Reliance Industries Limited: Hazira Manufacturing Division
Reliance Industries Limited: Hazira Manufacturing Division
Aromatics
PTA-2
ETP
Guest House
Hazira progression
Plants CPP & U MEG 1 Shell Licensor Technology Startup May 1991 Sep. 1991 Capacity ( KTA )
Installed
60 MW 100
PVC
VCM PE 1 POY PP PSF PTA 1
Geon
Geon Du Pont Du Pont UCC Du Pont ICI
Dec. 1991
Apr. 1992 Jul. 1992 Dec. 1995 Sep. 1996 Sep. 1996 Jan. 1997
160
160 160 120 360 160 350
4
Hazira progression
Plants CPP 2 Cracker Aromatics S&W Licensor Technology Startup 1996-1998 Mar. 1997 HRI/Mobil Mar. 1997 Capacity ( KTA )
Installed
MEG 2
PE 2 PET
Shell
Nova Sinco
Mar. 1997
May 1997 Oct. 1997
120
200 80
PFF
MEG 3 PTA 2
Du Pont
Shell ICI
Oct. 1997
Oct. 1997 Nov. 1997
30
120 350
5
Cogeneration Plant At Hazira :The Cogeneration Plant was commissioned in September, 1991. Cogeneration is the combined production of Heat and Electric Power. Each cogeneration plant has Gas Turbines and 125 TPH Heat Recovery Steam Generator. The fuel for the Congeneration plant is natural gas and HSD.
FEATURES : Solid movement about 550 truck per day - POY, PSF, PP, PE, PVC, etc. // Liquid movement -- about 475 truck per day MEG, Bz, Xy, EDC, etc // Provision for moving out polymers and polyesters in bulk / containers // Provision for hopper car loading // Adequate tankages and warehousing capacities / loading-unloading facilities // Drumming facility for DEG and TEG
8
TECHNOLOGY
Design Documentation Process Management of Change
Hazard information
Sharing
HEALTH
Health Surveillance Medical Mutual Aid
Hazcom
TOP Managemen Support HSE Reporting Level Quantity / Quality of Resources Line Responsibility for HSE Management On going HSE Awareness & Training Continuous Improvement
PERSONNEL
Job Skills Contractors Fitness for Duty Safe Work Practice Initial Training
Emergency Treatment
CPR Training/
Employee Proficiency
ENVIRONMENT PROTECTION
Env. Protection
PRODUCT STEWARDSHIP
Consumer Premises Audit Transport
Emergency
Measures Statutory
Compliance
Env.
Monitoring
Team
Tanker Inspection
Process Engineering
Test runs & debottlenecking Energy Conservation
10
MECHANICAL Planning Inspection & Corrosion Condition Monitoring Contract Lineup Drawing & FCOs Documentation / Technical Library Machining & Overhauling ELECTRICAL Motor Over Hauling Relay Testing & Calibration Transformer Oil Filtration & Oil Checking
11
INSTRUMENTATION Testing & Calibration of Instruments / Control Valves Maintenance of Analyzer Maintenance of DCS Maintenance of PLCs Import Substitution POWER ELECTRONICS Telecommunication Plant Address System Fire Protection System Maintenance of UPS Power Electronics
CIVIL Maintenance of Buildings & Roads Mini Projects Execution Town Ship Maintenance
12
PreventiveMaintenance Schedules
Maintenance Cost
13
The MIS/IT department at hazira is centralised function for whole site looking after the followings Installation and maintenance of infrastructure required for IT Development, implementation and support of application system for areas of manufacturing and commercial (Now apart from SAP) Providing central help desk support to overcome user' problems in relation to computerised system
All the computer system and plant process control systems are connected to a system of network comprising of following
Fibre optic cable Switches PCs Modems UTP Cable Hubs Printers Servers
14
Hazira site is network is connected to Reliance group through settalite Insat 1C for the office of Makers-Mumbai, Patalganga and Jamnagar. This connection is also used for video conferencing between the offies working at these locations. The IT department is dividied in two sections 1, Infrastructure support activities Network extension and modification project Desktop support System operation support Network management E-Mail administration 2, Application Development and technical support activities Recording of system requirements Approval by HOD System analysis and design Programming, testing, implementation and documentation Testing Implementation and User' training Documentation
15
All the plants are designed and erected / constructed with due regards to the appropriate fire protection measures, [under relevant / adapted standards & codes of practices] broadly in terms of (i) safety distances between equipment as well as between the plants, (ii) fire / safety risk analysis including hazard operability study (hazop) and hazard analysis (hazan) (iii) isolation of process equipment including of emergency shut-down systems & (iv) passive fire protection viz. fire doors, fire barriers, fire resistant coatings & sealant etc.
16
19
20