Trabajo N°1 de Minerales: Equipo: Trituradora Giratoria

This document contains the summaries of two mineral processing simulations. The first simulation models a gyratory crusher processing 288 tons of material per hour. The second simulation models a gyratory crusher followed by a wet screen, processing 91 tons of material per hour. Both simulations provide detailed input data on the size distributions and characteristics of the feed and product materials, as well as the expected power requirements and sizes of the selected equipment.

Uploaded by

Sandra Ariana
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Trabajo N°1 de Minerales: Equipo: Trituradora Giratoria

This document contains the summaries of two mineral processing simulations. The first simulation models a gyratory crusher processing 288 tons of material per hour. The second simulation models a gyratory crusher followed by a wet screen, processing 91 tons of material per hour. Both simulations provide detailed input data on the size distributions and characteristics of the feed and product materials, as well as the expected power requirements and sizes of the selected equipment.

Uploaded by

Sandra Ariana
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

TRABAJO N1 DE MINERALES

EQUIPO: TRITURADORA GIRATORIA

*****************************
* MODSIM UNIT DESIGN REPORT *
*****************************

UNIT EQUIPMENT DATA SHEET - GYRATORY CRUSHER


********************************************
Unit number 1
MODSIM model name GYRA
Job name: Minerales I
Tonnage to be processed 288.0
Open side discharge setting 15.00

Size distribution in feed


Size % passing
cms
0.168
100.000
0.119
100.000
0.841E-01 100.000
0.595E-01 100.000
0.420E-01 100.000
0.297E-01 100.000
0.210E-01 100.000
0.149E-01 100.000
0.105E-01 100.000
0.744E-02 100.000
0.525E-02 100.000
0.372E-02 100.000
0.263E-02 100.000
0.186E-02 100.000
0.131E-02 100.000
0.929E-03 100.000
0.657E-03 100.000
0.465E-03 100.000
0.328E-03 100.000
0.232E-03 100.000
0.164E-03 100.000

tons per hour


cms

0.116E-03 100.000
0.821E-04 100.000
0.581E-04 100.000
0.00
0.000
Top size in feed is approximately 0.00 cms
Dimension A of crusher must be at least 0.00 cms
Minimum head diameter required to handle the tonnage.....
"Fall through" material in feed NaN percent.

Size distribution in product


Size % passing
cms
0.168
2.623
0.119
1.961
0.841E-01
1.464
0.595E-01
1.093
0.420E-01
0.815
0.297E-01
0.608
0.210E-01
0.453
0.149E-01
0.338
0.105E-01
0.252
0.744E-02
0.187
0.525E-02
0.140
0.372E-02
0.104
0.263E-02
0.077
0.186E-02
0.058
0.131E-02
0.043
0.929E-03
0.032
0.657E-03
0.024
0.465E-03
0.018
0.328E-03
0.013
0.232E-03
0.010
0.164E-03
0.007
0.116E-03
0.005
0.821E-04
0.004
0.581E-04
0.003

0.00

0.000

Impact work index of the material is 10.88 kWhr/ton


80% passing size in feed is 0.00 mms.
80% passing size in product is 208.53 mms.
Estimated power requirements -.459E+05 kW
Power requirement to allow for 35% surge capacity-.6197E+05 KW.
Crusher selected.....

Crusher capacity from manufacturer's tables.....tons per hour.


Number of crushers required......

EQUIPO: TRITURADORA GIRATORIA CON TAMIZADOR

*****************************
* MODSIM UNIT DESIGN REPORT *
*****************************

UNIT EQUIPMENT DATA SHEET - GYRATORY CRUSHER


********************************************
Unit number 1
MODSIM model name GYRA
Job name: Minerales II
Tonnage to be processed 90.72
Open side discharge setting 15.00

Size distribution in feed


Size % passing
cms
0.336
100.000
0.238
100.000
0.168
100.000
0.119
100.000
0.841E-01 100.000
0.595E-01 100.000
0.420E-01 100.000
0.297E-01 100.000
0.210E-01 100.000
0.149E-01 100.000
0.105E-01 100.000
0.744E-02 100.000
0.525E-02 100.000
0.372E-02 100.000

tons per hour


cms

0.263E-02 100.000
0.186E-02 100.000
0.131E-02 100.000
0.929E-03 100.000
0.657E-03 100.000
0.465E-03 100.000
0.328E-03 100.000
0.232E-03 100.000
0.164E-03 100.000
0.116E-03 100.000
0.00
0.000
Top size in feed is approximately 0.00 cms
Dimension A of crusher must be at least 0.00 cms
Minimum head diameter required to handle the tonnage.....
"Fall through" material in feed NaN percent.

Size distribution in product


Size % passing
cms
0.336
4.679
0.238
3.506
0.168
2.623
0.119
1.961
0.841E-01 1.464
0.595E-01 1.093
0.420E-01 0.815
0.297E-01 0.608
0.210E-01 0.453
0.149E-01 0.338
0.105E-01 0.252
0.744E-02 0.187
0.525E-02 0.140
0.372E-02 0.104
0.263E-02 0.077
0.186E-02 0.058

0.131E-02 0.043
0.929E-03 0.032
0.657E-03 0.024
0.465E-03 0.018
0.328E-03 0.013
0.232E-03 0.010
0.164E-03 0.007
0.116E-03 0.005
0.00
0.000
Impact work index of the material is 10.88 kWhr/ton
80% passing size in feed is 0.00 mms.
80% passing size in product is 208.08 mms.
Estimated power requirements -.102E+05 kW
Power requirement to allow for 35% surge capacity-.1380E+05 KW.
Crusher selected.....

Crusher capacity from manufacturer's tables.....tons per hour.


Number of crushers required......

NOTES:

UNIT EQUIPMENT DATA SHEET - WET SCREEN


**************************************
Unit number 2
MODSIM model name SCR1
Job name: Minerales II
PARAMETERS:

D50 size
100.0 microns
Water split to undersize 0.95
Sharpness parameter alpha 1.000
Particle size distribution in the feed.
Size % passing
mms
3.36
4.679
2.38
3.506
1.68
2.623
1.19
1.961
0.841
1.464
0.595
1.093
0.420
0.815
0.297
0.608
0.210
0.453
0.149
0.338
0.105
0.252
0.744E-01 0.187
0.525E-01 0.140
0.372E-01 0.104
0.263E-01 0.077
0.186E-01 0.058
0.131E-01 0.043
0.929E-02 0.032
0.657E-02 0.024
0.465E-02 0.018
0.328E-02 0.013
0.232E-02 0.010
0.164E-02 0.007
0.116E-02 0.005
0.00
0.000
Particle size distribution in the overflow.
Size % passing
mms
3.36
4.475
2.38
3.299
1.68
2.415
1.19
1.751

0.841
1.253
0.595
0.881
0.420
0.602
0.297
0.395
0.210
0.240
0.149
0.125
0.105
0.058
0.744E-01 0.031
0.525E-01 0.018
0.372E-01 0.011
0.263E-01 0.007
0.186E-01 0.005
0.131E-01 0.003
0.929E-02 0.002
0.657E-02 0.001
0.465E-02 0.001
0.328E-02 0.001
0.232E-02 0.001
0.164E-02 0.000
0.116E-02 0.000
0.00
0.000
Particle size distribution in the underflow
Size % passing
mms
3.36
100.000
2.38
100.000
1.68
100.000
1.19
100.000
0.841
100.000
0.595
100.000
0.420
100.000
0.297
100.000
0.210
100.000
0.149
99.688
0.105
90.676
0.744E-01 73.394
0.525E-01 56.975
0.372E-01 43.535
0.263E-01 32.999

0.186E-01 24.885
0.131E-01 18.698
0.929E-02 14.012
0.657E-02 10.482
0.465E-02 7.831
0.328E-02 5.845
0.232E-02 4.360
0.164E-02 3.250
0.116E-02 2.422
0.00
0.000