Drainage from below listed areas are collected to storm water tanks located at Basement 2.
1 Calculation for collected storm water volume from mall roof area and 50% tower vertical façade under mall roof
For Tank 1
Mall roof area on tank 1 97908 Sq.mts.
Riser tag for roof storm drain
SD 1-2, SD-1-1,SD 5-4, SD 2-1, SD-2-2, SD 2-
3, SD 2-4, SD 2-5, SD 3-1,SD 3-2, SD 3-3, SD
4-4, SD-4-1, SD-5-2, SD 5-3, SD 7-1, SD7-2,
SD 8-1, SD 8-2, SD 4-2, SD 7-3, SD 8-3, SD
4-3, SD 4-5, SD 4-6, SD 9-2, SD 9-5, SD 2-
7, SD 9-6, SD 5-1, SD 5-1A, SD-8-6, SD-9-4,
SD-9-3 ,SD-8-4 ,SD-8-5, SD-13-01
Rainfall intensity considering 50yrs return period and 24 hr. duration 2.23 mm/hr.
Runoff coefficient 0.9 (ASCE, 1969) (McCuen Page 284) &
ASPE Vol.2 (2015) (Page 47)
Rainfall water runoff flow 54.6 L/s
196.7 m3/hr.
total volume required for storage of mall roof on tank 1 4720.2 m3/day
3 Volume required from Hardscape including 50% vertical mall façade area (Inputs from W&E)
Rainfall intensity considering 50yrs return period and 24 hr. duration 2.23 mm/hr.
SUMMARY :