Sub-Sation Construction Presentation
Sub-Sation Construction Presentation
23-12-2010
No. Particulars Substations 400 KV 3 Nos. 220 KV 10 Nos. 132 kV 14 Nos. Total 27 Nos. Length of Transmission Lines 400 KV 756 CKM 220 KV 742 CKM 132 kV 660 CKM Total 2158 CKM
2
Details
1 400 KV Substation Malkaram 2 2nd Ckt. LILO to 220 KV Sivarampally SS 3 50 MVA PTR at Malkaram 220 KVSS 4 50 MVA PTR at Gachibowli 220 KVSS 5 50 MVA PTR at Jubilee Hills 13 KVSS 6 31.5 MVA PTR at Shamshabad 220 KVSS 7 50 MVA PTR at Ramachandrapuram 132 KVSS Total Cost
350.00 17-05-2010 3.18 03-06-2010 1.12 23-04-2010 5.31 05-06-2010 4.23 19-07-2010 2.35 31-08-2010 4.25 20-09-2010 370.44
3
1 2 3 4
Under Execution Under Execution Tenders under finalisation Tenders under finalisation Tenders under finalisation Work awarded Tenders under finalisation Tenders under finalisation Tenders under finalisation
Oct. 2010 Oct. 2010 Mar. 2011 Mar. 2011 Mar. 2011 Dec. 2010 Mar. 2011 Mar. 2011 Mar. 2011
Narayanaguda GIS 6 with XLPE Cable Mamidipalli Conventional 7 with OH Line LGM Pet Conventional 8 with OH Line NIMS GIS with 9 XLPE Cable Total 132 KV 18 Nos. Grand Total
1 160 MVA PTR at 220 KV Medchal SS 2 Addl. 100 MVA PTR at 220 KV Shamshabad SS 3 80 MVA PTR at 132 KV Bandlaguda SS 4 80 MVA PTR at 132 KV Erragadda SS 5 50 MVA PTR at 132 KV Asifnagar SS 6 50 MVA PTR at 132 KV Medchal SS 7 31.5 MVA PTR at 220 KV Ghanapur SS Grand total
Benefits accruing from Infrastructure improvement planned for next 100 days 100 MVA Additional capacity availability
Shapoornagar
Marginal load relief at existing 132 KV Madhapur, Bandlaguda and Medchal Substations
Future Planning
400KV Sub-station at Maheswaram and Narsapur To meet the load growth along the ORR following Substations also envisaged at :
220KV SS 1. Miyapur 2. Bandlaguda 3. RC Puram/Patancheru 4. Turkayamjal 5. Golkonda Kalan 6. Raviryal (ITIR) 7. Sardarnagar (ITIR) 8. Nadargul (ITIR) 9. Mankal (ITIR) Total No. of Substations : 17
132KV SS 1. Mohammednagar (Yakutpura) 2. IIT area 3. Danthanpalli 4. Pocharam 5. Gowlidoddi 6. Adibhatla 7. APPA 8. Peerjadiguda
9
Support Requested
Land requirements for new sub-stations Corridor for transmission lines/UG cables
Road cutting permissions from GHMC, R&B, HMWS&SB and National Highway
Permission from Traffic Police & Railways Site required for construction of already programmed works:
220 KV sub-station at Miyapur area
10
THANK YOU
Conductor Material
Thermal Aluminium Alumunium All Aluminium Alloy with Conductor Alloy INVAR Steel re-inforced Conductor (Nickel+Steel) Core
1 Tadikonda -VTPS-I
2 Tadikonda -VTPS-II 3 Shivarampally-Mamidipally Ghanapur-Malkaram-IShapurnagar I Ghanapur-Malkaram-II5 Shapurnagar-II 4 6 Wadekothapally -Budidampadu 7 Shamshabad-Mamidipally 8 Shapurnagar-KTPS 9 Budidampadu-Bhongir 10 Chinakampalli - Kalikiri 11 HIAL - Gachibouli 12 Narnoor - Wanaparthy 13 VTPS-Narasaraopet 14 VTPS - Podili
Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Deer Zebra Moose Moose Moose
205 220 205 205 200 190 206 190 211 190 190 210 210
13
14
19 RSS-Mancherial 20 AP Carbides - Gadwal 21 Pashamailaram - R.C.Puram 22 CHG - Ibrahimpatnam - KM Palli 23 Minpur - Lingampet - Kamareddy Ramachandrapuram - Bollaram 24 Shapurnagar 25 26 27 28 Shapurnagar - Erragadda - IDPL Kalwakurthy - KM Palli Warangal - Waddepalli Durshed - RSS 1,2,3
15
4 Malayalapalli (RSS)
1*315+2*250+2*200
90%
17