Net Metering Application Form 1
Net Metering Application Form 1
Net Metering will provide a customer credit for the excess generated energy that flows
onto the distribution system according to the terms of ComEd’s Net Metering tariff, Rider
POGNM – Parallel Operation of Retail Customer Generating Facilities with Net
Metering. For Rider POGNM eligibility requirements and details please see
www.comedrates.com.
If ComEd is not your electricity supplier, you must contact your electricity supplier
directly for details about your electricity supplier’s net metering program, and to get an
enrollment form. Your electricity supplier will work directly with ComEd.
After receiving a completed Application, ComEd will review the Application for program
eligibility and mail a letter to you within 10 business days notifying you whether the
Application for Net Metering service is incomplete, approved, or denied.
Upon approval, you will be asked to sign an Interconnection Agreement and a Net
Metering Agreement to participate in Net Metering. ComEd will place your electric
service account under Rider POGNM. This includes the determination and installation of
the appropriate type of electric meter.
Date: ____________
Section 1. Net Metering Applicant’s Contact Information:
Name: __________________________________________________________________
Mailing Address: _________________________________________________________
City: ___________________________ State: ________ Zip Code: _______________
Telephone Number: ________________________________
Facsimile Number: _________________________________
E-Mail Address: ___________________________________
Total Nameplate Capacity of the Eligible Net Metering Facility (kW): ______________
Type of Facility:
Type of Facility
Prime Mover: The type of system that will produce the electric power. The term
“generator” is used to generically describe a system that produces electric power.
Fuel Type: The energy source for the generator.
NOTE: Please complete a separate Net Metering Application Form for each facility
type installed.
This Application must be completed in its entirety to be considered for Net Metering
service from ComEd under the provisions of Rider POGNM – Parallel Operation of
Retail Customer Generating Facilities with Net Metering (Rider POGNM).