App1 - PC AND PV SUM
App1 - PC AND PV SUM
PROVISIONAL SUM PROVISIONAL SUM The following Provisional Sums are to be expended as directed by the Architect or deducted wholly or in part if not required:A Provide the Provisional Sum of Ringgit Malaysia: Eighty Five Thousand Only (RM 85,000.00) for Hard and Soft Landscaping Provide the Provisional Sum of Ringgit Malaysia: One Hundred Thousand Only (RM 100,000.00) for Work Outside Boundary Provide the P.C Sum of Ringgit Malaysia: Sixty Five Thousand Only (RM 65, 000.00) for kitchen Equipment supplied and installed complete by a Nominated Sub-contractor Add for profit Allow for attendance as described in Prelimineries' upon Nominated Sub-contractor executing foregoing work including making good all trades after completion. Provide the Provisional Sum of Ringgit Malaysia: Ten Thousand Only (RM 10,000.00) for Contribution to Authorities Provide the Provisional Sum of Ringgit Malaysia: One Hundred Fifty Thousand Only (RM 150,000.00) for Contingencies/Adjustment Provide the P.C Sum of Ringgit Malaysia: Twenty Thousand Only (RM 20, 000.00) for Telephone Installation to be supplied and fixed complete by Nominated Sub-contractor Add for profit Allow for attendance as described in Prelimineries' upon Nominated Sub-contractor executing foregoing work including making good all trades and painting conduits and cutting chases. TO SUMMARY OF TENDER Unit Qty Rates RM
SUM
85,000.00
SUM
100,000.00
SUM
65,000.00
D E
SUM
10,000.00
SUM
150,000.00
SUM
20,000.00
J K
B5/SUM/1