Building Bye Laws

This document outlines a 6 stage process for ensuring a building design and construction complies with local building bye laws. It discusses identifying the applicable bye laws, classifying the building type, analyzing site layout and volumetrics, floor area and spatial requirements, lighting, HVAC, and other building services, to ensure all criteria are met before construction. The 6 stages provide a systematic approach to verifying jurisdiction, analyzing building type specifications, and checking site layout, access, services and more to comply with regulations.

Uploaded by

Anjali Katare
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
290 views

Building Bye Laws

This document outlines a 6 stage process for ensuring a building design and construction complies with local building bye laws. It discusses identifying the applicable bye laws, classifying the building type, analyzing site layout and volumetrics, floor area and spatial requirements, lighting, HVAC, and other building services, to ensure all criteria are met before construction. The 6 stages provide a systematic approach to verifying jurisdiction, analyzing building type specifications, and checking site layout, access, services and more to comply with regulations.

Uploaded by

Anjali Katare
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Building Bye Laws

An exhaustive checklist
Harsh Tiwari Rahul Upadhyay Anjali Katare Mohammed Roshan 111110014 111110016 111110022 111110033

Bye Laws
Building Bye Laws is a code of practice to be strictly followed throughout the design process as well as construction phase. It is the primary constraint guidelines that invariably determines the usability, access criteria, volumetric constraints, access and services, HVAC, water supply and sanitation, drainage and anything else that may have an impact, direct or indirect to the surroundings, the users of the structure as well as the building itself.

Stage 1
Identifying the region the site comes under.
Getting required building laws from concerned authorization body.
From Institute/concerned building From TnCP From municipality

Verifying Jurisdiction and validity of bye laws.


Inside the municipal limits of the city. Lies outside the jurisdiction of municipality.

Stage 2
Identifying the Building Type(s)
Verifying the category the intended building(s) belong(s) to.
Educational Institutional Residential Commercial Mixed Land Use Government (Eg. Military, air force, etc.) Temporary structure Any other---___________________________

Volumetric analysis of the building type(s).


Number of floors---G+_______ Basement if Any( specify number)----________

Stage 3
Site Layout
Questions
Offset of building Ground coverage Landscaping Height of the building Width of road in front of the site F.A.R. As Specified for the area

Bye-laws/ Standards
FrontRearOtherMaximumDetails if any Max. Permissible Height

At site

Remarks

Stage 5
Questions Floor Area analysis Accessibility Spatial distribution Vertical Connectivity Furniture Layout, If any Movement Analysis ElevatorStaircaseFire escapeBye-laws/ Standards At site Remarks

Stage 6
Questions Daylighting and artificial lighting specification HVAC Electrical Services Mechanical Services Plumbing Services Bye-laws/ Standards At site Remark