Mohan Singh Chouhan, a contractor and supplier, submitted an offer for LT Underground Electrification for a residential township in Jaora, detailing the provisions and cost breakdown for various electrical components. The total estimated cost for the project is approximately 3,670,584 INR, which includes materials, labor, and GST. The proposal emphasizes that any changes in planning may alter the costs and that civil work is not included in the estimate.

Uploaded by

prathviraj0516
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views2 pages

Saarthak Green City Jaora Old

Mohan Singh Chouhan, a contractor and supplier, submitted an offer for LT Underground Electrification for a residential township in Jaora, detailing the provisions and cost breakdown for various electrical components. The total estimated cost for the project is approximately 3,670,584 INR, which includes materials, labor, and GST. The proposal emphasizes that any changes in planning may alter the costs and that civil work is not included in the estimate.

Uploaded by

prathviraj0516
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MOHAN SINGH CHOUHAN CONTRACTOR & SUPPLIERS

Spreading Power Proficiently | Email:- mschouhan0717@gmail,com


Indore (M.P.) Contact:8982505017
To
SAARTHAK GREEN CITY
Jaora
Subject :- :- Offer for LT Underground Electrification of residential township, at Jaora

Dear sir,
We are grateful to submit projection of Lt Underground Electrification of your esteemed residential township at Jaora as per given
map & Site visit.
Provisions
1. Underground Lt (Double cable)
2. Underground Service Connections
3. Feeder Pillars
4. Street Lighting
5. 100 & 200 KVA Distribution Transformer

CALCULATION OF COST OF EXTERNAL ELECTRIFICATION


S. no. PARTICULARS Unit QTY. Rate Amount
Supply of level II (New), 100 KVA Distribution Transformer NOS. 1
1 181000
181000.00
Supply of level II (New), 200 KVA Distribution Transformer NOS. 1
2 331000
331000.00
H-Beams 152 X 152 mm., 37.1 Kg./Mtr.-13 mtr. Long
3 =482.3 kg NOS. 3 27100 81300.00

4 11 KV 'V' cross-arms angle type (65x65x6 mm angle) NOS. 2 1650 3300.00

5 11 KV Pin insulator Polymer Composite (5KN) FRP NOS. 15 130 1950.00

6 11KV disk & hard ware NOS. 6 250 1500.00

7 11KV Cut point set Set 2 1800 3600.00

Set 3 550 1650.00


8 Stay set 16mm
KG 35 80 2800.00
9 Stay wire 7/3.15 mm
KG 650 60 39000.00
10 DP Structure iron

11 DP complete (LA , DO , DTR meter ) set


Set 2 23000 46000.00
12 L.T. Distribution box suitable for 100 KVA transformer
NOS. 1 18000 18000.00
(without TPN switches) with MCCB on incoming and PF
units on outgoing side

L.T. Distribution box suitable for 200 KVA transformer


13 NOS. 1 23000 23000.00
(without TPN switches) with MCCB on incoming and PF
units on outgoing side
Set 2 8500 17000.00
11 KV AB switch with pipe
14
KG 55 4125.00
GI strip 25*3 75
15
Set 10 20000.00
Earthing set (pipe ,GI plate 2*2 , salt&coal ) 2000
16
KG 50 13500.00
AAAC Rabbit conductor 0.05 sq. inch. 270
17 (55 sq.mm.Al.Eq.)
MTR. 20 4400.00
150 Sq.mm.,single core XLPE insulated un-armoured 220
18 aluminium conductor cable
MTR. 48 15600.00
300 Sq.mm.,single core XLPE insulated un-armoured 325
19 aluminium conductor cable
MOHAN SINGH CHOUHAN CONTRACTOR & SUPPLIERS
Spreading Power Proficiently | Email:- mschouhan0717@gmail,com
Indore (M.P.) Contact:8982505017

S. no. PARTICULARS Unit QTY. Rate Amount

20 M.S.Nuts and Bolts KG 55 90 4950.00

21 Red oxide paint Ltr. 4 220 880.00

22 Aluminium paint Ltr. 8 360 2880.00


20
23 Anti climbing devices KG 85 1700.00
3
24 Danger boards enamalled type 11kv NOS. 55 165.00

25 Polycab LT ALU ARMD XPLE insulated PVC MTR. 3000 98 294000.00


SHEATHING CABLE 4c X 10sqmm

26 Polycab LT ALU ARMD XPLE insulated PVC MTR. 500 83 41500.00


sheathing cable 4c x 6sqmm

27 Polycab LT ALU ARMD XPLE insulated PVC MTR. 500 565 282500.00
sheathing cable 3.5c x 150sqmm

28 Sub feeder pillar for service connections NOS. 7 38500 269500.00

29 Panel for street light & common services NOS. 1 35500 35500.00

30 5 mtr Decorative lighting pole with foundations bolts NOS. 30 29500 885000.00

31 100 Watt Decorative light NOS. 30 6550 196500.00

32 Transportions LS. --- ---- 75000.00

2898800.00
521784.00
GST 18% 250000.00
LABOR CHARGES FOR ELECTRIC WORK AND DWC PIPE

3670584.00
Total cost of Project

 If there is any change occurs in planning than costing of above projection may differs
 Civil work like plinth, Chamber, concerting, supply & installation is not included

The total work will be fully supervised, construction, erection & testing as per Electricity Department specifications

Looking for a favorable reply from your end.

Thank you & regards,

From, MOHAN SINGH CHOUHAN MATERIAL SUPPLIER & CONTRACTOR.