0% found this document useful (0 votes)
5 views1 page

Ventilation Plan 29.02.24

The document contains various technical specifications and details related to ventilation systems, shaft dimensions, and air quantities for a mining operation. It includes information on safety measures, equipment, and operational parameters. Additionally, it references specific blocks and areas within the mining site, along with historical data on occurrences and preparations for filling.

Uploaded by

Sikun Sahoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views1 page

Ventilation Plan 29.02.24

The document contains various technical specifications and details related to ventilation systems, shaft dimensions, and air quantities for a mining operation. It includes information on safety measures, equipment, and operational parameters. Additionally, it references specific blocks and areas within the mining site, along with historical data on occurrences and preparations for filling.

Uploaded by

Sikun Sahoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

10

E
00

E
E
90

00

00
00
00
0 N 10
N

38

41
00

39
37
M

E
INLET N

00
145mRL N

40
DECLINE

E - 3836.850
N - 975.016
Intake Air Quantity Z - 167.01mRL
4145m3/Min Size:-4.5X3.5m.

MH-1

GR
AD IEN
T
=1
MH-2

IN
9
12-60-03
80
0 N Ventilation MH-3

Dow
Shaft Dia- 5.0m.

n
Ventila

MH-4
ti
on Sh
aft x-c
ut

DISHA
6355 Cum/Min MH-5
3 /Min
5m
414
Z O N E
COMMONBOUNDARYWITHM/SBALASOREALLOYSLIMITED

Z O N E
MH-6
S A F E T Y

MH-7

S A F E T Y
Inlet Air Quantity
2290m3/Min Vertical Shaft (Ø4.5m.)
Collar RL=200m equipped
A B

AREAHELDBYGOVT.OFO
with Ladder & Platform

2nd Outlet
MH-8

70 MH-9
0N 10
Fire Extinguisher 00
Telephone N
3
1365m /Min

m
o sa
rfe r.
iV MH
13m
5 5
4
L1
O
T
R mL
R m
L
5
R
31m
orf W
yan
M
a
m
L5
R
41O
T

or f es i aR .V
m
R541 ot Lm
Lm R531 H/W
O
M
RFESIA
R .V
/Min
250 Cum
Dumping Raise m
L
5
R41O
TmL
5
R31
from 135mRL to 145mRL

V. Door
Closed

F/W

O
M
RFE
SIA
RSA
PEO
R
m
L
5R
41O
TmL
2
R
31

E
E

E
E

00
90
00

70

00
00

00

80 0
0N 0N N

42
39

41
38

40

80 90 10
E

E
E
0N 00
E

0N
00

00
00
00

N
38

41
40
39

132mRL
Fro
mS

MH-23

10 4 m
urfa

2 MH-24
MH-2

101mRL
MH-25
MH-21
2nd Outlet

MH-26
ce
COMMON BOUNDARY WITH M/S BALASORE ALLOYS LIMITED

MH-20

E
R
MH-27

00
MH-29

L
MH-19 MH-28
n
2470 Cum/Mi

42
MH-1
8 Ventilation Door
E

MH-17 AT 115mRL Vertical Shaft (Ø4.5m.) MH-30


00

Collar RL=200m equipped


A B
37

with Ladder & Platform


Ventilation Door

DISHA
MH-16 AT 145mRL
2nd Outlet

Z O N E
To 85mRL
145mRL
Z O N E

70
132mRL

0N 2760 Cum/Min MH-11 10


MH-15 MH-14 MH-12 V. Door
MH-13 00
Opened
98mRL N

MH-1

S A F E T Y
rfe
m
o r.
iV
sa
13m
5 O
T
R5
4
L1mL
R
S A F E T Y

335 Cum/Min
V. Door
Closed MH-2 1185 Cum/Min
m
L
5
R
31m
orf W
yan
M
a
m
L5
R
41O
T
O
M
RFESIA
R .V
mL
2
R
31OTmL
8
R8
210 Cum/Min

AREAHELDBYGOVT.OFO
m
L
5
R
31m
orf esia
R .V
m
L
5
R
41ot
EOM
.IFR
S
A
RV
sand bag 135mRL145mRL
TO
stopping F/W
02/21/81

dt.24.12.20
dt.11.01.20 dt.25.01.19 dt.29.02.20 dt.19.01.22
dt.04.03.21 dt.09.06.20
dt.21.07.20 dt.16.07.19 142
0 Cu dt.26.04.21 dt.17.08.20
m/M
in dt.09.03.22 dt.27.10.21
dt.28.04.19
dt.26.06.21
dt.12.02.20

BLOCK 9
dt.06.01.24 FILLED WITH
dt.16.09.22
H/W COLLAPSED MUCK
dt.28.05.23
Date of Occurrence
E

31.10.2018
E

BLOCK 10P4
00

00

90
00
E

Surface Back-filling 0
00

STOPED OUT & N


70 80
38

39

41

0E
0N 0N Volume- 10784.16m3 PREPARATION
40

0
FOR FILLING

42
BLOCK-1 BLOCK 2S1 BLOCK 2P BLOCK 2S2 BLOCK 3 BLOCK 4S1 BLOCK 4P BLOCK 4S2 BLOCK 5 BLOCK 6S1 BLOCK 6P BLOCK 6S2 BLOCK 7 B7(T9) B7(S8) B8(P8) B8(T8) B8(S7) B8(P7) B8(T7) B8(P6) B9(S6) B9(T6) BLOCK 9 B9(T5) B10(S4) B10(P4) B10(T4) B10(S3) B10(P3) B10(T3) B11(S2) B11(P2) B11(T2) B11(S1) B11(P1) B11(T1)

80 90
E
E
E

0N 0N 10
E

00
00
00

E
00
00

00
N
40
39
38

85mRL
37

41
101mRL

3
2 MH-5
MH-5
1
MH-5

E
0

00
MH-5
69mRL

MH-49

42
V.Door

A B
MH-48

utlet Vertical Shaft (Ø4.5m.)


2nd O
COMMON BOUNDARY WITH M/S BALASORE ALLOYS LIMITED

Collar RL=200m equipped


with Ladder & Platform

Ventilation Door

DISHA
AT 86mRL
MH
-47

70 MH-42
72mRL

MH-43 MH-40
0N MH-46 MH-45
MH-44 1550 Cum/Min
MH-41 MH-39
10
00
N

Z O N E
Z O N E

915 Cum/Min
98mRL

RCC Wall

Sump-1 MH-1 es ia
R ya
w
nM
a
) tel tO
u dn2(
Ventilation Raise
es ia
R ya
w
nM
a 75mRL TO 85mRL

S A F E T Y
) tel tuo dn2(
S A F E T Y

Ventilation Raise 75mRL to 85mRL RCC Wall Ventilation Raise (filled with Sludge)
from 75mRL to 85mRL
O
M
RFESIA
R .V es ia
R ya
w
nM
a
mL
2
R
31OTmL
8
R
8 ) tel tuo dn2( 20%
Ventilation Raise 75mRL to 85mRL Sump-2
Opening

AREAHELDBYGOVT.OFO
m
L
5
R
7morF esia
R .V
m
L
5R
8ot
Barri Barr
Barricade
485 Cum/Min Barricade Barricade
Barricade

Barricade icad Barricade


cade

Closed
Barr e
icad RCC

3
Brow
LE 810 Cum/Min
HO
AIN
R DR
Barricade
Brow

dt.09.06.20 505 Cum/Min


Barricade

dt.11.01.20
Brow

dt.04.03.21
dt.25.01.19 Barrica
de

Ba
rr
dt.16.07.19 ica
de Ba
rr
ic
dt.21.07.20 dt.24.12.20
ad
e

dt.29.02.20
dt.26.06.21
dt.19.01.22 dt.09.03.22 dt.27.10.21 dt.26.04.21
dt.16.09.22
dt.28.05.23 dt.17.08.20
dt.12.02.20 dt.28.04.19
Barricade

H/W BLOCK 9
12.90.03

FILLED WITH
dt.06.01.24
COLLAPSED MUCK BLOCK 10P4
Date of Occurrence STOPED OUT &
31.10.2018 PREPARATION
Surface Back-filling
E

FOR FILLING
E

E
E

00

70 80
00

Volume- 10784.16m3
00

90
00

0N 0N
E

0N
41
39

00
40
38

42

BLOCK-1 BLOCK 2S1 BLOCK 2P BLOCK 2S2 BLOCK 3 BLOCK 4S1 BLOCK 4P BLOCK 4S2 BLOCK 5 BLOCK 6S1 BLOCK 6P BLOCK 6S2 BLOCK 7 B7(T9) B7(S8) B8(P8) B8(T8) B8(S7) B8(P7) B8(T7) B8(P6) B9(S6) B9(T6) BLOCK 9 B9(T5) B10(S4) B10(P4) B10(T4) B10(S3) B10(P3) B10(T3) B11(S2) B11(P2) B11(T2) B11(S1) B11(P1) B11(T1)

80 90 10
00
E

0N
E

0N
E
E

00
00

N
00

72mRL
00

2
MH-5 3
40
37

MH-5
41
38

1
MH-5
E

0
00

MH-5
69mRL

MH-49
42
COMMON BOUNDARY WITH M/S BALASORE ALLOYS LIMITED

V.Door

A B
MH-48

utlet Vertical Shaft (Ø4.5m.)


2nd O Collar RL=200m equipped
with Ladder & Platform
DISHA

Ventilation Door
AT 86mRL
MH

Ventilation Raise from


-47

28mRL to 72mRL
Z O N E

70
72mRL

MH-43 MH-42
0N MH-46 MH-45 MH-44 1550 Cum/Min
MH-41
10
00
N
Z O N E

310 Cum/Min
RCC Wall Ventilation Raise
(28mRL TO 72mRL)

es ia
R ya
w
nM
a
) tel tO
u dn2(
S A F E T Y

Ventilation Raise
75mRL TO 85mRL
es ia
R yawnM
a
) tel tuo dn2(
S A F E T Y

Ventilation Raise 75mRL to 85mRL es ia


R yawnM
a
) tel tuo dn2( Ventilation Raise (filled with Sludge)
Ventilation Raise 75mRL to 85mRL
from 75mRL to 85mRL

Ventilation Raise
AREAHELDBYGOVT.OFO

20% Opening
525 Cum/Min
Barricade F/W from 75mRL to 85mRL
R 330 Cum/Min

dt.21.01.22
dt.22.08.21 710 Cum/Min

dt.11.08.23 dt.02.07.21 dt.01.03.23 dt.21.11.22


dt.21.05.22 dt.31.05.22
dt.19.08.21 dt.28.01.21 dt.21.03.22
dt.06.07.21
dt.05.12.23 dt.18.11.23
02.11.03
dt.30.12.22
H/W dt.17.05.23

dt.17.02.23

dt.05.05.23 12-70-70
dt.29.09.23
BLOCK AP9
STOPPING
BLOCK AP10 BLOCK AS16
UNDER BLOCK AP14
BLOCK AP11 STOPED OUT &
PROGRESS STOPED OUT & STOPED OUT &
E

STOPPING FILLING UNDER


E
00

PREPARATION
E

FILLING UNDER
E

BLOCK AP12
00
E
00

UNDER
00

70
9 PROGRESS
00
40

0N FOR FILLING 00 PROGRESS


42

STOPPING UNDER
39
38

PROGRESS
41

PROGRESS
N
BLOCK AP7 0202
BLOCK AP1 BLOCK AS1 BLOCK AP2 BLOCK AS2 BLOCK AP3 BLOCK AS3 BLOCK AP4 BLOCK AS4 BLOCK AP5 BLOCK AS5 BLOCK AP6 BLOCK AS6 BLOCK-60
-0
AS7 BLOCK AP8 BLOCK AS8 BLOCK AP9 BLOCK AS9 BLOCK AP10 BLOCK AS10 BLOCK AP11 BLOCK AS11 BLOCK AP12 BLOCK AS12 BLOCK AP13 BLOCK AS13 BLOCK AP14 BLOCK AS14 BLOCK AP15 BLOCK AS15 BLOCK AP16 BLOCK AS16 BLOCK AP17
3
80 90 10
E

E
E

0N
0 00
25mRL
00

00
00

N
00

N
38

41
37

40

MH-54
55mRL MH-55
MH-56
MH-57
E
39mRL

MH-58
00
COMMON BOUNDARY WITH M/S BALASORE ALLOYS LIMITED

MH-60

MH-59
Ventilation Door
42

At 55mRL 1530 Cum/Min

A Ventilation Raise
-38mRL to 25mRL Vertical Shaft (Ø4.5m.)
Collar RL=200m equipped
B
with Ladder & Platform
53
DISHA

5
Ventilation Door Cu
m
/M
Ventilation Raise in
28mRL to 72mRL
1
-6
H
70 Ventilation Raise M
36mRL

MH-69
MH-66 MH-65 MH-64 MH-63
MH-68
25mRL

MH-67 1070 Cum/Min MH-62


0N 15mRL to 25mRL 10
Pu tati
12mRL

Ma
e
n
sw
R
a
yi
S
m on

00
pi

Food Shelter
ng

)e
tlo
u
t2
n
d( N
Z O N E

Ventilation Raise 15mRL to 25mRL


Sump Ventilation Raise from
SAFETY ZONE

RCC Wall 28mRL to 72mRL


Ventilation Raise
15mRL to 25mRL
Closed Ventilation Raise from
15mRL to 25mRL
2325 Cum/Min Loading X-cut-1
1010 Cum/Min
S A F E T Y

Loading X-cut-2
m/M in
985 Cu
AREAHELDBYGOVT.OFO

F/W
1075 Cum/Min

dt.11.08.23 dt.02.07.21
dt.30.12.22 dt.01.03.23
dt.21.05.22
dt.21.11.22
dt.05.12.23
dt.21.01.22 dt.22.08.22 H/W
dt.31.05.22 dt.29.09.23
dt.19.08.21 BLOCK AP10
12-70-70 dt.28.01.21
12-10-72
dt.06.07.21 STOPED OUT & BLOCK AP11 BLOCK AP12
02.21.90 PREPARATION STOPPING STOPPING
dt.05.05.23 FOR FILLING UNDER UNDER
PROGRESS PROGRESS
dt.18.11.23

BLOCK AP14 dt.17.05.23


dt.17.02.23
STOPED OUT &
E

BLOCK AP9
E

70 FILLING UNDER
E

00
00

00
00

0N STOPPING PROGRESS
BLOCK AS16
41
39

40
38

UNDER STOPED OUT &


FILLING UNDER
PROGRESS PROGRESS
BLOCK AP1 BLOCK AS1 BLOCK AP2 BLOCK AS2 BLOCK AP3 BLOCK AS3 BLOCK AP4 BLOCK AS4 BLOCK AP5 BLOCK AS5 BLOCK AP6 BLOCK AS6 BLOCK AP7 BLOCK AS7 BLOCK AP8 BLOCK AS8 BLOCK AP9 BLOCK AS9 BLOCK AP10 BLOCK AS10 BLOCK AP11 BLOCK AS11 BLOCK AP12 BLOCK AS12 BLOCK AP13 BLOCK AS13 BLOCK AP14 BLOCK AS14 BLOCK AP15 BLOCK AS15 BLOCK AP16 BLOCK AS16 BLOCK AP17
80 90 10
E

0N
E

0 00
00

00
00

00

N N
12mRL
39

40
38

41
E
00
37

Loading X-cut

Min
Cum/
830 MH
-20mRL

-77
MH-76 MH-78
MH-79
MH-75 MH-80
E

MH-74
9mRL

MH-81
00

MH-73 Ventilation Door MH-82


-4 mRL
42

MH-72
At -4mRL MH-83
COMMON BOUNDARY WITH M/S BALASORE ALLOYS LIMITED

A M
H-
71
Vertical Shaft (Ø4.5m.)
Collar RL=200m equipped
MH-84 B
DISHA

with Ladder & Platform

Ventilation Door Ventilation Door


MH

At -35mRL
-70

-23mRL

70
.13
9102.21

MH-89 850 Cum/Min


Z O N E

MH-87 MH-86
0N
-35mRL

MH-90
10
-35mRL

MH-88 MH-85
00
Ventilation Raise Ma
e
n
sw
R
a
yi V. Door N
Ventilation Raise
12mRL

15mRL to 25mRL )e
tlo
u
t2
n
d( OPen 15mRL to 25mRL
Ventilation Raise 15mRL to 25mRL
825 Cum/Min Closed
SAFETY ZONE

S A F E T Y

Ventilation Raise from


F/W 15mRL to 25mRL

1635Cum/Min
AREAHELDBYGOVT.OFO

650 Cum/Min

H/W

70
0N
Slot Raise
-32mRL to 12mRL
0E
E
0E
E

80
00
00

Ventilation Raise 90
00

0
0

-32mRL to 12mRL 0N 0N
42
41
39
38

40

12.90.03

BLOCK BP1 BLOCK BS1 BLOCK BP2 BLOCK BS2 BLOCK BP3 BLOCK BS3 BLOCK BP4 BLOCK BS4 BLOCK BP5 BLOCK BS5 BLOCK BP6 BLOCK BS6 BLOCK BP7 BLOCK BS7 BLOCK BP8 BLOCK BS8 BLOCK BP9 BLOCK BS9 BLOCK BP10 BLOCK BS10 BLOCK BP11 BLOCK BS11 BLOCK BP12 BLOCK BS12 BLOCK BP13 BLOCK BS13 BLOCK BP14 BLOCK BS14 BLOCK BP15 BLOCK BS15 BLOCK BP16 BLOCK BS16 BLOCK BP17

80 90 10
E

-35mRL
0E

0N
E

0N 00
00

00

00
00

N
0
37

39

40

41
38
COMMON BOUNDARY WITH M/S BALASORE ALLOYS LIMITED

DISHA

MH-99
MH-98
(-)65mRL MH-100
MH-101
/Min
-80mRL

Horizontal Level
MH-97 2010 Cum MH-102
Z O N E

MH-103
MH-96
0E

MH-104
MH-95
-51mRL

0
42
SAFETY ZONE

A Vertical Shaft (Ø4.5m.)


Collar RL=200m equipped
B
with Ladder & Platform
0202-90-03

S A F E T Y

Ventilation Door Ventilation Door


At -35mRL MH-105
-83mRL

MH-107 MH-106
MH-108
AREAHELDBYGOVT.OFO

MH-93 MH-91 2070 Cum/Min


70
-48mRL

MH-94
DD X-cut

MH-92 MH-109
0N Towards -95mRL
-35mRL

MH-90
10
-35mRL

00
N

SUMP-2

SUMP-1

845 Cum/Min 1250 Cum/Min

F/W

350 Cum/Min Auxiliary


Fan(20HP
)

9102-21-13

H/W

Slot Raise
-32mRL to 12mRL
E

0E
E

Ventilation Raise
00

80
E

00

0N 90
00

00

70 -32mRL to 12mRL
0
41

0N
42

0N
40
38

39

12-1-03

BLOCK BP1 BLOCK BS1 BLOCK BP2 BLOCK BS2 BLOCK BP3 BLOCK BS3 BLOCK BP4 BLOCK BS4 BLOCK BP5 BLOCK BS5 BLOCK BP6 BLOCK BS6 BLOCK BP7 BLOCK BS7 BLOCK BP8 BLOCK BS8 BLOCK BP9 BLOCK BS9 BLOCK BP10 BLOCK BS10 BLOCK BP11 BLOCK BS11 BLOCK BP12 BLOCK BS12 BLOCK BP13 BLOCK BS13 BLOCK BP14 BLOCK BS14 BLOCK BP15 BLOCK BS15 BLOCK BP16 BLOCK BS16 BLOCK BP17
80
-153 mRL
-155 mRL

10
E

0N
E

90
E

00
00
-155 mRL
00

00

0N
00
0E

Loading Xcut
-145mRL

N
40
37

38

in
-95mRL
41

um/M
0

450 C
39
COMMON BOUNDARY WITH M/S BALASORE ALLOYS LIMITED

DISHA
-140.35 mRL

Auxilia
ry Fan
(2 0HP)
-125 mRL Sump MH-13
3
-115mRL MH-13
2
MH-121 MH-122
MH-123 MH-131
MH-120
-106 mRL

in MH-124
um/M
2210MH-119 MH-125
Pump MH-130

8
Auxiliary Fan(20HP) Station MH-126 MH-127
1
Z O N E

MH-1 MH-128 29
-1
E

MH
-111mRL

7
-11
00
7
01
-3

MH
1
2

42
SAFETY ZONE

-137.35 mRL

A B
-80mRL

Vertical Shaft (Ø4.5m.)


6 1
MH-1

Collar RL=200m equipped


with Ladder & Platform
S A F E T Y

AREAHELDBYGOVT.OFO
-83mRL

MH-107 MH-106
MH-110 MH-108
MH-109
-108mRL

MH-114 MH-112 MH-111


MH-115 MH-113
-95mRL
-95mRL

10
-103mRL

00
N
E

E
E

E
E
00

80
00

90
00

00
00

0N 0N
39

40
38

42
41

LEGEND
M.L.BOUNDARY AIR INTAKE
SAFETY ZONE AIR RETURN
M/S INDIAN METALS & FERRO ALLOYS LIMITED
VERTICAL SHAFT VENTILATION FAN IMFA BUILDING,BOMIKHAL,BHUBANESWAR - 10
DECLINE EXISTING POSITION VENTILATION DOOR
145mRL EXISTING DRIVE POSITION R REGULATOR MAHAGIRI MINES ( CHROMITE)
(OVER AN AREA OF 73.777Ha.)
132mRL EXISTING DRIVE POSITION 1920 Cum/Min
AIR MEASUREMENT STATION
85mRL EXISTING DRIVE POSITION BRATTICE PARTITION
72mRL EXISTING DRIVE POSITION FILLED WITH COLLAPSED MUCK VENTILATION PLAN
55mRL EXISTING DRIVE POSITION FILLED AREA
DATEOFSURVEY-29/02/2024 SCALE:-1:1000 PLAN NO:-MMC/ VP /24/02
25mRL EXISTING DRIVE POSITION STOPED OUT / VOID UNDER FILLING
12mRL EXISTING DRIVE POSITION STOPING UNDER PROGRESS Certified that the Section is up to date & correct
-35mRL EXISTING DRIVE POSITION
-95mRL EXISTING DRIVE POSITION
(Tapas Pal) (Abhijeet Rout) (R. R. Sharma)
PROPOSED DEVELOPMENT MINE SURVEYOR VENTILATION OFFICER MINES MANAGER

You might also like