100% found this document useful (1 vote)
363 views1 page

App1 - PC AND PV SUM

The document lists various provisional sums and prime cost sums totaling RM450,000 for a construction project. It includes sums of RM85,000 for landscaping, RM100,000 for work outside the boundary, RM65,000 for kitchen equipment, RM10,000 for contributions to authorities, RM150,000 for contingencies, and RM20,000 for telephone installation. Allowances are made for profits and attendance on the nominated subcontractors executing some of the work.

Uploaded by

dira_minho
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
363 views1 page

App1 - PC AND PV SUM

The document lists various provisional sums and prime cost sums totaling RM450,000 for a construction project. It includes sums of RM85,000 for landscaping, RM100,000 for work outside the boundary, RM65,000 for kitchen equipment, RM10,000 for contributions to authorities, RM150,000 for contingencies, and RM20,000 for telephone installation. Allowances are made for profits and attendance on the nominated subcontractors executing some of the work.

Uploaded by

dira_minho
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Final Exam 256BE_Appendix 1_Q1 (c )_ Page 1 of 1 PRIME COST AND PROVISIONAL SUM Item Description PRIME COST AND

PROVISIONAL SUM PROVISIONAL SUM The following Provisional Sums are to be expended as directed by the Architect or deducted wholly or in part if not required:A Provide the Provisional Sum of Ringgit Malaysia: Eighty Five Thousand Only (RM 85,000.00) for Hard and Soft Landscaping Provide the Provisional Sum of Ringgit Malaysia: One Hundred Thousand Only (RM 100,000.00) for Work Outside Boundary Provide the P.C Sum of Ringgit Malaysia: Sixty Five Thousand Only (RM 65, 000.00) for kitchen Equipment supplied and installed complete by a Nominated Sub-contractor Add for profit Allow for attendance as described in Prelimineries' upon Nominated Sub-contractor executing foregoing work including making good all trades after completion. Provide the Provisional Sum of Ringgit Malaysia: Ten Thousand Only (RM 10,000.00) for Contribution to Authorities Provide the Provisional Sum of Ringgit Malaysia: One Hundred Fifty Thousand Only (RM 150,000.00) for Contingencies/Adjustment Provide the P.C Sum of Ringgit Malaysia: Twenty Thousand Only (RM 20, 000.00) for Telephone Installation to be supplied and fixed complete by Nominated Sub-contractor Add for profit Allow for attendance as described in Prelimineries' upon Nominated Sub-contractor executing foregoing work including making good all trades and painting conduits and cutting chases. TO SUMMARY OF TENDER Unit Qty Rates RM

SUM

85,000.00

SUM

100,000.00

SUM

65,000.00

D E

SUM

10,000.00

SUM

150,000.00

SUM

20,000.00

J K

B5/SUM/1