100% found this document useful (2 votes)
2K views15 pages

NASC Scaffold Specification

National Access and Scaffolding Confederation (NASC) Scaffold Specification Template management guide NASC guidance 26th April 2011. Document is intended for use by any undertaking that has responsibility for the management, use, monitoring and provision of scaffolding.

Uploaded by

stephen155
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views15 pages

NASC Scaffold Specification

National Access and Scaffolding Confederation (NASC) Scaffold Specification Template management guide NASC guidance 26th April 2011. Document is intended for use by any undertaking that has responsibility for the management, use, monitoring and provision of scaffolding.

Uploaded by

stephen155
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

ScaffoldSpecificationTemplate

ScaffoldSpecificationTemplate
ManagementGuide

NASCGuidance
26thApril2011

National Access and Scaffolding Confederation (NASC)

__________________________________________________________________________
th

Page1of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

Publishedby:

NationalAccess&ScaffoldingConfederation
Email:[email protected]
Website:www.nasc.org.uk

NASC2011

Firstpublished2011

ThisguidehasbeenpreparedbytheNationalAccessandScaffoldingConfederation(NASC)
ScaffoldSpecificationWorkingGrouptoimprovethequalityofthescaffoldstructureserectedon
constructionsitesandotherworksofengineeringmaintenanceandwithinaccordancewith
currentlegislation,guidanceandprotocolandinturnminimisetheriskofaccidentorinjuryto
operativesworkingonornearthescaffoldandthegeneralpublic.

Thisdocumentisintendedforusebyanyundertakingthathasresponsibilityforthe
management,use,monitoringandprovisionofscaffolding.

Thisdocumentisformattedinatemplatestylethatwillallowsuchbusinessestoeasilyadopt
thisformat.Werecognisethatsomebusinessesmayhavetheirownpreferredmethodfor
distributionofthecontentandassuchthisdocumentisdeliberatelyinaneditableformatto
allowforlocalvariationsofdistribution,e.g.hardcopy,digital,onlinesoftwareetc.

Theguidehasbeenwrittenontheassumptionthattheexecutionofitsprovisionsisentrustedto
appropriatelyqualifiedandexperiencedpeopleandthatconstructionandsupervisionof
scaffoldswillbecarriedoutbycapableandexperiencedorganisations.

NASCshallbeundernoliabilityofwhatsoeverkindhowevercausedwhetherornotduetothe
negligenceorwilfuldefaultofNASCortheirservantsoragentsarisingoutoforinconnection
withthisdocumentoranypartthereof.

Amendmentsissuedsincepublication
Amd.No.
Date
Comments:

__________________________________________________________________________
th

Page2of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

Contents

1.

2.

3.

APPLICATION

2.1 Tube&FittingScaffolding
2.2 SystemScaffolding
2.3 LightweightMobileTower

REGULATIONS,CODESOFPRACTICE&BESTPRACTICE

COMPETENCE

4.1 ScaffoldingCompanies

4.2 ScaffoldingOperatives

4.2.1 ScaffoldingLabourer

4.2.2 TraineeScaffolder

4.2.3 Scaffolder

4.2.4 AdvancedScaffolder

SCAFFOLDERSSAFETYANDPPE

5
5
6
6
6
6
7

SCAFFOLDINGDESIGN

MINIMUMSCAFFOLDREQUIREMENTS

6.1 ScaffoldTube

6.2 ScaffoldBoards

6.3 ScaffoldFittings

6.4 Brickguards,SheetingandDebrisNetting
6.5 LoadingBays

6.6 Access/EgresstoScaffolds

6.7 InternalEdgeProtection

6.8 ScaffoldTies
6.9 HopUp/StageBrackets

9
9
9
9
9
9
10
10

11

SCAFFOLDHANDOVERSANDSTATUTORYINSPECTIONS

11

RISKASSESSMENTSANDMETHODSTATEMENTS

12

AppendixA NASCguidancelistingreferredtowithinthisdocument

13

4.

5.

6.

7.

8.

AppendixB

AppendixC

PageNo.

4
4
4
4

ExampleofCISRSScaffolderscards

14

ScaffoldInspectionReportSheet

15

__________________________________________________________________________
th

Page3of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

1. APPLICATION

Thisspecificationidentifiestheminimumrequirementsandstandardsforallscaffolding
andedgeprotectiondesigned,erected,altered,inspected,usedand/ordismantled.
Thisspecificationmaybeenhancedbyanindividualcompanysspecificscaffolding
policyandbranding.

Hoists,Ladders,StepladdersandPodiumStepsarenotincludedaspartofthis
standard.

1.1. TubeandFittingScaffolding

Thisappliestotraditionalsteeltubeandfittingscaffoldsandincludestheuseof
systemtypecomponentssuchasReadylokorEasifixtransoms,extending
transoms,steelandaluminiumladderbeamsandunitbeams.Allsuch
componentsmustbeusedinstrictaccordancewiththemanufacturers
instructions/designguidance,andtheinformationsuppliedtositeupon
request.

1.2. SystemScaffolding

Alltypes/brandsofSystemsScaffoldingusedonsitemustconformtothe
relevantBritishandEuropeanStandardsBSEN12810/12811.Theleadhandofa
scaffoldgangusingsystemsscaffoldingmusthavesuccessfullycompletedthe
relevantCISRSSystemsproducttraining.CISRSScaffoldersorTraineeoperatives
willbeable,asamemberofthissquadtoerect,alterordismantlethis
equipmentunderthedirectsupervisionoftheCISRSsystemsqualifiedoperative
priortothemcarryingouttherequisiteCISRStraining.

Seewww.cisrs.org.ukforthecurrentlist.

1.3. LightweightMobileTower

Anominatedpersonispermittedtoerect,inspect,use,move,alterand/or
dismantlealightweightMobileToweriftheyarecompetentandholda
recognisedqualificationspecificallyincludesmobiletowers.

Mobiletowersmustbeinspectedasoftenasisnecessarytoensuresafety.
Recommendedbestpracticeisthattheybeinspectedandareportmadebya
competentpersonafterassembly,orsignificantalteration,andbeforeuse.
Thereafter,theyshouldbeinspectedasoftenasnecessarybutatleastevery7
days,orafteranyeventlikelytohaveaffectedstabilityorstructuralintegrity,
suchasadverseweatherconditions.But,thereisnoneedtoinspectand
reporteverytimethemobiletowerismovedatthesamelocation.
Note:RefertorelevantindustryassociationPrefabricatedAccessSuppliers&
ManufacturersAssociation(PASMA)websitewww.pasma.co.ukformoreinformation.

Deleted:
Deleted:

__________________________________________________________________________
th

Page4of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

PASMAhasagreedwiththeHSEthatthecompletionandaffixingofaPASMATower
InspectionRecordsatisfiestheregulatoryrequirementtorecordtheinspectionand
delivertothepersonforwhomitwascompleted.

2. Regulations,CodesofPracticeandbestpracticerequirements

Allscaffoldingworksshallbecarriedoutinaccordancewiththefollowing
Regulations,CodesofPracticeandindustrybestpracticerequirements:
2.1. TheHealthandSafetyatWorketcAct1974
2.2. TheManagementofHealthandSafetyatWorkRegulations1999asamended
2.3. TheWorkatHeightRegulations2005asamended
2.4. TheConstruction(DesignandManagement)Regulations2007
2.5. BSEN128112003Scaffoldsperformancerequirements
2.6. BSEN128102003Facadescaffoldsmadeofprefabricatedcomponents
2.7. NASCTG20GuidetoGoodPracticeforScaffoldingwithTubesandFittings.
(LatestEdition)
2.8. NASCSG4Preventingfallsinscaffolding(LatestEdition)
2.9. CISRSCAP609GeneralInformation(LatestEdition)
2.10. BSEN13374Temporaryedgeprotectionsystems
THISLISTISNOTEXHAUSTIVE.

3. COMPETENCE
3.1. ScaffoldingCompanies
3.1.1. ShouldbefullandregulatedmembersoftheNASC.
3.1.2. Theymustmaintaincurrentinsurancesofaminimumof10millionfor
EmployersLiabilityand5millionforPublicLiability.
3.1.3. Theymustbeabletodemonstratethattheyhavecompetentsupervision
(e.g.CISRS5dayScaffoldSupervisortrainingcourseandholdaCISRS
ScaffoldSupervisorcard).
3.1.4. AqualifiedCISRSScaffolderorCISRSAdvancedScaffolderworkingwithin
hiscapabilityissuitablyqualifiedtoleadthescaffoldoperationswithina
gang/squadofscaffoldersandtodirectthepracticaloperationsonsite.
3.1.5. Theymustemploycompetentscaffoldersforthetypeofscaffoldingto
beundertakenonsiteasdefinedinitem3.2below.
3.1.6. Management,Supervisionandoperativesmusthavereceivedrelevant
trainingonTG20andSG4(LatestEditions)
3.1.7. Thecompanymusthaveaccesstocompetentscaffolddesigners.
__________________________________________________________________________
th

Page5of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

3.1.8. Thecompanymustensurethatalldeliveriesofscaffoldingmaterialsare
undertakeninasafemannerandconsiderationisgiventotheriskof
fallsfromvehiclesandassuchthisworkisundertakeninlinewithNASC
SG30(LatestEdition)WorkingfromVehicles.
3.1.9. Alldeliverieswherepoweredliftingisused(e.g.:HIAB)willrequireproof
ofOperatorcompetenceandthattheliftingequipmenthasacurrent
certificateoftestandthoroughexamination.
3.2. ScaffoldingOperatives
3.2.1. ScaffoldingLabourers
3.2.1.1. Labourersmusthavereceivedscaffoldingmanualhandling
traininginaccordancewithNASCGuidanceNoteSG6Manual
Handling.
3.2.1.2. Labourersmustbeadequatelytrainedtoallowthemtocarryout
theirdutiessafely
3.2.1.3. ACISRSScaffoldersLabourerscardisavailableforoperatives
carryingouttheseduties
3.2.1.4. Labourersareonlyallowedtoworkatgroundlevelorwithsafe
accesstoafullyboardedanddoubleguardrailedsectionofa
scaffoldplatformpassingscaffoldingequipment.
3.2.2. TraineeScaffolder
3.2.2.1. Traineesmusthavereceivedscaffoldingmanualhandling
traininginaccordancewithNASCGuidanceNoteSG6Manual
Handling.
3.2.2.2. TheymustholdacurrentCISRSTraineeScaffolderscard
(SeeappendixA)
3.2.2.3. ThemusthavereceivedSG4(LatestEdition)trainingandworkin
compliancewiththeguidance
3.2.2.4. TheycanonlyworkunderthedirectsupervisionofeitheraCISRS
ScaffolderorCISRSAdvancedScaffolderatalltimes.
3.2.2.5. AnoperativeisconsideredaTraineeScaffolderuntiltheyhave
completedallrequisitetrainingandassessmenti.e.CISRSPart1,
CISRSPart2,S/NVQ2,H&StestingandholdaCISRSScaffolder
Card,irrelevantoftheirtimeintheindustry.
3.2.3. Scaffolder
3.2.3.1.

TheScaffoldermustholdacurrentCISRSScaffolderscard
(seeappendixA)

3.2.3.2.

TheymusthavereceivedSG4(LatestEdition)trainingandworkin
compliancewiththeguidance

__________________________________________________________________________
th

Page6of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

3.2.3.3.

Theleadhandofascaffoldgangusingsystemscaffoldingmust
havesuccessfullycompletedtherelevantCISRSSystemsproduct
training.

3.2.3.4.

Scaffolderscanworkonthefollowingstructures:

Independenttiedscaffolding

Putlogscaffolding

Birdcagescaffolding

Towerscaffolding(steel)

Trussoutscaffold

Scaffoldswithbeams

Protectivefans

Pavementgantry

Loadingbay

Roofsaddlescaffold

Splayscaffold

Roofedgeprotection

Tietesting

TheyareentitledtoworkonAdvancedorcomplexdesign
structuresbutonlyunderthedirectsupervisionofan
AdvancedScaffolder.

THISISNOTANEXHAUSTIVELIST

3.2.4. AdvancedScaffolder
3.2.4.1.

MustholdacurrentCISRSAdvancedScaffolderscard
(seeappendixA)

3.2.4.2.

TheymusthavereceivedSG4(LatestEdition)trainingandworkin
compliancewiththeguidance

3.2.4.3.

Theleadhandofascaffoldgangusingsystemsscaffoldingmust
havesuccessfullycompletedtherelevantCISRSSystemsproduct
training.

3.2.4.4.

Advancedscaffolderscanworkonanytubeandfittingsteel
scaffoldingstructureincludingthefollowing:

Tubulardropscaffoldfromsteelwork
Cantileverdropscaffold
2CordRakingshore
3CordRakingshore

__________________________________________________________________________
th

Page7of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

Deadshore
Flyingshore
Temporaryroofscaffold
Stairways
Ramps

THISISNOTANEXHAUSTIVELIST

4. SCAFFOLDERSSAFETYANDPERSONALPROTECTIVEEQUIPMENT
4.1. ScaffoldersshallatalltimeswearthefollowingminimumPPEatalltimeswhilst
workingonsite:
4.1.1. Safetyhelmet
4.1.2. Safetyfootwear
4.1.3. HighVisibilityvest.
4.1.4. Gloves
4.1.5. Fallarrestharnesswithreardorsalring,afallarrestlanyardand55mm
openingscaffoldconnectorsasdetailedinNASCSG4(LatestEdition)
4.1.6. OtherPPEasrequiredbytheworktaskorlocalsiterequirements
4.2. Wheneverharnessesbeingareused,rescueplan(s)inlinewithNASCSG19
(LatestEdition)GuidetoFormulatingaRescuePlanmustbeinplacebefore
commencementofworkonsite.
4.3. AllscaffoldingshallbeerectedinstrictaccordancewithNASCSG4(Latest
Edition)andcontractorsshalladheretorecommendedmethodsofworkwithin
theguidance,givingcollectivemethodspriorityoverothermethodswhere
practicable.
4.4. AllScaffoldingmaterialsmustbepassedfromhandtohandorraisedand
loweredinacontrolledmanner.(lightlineorGinWheel&Ropeetc)The
uncontrolledpassingordroppingofanyscaffoldingmaterialsisnotpermitted.
Note:NASCGuidanceNoteSG6ManualhandlingintheScaffoldingIndustry
containsfurtherguidance.
4.5. AllliftingoperationsmustbeundertakenwithinthescopeoftheLifting
Operations&LiftingEquipmentRegulations(LOLER)

5. SCAFFOLDINGDESIGN

5.1Whereadditionalscaffoldingdesigninputisrequired(i.e.:thosescaffoldsthat
arenotdesignatedasaBasicScaffoldinNASCTG20LatestEdition)thedesign
shallbeprovidedbyacompetentscaffolddesignerandtheappropriatedesign
standardfollowed.Thecostsofproducingandamendingdesignschemes
(whererequired)willbereflectedwithinthescaffoldcontractorsquotationetc.

__________________________________________________________________________
th

Page8of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

5.2Allsystemscaffoldingistobeerectedinaccordancewiththemanufacturers
designmanual/erectionguideorbesubjecttoaspecificdesign.

5.3 Wheredesigndrawingsareproduced,theyshallincludeanelevationofthe
scaffoldwithalltiepositionsmarkedonthedrawingclearlystatingtherequired
tieclassificationlightduty(3.5KN),standard(6.1KN)orheavyduty(12.2KN).

5.4 Whereappropriate,standardscaffolddesignsolutionsmaybepermittedto
determinedesigninputofcertainscaffoldstructures(Stairtowersetc)

5.5 Asystemforthemanagementofdesignvariationsshallbeinplace.

5.6 Copiesofscaffolddesigndrawingsshallbeissuedto/heldonsite.

6. MINIMUMSCAFFOLDREQUIREMENTS
Thefollowingminimumscaffoldrequirementsshallbeinplaceonallsites:

6.1. ScaffoldTube
AllscaffoldtubemustbegalvanisedandcomplywithBSEN39:2001orBSEN
1021012006andtobemarkedinsuchawayastoidentifythescaffolding
companywhoownit.

6.2. ScaffoldBoards
6.2.1. AllscaffoldboardsmustcomplywithBS2482:2009

6.2.2. Shortboards(lessthan2.14metreslong)aretobesecuredtoprevent
displacementasareinternalboardsthatareconsideredlikelytobe
displacedaccidently.

6.2.3. Otherthanatreturnsofscaffoldslappedboardstobeavoidedsofaras
reasonablypractical.

6.3. ScaffoldFittings
6.3.1. AllscaffoldfittingsmustcomplywithcurrentUKindustrystandards.
(BSEN74etc)

6.4. Brickguards,SheetingandDebrisnetting
6.4.1. Inaccordancewiththecontractspecifications,(whichshouldincludea
suitableriskassessmentbythemaincontractor)scaffoldsmayrequire
brickguards,sheetingordebrisnettingfitted

6.5. ScaffoldLoadingBays
6.5.1. AllScaffoldloadingbays(exceptwherecranesareused)shallbefitted
withscaffoldloadingbaygatesthatprotectoperativesfromtheexposed
edgewheninanopenpositionandpreventfallsofoperativesand/or
materialswheninaclosedposition.

__________________________________________________________________________
th

Page9of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

6.5.2. Scaffoldloadingbaystobeprovidedwithbrickguardsorsimilar
protectiontotheperimeter.

6.5.3. Scaffoldloadingbaysmusthaveclearsignagetoprovideuserswithclear
informationregardingsafeworkingloads.

6.6. Access/egresstoScaffolds
6.6.1. Access/egresstoscaffoldsmustbeprovidedinordertocomplywiththe
WorkatHeightRegulations2005,HSEguidanceandNASCSG25(Latest
Edition)Accessandegressfromscaffolds,withregardtothehierarchy
asfollows:

6.6.2. Externalladderaccessshouldbeprovidedtonomorethantwolifts
(Nominally4m)

6.6.3. Considerationsthatneedtobemaderegardingtheassessmentof
suitableaccessandegressfromscaffoldsmayinclude:
Heightandwidthofscaffold.
Numberofpeopleusingthescaffoldatanyonetime.
Durationofscaffoldhire.
Localemergencyrequirements.(Fire,evacuationetc.)
Typeofworktobeundertakenonscaffold(e.g.accesstoconfinedspaceentry
workandasbestosremovalenclosureswhilstusingfullfacerespiratorsetc.
requiresahigherdegreeofassessmentforaccessandegress).

6.7. InternalEdgeProtection
6.7.1.InternaledgeprotectiononscaffoldplatformstoconformtoNASCSG29
(LatestEdition)InternalEdgeProtectiononScaffoldPlatforms

6.8. ScaffoldTies
6.8.1. Allconcrete/masonryanchorsthatareusedfortheinstallationof
scaffoldtiesmustbetestedinaccordancewithNASCTG4(Latest
Edition)Anchoragesystems(i.e.:minimumof3perscaffoldor5%of
totalnumberoftieswhicheveristhegreater)withaproofloadof1.5
timestherequiredtensileloadusingapurposemadescaffoldtietester.
Recordsoftietestresultmustbemaintained.

__________________________________________________________________________
th

Page10of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

6.8.2. Whenworkingondomesticpremisestheoccupiermustbeinformed
priortoanydrillingtakingplaceformasonryanchors,orwhereitmaybe
necessarytorakeoutbrickworkjointstosupportaputlogscaffold.

6.9. HopUp/StageBrackets
6.9.1 Hopup/stagebracketsshallbeusedinaccordancewithNASCGuidanceNote
SG32GuidanceontheProvisionofInsideBoardBrackets(Hopup/Stepdown)
(LatestEdition).

7. SCAFFOLDHANDOVERSANDSTATUTORYINSPECTIONS

7.1. AllScaffoldingshoulduseaDONOTUSEnoticeforrestrictingaccesstothe
scaffolduntilthescaffoldinghasbeeninspectedandhandedoverforuse.

ScaffoldHandover

7.2. Wheneachscaffoldiscompleted,acompetentemployeeoftheScaffolding
Contractorwillinspectthescaffoldforcompliancewithregulations,codesof
practiceandthispolicyandthencompleteaScaffoldHandovercertificate.This
shouldconformtothecurrentNASCtemplateSG35HandoverofScaffold
Structures(LatestEdition)asaminimumandensurethattheclients
representativereceivesacopy.Whereapplicable,thegreeninsertofatagtype
inspectionsystem(ifused)shallbecompletedandlocatedattheaccesspoint
ofthescaffold,andthefirstentrymadeinthestatutoryscaffoldinspection
registerbythecompetentperson.

ScaffoldInspection

7.3. Regularstatutoryinspectionsofthescaffoldingshalltakeplaceatleastevery7
daysorafteranyeventlikelytohaveaffectedthescaffoldsstabilityand
recordedinthescaffoldregister(SeeappendixC).Thetagtypesysteminsert(if
used)willalsobeupdatedtorecordtheinspection.(Whereapplicable).
Note:Anytagsystemisasupplementarycheckonlyanddoesnotreplacethe
statutoryinspectionandreportasrequiredwithintheWorkatHeight
Regulations2005.

7.4. Allinitialandweeklyscaffoldinspectionsmustbeundertakenbyacompetent
personwhohasattendedanationallyrecognisedscaffoldinspectiontraining
course.(e.g.CISRSScaffoldInspectionTrainingScheme(SITS)Basicor
Advanced),alternativelyaCISRSScaffolderorAdvancedcardholdercanbe
deemedcompetenttoinspectstructuresuptothegradeoftheircardi.e.CISRS
ScaffolderBasicStructures,andAdvancedScaffolderallstructures.

__________________________________________________________________________
th

Page11of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

CISRSBasicand

AdvancedScaffold

inspectionCards

8. RISKASSESSMENTANDMETHODSTATEMENT

8.1. Eachindividualscaffoldstructuremusthaveajobandsitespecificrisk
assessmentrecordedinwritingwhichisacceptedbytheContractorthatthe
ScaffoldingContractorisworkingforbeforeworkcommencestoerect,alteror
dismantleascaffold.
8.1.1. AllriskassessmentwillbecarriedoutinlinewiththeScaffold
ContractorsHealthandSafetyPolicywhichasaminimumstandard
followNASCSG7:(LatestEdition)GuidetoRiskAssessments.

8.1.2. Allmethodstatementswillincludeafulldescriptionofthescaffold
includingsize,location,numberofboardedlifts,numberofworkinglifts,
sheetingstatusandloadingclassificationinlinewithTG20(Latest
Edition)table1andbeinlinewithNASCSG24(LatestEdition)AGuide
toScaffoldPlans(MethodStatements)

8.1.3. RiskAssessmentandMethodStatementsshallbecommunicatedto
operatives.CopiesofallRiskAssessmentsandMethodStatements
shouldbeheldasaminimumforthedurationofthecontract.

__________________________________________________________________________
th

Page12of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

APPENDIXALISTOFNASCREFERENCEGUIDANCEREFERREDTOWITHINTHIS
DOCUMENT

Note:RefertoNASCwebsiteatwww.nasc.org.ukforlatesteditionsoftheguidance
listedbelow.

Health&SafetyGuidanceNotes
SG4

PreventingFallsinScaffolding

SG6

ManualHandlingintheScaffoldingIndustry

SG7

GuidetoRiskAssessment

SG19

AGuidetoFormulatingaRescuePlan

SG24

AGuideforScaffoldPlans(MethodStatements)

SG25

AccessandEgressfromScaffolds

SG29

InternalEdgeProtectiononScaffoldPlatforms

SG30

WorkingfromVehicles

SG32

GuidanceontheProvisionofInsideBoardBrackets(Hopup/Stepdown)

SG35

HandoverofScaffoldStructures

TechnicalGuidanceNotes

TG4

AnchorageSystems

TG20

GuidetoGoodPracticeforScaffoldingwithTubesandFittings

CompetenceGuidanceDocuments

CISRSCap609GeneralInformationBooklet

__________________________________________________________________________
th

Page13of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

APPENDIXBEXAMPLEOFCISRSSCAFFOLDERSCARDS

Onlytoworkatgroundleveloronafully
boardedanddoubleguardrailedscaffold
platformpassingscaffoldingequipment.

Workunderthedirectandimmediate
supervisionofeitheraCISRSScaffolder
orAdvancedScaffolderatalltimes.

HaveaCISRSScaffolderscardendorsed
fortubeandfittingscaffoldingor
systemscaffoldtobeused.Canwork
onscaffoldslistedinSection3.2.3.4
andanyotherscaffoldnotincludedon
thislistbutonlyunderthedirectand
immediatesupervisionofanAdvanced
Scaffolder.

HaveaCISRSScaffolderscardendorsed
fortubeandfittingscaffoldingor
systemscaffoldtobeused
Canworkonanysteelscaffolding
structure.

CardisusedtoprovideproofthattheScaffold
Supervisoristrainedandcompetent.

__________________________________________________________________________
th

Page14of15
IssueDate:26 April2011

ScaffoldSpecificationTemplate

APPENDIXCSCAFFOLDINSPECTIONREPORTSHEET(EXAMPLE)
ScaffoldInspectionReport(inlinewithregulation12ofTheWorkatHeightRegulations2005)
CompanyName
&Address:

Sheet:

SiteAddress:
No

Locationanddescriptionof
workplaceinspected

Date&
Mattersobservedthatgiveriseto
Detailsofaction
Timeof
anyhealthandsafetyrisks
takenattimeof
inspection
inspection

Detailsofanyfurther
actionconsidered
necessary

Name,signature&
positionof
inspector

_______________________________________________________________________________________________________________________
IssueDate:26thApril2011

Page15of15

You might also like