Insulation Installation
Insulation Installation
Appendix - 8
Department: Subject:
Number:
PCM-CP-000X-8
Revision:
Date Prepared:
YES / NO / N/A COMMENTS
Page 1 of 2
MAJOR PROJECTS
Appendix - 8
Department: Subject:
Number:
PCM-CP-000X-8
Revision:
inspection and sign-off Third Part Inspection And Testing: a) Available b) Scheduled Vendor Requirements: a) Required b) Available c) Scheduled Scaffolding / Manlift Requirements: a) Identified b) Available c) Scheduled d) Built (Scaffold Only) Man Basket Requirements: a) Identified b) Available d) Scheduled All Required Drawings, Details And Specifications Included In Work Package: a) Piping / Equipment; Drawings To Be Insulated b) Signed Copy Of Release For Insulation c) Insulation Details d) Insulation Specification e) Special Requirements f) Design Change Notices g) Request For Information h) Inspection And Test Plan i) Lessons Learned Suggestion Form Insulation And Cladding Installed, Inspected And Sign-Off As Complete
Planner Signature:
Issue Date:
Superintendent Signature:
Issue Date:
Page 2 of 2