Install Guide
Install Guide
Technical Installation
Belgard Sales Office and Plants:
Amcor Utah Block an Oldcastle Company 333 S. Redwood Road North Salt Lake, UT 84054 Tel: (801) 936-7628 1 800 800-4004 Fax: (801) 936-5470 Anchor Concrete Products an Oldcastle Company 1913 Atlantic Avenue Manasquan, NJ 08736 Tel: (732) 292-2500 Fax: (732) 292-2650 www.anchorcp.com Akron Brick and Block an Oldcastle Company 3225 Mogadore Road Akron, OH 44312 Tel: (330) 628-2603 Fax: (330) 628-4467 Balcon an Oldcastle Company P.O. Box 3388 2630 Conway Road Crofton, MD 21114 Tel: (410) 721-1900 1 800 580-5838 Fax: (410) 793-0657 Big Rock Building Products an Oldcastle Company 600 Cardiff Valley Road Rockwood, TN 37854 Tel: (865) 354-6660 1 888 624-3088 Fax: (865) 354-6661 Bosse Concrete Products an Oldcastle Company 1443 Battlecreek Road Jonesboro, GA 30236 Tel: (770) 478-8817 1 800 621-5222 Fax: (770) 471-2128 www.bosseconcrete.com Domine Builders Supply an Oldcastle Company P. O. Box 472 735 Wangum Road, Fishers, NY 14453-0472 Tel: (585) 924-2103 1 800 444-2103 Fax: (585) 924-2141 Foster-Southeastern an Oldcastle Company 46 Spring Street Holbrook, MA 02343 Tel: (781) 767-2202 1 800 462-2225 Fax: (781) 767-2991 Goria Enterprises an Oldcastle Company 108 Buchanan Church Road Greensboro, NC 27405 Tel: (336) 375-5656 1 800 446-7421 Fax: (336) 375-8259 Goria Enterprises an Oldcastle Company 108 Buchanan Church Road Greensboro, NC 27405 Tel: (336) 375-5656 1 800 446-7421 Fax: (336) 375-8259 Jewell Concrete Products an Oldcastle Company 400 Jewell Drive Waco, TX 76712 Tel: (254) 772-3440 1 800 792-3216 Fax: (254) 772-6999 www.jewellconcrete.com Miller an Oldcastle Company 2405 East 85th Street Kansas City, MO 64132 Tel: (816) 444-2244 1 800 289-2244 Fax: (816) 444-8736 Northfield Block an Oldcastle Company One Hunt Court Mundelein, IL 60060 Tel: (847) 816-9000 Fax: (847) 816-9072 www.northfieldblock.com Schusters Building Products an Oldcastle Company 901 East Troy Avenue Indianapolis, IN 46203 Tel: (317) 787-3201 1 800 424-0190 Fax: (317) 788-5906 Sierra Building Products an Oldcastle Company 10714 Poplar Avenue Fontana, CA 92337 Tel: (909) 355-6422 1 866 749-3038 Fax: (909) 355-6444 www.sierrapavers.com Superlite Block an Oldcastle Company 4150 W. Turney Phoenix, AZ 85019 Tel: (602) 352-3500 1 800 366-7877 Fax: (602) 352-0101 Young Block an Oldcastle Company 2200 West Gardner Lane Tucson, AZ 85705 Tel: (520) 887-1234 1 800 794-1236 Fax: (520) 888-2079 4D an Oldcastle Company 426 River Street Midland, MI 48640 Tel: 1 800 227-6512 Fax: (989) 631-5070
www.belgard.biz
1 877 BELGARD
1 877 235-4273
Maintenance
guide
www.belgard.biz 1-877-BELGARD
(1-877-235-4273)
Contents
Technical Guide
C oPage t e n t s n
Installation Guide
Page 26 26 27 28 28 29 29 30 31 31 32 36 37 38 39
Installing Circle PaversPage Interlocking Concrete Pavement 2 Section 1 Interlocking Concrete Pavement Circle 4 Dublin Cobble Interlock 2 Interlock 4 Cambridge Cobble Circle & Fan Other Pavement Systems 3 Other Pavement Systems 5 Bergerac Circle Mega-Bergerac Circle Components of the ICP System 4 Section 2 Components of the ICP System 6 Subgrade 4 Subgrade Dublin Cobble Modular 6 Geotextile 5 Geotextile 7 Sub-base 5 Sub-base 7 Mega-Bergerac Base 5 Base 7 Edge Restraint 5 Edge Restraint 7 Celtik Wall Sand Setting Bed 5 Sand Setting Bed Anchor Pin System 7 Interlocking Concrete Pavers 6 Interlocking Concrete Pavers 8 Corners/Curves Joint Sand 6 Joint Sand 8 Capping Modules Steps/Stairs Tools, Supplies and Equipment 7 Pillars Section 3 Tools, Supplies and Equipment 9 Curbs Constructing the ICP 8 Utility Location 8 Section 4 Constructing the ICP 11 Patterns Site Access 8 Utility Location 11 Layout 8 Site Access 11 Maintenance Guide Excavation 9 Layout 11 Base 9 What makes up Excavation 12 Edge Restraint 10 my Belgard Pavement? Base 12 Sand Setting Bed 10 Edge Restraint 13 Will the color of Pavers 10 Sand Setting Bed my Belgard pavement fade? 13 Starting Laying Pattern 13 Pavers 14 Cutting Pavers 13 Do I need to seal Starting Laying Pattern Belgard pavement? 17 my Pavement Compaction 15 Cutting Pavers 17 Joint Sanding 15 Pavement Compaction 19 Removing stains from Completion of Project 16 your Belgard pavement 19 Joint Sanding Completion of Project 20 Cleaning Estimating Materials 16 your Belgard Pavement Appendix A Section 5 Estimating Materials 21 Sealing Materials 24 your Belgard Pavement Appendix A Materials 23 Belgard protective sealant for paving stones 1
DISPLACED SAND
DISPLACED SAND
HORIZONTAL DISPLACEMENT
HORIZONTAL DISPLACEMENT
NO VERTICAL INTERLOCK
NO ROTATIONAL INTERLOCK
NO VERTICAL INTERLOCK
VERTICAL INTERLOCK This is achieved by the shear transfer of loads to surrounding units through the sand in the joints. This shear transfer also prevents one paver from moving vertically in relationship to its neighbor(s).
ROTATIONAL INTERLOCK This is achieved through use of the proper paver thickness in relationship to load and use and by a perimeter edge restraint. A slight crown constructed into the pavement will increase rotational interlock and the load bearing capacity of the
pavement. HORIZONTAL INTERLOCK This is achieved through the use of laying patterns that minimize the length of uninterrupted joint lines and disperse forces from braking, turning and accelerating vehicles. Certain geometrically interlocking paver shapes enhance horizontal interlock. Herringbone laying patterns provide the most effective horizontal interlock and should always be used in vehicular applications.
43 43 44 44 45 45 45
In summary, the contractor achieves vertical, rotational and horizontal interlock by the interaction of these factors: JOINT WIDTHS - consistent joint widths of approximately 1/8 in. JOINT SAND - properly selected joint sand THICKNESS OF PAVER - 60 mm. (2-3/8 in.) for pedestrian and residential driveways 80 mm. (3-1/8 in.) for all other vehicular and industrial applications EDGE RESTRAINT - non-moving fixed edge restraint LAYING PATTERN - minimize length of uninterrupted joint lines in all directions. Most commonly used pattern is Herringbone. Pavers which cannot be laid in Herringbone can usually be laid in another acceptable pattern. PAVER SHAPE - shapes which allow Herringbone type laying patterns and which geometrically interlock on two or more sides with each other CROWN - slight crown in pavement cross section
Asphalt: Flexible, but more apt to crack than ICP. Cracks from evaporation of essential oils. Dissolved by spilled fuels or oil. Limited colors. Patches and repairs obvious. Relatively short design life. Must be sealed on a regular basis. Loses strength with increase in temperature. Installation requires special equipment. Poured-in-Place Concrete: Cracks from load flexing and from thermal expansion and contraction. Difficult to effectively repair and repairs are obvious. Less resistant to de-icing compounds than ICP. Design life longer than asphalt, less than ICP. Must cure before use. Subject to environment during curing. Needs expansion joints. Stamped concrete typically colored only on the top.
GEOTEXTILE Sometimes called filter cloth or soil separation fabric. A layer of woven or non-woven fabric placed between the subgrade and base to prevent the two layers from mixing under repetitive traffic loading. A Geotextile should be used if the subgrade is clay or is poorly drained and apt to stay wet for extended periods. A greater amount of base does not substitute for a Geotextile fabric in poor soil conditions. Check with your Authorized Belgard Distributor for the proper Geotextile. SUB-BASE A compacted layer or layers of specified material placed on the subgrade to support the base. Sub-bases are used primarily in heavy duty pavements or in areas with poor subgrade material. BASE A layer of specified material of a designed thickness placed on the subgrade (or sub-base) to support the pavement surface. In an ICP, the most common base material is a compacted layer of Dense Graded Aggregate (DGA). Do not use stone dust or screenings. Check with your Authorized Belgard Distributor for the proper DGA for your area. The following chart serves as a guideline for base construction for driveways, patios, walks and pool decks. In very cold winter climates, or in soils that retain excess water, thickness may be increased by two to six inches. APPLICATION Driveways Patios Walkways Pool Decks BASE THICKNESS 6 in. - 8 in.* 4 in. - 6 in. 4 in. - 6 in. 4 in. - 6 in.
INTERLOCKING CONCRETE PAVERS A concrete paver unit meeting requirements of ASTM C936-96, a copy of which is included in Appendix A. The pavers shall be capable of being lifted and placed with one hand, and shall have an exposed face (top surface) area less than or equal to 100.75 sq. in. The aspect ratio (that is, overall length divided by thickness) shall be equal to or less than 4. A 12 in. x 12 in. paver does not qualify because it has a top surface area greater than 100.75 sq. in. Other requirements of concrete pavers are: Average compressive strength not less than 8,000 lbs. per sq. in. Resistance to freezing and thawing. Less than 5 percent absorption Dimensional tolerance These requirements of ASTM C936 insure a uniform durable paver unit. Concrete pavers are manufactured in two thicknesses. Pavers 2-3/8 in. (60mm.) thick are used for pedestrian applications such as walkways, patios, plazas and pool decks. They may also be used in residential driveways. Pavers 3-1/8 in. (80mm.) thick are used in vehicular traffic and heavy duty applications. JOINT SAND The sand used to fill the joint spaces between pavers to achieve vertical interlock. This sand must be clean, sharp, durable and well graded. Generally, it is best to use the same washed concrete sand (ASTM C33) used for the bedding layer as the joint sand. This is especially important in vehicular trafficked ICP. The sand should be spread, allowed to dry, then swept into the joints. The process can be accelerated if after the initial sweeping, a plate compactor is run over the pavement while the sweeping is continued. Finer sand conforming to ASTM C144 specifications may be used in pedestrian and residential driveway applications. Bagged all-purpose sand may be used in pedestrian ICP but masonry sand, box or play sand as well as stone dust or screenings should not be used. The recommended gradation for the joint sand may be found in Appendix A. Be sure the joints are filled with sand. In some cases it may be necessary to re-sand the job in two to three weeks. Summary: The components of an ICP are: Subgrade Geotextile (if needed) Edge Sub-base (if needed) Restraint/ Base Curb Bedding Sand Edge Restraint Interlocking Concrete Pavers Joint Sand
*Add 2 in. for low, wet, clay and silt soils. EDGE RESTRAINT A specially designed edging, curb, building or other stationary object that contains the bedding sand and pavers so they do not spread and lose interlock. There are many plastic, aluminum and steel edge restraints specifically designed for use with unit pavers. In addition to the specially designed edge restraints, properly installed troweled concrete, poured-in-place concrete structures and treated timbers may be used. Troweled concrete is especially applicable in areas of sandy soil which does not allow spiked edge restraints to stay in place. Check with your Authorized Belgard Distributor for a list of products available. SAND SETTING BED A layer of coarse, clean sand loose screeded to a thickness of one (1) inch over the base layer for bedding the pavers. When the pavers are compacted into the sand bedding layer, some sand enters the joints between the pavers from the bottom and begins the process of vertical interlock. The sand layer also allows the compaction process to achieve a smooth pavement surface, compensating for any minor differences in paver thickness. Do not compact the sand setting bed before setting pavers. The bedding sand may be natural or manmade but should conform to the requirements of ASTM C33. Do not use mason sand, stone dust or screenings. The gradation of ASTM C33 is included in Appendix A.
Concrete Pavers with sand filled joints Sand bedding 2540mm. thick Compacted aggregate or stabilized base to suit traffic and environmental conditions Geotextile as required by design
Equipment: Installation equipment may be owned or rented. The most common equipment needed is: Builders level or transit level with tripod and rod. Laser levels are excellent. Vibratory plate compactor rated minimum 5000 ft. lbs. Masonry saw Table saw, wet or dry, or a hand held cut-off saw. Either should be gasoline powered. A hand held cut-off saw is the most flexible and productive. Heavy Equipment: Skid-Steer Loader capable of lifting 5000 lbs. - equipped with interchangeable bucket, forks and rotary broom Vibratory Roller - used for subgrade and base compaction on larger jobs Jumping Jack Compactor - for compacting trenches Backhoe - for excavation (especially demolition) Dump Truck - to haul excavated materials and to deliver material to job site
Folding 6 ft. ruler 16 ft. Tapes 100 ft. Tape Steel or Aluminum Carpenter Square Claw Hammer Mason Hammer 3 lb. Maul 12 lb. Sledge Hammer Rubber or Deadblow Hammer Steel Garden Rake Push Broom Contractors Wheel Barrow Screed Board (Magnesium) or 10 ft.-12 ft. wood 2x4s Hacksaw Carpenters Saw Plumb Bob Chalk Line
1 1
4 ft. Level Torpedo Level Line Level Mason Trowel - Rectangular Mason Trowel - Pointed Mason Wood Float 4 in. Brickset (Mason Chisel) Pair Metal Snips Shovel(s) Square Point Shovel(s) Round Point Slim Jim Pry Bar 36 in. Crow Bar Large Flat Blade Screw Drivers Screed Rails 3/4 in. ID Steel Pipe or 1 in. Square Steel tubing approximately 10 ft. long (a couple of 4 ft. pieces are handy) Garden Hose (75 ft.-100 ft.) Hand Tamper
Some special tools designed specifically for the ICP industry are: Paver Cart - to transport full straps of pavers Paver Extractor - to remove installed pavers Dead Blow Rubber Hammer - to help adjust pavers Paver Scribe - to mark pavers for cutting Paver Adjuster - to move installed pavers to straighten lines Personal Safety and Comfort Supplies: Eye Protection Dust Mask (disposable) Gloves Back Support First Aid Kit
Ear Protection (muffs or plugs) Steel Toed Shoes Knee Pads Finger Tape (can use duct tape) Water Cooler
Expendable Supplies : Mason String Line Marking Crayon (keel) 2 ft. Wood Stakes Fuel & Oil 7
Chalk for Chalk Line Flagging Tape Diamond Saw Blades Spray Marking Paint
EXCAVATION/SUBGRADE Make sure that the area to be excavated is at least 12 in. wider than the limits of the ICP. This provides a firm base to support the edge of the pavement and the edge restraint. Make sure that the depth to be excavated is measured from finished pavement surface elevations and is marked on all grade stakes. The bottom of excavations, below finished pavement elevation, should equal the total thickness of the designed base, sand bed (after paver installation and compaction) and the paver being used. EXAMPLE: Sub-base (if any) 0 Base (compacted) 6 Sand bedding (compacted) 5/8 Paver thickness 2 3/8 Total Depth 9 in. in. in. in. in.
EDGE RESTRAINT Edge restraints must be installed on that part of the pavement edge which is not restrained by an existing structure such as a building, concrete curb or concrete slab. Edge restraints are typically placed before installing the bedding sand and pavers. Some edge restraints can be installed after placement of the pavers and before compaction. Troweled concrete edge restraint is installed after the pavers have been placed. A detailed description of the various types of edge restraints is contained in Appendix A. Consult your Authorized Belgard Distributor for the edge restraint(s) recommended for your area. Also refer to ICPI Tech Spec 3 Edge Restraints for Interlocking Concrete Pavements. Be sure that any area where bedding or joint sand can escape through or under the edge restraint is lined with a strip of Geotextile. Loss of sand will cause eventual settlement of the pavers. Back fill outside of edge restraint as soon as possible to prevent sand from escaping under the edge restraint. SAND SETTING BED Loose screed the washed concrete sand (see Appendix A) to an uniform thickness of 1 in. over the compacted base course. In no case should the sand be greater than 1-1/2 in. thick. If the edge restraint has already been installed, the screed board may be notched to ride on the edge restraint on one or both ends. The notch should be cut to allow for the screeding of a 1 in. thick sand layer. If the edge restraint cannot be used to carry the screed board, screed rails must be used. Screed rails may be wood, plastic or iron pipe or square steel tubing. The rails should be sized to allow for a 1 in. thick sand bed. For example, a 3/4 in. iron pipe (3/4 in. is the inside pipe diameter) has an outside diameter of approximately 1 in. Place the screed rails parallel to each other and close enough together to enable the screed board to be pulled along the rails without falling off. Set the top of the rails to the desired elevation below grade lines and stabilize by hand packing sand along both sides of the rail. Place the washed concrete sand between the screed rails and rough screed with a shovel, steel rake or lute. Excess sand makes the screed board difficult to pull. Place screed board on the rails and draw forward leaving a smooth surface. Fill in and rescreed any open streaks. When a screed rail is no longer needed, it should be carefully removed and the void filled with sand and hand floated. Do not compact the sand setting bed before laying pavers. PAVERS In most ICP projects, the pavers, regardless of paver shape, are laid in patterns where two sets of joints run perpendicular to each other. Radii or curves are cut into the pavement after the field pavers have been laid but not compacted. Straight joint lines not only make the finished pavement look clean and sharp but make installation much easier. If pavers shaped to geometrically interlock with each other are not laid in straight lines, they will not fit together. To keep joint lines straight, parallel string lines or chalk lines snapped on the sand setting bed should be used. The lines should be spaced five to ten feet apart with the spacing equal to the laying modulus of the paver shape being installed. This can be determined by laying a course of pavers in the proper pattern with 1/8 in. joints and measuring the distance between at the desired line separation distance. Procedure: Snap a string line on the screeded sand in the center of the area(s) to be placed. The line should be perpendicular to the laying face. Place pavers in the given laying pattern on both sides of the line. If additional lines are snapped, they should be parallel to each other. Check this by measuring the distances at the opposite ends of each line. They should be equal. If they are not parallel, they can be erased and snapped again.
Try not to disturb the subgrade below the planned excavation depth. Over excavation is costly and can cause future problems. When all excavation is completed, compact the subgrade with a vibratory plate compactor. Make sure that compaction is thorough, uniform and complete. If soft spots are encountered, they should be removed and backfilled with the material to be used for the base. If the subgrade is too wet to compact, allow it to dry or try adding a few inches of dry base material before compacting. BASE The recommended DGA base material (see Appendix A) should be spread in layers of uniform thickness then compacted. The thickness of the layer depends on the method of compaction and the planned use of the pavement. While compaction of the subgrade and base layers is key to the performance of any pavement, it is absolutely essential to pavements trafficked by vehicles. The 4 in. 6 in. base for patios, walkways and pool decks may be placed in two or three layers and compacted with a vibratory plate compactor of 5,000 ft. lbs. of force or greater. The 6 in. - 8 in. base for driveways may be placed in two lifts of 3 in. - 4 in. if a vibratory roller is used. Place and compact the base material as recommended, making sure to keep the material lightly dampened. If free water appears on the base surface during compaction, the material is too wet and should be allowed to dry (or add a layer of dryer base material) before continuing compaction. Be sure to thoroughly compact along edges, in corners and around structures. These are the most difficult areas to treat and the most apt to cause future settlement problems. Do not use frozen base material and do not place base material over a frozen subgrade. Be sure that the outside limits are at least 12 in. wider than the outside limits of the pavement. When proper compaction of DGA has been achieved, the surface should be smooth, leave no areas into which the bedding sand can migrate. It may be necessary to fill any such areas with a finer material then recompact. The finished base surface should be flat (no more than 3/8 in. plus or minus variation under a 10 ft. straight edge) and uniformly true to grade. Summary: Base must be 12 in. wider than pavement on all sides. Use proper base material. Do not place frozen base material. Do not place base material over frozen subgrade. Place and compact base in layers. Fully compact. 9
10
12' (4m) Parallel chalk lines snapped in bedding sand or string lines pulled above sand and pavers
3:4:5 Triangle may be used to establish a 90 degree angle or to check existing corners:
6' (2m)
6' (2m)
10' (5m)
Lay one side first
6' (3m)
6' (3m)
Lay other side next Fill this area
Parallel string lines are also used to pave around openings in the pavement such as manholes or swimming pools. Procedure: Pull perpendicular string or snap chalk lines on all four sides of the opening. Lay pavers on one side, then the other. Count the courses needed to surround the openings on each side. They should be equal in number on both sides. Then fill around the remaining side of the opening. Cut pavers to fit and fill against the edge restraint around the opening.
90
OPENING IN PAVEMENT
A quick way to establish a line perpendicular to an edge (no corner walls) is with the following procedure: Measure and mark the length of the edge, or line, from which paving will begin. The line can be 10-20 ft. (3-7m.) long. This line is where an edge restraint will be placed, or where one is already placed. Mark exactly the half way point on the line that was just measured. In other words, divide the line in half. Take one tape measure and extend it from the other end of the line at an angle toward the center. Be sure the tape extends past the middle of the line by a foot or two (0.2m.-0.6m.). Take a second tape measure and extend it from the other end of the line at an angle toward the center. Overlap one tape on the other and match the length of both tapes. The same Tape marked dimensions on each tape Measures should be touching each other. Snap a line from the point where the two tape measures cross to the center of the line. This line is perpendicular to the line from which paving will begin.
Plan your installation to begin along a straight line and preferably in a corner which is easily accessible. Make absolutely certain that the beginning corner is a true 90 degree angle. If the intersection of 2 sides is not a true 90 degree angle, you must establish a 90 degree starting point.
String Line
direction of paving
90
Fill gaps with cut pavers
Exact Midpoint
String line90 Lay pavers to perpendicular string lines
11
12
STARTING LAYING PATTERNS Starting the first few rows of the pavement requires attention to the order of placing the pavers. The proper order for beginning herringbone patterns with a rectangular paver is illustrated below. The installation begins at a 90 degree corner. When placing the pavers, it is important to maintain consistent joint spacing of 1/16 in. to 3/16 in. Consistent joint width of approximately 1/8 in. will spread loads (vertical interlock) better than wider joints. Consistent joint spacing will result in a neat and orderly appearance of the finished pavement. The 1/16 in. spacer ribs molded into the sides of pavers are to ensure a minimal joint and that at least some sand can enter the joints between pavers. They are not intended to be the spacing mechanism. The best way to maintain joint consistency during paving is by the click and drop method.
Edge Pavers and Paver Cutting Especially manufactured edge units are available for some paver shapes. Check with your Authorized Belgard Dealer for availability of these units. In most cases, pavers along the pavement edges will need to be cut. The four types of cutting equipment generally available are: 1. Mechanical cutter or guillotine splitter. This equipment cuts pavers between two steel blades through hydraulic or mechanical pressure. The cutting process is quick but the cut edge tends to be rough. The equipment is relatively inexpensive. 2. Gasoline or electric powered saws mounted on a stand. These saws are generally set up to be run wet but can be run with a dry diamond blade. Very accurate cuts can be made but in most cases the pavers must be marked, brought to the saw, cut, then returned to the edge and installed. The process is labor intensive. Gasoline powered saws may be mounted on a coxet to facilitate the process. 3. Walk behind diamond saw. Powered in most cases by a gasoline engine, the units roll on wheels while cutting. They are usually set up to run wet but can use a dry diamond blade. The advantage is that the pavers may be cut in place. The quality of cut is excellent but the saws are awkward to maneuver. 4. Gasoline powered cut-off or quick saws. These hand held saws are similar to chain saws with the diamond saw blade replacing the chain. While some cut-off saws can be run wet, most are used with dry blades. These units provide good output and, in the hands of an experienced operator, excellent quality of cut. Cut-off saws have become the most used equipment for cutting pavers. Tips Diamond saw blades come in wet or dry versions. Dry blades may be run wet but wet blades should never be run dry. Use of water with either type blade extends blade life. Care must be taken to make sure that the slurry (mixture of water and cutting dust) from wet saws or dust from dry saws is washed off installed pavers immediately before it dries. Surrounding structures, vegetation and automobiles should be protected from the dust. Cut-off saws with dust collection capability have recently become available. Check with your Authorized Belgard Dealer for the proper cutting equipment. Cutting Procedure Mark lines to be cut with lumber pencil or crayon, chalk, welders soapstone or water-base liquid marker. Do not use a marker which will not eventually come off. It is best to use a color which is easily visible against the color of the paver. Curved lines may be marked by using a garden hose as a guide. The pavement will perform best if the size of cut units left in the pavement is as large as possible. Thin pieces tend to break or displace with time and use. In most cases, the pattern may be adjusted at or near the edge to allow for larger cut pieces. A border or header course of whole pavers between the field pavers and the edge restraint tends to keep the cut field pavers in place better than the edge restraint alone. The border pavers also add a neat finished appearance to the pavement. Cut and place all edger pieces before compacting the pavers and applying joint sand. Summary: Use proper hand, eye, ear and respiratory protection equipment. Mark lines to be cut. Maximize size of cut pieces to remain in pavement. Make clean neat cuts. Make all cuts before compacting pavement. Clean all cut residue from pavement immediately. Use paver border or header course as often as possible.
Click and Drop Procedure: While holding a paver, the bottom 1/4 in. to 1/2 in. should click firmly against the top portion of the side of the pavers already placed. Do not hit the previously placed pavers so hard that they move. Release grip, dropping the paver an inch or so directly downward. A slight pressure with fingers will ensure that the paver does not move away from those already placed. CUTTING PAVERS Pavers may be cut with any one of three basic pieces of equipment. They are: 1. Mechanical or guillotine splitter 2. Masonry saw 3. Hand held cut-off saw Mechanical or guillotine cutters are relatively inexpensive to buy but produce the least desirable results. Masonry saws may be either gasoline engine or electric motor driven. They may be hand held or mounted on a stand. Hand held cut-off saws are the most convenient and produce the best overall combination of quality and productivity.
13
14
COMPLETION OF PROJECT PAVEMENT COMPACTION AND JOINT SANDING Compaction of the ICP evens the tops of the pavers and begins the process of vertical interlock by forcing some of the bedding into the joints from the bottom. On small jobs, compaction should take place after all pavers, including cut edges, are in place. On jobs lasting more than one day, all pavers placed should be compacted and the joints filled at the end of the workday. Do not compact or fill joints within 3 ft. of any unrestrained or incomplete edge. Do not spread joint sand before initial compaction of pavement. Using a gasoline powered vibratory plate compactor with a minimum compaction force of 5000 ft. lbs. for 3-1/8 in. pavers, follow this procedure: Compacting Procedure Start on one edge of the pavement and compact the perimeter. Compact in overlapping rows on the rest of pavement. Compact the pavement again but in the opposite direction. All pavers will need to be exposed to at least two passes of the compactor. Do not compact within 3 ft. of an unrestrained edge or the pavers will creep out. The operator looks for broken pavers just behind the plate compactor and marks them while compacting. The broken pavers are removed with a paver extractor and replaced with whole units. Figure 3 (right) Compaction sequence working from the perimeter to the center of the pavement. All pavers should have two passes of the plate vibrator over them prior to filling the joints. After the joints are filled with sand, follow the same compaction sequence from the perimeter to the center. JOINT SANDING After compaction of pavement and replacement and recompaction of replacement pavers, spread the joint sand. Refer to Section 2, Joint Sand for recommended sands. Dry sand works best, so if the sand is damp, allow it to dry. Sweep the dry sand into the joints. If necessary, dry bagged sand conforming to ASTM C144 may be used (see Appendix A). Do not use mason sand, play sand or sandbox sand. After the initial sweeping, the filling of the joints can be expedited by alternating sweeping and passes of the vibratory plate compactor. Continue until all joints are filled. It is a good idea to reinspect a job two to three weeks after completion at which time it may be necessary to re-sweep sand into the joints. Summary: Compact pavement after pavers are installed and before joint sand is spread. Replace broken pavers while compacting and before applying joint sand. Spread and dry joint sand. Sweep joint sand into joints and fill by alternating sweeping and vibrating. Check job in 2-3 weeks and re-sand if necessary. Sweep off excess sand. On some commercial jobs, excess sand may be left on the pavement to help ensure joints are filled. 15 When the installation has been completed, clean up the site. Some pavers of each shape and color used may be left with owner for possible future replacement. Store these pavers neatly where the owner directs. Walk the job with the owner and address any problems immediately. Review maintenance procedures with the owner and leave information regarding care and maintenance with him/her.
ESTIMATING MATERIALS
EXCAVATION Calculate the area to be excavated. Remember to include the 12 in. outside the area to be paved. If an electronic digitizer is not available, break the area down into geometric shapes (squares, rectangles, triangles or circles), calculate the area of each, then add all together to arrive at total area in square feet. Calculate volume of soil to be excavated by multiplying the total area in square feet by the depth to be excavated in feet. This will give the total cubic feet of soil to be excavated. In most residential projects, the depth to be excavated is uniform or easily averaged over the area to be paved. If the pavement is to be cut into a hill slope or will be built partially over an area to be filled, be sure to consider these conditions in your estimate. In the first case, more material will need to be excavated and disposed of. Some or all of that material may possibly be used as fill. When soil is excavated it expands in volume. This expansion is called swell and ranges from 30 percent for clay to 15 percent for sand with average soil expanding about 25 percent. If the average soil expands 25 percent then the volume after excavation, or loose volume, is 125 percent greater than the volume of the soil in place. Thus, if the calculated in place volume of the soil to be excavated is 100 cubic yards, the volume to be hauled is approximately 125 cu. yds. (100 x 1.25). Since the volume of soil increases when excavated, the weight per unit of volume must decrease. The average soil weighs approximately 3250 lbs. (1.625 tons) per cubic yard in place and approximately 2600 lbs. (1.3 tons) per cu. yds. after excavation. Thus, the 125 cu. yds. to be hauled in the last example would weigh 162.5 tons (125 x 1.3). Knowing the volume and weight of soil to be excavated, hauled and disposed of is absolutely necessary to accurately estimate time and cost. More detailed information is contained in Appendix A-Materials. BASE Calculate the base material by multiplying the area excavated in square feet by the design depth of the base in feet after compaction. Divide the result by 27 to obtain the cubic yards of base material needed in the compacted state. Since the base material will usually be purchased by the ton, the volume needed after compaction must be converted from cubic yards to tons. This conversion can be made accurately if the bulk density of the base material is known. If the bulk density is not known, multiply the calculated volume needed by 1.6 to get tons needed. EDGE RESTRAINT The lineal feet of edge restraint required is simply the total feet of pavement edge which must be restrained by the specified edge restraint system. In many cases, both straight and curved restraints must be installed. Total quantities of each should be estimated. If the edge restraint to be used requires stakes or spikes, this quantity must also be estimated. Space stakes or spikes as recommended by the manufacturer of the edge restraint system used. This information may be obtained from your Authorized Belgard Dealer. BEDDING SAND The quantity of bedding sand will vary with the thickness of the loose screeded sand bed, 1 in. to 1-1/2 in., and with the moisture content of the sand being delivered. A good rule of thumb, however, is to order 1/2 ton of ASTM C33, washed concrete sand for every 100 sq. ft. of installed pavement. This should suffice for both the bedding and joint filling.
16
PAVERS In simple straightforward projects requiring no cutting loss, the quantity of pavers to be ordered is equal to the area of the pavement, plus a 2 percent cull factor rounded up to the next highest package unit. In some cases it may be possible to order pavers in straps or section quantities while in others it may be necessary to order full cubes. An additional quantity must be added for portions of pavers lost on edges which must be cut. A good rule of thumb is to add 30 sq. ft. of pavers for each 100 linear ft. of cut edge. Edge pavers must be calculated separately for each paver shape. This information is available in the Product Guide available from your Authorized Belgard Dealer. Remember, edge pavers are only available for a limited number of paver shapes and may only be used on straight edges parallel to the laying pattern. Border pavers, such as a header course, must be calculated based on the paver shape being used and the border pattern to be installed. In the common soldier course border using a 4 in. x 8 in. rectangular paver, 3 pavers are needed per 1 ft. of border or 0.67 sq. ft. of 4 in. x 8 in. pavers. The ordered quantity would be 0.67 x the lineal feet of border plus 2 percent rounded up to the next package unit. If bands are to be inset into the paver field, it is usually best to lay the entire field then saw cut and remove field pavers to install the band pavers. In this case, do not deduct the quantity of band pavers from the gross field pavers required. JOINT SAND If the same sand used to fill the joints is used for the sand setting bed, the quantity will be included in the bedding sand estimate. In non-vehicular residential projects, such as patios, dry bagged sand may be used. Use an all purpose or construction sand. Do not use play sand or sandbox sand. All purpose sand is generally packaged in 60 lb. bags. Use the table below to estimate quantity needed: Lbs./100 sq. ft. 6 cm. (2 3/8 in.) pavers w/ 1/8 in. joint 8 cm. (3 1/8 in.) pavers w/ 1/8 in. joint 6 cm. (2 3/8 in.) pavers w/ rounded corners 8 cm. (3 1/8 in.) pavers w/ rounded corners JOINT SAND If the sand used for the sand setting bed is not used for filling the joints, the sand used should meet the gradation requirements of ASTM C144. ASTM C144 - Gradation of Joint Sand Sieve Size No. 4 No. 8 No. 16 No. 30 No. 50 No. 100 No. 200 NOTE: 17 1. Do not use sandbox or play sand. 2. Do not use stone dust. 3. Do not use Mason sand. Percent Passing 100 95-100 70-100 40-75 20-40 10-25 0-10 200 lbs. 265 lbs. 300 lbs. 400 lbs.
EDGE RESTRAINTS Restraints hold the pavers tightly together, enabling consistent interlock of the units across the entire pavement. They prevent pavers from spreading due to horizontal forces from tires and minor settlement. Edge restraints are designed to remain stationary while receiving occasional impacts from tires. When a compacted aggregate base supports the paver and bedding sand, the base should extend beyond the restraint. The rule of thumb is that the base should extend beyond the restraint the same dimension as the thickness of the base material. For example, if the base is 6 in. thick, then it should extend at least 6 in. beyond the outside edge of the restraints. This contributes stability to the restraint and pavement edge especially in soils subject to heaving. Soil backfield is never a suitable edge restraint and should never be installed on top of the bedding sand. If there is a possibility of sand loss from beneath the pavers, or between the joints of the edge restraint, Geotextile (filter cloth) is recommended to prevent its migration. A 12 in. (0.3m.) wide strip can be applied along the base and turned up along the sides of the restraints. Filter cloth generally is not required across the entire surface of the base, nor should it be placed on top of the bedding sand. There are two general types of edge restraints. Those made elsewhere and installed at the site include precast concrete, plastic, cut stone, aluminum, steel and timber. Restraints formed on-site are made of poured-in-place concrete. Full depth precast concrete or cut stone edging generally extends the depth of the base material. They can be compacted soil (not subject to heaving), compacted aggregate or concrete backfield. The preferred method of installation with vehicular pavements is for the curb to rest on the compacted aggregate road base. Partial depth precast concrete edge restraints may be used for residential and light duty commercial applications. These precast units are anchored on a compacted aggregate base with steel spikes. The spikes are typically 3/8 in. diameter. Depending on the design, the top on the concrete edge can be hidden or exposed. Aluminum and steel edging should be selected to provide a smooth vertical surface against the pavers. L-shaped edging provides additional stability. Stakes fastened to the edging should be below the pavers or on the outside of the restraints. Steel should be painted or galvanized so that rust does not stain the pavers. Spikes to secure steel and aluminum edging should extend well into the base course. Consult manufacturers literature for recommended spacing of the spikes. Aluminum and steel edgings are manufactured in different thickness. The thickest edging is recommended when pavers are subjected to vehicular traffic. Timber should only be used to restrain residential patios and walks. It should be treated to resist insects and rot. A nominal 6 in. x 6 in. minimum dimension will restrain the bedding sand and 2 3/8 in. thick pavers. Smaller dimensioned lumber will likely warp. Stakes should be placed on the outside of the lumber, or below the pavers if placed on the inside. The stakes should extend into the base. Plastic edging installs quickly and will not rust or rot. Plastic edging should be specifically designed for use with pavers. It can be used with light duty residential, commercial or on some heavy duty, industrial applications, depending on the design. It should be firmly anchored into the compacted aggregate base course with steel spikes. Consult the manufacturers literature for the recommended spacing of the spikes. Edging for planting beds and lower gardens is not an acceptable restraint for interlocking concrete pavements. Elevations should be set accurately for restraints that rest on the base. For example, 2 3/8 in. thick pavers with 1 1/4 in. of bedding sand would have a base elevation set 3 in. below that of the finish elevation of the pavers. This allows 1/4 in. settlement from compaction and 1/8 in. for minor settling over time. Restraints formed on-site, poured-in-place concrete curbs, or combination curb and gutters required by municipalities make suitable restraints for pavers. Exposed concrete edges should have a 1/8 in. radius edge to reduce the likelihood of chipping. As with precast, the side of the curbs should extend well below the sand bedding course. Troweled concrete from a bag mix, or batched on-site, can be applied without forms against edge pavers and on the compacted base. If the top of the concrete edge is recessed and slopes away from the pavers, grass can grow next to them. The depth below the surface of the pavers must be sufficient to prevent the concrete from becoming a heat sink that dries the grass and topsoil. This edge restraint is suitable for pavers subjected to pedestrian traffic and for residential driveways. Troweled edges should be at least 6 in. wide. Steel reinforcing such as DuraWall should be placed in the concrete to increase service life. Troweled concrete curbs are not recommended in freezing climates as they may crack and be an on-going maintenance problem. 18
The second letter describes a secondary soil type, the gradation or the ability of the soil to retain water. Gradation (variation in particle sizes) W = well-graded (high variation - good for pavements) P = poorly graded (low variation - not good for pavements) Liquid Limit Symbols (Liquid limit is the ability of the soil to hold water) H = high (can hold water, does not drain well - not good for pavements) L = low (does not hold water, drains well - good for pavements) The 15 USCS soil groups and their respective suitability for use as a subgrade for a pavement system are: Symbol GW GP GM GC SW SP SM SC ML CL Soil Description Well-graded gravels and gravel sand mixtures, little or no fines Poorly graded gravels and gravel sand mixtures, little or no fines Silty gravels, gravel-silt-clay mixtures Clay gravels, gravel-sand-clay mixtures Well-graded sand and gravely sands, little or no fines Poorly graded sands and gravely sands, little or no fines Silty sands, sand-silt mixtures Clay sands, sand-silt mixtures Inorganic silts, very fine sands, rock flour, silty or clayish fine sands Inorganic clays of low to medium plasticity, gravely clays, silty clays, lean clays Inorganic silts, micaceous or diatomaceous fine sands or silts, plastic silts Inorganic clays or high plasticity fat clays Organic clays of medium to high plasticity Peat X (2) X (1) X (1) X (1) Subgrade Poor Med Suitability Good Excellent X (1) X (1) X (1) X (1) X (1)
(1) Use 6 in. compacted base in driveways. (2) Use Geotextile between subgrade and base and thickness base to 8 in. in driveways. (3) Use Geotextile between subgrade and base and thickness base to 8 in. in driveways and thicken driveway base to 10 in. BASE MATERIAL The specification for aggregate base materials for use under flexible asphalt pavement are suitable for use as base material under ICP. If no municipal, county or state specifications are available, use material meeting the specifications of ASTM D 2940 as shown below. Sieve Size 2 in 1-1/2 in 3/4 in 3/8 in No. 4 No. 30 No. 200 Percent Passing 100 95-100 70-89 50-70 35-55 12-55 0-8
The material meeting this specification is suitable for bases more than 4 in. thick. For bases less than 4 in. thick, the material should have 100 percent passing the 1-1/2 in. sieve and 95-100 percent passing the 3/4 in. sieve. In either case, the material passing the No. 200 sieve must not be greater than 10 percent. SAND SETTING BED The setting bed materials must be a coarse, sharp, washed sand. It may be a processed natural sand or a man made sand. It must meet the gradation specifications of ASTM C33. The most common term for the proper sand is Washed Concrete Sand. ASTM C33 - Gradation to Bedding Sand. Sieve Size 3/8 in. No. 4 No. 8 No. 16 No. 30 No. 50 No. 100 No. 200 Percent Passing 100 95-100 80-100 50-85 25-60 10-30 2-10 0-2
X (2)
MH
CH OH Pt
NOTE: 1. Do not use stone dust or unwashed screenings. 2. Do not use mason or bank sand.
19
20
Utility manhole
Cover String course around collar Re-bar
Cover Curb Concrete pavers Bedding sand Compacted aggregate base Compacted soil subgrade Concrete collar min. 6" (150 mm.) 14" (7 mm.) below pavers Re-bar Filter fabric Concrete pavers Bedding sand Compacted aggregate base Filter fabric Compacted soil
21
22
Concrete beam
Appendix A
MATERIALS
GENERAL Gradation of subgrade soil, base material and bedding and joint sands is an important property of these materials. The size and distribution of their particle sizes greatly influence their performance under interlocking concrete pavements and therefore the performance of the pavement. Gradation is determined by placing a known weight of dry material in the uppermost of a stack of sieves or screens. Each sieve going down the stack has smaller openings than the one above it with the bottom unit a pan to catch the finest particles. After the sieves are shaken for a specified amount of time, the material retained on each sieve is weighed and the percentage of material passing each sieve is calculated. There are standardized ASTM tests for determining the gradations of soils, base materials, bedding and joint sands. SUBGRADE SOILS Subgrade soils range in particle size from coarse grained sands to fine grained silts and the finest grained clays. Most soils are a combination of the three particle size categories. In general, the soils containing a high percentage of clay particles are less suitable for good subgrade support of a pavement. Of the several systems used to classify soils with respect to their ability to support a pavement system, the Unified Soil Classification System (USCS) used by the Army Corps of Engineers is probably the easiest to use. This system is also described as ASTM D 2487, Standard Classification of Soils for engineering purposes. In this system, soils are separated into 15 groups which are each designated by a two letter code. The first letter describes the predominate soil type: G = gravels or gravely soils S = sand or sandy soils M = silt - non-plastic (non putty-like when wet), or very slightly plastic, and having little or no strength when air dry C = clay - plastic (putty-like when wet), and having considerable strength when wet.
Aggregates placed in coarsest sieve Coarsest Sieve
Intermediate Sieves
Finest Sieve
JOINT SAND If the sand used for the sand setting bed is not used for filling the joints, the sand used should meet the gradation requirements of ASTM C144. ASTM C144 - Gradation of Joint Sand Sieve Size No. 4 No. 8 No. 16 No. 30 No. 50 No. 100 No. 200 NOTE: 1. Do not use sandbox or play sand. 2. Do not use stone dust. 3. Do not use Mason sand. Percent Passing 100 95-100 70-100 40-75 20-40 10-25 0-10
Pan
Pt = peat - vegetation in various stages of decomposition usually black or dark brown in color. 24
23
www.belgard.biz
1 877 BELGARD
1 877 235-4273
Dimensions
A B E F G
2 3/8 x 5 7/8 x 5 1/8
Installation Guide Installing Circle pavers . . . . . . . . . . .26 Dublin Cobble Circle . . . . . . . . . . . . .26
guide
Installation
Cambridge Cobble Circle & Fan . . . .27 Bergerac Circle . . . . . . . . . . . . . . . . .28 Mega-Bergerac Circle . . . . . . . . . . . .28 Dublin Cobble Modular . . . . . . . .29 Mega-Bergerac . . . . . . . . . . . . . . .29 Celtik wall installation guide . . . .30 Anchor Pin System . . . . . . . . . . . . .31 Corners/Curves . . . . . . . . . . . . . . . .31 Capping Modules . . . . . . . . . . . . . . .32 Celtik steps and stairs . . . . . . . . .36 Celtik pillars . . . . . . . . . . . . . . . .37 Celtik curbs . . . . . . . . . . . . . . . . .38 Patterns . . . . . . . . . . . . . . . . . . . . .39
6 5 9 5
26
A C
B D E
2.38 m (7 10) 3.52 m (11 7)
G
C
E
D
D
G E G
D
C
G
E G E
G
D
E
E
G
D
D
E F
D
D
D
D
F
G E
G E
G E
Dimensions
C Center Stone 3 x 6 1/2 Half Stone 3 x 6 3/4 3/4 Stone 4-1/2 x 6 LC Large Circle Stone 5 x 6 SC Small Circle Stone 7 x 6
27
F F F E B B
D E
B
A
C F
B B
2.64 m (8 8)
E G
G E
E G
F
C
D E
C F
B B
G E
D
G
E
G
28
Installation guide
Row by row
A. Installation of the first row it is preferable to use the longest modules for the first row, and lay them on the compacted foundation. It is important to carefully align the first-row modules horizontally to ensure that the wall will be level. Even if the selected arrangement is a combination of 90 mm and 135 mm modules, the first row most contain only one size of module (90 mm or 135 mm). At this stage, no pins are used.
Illustration X
B. Installation of following rows, walls of 90 mm or 135 mm modules: Harmoniously lay modules of following rows, not forgetting, however, to insert a pin in each module before installation. First insert pins in modules to be installed. Use appropriate grooves, depending on whether the wall is to be vertical or 9-sloped. Lay each row by overlapping joints of the last row installed.
Layer by layer
Modular pavers are designed in proportional multiples.
A B A C B
90 mm modules with jumper 135 mm modules with jumper
Illustration Y
Supplied radiuses may be used vertically to give a natural and original look to the layout. Two of those radiuses measures two rows high. Use a small radius (6 3/4) to match two 90 mm rows (see illustration X), and a medium radius (10 1/4) to cover two 135 mm rows (see illustration Y).
A
Dublin Cobble Modular 3 x 5 7/8 Mega-Bergerac
4 3/4 x 9 1/2
B
5 7/8 x 5 7/8 9 1/2 x 9 1/2
C
5 7/8 x 8 7/8 9 1/2 x 14 1/4
D
Illustration Z
A blend of Dublin Cobble standard pavers and Dublin Cobble Modular pavers gives even more flexibility in terms of paver size and, consequently, more interesting bond patterns. IMPORTANT: A blend of Dublin Cobble standard pavers and Dublin Cobble Modular pavers can be laid in a running bond pattern only.
50% 90 mm modules and 50% 135 mm modules 50% 90 mm modules and 50% 135 mm modules with jumper
Combination of 90 mm and 135 mm modules Carefully distribute different sizes of modules to give a well-balanced, natural look to the layout (see opposite arrangement examples). To integrate vertical elements to the arrangement, split 17 1/4-long modules (90 or 135 mm high) in halves. A split half cover the total height of a 90 mm module plus a 135 mm module. (see illustration Z) C. Back filling Every two rows, fill the space behind modules with 3/4 clean stone. Repeat steps B and C up to the desired height. NOTE: When combining 90 mm and 135 mm modules, spaces may appear between some modules in the structure.
Pallet packing Dublin Cobble Modular and Mega-Bergerac pavers are packed in pairs of pallets, providing great flexibility depending on the chosen laying proportion.
Mega-Bergerac Three basic pavers Dublin Cobble Modular Large square pavers
29
30
Installation guide
Constructing a corner (90)
90 angles (corners) use the 17 1/4 long modules to finish the 90 angle. Split the block at 90 along one of the newly split surface to obtain the same finish as the other blocks.
Option 1
The Celtik straight capping module can be used in most cases. How to order Celtik straight capping modules are purchased individually. Each module measures 16 in length.
CAPPING MODULE
5 1/4 MODULE
Making a curve
For a Celtik curve construction, the minimum radius recommended is 3 ft.
3 1/2
A
16 12
PERFORATED DRAIN
To create curves in a Celtik wall, the minimum radius is 3. Convex curve: Strike the extremities of the module at the back.
Before
Capping a corner Prepare a Celtik straight capping module as follows. 1) Cut, using a cold chisel or a guillotine, 4 from the capping module (lengthwise).
2) Flip the module over and cut off the retaining lip. 3) Tap the newly cut face with a sledgehammer to achieve the same finish as that of the other sides. 4) Install this corner cap first before proceeding with installation of the other capping modules. 5) Always spread a layer of concrete adhesive along the top row of Celtik pavers before laying the capping modules.
Convex curve
minimum radius recommended is 3 ft.
12 12
Basic model
31
32
Option 2
Walls can also be capped using Celtik standard modules, in one of two styles: Flush Overhanging In either case, the modules must be properly secured with adhesive to ensure wall stability. Save straight modules (A) for capping the straight portions of the wall. Use beveled modules for the curved portions-less cutting will be required. Note: Several small modules will give a shorter bend radius, while larger modules will give a larger radius. Advantage A Celtik retaining wall with standard modules as capping modules is economical, easy to install, and versatile, offering a number of possibilities.
3 1/2
C
Straight line S-curve
A B C B C A
A B C
C
B C
63 75
A
17 1/4
B
13 3/4
C D
10 1/4 6 3/4 9
We recommend properly securing the modules with adhesive to ensure wall stability. A straight wall visible on both sides Perfect for construction a bench, small balustrade, etc. Stack the Celtik beveled capping modules and spread concrete adhesive between each row. How to order Celtik beveled capping modules are purchased per linear foot.
B
A
Flush capping
9
A
A
A C
5 1/4
B
55 1/2 67 1/2
C
6 3/4 9 6 1/2
Overhanging capping
To create curves in a Celtik wall, the minimum radius is 3. Convex curve: Strike the extremities of the module at the back.
Before
3 1/2
A
12 8 7/8 9 1/2
B
B
B B
After
3 1/2
B C
14 3/4 12
B
48 60
B
B
3 1/2
A
A
B
B
40 1/2 52 1/2 Different combinations of capping elements can be used to create uniform bend of varying lengths, making them ideal for creating semicircular walls.
A A A
Advantage Celtik beveled capping modules are treated on both sides. This finish enables excavation or laying of sod inside the wall, below the top of the wall-the finish is equally attractive on each side.
A A A
33 1/8 45 1/8
33
34
Detailing
Creating corners Use 14 3/4 Celtik beveled capping modules to finish 90 corners. Use a concrete saw to cut the modules at 45 angles. Always start with the corner modules when capping a wall.
14 3/4 12 3/8
Steps
Creating straight steps or curved landings Steps or landings can be laid using Celtik standard wall and Celtik capping modules. Semicircular landings can also be created using the Celtik capping modules. Corner with 45 cut
12 Capping module Module 3 1/2 Paver Module 3 1/2 Capping module 12 Module 3 1/2 Capping module 180 mm (7) Module 3 1/2 Module 3 1/2 Module 3 1/2 3 1/2
Creating stepped walls Use 14 3/4 Celtik beveled capping modules to finish 90 stepped walls. Split the 90 module along one of the two grooves. Tap the newly cut face with a sledgehammer to achieve the same finish as of the other sides. Always start from one end when capping a stepped wall. In either case, always spread a layer of concrete adhesive along the top row of Celtik modules before laying the capping modules.
45
Cut line
Groove
90
Note: Celtik steps and risers give a step height of 7. If the height of the wall and that of the step must be the same, ensure that the height of the wall containing the steps is a multiple of 7.
13 1/2
Creating stairs
1) Installing the first row Lay a 4 x 8 x 16 solid block such that it is flush with the interlocking paving stone. The solid block will support the concrete riser.
Cutting
Cutting a module using a cold chisel 1) Strike the module along the cut line. 2) Strike along an imaginary line running all the way around the module. 3) Finish cutting by firmly striking one of the visible faces of the module. 4) Tap the newly cut face with a sledgehammer to achieve the same finish as of the other sides. Use a guillotine if several cuts are required.
Strike along an imaginary line running all the way around the module. Firmly strike one of the visible faces of the module.
2) Installing the second row Lay a 10 1/2 Celtik riser on top of the first row. Fill the space behind the riser with 0-3/4 crushed stone and compact. 3) Fastening the step Lay a 13 1/2 Celtik step module on top of the riser. 4) Installing additional rows Repeat steps 1, 2 and 3. Be sure to use concrete adhesive to secure the riser and step modules.
LAYING BED 1 (CONCRETE SAND) FOUNDATION 03/4 IN SITU SOIL
35
36
Pillars
Building pillars To build a pillar minimizing joint alignment and better stability, be sure to follow the laying order for each step and by rows, as illustrated. Measure the site for the pillar(s). Each pillar has side 29.
B D D A C C A B
Celtik curbs
Creating Celtik curbs Make sure the depth of the 0-3/4 crushed stone foundation where the curb is to be laid is the same as that beneath the pavers. This foundation must extend at least 12 beyond the curb so that it the latter may be solidly anchored. Install the curbs on the same laying bed as the pavers. To create a straight-line curb, use alternating angled curb modules (see illustration at far right). To create a concave or convex curve, lay curb modules in the same direction (see illustration at right). Use a hammer or sledgehammer to insert the plastic anchors into one of the two openings on either side of each curb.
D
D
A D
For the corners, cut a C and D modules as illustrated: Trim the C module in the middle trim the D module along one of the two grooves (left or right)
A C
Insert nails and press into the foundation (foundation must be well compacted). Advantages Flexibility and better performance than plastic edging - more attractive - better patio/lawn delineation - easy to maintain - prevents grass regrowth quick installation solid attractive rounded finish added value
12 3 1/2 4 1/2
D
Step 2 (rows 2 and 6)
D A C B C A B D
WARNING If a lighted pillar is desired, make sure all electrical wiring is laid before the modules are laid. If flowers are to be planted atop the pillar, install a geotextile membrane inside the pillar before filling with earth.
For a concave or convex curve, lay curb modules in the same direction.
1) Installing the first row Lay the first four modules as illustrated (A, B, C and D), followed by the next four. 2) Installing the second, third and fourth rows For each row, proceed as illustrated. Starting from the fifth row, lay as for the first row, followed by the next until the desired height is reached (see illustration). 3) Capping Use Celtik straight capping modules.
PAVING STONE
CELTIK CURB
D B C A D B
FOUNDATION 03/4 1215 EXCESS WIDTH
A C
(15) (12)
29
29
37
38
Paver
Motif A) sinuous pathway B) in circle C) funnel-shaped D) quarter round
39
Note: Mega-Bergerac gives the same bond patterns as Dublin Cobble Modular, but on a larger scale.
40
Holland Stone
Paver
Maintenance Guide
www.belgardhardscapes.com
1 877 BELGARD
1 877 235-4273
Maintenance Guide What makes up my Belgard Pavement? . . . . . . . . . .43 Will the color of my Belgard pavement fade? . . . . . .43 Do I need to seal my Belgard pavement? . . . . . . . . .44 Removing stains from your Belgard pavement . . . . . . . . .44 Cleaning your Belgard Pavement . . . . . . . . .45 Sealing your Belgard Pavement . . . . . . . . .45 Belgard protective sealant for paving stones . . . . . . . . . . . . .45
Maintenance
guide
41
Congratulations for selecting Belgard as your new pavement. Your choice constitutes a wise investment adding aesthetic and monetary value to your property while providing long term savings through durability and low maintenance. The Belgard pavers incorporated in your pavement are made to exacting standards and are guaranteed as long as you own the property, provided that the pavement has been installed by an Authorized Belgard Contractor actively participating in the Belgard program. WHAT MAKES UP MY BELGARD PAVEMENT? The successful combination of attractive, durable pavers, high quality support materials and the craftsmanship of an Authorized Belgard Contractor makes Belgard Interlocking Pavement Systems the best choice for your paving needs. We manufacture Belgard concrete pavers in the most modern facilities to the exacting requirements of ASTM C936. This is the same standard which all commercial and industrial interlocking concrete pavers must meet. The Interlocking Concrete Pavement Institute certifies that all Belgard pavers comply with ASTM C936. The material used by your Authorized Belgard Contractor to construct the base of your pavement must meet the standards of your state governing graded aggregate material. The bedding sand must comply with ASTM C33 or ASTM C144. The Authorized Belgard Contractor who installed your pavement underwent training to use the proper materials and to construct your pavement using the guidelines and recommendations of the Interlocking Concrete Pavement Institute. Your Authorized Belgard Contractor takes pride in his workmanship and provides you with a guarantee of his workmanship for a period of 5 years. The Belgard interlocking concrete pavers used in your pavement are extremely durable. We manufacture our pavers using specific sands, crushed stone, cement, water and color fast pigments which provide most of the color. A computer operated machine, especially designed for the purpose, forms the concrete mixture into the shapes used in your pavement. We manufacture most Belgard pavers with a beveled edge around the top of the paver. The bevel, or chamfer, ensures that there is no tripping hazard if a paver happens to be slightly higher or lower than its neighbors. The chamfer also reduces the chance for chipping of the paver edge. You will notice that the surface of your paver is slightly coarse to the touch. This texture is to provide a safe non-slip walking or driving surface even when wet. The very dense structure of the paver minimizes the amount of moisture which can penetrate and cause damage during freeze cycles. The contractor places the pavers in a sand setting bed surrounded by an edge restraint which keeps the desired uniform joint spaces between pavers and prevents the edge pavers from moving outward. The sand used to fill the joint spaces provides vertical interlock between pavers and allows the pavement to behave as a strong but flexible mat. Your Belgard Pavement features superior aesthetic value and far less maintenance than competing pavements. WILL THE COLOR OF MY BELGARD PAVEMENT FADE? The color of your Belgard Pavement is a combination of the pigmented cement paste which holds the sand and aggregate particles together, and the natural color of the sand and aggregate particles themselves. When we manufacture our pavers, some of the pigmented paste covers the sand and aggregate particles at the surface of the pavers. A combination of the installation process, use and weathering over the first year or two will remove that paste from some of the particle surfaces, 43
resulting in a mellowing of the overall appearance of the pavement in much the same way as fine wood achieves a patina with age. The exposure of some of the sand and aggregate particles not only adds to the character of the pavement but also can enhance the slip resistance. We use synthetic iron oxide pigments, in all our Belgard pavers, which are very stable and fade resistant. A perception of fading can occur when the phenomenon called efflorescence takes place. Efflorescence results when water soluble salts within the pavers are brought to the surface by moisture, then react with air to form small crystals on the paver surface. Efflorescence can manifest itself as a slight haze or a white powder like coating. The phenomenon is quite common in most concrete products and some clay products especially those which incorporate mortar in their structure. Efflorescence is not harmful in any way and it is recommended that you allow the weathering process to effect removal. If for some reason you wish to hasten the process, you may follow the procedures listed in the section on cleaning. DO I NEED TO SEAL MY BELGARD PAVEMENT? Your Belgard Pavement is a durable pavement and very resistant to the damage that spilled fuels or deicing materials may cause to other paving systems. Sealing is not necessary to preserve the strength or durability of your Belgard Pavement. You may use a sealer to deepen the color tone of your pavement or give it a wet look. Recommended sealers can help protect the appearance of your Belgard Pavement from oil leaks, tire marks or spilled liquids and foods. Consult the section on Sealing before sealing your Belgard Pavement. REMOVING STAINS FROM YOUR BELGARD PAVEMENT If you plan to seal your pavement, it is best to first remove any stains then clean the pavement prior to sealing. Following is a list of common stains and the procedure used to remove them. The list has been taken from Interlocking Concrete Pavement Institute Tech Spec Number 5. In all cases, follow recommended procedures and practices and use the proper personal protection equipment. Asphalt and Emulsified Asphalt - Chill with ice (if warm outside) then scrape away as much as possible. For large areas use Belgard Paint, Tar and Rubber remover as directed. For smaller areas use Belgard Sealant Remover. Cutback Asphalt and Roofing Tar - Use Belgard Paint, Tar and Rubber Remover as directed. Blood, Candy, Ketchup, Mustard, Food Stains - Apply liquid detergent full strength and allow it to penetrate for 20-30 minutes. Scrub and rinse with hot water. Removal is easier if you treat the stains immediately. Caulking and Chewing Gum - Chill with ice then scrape off as much as possible. Make a poultice (paste) of talcum powder and denatured alcohol. Scrub area with poultice and stiff brush then rinse with hot water and strong detergent. If the caulking is acrylic latex, use Belgard Oil, Paint and Sealer Remover as directed. Clay Soil - Scrape off dry material then scrub with detergent and rinse with hot water. Leaf, Wood Rot and Tobacco - Apply household bleach and scrub with stiff bristled brush and rinse. 44
Mortar - Let harden then carefully remove hardened spots with a trowel, putty knife or chisel. Then clean with Belgard Efflorescence Cleaner. Oil and Grease - Mop up excess with rags or paper towels. Cover area with cat litter and allow to stay 24 hours. Change litter when it begins to look saturated. Remove litter and treat area with Belgard Dirt and Grease Cleaner. Paint, fresh - Sop up all paint possible without wiping. If the paint is water based latex, soak and then scrub the area with hot water, scouring powder and a stiff brush until improvement ceases. Let dry and treat as for dried paint. Paint, dried - Treat with Belgard Oil, Paint and Sealer Remover as directed. A commercial paint remover may be used. Apply a liberal coat and allow to sit for 20-30 minutes. Gently scrub area to loosen paint. Do not rub loosened paint into paver surface or allow to spread. Blot up loosened paint and remover. Rust - Treat with Belgard Rust Remover as directed. Tire Marks - Scrub black area with water, detergent and scouring powder. Rinse with water. If tire marks remain after several attempts, treat area with Belgard Oil, Paint and Sealer Remover. CLEANING YOUR BELGARD PAVEMENT You can remove most dirt and grime from your Belgard Pavement by washing it off with the garden hose or a combination water spray and a stiff bristle broom. If stains are present on your pavement, remove before cleaning. You can remove efflorescence, ground-in dirt and some mortar smears effectively with Belgard Efflorescence Cleaner, available from your Authorized Belgard Dealer. Be sure to follow the directions carefully and use the recommended personal protection equipment such as eye protection and plastic or rubber gloves. SEALING YOUR BELGARD PAVEMENT You should never seal your Belgard Pavement until at least 60 days after installation. It is better to wait for a year. The time interval between installation and sealing allows the pavement to mellow and any efflorescence to rise to the surface and be removed with Belgard Efflorescence Remover. Prior to sealing any Belgard Pavement, remove stains, thoroughly clean, then let pavement and joint sand fully dry. Re-sweep joints with sand if necessary. BELGARD PROTECTIVE SEALANT FOR PAVING STONES A solvent based sealer protects against oil and dirt and makes routine cleaning easier. This product enhances the paver color and gives the surface a wet look but does not make the pavement slippery. Prepare the pavement and apply Belgard Protective Sealant for Paving Stones as directed.
Notes
45
46