Rescue Field Operations Guide
Rescue Field Operations Guide
US&R-23-FG
Level 3
Level 4
This document is consistent with and supports the Federal Response Plan for implementation of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. 5121, et seq. The most current copy of this document, including any change pages, is available through the FEMA Intranet in the National Emergency Management Information System (NEMIS) Reference L brary (http://nemis.fema.net), under Response and Recovery/Policies and Guidance, Disaster Operations Guidance.
15 Sep 2006
US&R-23-FG
FOREWORD This Rescue Field Operations Guide has been prepared to guide Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA) Rescue personnel during Federal disaster response operations. The National Urban Search and Rescue (US&R) Response System provides for the coordination, development, and maintenance of the Federal effort with resources to locate, extricate, and provide immediate medical treatment to victims trapped in collapsed structures; and to conduct other life saving operations. This guide is designed to supplement the National US&R Response System Field Operations Guide, September 2003 (US&R-23-FG) which provides the US&R Response System methods of operation, organization, capabilities, and procedures in mobilization, on-site operations, and demobilization. This guide provides a detailed reference for performing Rescue Operations. The content further elaborates on the content initially provided in US&R-23-FG. Questions, comments, and suggested improvements related to this document are encouraged. Inquiries, information, and requests for additional copies should be directed in writing to the Department of Homeland Security, Federal Emergency Management Agency, Response Division, Operations Branch, 500 C Street SW, Washington, DC 20472
15 Sep 2006
US&R-23-FG
Introduction: The Department of Homeland Security (DHS), Federal Emergency Management Agency (FEMA), developed the National Urban Search & Rescue (US&R) Response System to support the Emergency Support Function (ESF) #9 (Urban Search and Rescue) of the Federal Response Plan. Within this framework, resources are mobilized to respond to structural collapse and other incidents nationwide. Document Purpose: This DHS/FEMA US&R Rescue Operations Guide has been developed to support response resources during training and on missions. This guide supplements the National Urban Search and Rescue Response System FOG, September 2003 (US&R-2-FG). This guide is a compilation and summary of important strategic and tactical information, developed procedures, and reference material specifically for the performance of Rescue Operations.
15 Sep 2006
US&R-23-FG
Table of Contents
1. Onsite Information 1. Personnel Assignments 2. Radio Channels 3. Team Briefing Components 4. Squad POA Requirements Position Duties 1. RTM General Duties 2. RTM On Site Duties 3. RSO General Duties 4. RSO On Site Duties 5. Blank Medevac Procedures 1. Medevac Procedures 2. Helicopter Hand Signals 3. NATO Phonetic Alphabet BOO Setup 1. Requirements 2. Priorities 3. Assignments 4. Responsibilities 5. Setup Procedures 6. Cache Procedures 7. TFCP Procedures 8. Medical Procedures 9. Shelter Procedures 10. Sanitation/Hygiene Procedures 11. Community Tent Procedures 12. Security/Hazards Procedures 13. Tent Assignments 14. Sample Layout RECON/Marking Systems 1. Strategic, Management & Search Markings 2. Search & Recon Initial Tasks 3. Structure ID 4. FEMA Structures/Hazards Marking 5. FEMA Search Assessment Marking 6. FEMA Victim Location Marking 7. INSARAG Structure Assessment Marking 8. INSARAG Victim Location Marking 9. Recon Team Make-Up 10. Recon Operations 11. Site Assessment Forms 2-1 2-2 2-3 2-4 3-1 3-2 & 3 3-4 3-5 3-6 4-1 & 2 4-3 4-4 5-1 5-2 5-3 5-4 5-5 5-6 5-7 5-8 5-9 5-10 5-11 5-12 5-13 5-14 6-1 6-2 6-3 & 4 6-5 6-6 & 7 6-8 6-9 6-10 6-11 6-12 6-13 & 14
2.
3.
4.
5.
15 Sep 2006
US&R-23-FG
8. 9.
10.
15 Sep 2006
US&R-23-FG
Personnel Assignments
Rescue Squad: Squad Personnel Officer: 1(ASL): 2: 3: 4: 5: HM: Medic: TFL 1: RTM 1: LOG 1:
15 Sep 2006
Radio Channels
TFL 1 TFL 2
RTM 1
RTM 2
LOG 1
LOG 2
MED 1
MED 2
BOO 1
BOO 2
15 Sep 2006
US&R-23-FG
1-2
15 Sep 2006
US&R-23-FG
1-3
15 Sep 2006
US&R-23-FG
1-4
Functional requirements Work schedules and rotation periods Adequacy of support facilities
Coordinate activities with Search & Recon Assist in development of team action plan Coordinate objectives and personnel assignments Ensure proper worksite setup, control & safety Evaluate operations and modify as needed Evaluate capacity of resources to complete assignment Order additional resources as needed
15 Sep 2006
US&R-23-FG
2-2
15 Sep 2006
US&R-23-FG
2-3
15 Sep 2006
US&R-23-FG
2-4
NOTES: _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________ _____________________________________________________
15 Sep 2006 US&R-23-FG 2-6
Medevac Procedures
Select and Secure Landing Site:
Size depends on number and type of aircraft Ground slope <15 degrees Ensure surface free of rocks and debris Avoid dust, sand and snow Ensure ground firm enough to prevent aircraft from bogging down during loading/unloading At approach/departure ends, clearly mark obstructions that cannot be removed Ensure 10:1 horizontal clearance to vertical obstructions Mark landing/touchdown site Use smoke, signalman and or lights When dark, mark touchdown point with inverted Y composed of four lights
15 Sep 2006
US&R-23-FG
3- 1
Medevac Procedures
Night Marking of Landing Zones
Right Stem
Note: The touchdown point will be midpoint of the legs of the Y. If more than 1 small aircraft will land, add 1 additional light at the exact point each is to land. If more than 1 large aircraft will land, add 2 lights placed 10mm apart aligned in the direction of flight.
15 Sep 2006
US&R-23-FG
3-2
15 Sep 2006
US&R-23-FG
3- 3
N - November O - Oscar P - Papa Q - Quebec R - Romeo S - Sierra T - Tango U - Uniform V - Victor W - Whiskey X - X-ray Y - Yankee Z - Zulu
US&R-23-FG 3-4
15 Sep 2006
US&R-23-FG
4- 1
15 Sep 2006
US&R-23-FG
4-2
Squad 2:
Assigned to tent ________________ Personnel Shelter setup (Priority 1)
Squad 3:
Assigned to tent ________________ Cache setup & organization (Priority 1)
Squad 4:
Assigned to tent ________________ Cache setup & organization (Priority 1)
15 Sep 2006 US&R-23-FG 4- 3
Cache Setup and Organization (Priority 1) Log Chief, Log Specialists, Squads 3 & 4 TFCC Setup (Priority 1) Task Force Leader, Plans Chief, Comm
Specialists, Technical Info Specialist & Safety
Medical Treatment Area Setup (Priority 1) Medical Manager & Medical Specialists Personnel Shelter Setup (Priority 1) Squad 2 Sanitation/Hygiene Issues (Priority 2) Safety Canine Exercise Area (Priority 3) Search Team Manager & Canine Specialists Community Tent Setup (Priority 3) Log Chief & Technical Info Specialist
15 Sep 2006 US&R-23-FG 4-4
2 - 100ft tapes, roll fireline tape, BOO signs, digital camera, vests, chalk, binoculars & paint
Layout and identify sections with signs and fireline tape Entrance should be adjacent to main access or travel route Mark ground for location, dimension and spacing of each section and tent Identify travel/access routes Ensure fire extinguishers and signs are present Generators placed on perimeter near section to be powered Identify remote fuel storage area Post signs for all sections and each tent
15 Sep 2006 US&R-23-FG 4- 5
4 rows Rescue 1 row Technical 1 row WMD (as needed) 1 row Logistics
Erect 19x35ft Western Shelter tent for weather sensitive equipment and office Provide electricity and light Identify empty boxes for counter space/seating Provide tarps/sheeting for weather/security
15 Sep 2006
US&R-23-FG
4-6
Command and Control Workspace Communications Equipment setup Plans/Technical Information workspace
US&R-23-FG 4- 7
15 Sep 2006
Patient treatment area, with privacy Acute care equipment Office workspace with shelving and seating
15 Sep 2006
US&R-23-FG
4-8
15 Sep 2006
US&R-23-FG
4- 9
15 Sep 2006
US&R-23-FG
4 - 10
15 Sep 2006
US&R-23-FG
4- 11
Identify/Mark Hazards within or adjacent to the BOO Isolate fuel storage Provide fire extinguisher at fuel storage and refueling locations Post No Smoking signs as appropriate Cover cache, supplies and equipment as appropriate Request additional generators/lighting for improved safety/security Post and announce plan for evacuation and assembly points Identify availability of local police/military
15 Sep 2006
US&R-23-FG
4 - 12
Tent
A B C D E F G H I Medical Comm Log
15 Sep 2006
US&R-23-FG
4- 13
Medical
A B C D
15 Sep 2006
I H G E
US&R-23-FG
F
4 - 14
Strategic Considerations
The most effective rescue strategy should blend all viable tactical capabilities into a logical plan of operation. The general strategic considerations are outlined as follows:
Search Phases
There are generally five phases of organized search and rescue operations at collapse incidents: Phase One: Assessment of the collapse area. Phase Two: Removal of all surface victims as quickly and safely as possible. Phase Three: Search and rescue of victims from accessible void spaces. Phase Four: Selected debris removal to locate and rescue victims. Phase Five: General debris removal. Usually conducted after all known victims have been removed.
15 Sep 2006 US&R-23-FG 5- 1
15 Sep 2006
US&R-23-FG
5-2
Structure Identification
If no numbers known, use low #s
800
1000
Quadrant ID
Quad B Quad E Quad A Front Quad D Quad C
Floor ID
Floor 3 Floor 2 Floor 1 Basement 1 Basement 2 Basement 3 (Use arrow to designate best entry point)
Ground Level
15 Sep 2006
US&R-23-FG
5-4
Structure not safe for normal US&R operations Extensive safety measures must be taken before entry
15 Sep 2006
US&R-23-FG
Single slash upon entry into structure TF ID, date & entry time noted Indicates ongoing search
18SEP00 2130
Crossing slash upon exit Upon exit, date and time noted in top field Additional information placed in open areas of X Right - hazards Bottom - # of victims
When new search completed, cross out previous, and complete new search assessment marking
15 Sep 2006
US&R-23-FG
5-6
RATS
F 1- 4 F 5 Q A/B or No Entry
When search terminated prior to completion: Place filled circle at center of slash Add date & time search terminated in top field Note hazards to right Note victims beneath Place box below slash, & Note areas searched Use F to ID floors searched Use Q to ID quadrants searched If only searched Exterior, as in Hurricane, write No Entry in box
US&R-23-FG 5- 7
15 Sep 2006
CA-TF2
CA-TF2
CA-TF2
V V V V
2 2 2
CA-TF2 5
V indicates potential victim location Arrow may be used to pinpoint location, add distance on arrow. Line through V indicates confirmed deceased victim. If more than one, mark total number under V. Circle around V indicates confirmed live victim. If more than one, mark number under V.
15 Sep 2006
US&R-23-FG
5-8
Hazard information
G or N
(Go/No Go) Team ID Time/Date of start Time/Date of end Persons unaccounted for: Location of other victims:
V V V V
L-4 D-3 L-4 D-3
Below V: Place L & # to denote live victims Place D & # to denote dead victims Draw arrow to pinpoint confirmed victim Confirmation must be visual or audible, canine cannot confirm Circle marking when last live victim is removed or place line through V when only dead victims remain
15 Sep 2006
US&R-23-FG
5 - 10
15 Sep 2006
US&R-23-FG
5- 11
Recon Operations
Identify buildings Structure/hazards marking Area/building search Search/assessment marking Assess void space and atmospheric conditions Victim location identification Sketch search area and record information Communicate findings to appropriate manager
15 Sep 2006
US&R-23-FG
5 - 12
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
Site Assessment
Date: Time: Site#: Type of Occupancy: GPS: # of levels: Above ground: Below ground: Possible # of victims/location:
Hazards:
Water Other
5- 13
Sketch:
15 Sep 2006
US&R-23-FG
5 - 14
LCES
Lookouts
Appoint site Safety Officer Observe only
Communications
Request radio channel(s) Review evacuation signals
Escape Routes
Pre-established path to safe area
Safe Zones
Pre-established areas of refuge Pre-identified assembly area
15 Sep 2006
US&R-23-FG
6- 1
90 Degree
60 Degree
45 Degree
30 Degree
1000lbs 450 kg
1000lbs 450 kg
1000lbs 450 kg
Vertical 1x Rating
15 Sep 2006
Basket 2x Rating
US&R-23-FG
CRANE SIGNALS
15 Sep 2006
US&R-23-FG
6- 5
Cribbing
4x4 - 6000lbs (2700kg) per full contact point 6x6 - 15,000lbs (6750kg) per full contact point Overlap corners by 4 (10cm) Up to 15 degree slope max. (3 feet in 10 feet)
15 Sep 2006
US&R-23-FG
6-6
Window/Door
1 - Header 1 - Sole plate 2 - Posts 4 - Pair 2x4 wedges 1 Triangle Gusset 3 - Cleats 2 - Diagonals At least 1 (2.5cm) of header depth for each foot of horizontal opening spanned. (4x4 minimum)
15 Sep 2006
US&R-23-FG
6- 7
Window/Door Prefab
1 - Header 1 - Sole plate 2 - Posts 5 - Pair 2x4 wedges 8 Triangle Gussets At least 1 (2.5cm) of header depth for each foot of horizontal opening spanned (4x4 minimum)
15 Sep 2006
US&R-23-FG
6-8
Temporary T
1 - Header 1 - Sole plate 1 - Post 1 - Pair 2x4 wedges 2 Full-Gusset plates 1 Half-Gusset or Cleat Up to 11 ft (240cm) for 4x4 Up to 16 ft (360cm) for 6x6 3 ft header (90cm) gets 12x12 (30x30xcm) gusset plates
15 Sep 2006
US&R-23-FG
6- 9
Double T
1 - Header 1 - Sole plate
2 - Posts 2 - Pair 2x4 wedges 3 Dbl-Gusset plates 12x24 (30x60cm) 2 Half-Gussets or Cleats Up to 12 ft (240cm) for 4x4 Up to 18 ft (360cm) for 6x6 3 ft header (90cm) Post Spacing is 18 to 24 inches out to out
15 Sep 2006
US&R-23-FG
6 - 10
Vertical
1 - Header 1 - Sole plate 3 - Posts 3 - Pair 2x4 wedges 5 Half- Gussets 2 2x6 Diagonals Mid point brace if needed, use 1x6 or x 6 ply strip Post spacing is 1ft per 1in of header depth on center (3-4ft or 90-120cm) Overhand of 1ft (30cm) Mid point brace needed for: 4x4 over 8ft (240cm) tall 6x6 over 12ft (360cm) tall
15 Sep 2006
US&R-23-FG
6- 11
Laced Post
2 - Headers 2 - Sole plates 4 - Posts 8 - Horizontals 4 - Pair 2x4 wedges 8 - Diagonals 8 Half- Gussets Post spacing is 3 to 5 feet (90 to 150cm) 1 ft (30cm) overhang Lacing/bracing is 2x4 for 4x4 Lacing/bracing is 2x6 for 6x6 Add one horizontal & one diagonal to each side if over 11 ft (330cm) tall
15 Sep 2006
US&R-23-FG
6 - 12
Horizontal
Shims go on 2 - Wall plates undamaged side 3 - Struts 3 - Pair 2x4 wedges 7 - 4x4 wedges (9 if bottom strut not on floor) 1- Half-gusset (or Cleat) 2 - Diagonals 1 - Cleat
15 Sep 2006
US&R-23-FG
6- 13
Flying Raker
1 - Wall Plate 1 - Raker strut 1 - Cleat 2 Full- Gussets 2 - 2x6 Horizontal Braces 1 - U Channel Foot 1 - Pair 2x4 or 4x4 wedges
15 Sep 2006
US&R-23-FG
6 - 14
15 Sep 2006
US&R-23-FG
6- 15
15 Sep 2006
US&R-23-FG
6- 17
Insertion Point
Feet 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
15 Sep 2006
Strut Length
Inches 136 153 170 187 204 221 238 255 272 289 306 323 240 357 374 391 408 Cm 345 389 432 475 518 561 605 648 691 734 777 820 863 907 950 993 1036
6 - 18
Cm 244 274 300 335 366 396 427 457 488 518 549 579 610 640 671 701 732
US&R-23-FG
Insertion Point
Feet 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
15 Sep 2006
Strut Length
Inches 112 126 140 154 168 182 196 210 224 238 252 266 280 294 308 322 336 Cm 284 320 356 391 427 462 498 533 569 605 640 676 711 747 782 818 853
6- 19
Cm 244 274 300 335 366 396 427 457 488 518 549 579 610 640 671 701 732
US&R-23-FG
15 Sep 2006
US&R-23-FG
6 - 20
15 Sep 2006
US&R-23-FG
6- 21
15 Sep 2006
US&R-23-FG
6 - 22
15 Sep 2006
US&R-23-FG
6- 23
15 Sep 2006
US&R-23-FG
6- 25
15 Sep 2006
US&R-23-FG
6 - 26
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
1. Incident Name:
2. Date:
3. Time:
5. Leader:
6. Operational Period:
7.
8. Time:
15 Sep 2006
US&R-23-FG
7-1
Time:
Major Events:
15 Sep 2006
US&R-23-FG
7-2
MODERATELY SEVERE Severe chest tightness VERY SEVERE Bluish discoloration of skin Respiratory failure Coma
Diarrhea (rare)
Unconscious Seizures
SLUDGEM
Salivation
Lacrimation
15 Sep 2006
US&R-23-FG
8-1
RE L INED
ON
DO NEE LI R
S ROS OT C N
T CR OSS
Collapse/Hazard Zone
15 Sep 2006 US&R-23-FG 8-3
Evacuation Signals
Evacuate
3 Short blasts (Continually until all out) (1 Second each) 1 Long blast (3 Seconds) 1 Long and 1 short blast
Cease Operations
Resume Operations
Note if different:
15 Sep 2006
US&R-23-FG
8-4