50% found this document useful (2 votes)
2K views

Blank Form Elemental Cost Analysis (ECA) - Form 3

This document provides a cost analysis breakdown for building construction by listing the major building elements and their associated sub-elements, including the substructure, superstructure, external walls, finishes, fittings and furnishings, services, and external works. It specifies the gross floor area and includes sections for specifications, measurements in square meters, and the tender date for the building project.

Uploaded by

Fatin Syahirah
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
2K views

Blank Form Elemental Cost Analysis (ECA) - Form 3

This document provides a cost analysis breakdown for building construction by listing the major building elements and their associated sub-elements, including the substructure, superstructure, external walls, finishes, fittings and furnishings, services, and external works. It specifies the gross floor area and includes sections for specifications, measurements in square meters, and the tender date for the building project.

Uploaded by

Fatin Syahirah
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ELEMENT COST ANALYSIS - Form 3 BRIEF SPECIFICATION GROSS FLOOR AREA: ELEMENT 1 Substructure 1A Piling 1B Work Below Lowest

Floor Finish 2 2A 2B 2C 2D 2E 2F 2G 2H 3 3A 3B 3C 3D 4 5 5A 5B 5C 5D 5E 5F 5G 5H 5J 5K 5L 6 6A 6B 6C 6D 6E Superstructure Frame Upper Floor Roof Staircase External Walls Windows & External Doors Internal Wall & Partition Internal Doors Finishes Internal Wall Finshes Internal Floor Finishes Internal Ceiling Finishes External Finishes Fittings and Furnishings Services Sanitary Appliance Plumbing Installation Refuse Disposal Air-conditioning & Ventilation System Electrical Installation Fire Protection Installation Lift & Conveyor Installation Communication Installation Special Installation Builder's Profit & Attendance on Services Builder's Work in Connection with Services External Works Site Work Drainage External Services Ancillary Buildings Recreational Facilities M2 TENDER DATE: SPECIFICATION