0% found this document useful (0 votes)
34 views

Question 1

Uploaded by

Anand Saravanan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Question 1

Uploaded by

Anand Saravanan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Time and work 1. A can do piece of work in 30 days while B alone can do it in 40 days.

In how many days can A and B working together do it? Ans 17 1/7 2. A and B together can complete a piece of work in 35 days while A alone can complete the same work in 60 days. B alone will be able to complete the same working in ans 84 days 3. A can do a piece of work in 7days of 9 horse each and B can do it in 6 days of 7 hours each. How long will they take to do it, working together 8 2/5 hours a day ? ans 3 days 4. A can do a piece of work in 15 days and B alone can do it in 10 days. B works at it for 5 days and them leaves. A alone can finish the remaining in ans : 7 1/ 2 days 5. A can do 1/3 of the work in 5 days and B can do 2/5 of the work in 10 days in how many days both A and B toether can do the wrok ans 9 3/8 6. A can do a piece of work in 80 days. He works at it for 10 days and then B alone finished the remaining work in 42 days. The two togther could complete the work in : ans 30 days 7. A and B can together finish a work in 30 days. They workd at it for 20 days and then B left. The remaining work was done by A alone in 20 more days A alone can finish the work in ans : 60 days 8. A and B can do a piece of work in 45 days and 40 days respectively. They began to go the work together but A leaves after some days and than B completed the reaminnig work in 23 days. The number o days after which A left the work was ans: 9 9. A does half as much work as B in three fourth of the time. If together they take 18 days to complete the work, how much time shall B take to do it ?ans 30 days 10. A can do a certain job in 12 days. B is 60% more efficient than A . The number of days, it takes B to do the same piece of work is ans 7 11. A can do a certain job in 25 days which B alone can do in 20 days. A stared the work and was joined by B after 10 days. The number odays tkane in completing the work was ans 16 2/3 12. A is twice as good a work man as B and together they finish a piece of work in 14 days The number odays taken by A alone to finish the work. Ans: 21 days 13. A is thrice as good a workman as B and Takes 10 days less to do a piece of work than B takes.B alone can do the while work work in : ans 15 days 14. A can do a piece work in 14 dys which B can do in 21 days. They being together but 3 days the completeion of the work. A leaves of the total number of days to complete the work is ans 10 1/5 15. If ramesh, suresh and hairsh can do a piece of work in 15 days, 10 days and 6 days resp. How long wil they take to do it, if all the three work it together. ? ans 3 days 16. A and B can do a piece of working 72 days : B and C and do it in 120 days ; A and C can do it in 90 days. In what time can A alone do it ? ans 120 days 17. A and B and C together can finish a piece of work in 4 days: alone can do it in 12 days and B in 18 days, then C alone can do it in : ans 9 days 18. If A and B C together can finish a piece of work in 4 days:

19. A and B can do a piece of work in 18 days: B and C can do it in 24 days : A and C can do it in 36 days. In 20. If A and B C together can finish a piece of work in 18 days B and C can do it in 24 days: A and C do it in 36 days after A has been working it for 5 days for days C finished in 13 days. In how many days C alone will do the work ans : 24 21. A is twice as good as workman as B and together they complete a work in 15 days . in how many days can the work be complete by B alone ans 45 22. 45 men can complete a wok in 16 dats. Six days after they started working 30 more men joined them. How many days will they now take to complete the remaining work? Ans 6 23. 12 men can complete a work in 18 days six days after they started working men joined them. How many days will all of them together complete the remainingi work? Ans 9 24. Twelve men can complete a work in 8 days. Three days after started the work 3 more men joined. In how many days will all of them together complete the remaining work ans 4 25. A,B and C are employed to do apiece of work for Rs.529. A and C are supposed to finish 19/23 of the work together. How much shall be paid to B? Ans 9

PERCENTAGE 1. If 75% of a number is added to 75, the result is the number itself. Then the number is Ans50 2. Subtracting 40% of a number from the number, we get the result as 30, the number is Ans: 50 3. If three fifth of a number is 40 more than 40% of the same number. What is the number An:200 4. A number on subtracting 15 from it, reduces to its 80%. What is 40% of that number? An30 5. Calculation shows that an angle is 37 %. The size obtained by drawing and measurement is 36%. The error percent is Ans :4 6. The population of a town has increased from 133575 to 138918. The percent increase in population is An:4 7. IF X is 90% of Y, what percent of X is Y? Ans : 111.1 8. If x % of y is the as 4/5 of 80, then the value of xy is 9. Subtracting 6% of x from x is equivalent to multiplying x by how much ? ans 94 10. If 8% of x=4% of y, then 20% of x is 11. (X% of Y+Y%of X)=? Ans 2% of xy 12. If 90% of A=30% of B and b=x% of A, then x is equal to Ans:300 13. X% of Y is y% of? Ans:x 14. A number increased 37 % gives 33. The number is An:24 15. The number which when decreased by 27 % given 87 is An:120 16. 40 quintal is what percent of 2 metric tones? Ans:200% 17. If is known that 20% of the mangoes are rotten. If the number of rotten mangoes is 35, then the total number of mangoes is : An:175 18. If 70% of students in a school are boys and the number of girls is 504, the number of boyes is ans : 1176 19. A student has to secure 40% makrs to pass. He gets 178 marks and failse by 22 marks. The maximum marks are : ans 500 20. A house owner was having his house painted. He was advised that he would require 25kg of paint. Allowing for 15% wastage and assuming that the paint is available in 2 kg cans, what would be the cost of pain purchased, if one can cost Rs.16? Ans :Rs.240 21. A reduction of 12.5% in the price of a dining table brought down it sprice to RS.4375, the original price (in Rs.) of the table was: Rs.5,000 22. Of the total amount received by krian, 20% was spent on purchases and 5% of the remaining on transportation. If he is left with RS.1520, the initial amount was Ans:2000 23. Ina library 20% books are in Hindi, 50% of theremianing are in English and the remaining 9000 are in various other languages. What is the total number of books in English? 24. Avinash spends 30% of his income on scooter petrol, of the remaining on house rent and the balance on food. If he spends Rs.300 on petrol, then what is the expenditure on house rent? Ans:Rs.175

25. A man spends 35% of his income on house rent 75% of the reaming on other items. What percentage of income does he save An: 16.25

You might also like