0% found this document useful (0 votes)
53 views

Date S.C Priority Supervisor SH Site Activity

The document appears to be a log or schedule containing details of planned site work for multiple sites on April 1st. For each date, it includes information such as the supervisor, site name, priority of the work, planned activities and equipment changes, and notes. It provides a detailed overview of the planned maintenance, upgrades and installations for the different sites on that date.

Uploaded by

Mohamed Yahi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Date S.C Priority Supervisor SH Site Activity

The document appears to be a log or schedule containing details of planned site work for multiple sites on April 1st. For each date, it includes information such as the supervisor, site name, priority of the work, planned activities and equipment changes, and notes. It provides a detailed overview of the planned maintenance, upgrades and installations for the different sites on that date.

Uploaded by

Mohamed Yahi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Date

S.C

Priority

Supervisor

SH

Site

Activity

1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr 1-Apr

Karim Karim Metwally Metwally Amr EFS1 EFS2 EFS2 EFS2 Mobilink1 Mobilink2 Mobilink2 MAG1 MAG1 MAG2 MAG3

P0 P1 p0 p1 p0 p0 p0 p1 P2 P0 P0 P1 p0 p1 p0 p0

Salah Salah Salah Salah Salah Sameh Sameh NA Sameh Maisara Maisara Ehab Amr Amr Amr Amr Amr Amr Amr

Multimarq1 P0 Multimarq2 P0 Multimarq2 P1

CAI2559_2G_EXP1 CAI0698_2G_EXP4 cai2326_2G_EXP4 CAI2879_2G_EXP1 CAI1236_2G_Exp2 CAI1642_2G_EXP1 CAI1327_2G_EXP3 CAI2990_2G_EXP3 cai1565_2G_EXP2 CAI1247_2G_Exp2 CAI1366_2G_EXP1 CAI2077_2G_EXP1 cai2983_2G_EXP3 CAI1701_2G_EXP4 CAI2071_2G_EXP2 CAI1094_2G_EXP2 CAI1321_2G_EXP1 CAI2784_2G_EXP2 CAI1356_2G_EXP2

CAI2559 CAI0698 CAI2326 CAI2879 CAI1236 CAI1642 CAI1327 CAI2990 CAI1565 CAI1247 CAI1366 CAI2077 CAI2983 CAI1701 CAI2071 CAI1094 CAI1321 CAI2784 CAI1356

Planned Delivery RFA and return materials Swap day time Return materials Swap day time Swap and integration day time Integration day time Planned Delivery Planned Delivery Integration day time Installation Planned Delivery Integration day time Planned Delivery Integration down time Integration day time Planned Delivery Planned Delivery Planned Delivery

Other pending issue and comment

Access comment
permission permission Moniem to confirm Moniem to confirm Moniem to confirm Moniem to confirm Moniem to confirm

Civil status

Receive delivery and make any installation needed from early morning Make the RFA and return materials Swap day time and check E1 status at 5Pm with mina might be ready Return Antenna andany extra materials Swap day time and check E1 status at 5Pm with mina might be ready Make the swap and integration , return materials Make the integration , return extra and prepare RFA Make the survey if not done today Receive delivery and report status Do the integration as it doesn't need E1 ,return extra materials and make the RFA Finalize installation and return extra materials to WH to integrate Monday Receive delivery anddo any installation needed Make the integration , return extra and prepare RFA Receive delivery and make any installation needed and report status Mag to integrate the site tonight and complete the rest of installation til 10AM tomorrow Make the integration , return extra and prepare RFA Receive delivery and do any installation needed Receive delivery and do any installation needed Receive delivery and report status

Planned Done Join visit Done Join visit

Planned no need permission Not requested Moniem to confirm Join visit


Moniem to confirm Moniem to confirm Moniem to confirm Moniem to confirm permission Moniem to confirm Moniem to confirm Moniem to confirm Moniem to confirm Moniem to confirm Planned Planned Planned Done Planned Planned Done Planned no need Done

MR status

E1 status

BSC

E1 route sent date 2012-03-01 2012-02-22 2011-12-05

Existing micro

Delivery comment

CR type

RBS 6000

Swap cabinet

Approved Approved Approved Approved Approved

Tested Pending test need E1 route Tested need E1 route Tested

CBX14 KBX18 PBX20 PBX21 KBX25

Approved BBX08 Approved No need PBX20 Not requested Tested CBX14 Approved need E1 route PBX27
Approved Approved Under approval Approved Approved Approved Approved Approved Under approval Under approval No need need E1 route E1 need route Tested Tested Tested Tested Tested need E1 route Tested SBX05 PBX27 PBX21 PBX21 KBX12 PBX27 KBX25 PBX27 PBX27 PBX21

40960 40911 40895

#REF! 0 #N/A 0 #N/A #N/A 6021 #N/A

2012-03-27 2012-03-01 2012-03-12 2012-03-12 2012-03-20 2012-03-12

Day time Yes(RUS) Swap Yes(RUS) Swap Yes(RUS) Swap Yes(RUS) Swap Day time Day time 0 Day time in progress Swap 6000 Yes(RUS) day time #N/A Day time #N/A Day time #N/A Down 0 Day time #REF! Day time #REF! Down #REF! Day time #REF! Day time #N/A Down #REF! Day time

6000 6000 6000 6000

6000

Type

Existing old 900 cabinet type

new 900

old 1800

new 1800

old CAB

req cab

E1

Outdoor Outdoor Outdoor Outdoor Indoor

Outdoor Outdoor Indoor Outdoor


Indoor Outdoor Indoor Outdoor Outdoor Indoor Indoor Outdoor Indoor Indoor

2RBS2116V 2+2+2+0 2+4+2+0 2+2+2+0 3+3+2+0 1 1+ 2RBS2116V 2+4+4+4 3+5+5+8 0+2+2+5 0+4+4+5 2 1+BBS2116 6+8+3+0 RBS2116 7+9+5+0 6+6+2+0 6+7+4+0 3 V2+BBS211 2+2+2+0 one 2+3+4+0 2+2+2+0 2+3+4+0 1 RBS2116V1 2*RBS2216 2+5+8+0 3+6+9+0 4+5+6+0 5+5+6+0 3 v2+RBS2116 2+2+2+0 3+3+3+04battery string3+3+3+0 2*RBS2116V1+2*BBS2116V1( 2+2+2+0 )+3G HUAWI

1 RBS6000 RBS6000 RBS6000 RBS6000

1 2 1 1 1

2 DRUs Only 1 2* RBS2116V1+BBS2116V1( 2battery string )+RBS2116V2+2*BBS2116V1(5battery string). 4+6+6+0 4+8+6+0 2+4+4+0 2+6+4+0 3 DRUs Only 0 2+2+6+0 2+2+4+6 2+4+4+0 2+4+4+4 2 1 1 2*RBS2116 V1+BBS2116 V1(2 battery string)+Huawie 4+4+6+0 6+7+7+0 4+2+4+0 5+4+5+0 2 RBS6000 2
2+2+2+0 2+2+2+0 2+2+2+0 4+4+4+0 3+3+3+0 4+4+3+0 3+3+3+0 7+4+4+0 4+4+6+4 4+8+4+0 4+6+5+0 4+4+4+0 6+6+6+0 4+6+7+0 5+2+2+0 2+2+2+0 2+2+2+0 2+4+4+0 2+2+2+2 2+4+2+0 4+4+4+0 2+2+2+0 4+2+2+0 2+2+2+0 5+3+3+0 3+3+3+0 3+3+2+0 4+4+4+0 3+2+2+2 3+6+4+0 5+5+4+0 3+4+3+0 5+4+4+0 3+3+3+0 RBS6000 1 1 2 2 2 2 1 2 2 DRUs Only 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1

RBS2216 V1+RBS600 1 RBS 2116 V1+ 1 BBS RBS2116V1 +PBC6500(3 RBS2116V2 +RBS2116V 2*RBS2116V

4+4+4+4 2+2*BBS211 2+6+2+0 2RBS2216 v1 +PBC 2RBS2216 2+4+4+0 v2 +PBC RBS2116V1 2+2+2+0 + 2RBS2216 4+4+4+0 v2 +PBC v1 2+4+6+0 RBS2216 +RBS226v2

Estimated Scope

S.C

Add Rented RBS2116V1 Karim Swap 3 CAB by 2 4 CAB Rented Swap by 2 RBS Rented Swap 2000 with Swap 3 RBS Rented 2000 by 0ne EFS DRUs900+6 3 DRUs1800+ 3

RF sys7/8 +3 antenna10port One DRUs1800+ one DRUs900+1.5 RF sys7/8+one battery string EFS Add cab indoor +RF+Swap2ANT10ports EFS Swap 3 CAB by 2 CAB6000+Light civil EFS
Mobilink Mobilink Mobilink Mag

2 RUG1800+3 Add RBS2116V1 RBS2216V1 +3antenna10 Add RBS2116V2 Add

MAG RBS2116V2 MAG AddRBS2216V1 MAG AddRBS2216V2 Multimarq Add RBS2116V1 Multimarq AddRBS2216V2 Multimarq AddRBS2216V1

You might also like