0% found this document useful (0 votes)
4 views1 page

RequisitionForm 11-05-24 (GTAW Gas)

The document outlines the process for the welding department to use a requisition form for purchasing materials, specifying requirements for base metals, filler materials, shielding gas, and other equipment. It details the necessary information to be included in the requisition, such as quantity, material type, and specific instructions for each category. Additionally, it emphasizes the importance of accompanying documents like certified mill test certificates and manufacturer’s certificates.

Uploaded by

hanz bermejo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

RequisitionForm 11-05-24 (GTAW Gas)

The document outlines the process for the welding department to use a requisition form for purchasing materials, specifying requirements for base metals, filler materials, shielding gas, and other equipment. It details the necessary information to be included in the requisition, such as quantity, material type, and specific instructions for each category. Additionally, it emphasizes the importance of accompanying documents like certified mill test certificates and manufacturer’s certificates.

Uploaded by

hanz bermejo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A requisition Form Must be used BY welding department to send to Purchasing.

The requisition Form is used to specify all requirements needed for a purchase order.
All requirements placed in the requisition form must be placed in the PO by Purchasing.
PO must be given to receiving personnel. Receiving personnel will use the requisition & PO to check the received goods
are correct as per requisition and PO.
Requisition Form: Requested BY: H. Bermejo Date: 11-05-24 Time: 10:00 AM :
Requisition For Base Metals
Date Needed
Quantity
Material Type & Grade
Dimension or Diameter
Thickness or Schedule
Specify on PO Must be accompanied by certified Mill Test Certificates (Mandatory)
Other Instruction
Direction of Rolling
Requisition For Filler Materials
Date Needed:
Quantity
Description
Product Form: Electrode,
Wire
AWS/ASME Specification
AWS Classification
BRAND – Optional
Size
Packaging Hermatically Sealed
Instruction on PO: MUST HAVE Manufacturer’s Certificate in accordance with AWS A5.1
Requisition For Shielding Gas
Date Needed ASAP
Quantity Cylinder for REFILL ---- 4 no’s.
Product Form Gas
Description GTAW Shielding Gas ---- Supplier: Metro Gas
Composition and % 100% Argon gas
100% Ar
AWS Classification AWS A5.32 – I1
Specific Instruction Content Composition Analisation Labels on Cylinders are Compulsory
Requisition For All Other Material Equipment
Date Needed:
Quantity
Description
Brand Type
Special Instruction Conforms
Requested By:
Date of Request: