Description: Tags: 03session20
Description: Tags: 03session20
1
In this session….
Operations Update
Processing Changes for 2004-2005
Customer Service Update
Processing Issues
2
3
Direct Loan Processing
YTD – as of October 21, 2003
2002-2003 2003-2004
Originations (#) 3.4 million 2.4 million
Originations ($) $12.0 billion $10.5 billion
Actual
5.9 million 1.9 million
Disbursements (#)
Actual
$11.3 billion $4.4 billion
Disbursements ($)
% Substantiated 99.64% 98.01%
4
DLOS Archive and Shutdown
5
Direct Loan Closeout
6
Promissory Notes
The eMPN is a success!!
9
10
Establishing a Direct Loan
Award
Anticipated Disbursement information is required
on initial submission of all Direct Loan awards.
All anticipated and actual disbursements must be
reported when establishing an award.
The sum of the anticipated and actual disbursements
must be equal to the Award Amount.
13
Pennies will not be Processed
14
Reports
Schools will be able to define sort options, delivery
options, and format options on the web site for the
following reports:
30-Day Warning Report
Duplicate Student Borrower Report
Funded Disbursement Listing
Inactive Loan Report
Pending Disbursement Listing
SSN/Name/Date of Birth Change Report
School Account Statement (SAS)
Specific options will vary based on report.
More information on specific report options is available in
the Technical Reference Appendices published in
November 2003. 15
Reports
16
Message Class Options
Inbound Outbound
Receipts
to COD from COD
Non-program Specific
and Non-award Year COMRECIN COMRECOP COMRECOP
Specific
18
Message Class Options
The outgoing message class for the COD batch response
will correspond to the incoming message class the school
used to send the batch to COD.
The COD System will not validate the document content
with the incoming message class used for submission.
Each System Generated document type will be assigned
its own message class for Full Participants.
The 2004-2005 COD Technical Reference published in
November contains more information.
19
SAIG Transmission Header
SAIG has increased the variable BAT= field on the SAIG
Transmission Header (N*05/N*95) from 26 to 50 characters.
20
Campus-Based
COD will accept and process Full Participant Campus-Based award
and disbursement data for the 03-04 and 04-05 award years and
forward.
Federal Work Study
Perkins Loans
FSEOG
Full Participants can submit student level Campus-Based data to
COD via the COD web site and the Common Record.
Campus-Based award and disbursement data will be viewable on
the COD web site.
COD will not generate reports for Campus-Based data.
COD will not populate the FISAP using Campus-Based data.
21
Extended Full Participant
Deadline
COD will accept Phase-In Participant records in
2004-2005.
22
COD Web Site
23
Batch Search Results
24
COD Web Site
25
Batch Award Detail
26
COD Web Site
27
MPN Search Results
28
COD Web Site
29
Applicant Search
Search
30
Applicant Detail
31
Applicant Detail
32
COD Web Site
34
School Summary Financial Information
35
COD Timeline
36
37
COD Customer Service Statistics
As of October 21, 2003
38
COD Customer Service
Beginning in July 2003, call
volume exceeded the COD School
30,000 Relations Center’s projections
25,000 This resulted in increased hold
times and a higher call abandon
20,000
rate
Month Totals
15,000
Increased call volume represented
10,000 a 94% increase of total calls in the
5,000
COD School Relations Center
from last year to this year
0
Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03
40
COD Customer Service
41
How do I contact the COD
School Relations Center?
Email [email protected]
42
Where Can I Get More
Information?
IFAP Web Site (www.IFAP.ed.gov)
Common Origination and Disbursement page
Electronic Announcements, FAQs, COD Technical
Reference
43
44
Current COD Issues
Stuck Batches and Missing Acknowledgements
Description:
Batches not being processed/responded to within 48 hours of submission.
Stuck batches and missing acknowledgements impact schools’ ability to disburse
funds to students.
Stuck batches are caused when the processing of the batch is halted in COD by a
code or data issue that the system cannot handle.
Missing acknowledgements are typically caused in transmission from COD to the
school.
Status:
COD operations continuously monitors the COD system for stuck batches. A
dedicated team has been established to work these issues until they have been
resolved.
COD School Relations emails the school with the Batch ID when a batch has not
been processed/responded to within 48 hours.
During peak processing, COD processes an average of 9,000 records a week with
200 stuck/missing acknowledgement batches. During normal processing, COD
processes an average of 6,500 records a week with 40-60 stuck/missing
acknowledgements batches.
45
Current COD Issues
Edit 58 – Duplicate Records Edit Incorrectly Being Hit
Description:
COD has experienced a high volume of edit 58 rejects.
In some instances, COD incorrectly sends this edit on a record within a stuck batch
that has just recently been unstuck/processed by COD, despite the fact that the
school only submitted the record once.
Edit 58 is also returned when a school resubmits a record which was previously
submitted in a stuck or missing batch.
Additionally, EDExpress Software was resubmitting records rejected with edit 58.
Status:
COD is incorrectly identifying the records as a duplicate in the process of releasing a
stuck batch. Software development for this issue is underway.
Schools resubmit records previously submitted in a stuck or missing batch.
EDExpress is releasing a patch in November that will treat a record rejected with
edit 58 instead of a rejected record.
46
Current COD Issues
Status:
System enhancements are currently being tested for SAS booked date.
Discrepancy between Ending Cash Balance and Beginning Cash
Balance may still occur due to ongoing data clean ups.
COD is reviewing options to include past dated transactions in the
current month’s SAS.
47
Current COD Issues
Description:
While the Direct Loan Rebuild file is now available, some schools are
experiencing difficulty importing the file from SAIG.
Status:
The Direct Loan Rebuild file is now being created correctly and can be
requested via the web.
COD and SAIG are currently investigating the reason why some schools
are unable to import the file.
48
Current COD Issues
Description:
MPNs with expirations dates of 10 years appear on the COD web site
with a 1 year expiration date.
Status:
All MPNs have been cleaned up (149,000+) in the COD System. COD
is currently researching 8 MPNs to validate the appropriate expiration
date.
COD is verifying that all of the updated MPN expiration dates have been
passed on to Servicing and NSLDS.
49
Resolved COD Issues
Status:
Corrected software in October and sent updated acknowledgements to
schools.
50
Resolved COD Issues
Status:
When a Full Participant school submits a change record to an existing
award, MPN status = blank is incorrectly returned on the response.
This prevented some schools from being able to process
disbursements.
Software updated at the beginning of September.
Unsolicited p-note acknowledgements with correct status have been
sent to the affected schools.
51
Resolved COD Issues
Edit 12 – Name/DOB/SSN Verification Edit
Description:
COD incorrectly sent edit 12 when a school submitted an origination
for a student that has existing award on COD, where the student
identifier information on the origination differed from that on the
existing award. COD incorrectly recognized the new origination as an
identifier change and used the existing award identifier information
when attempting to match CPS. COD rejected the identifier change
for no CPS match.
Status:
Software updated in September.
Schools are now able to resubmit records.
52
Resolved COD Issues
02/03 Funding and Payment Issues
Description:
COD software issues for the 02/03 Award Year caused funding and
payment levels to be incorrect.
Status:
Software has been corrected.
Financial data for the 02/03 Award Year has been corrected for Direct
Loan schools.
53
Other COD Sessions
54