024 Computed by: A.B./S.M.
Calculation for Storm Tank 1 volume verification applicable for Page : 4 of 6 Checked by: M.P./N.M.
Subject: module-1_Sub module-2 Phase-IFC Approved by: N.E.

SUMMARY :

Storm tank 1 Volume (Cu. m.)


Mall roof area 4720.19
tower roof area 630.00
Hardscape Area 173.00
Landscape (softscape) Area 193.30
Total volume calculated 5716.49
Bid requirement 8000.00
Tank Volume provided 8200.00

*Tender asks for 4 tanks of 8000 cu.m and a total requirement


of 32000 cu.m, current design has 6 tanks satisfying the total
requirement. Also intimated in RFI S19145-0100D-RFI-DAR-
NESMA-AECOM-MP-037

PRC-EN-04 (F1) Rev 2 Page 4/6


Design calculation sheet
Project SHO001 (S19145-0100D) Date : 02-02-2024 Computed by: A.B./S.M.
Subject : Calculation for Storm Tank 1 Volume Verification Applicable for module-1_Sub Page : 5 of 6 Checked by: M.P./N.M.
module-2 Phase-IFC Approved by: N.E.

References :

1 For runoff coefficient


ASPE Vol.2 (2015) (Page 47)

PRC-EN-04 (F1) Rev 2 Page 5/6


Design calculation sheet
Project SHO001 (S19145-0100D) Date : 02-02-2024 Computed by: A.B./S.M.
Calculation for Storm Tank 1 Volume Verification Applicable for module-1_Sub module- Page : 6 of 6 Checked by: M.P./N.M.
Subject :
2 Phase-IFC Approved by: N.E.

References :

2 For rainfall intensity


Intensity-Duration-Frequency (IDF) for Riyadh city, Saudi Arabia.

PRC-EN-04 (F1) Rev 2 Page 6/6