Sub-Sation Construction Presentation

The document provides a summary of the existing power infrastructure in Hyderabad city and the plans for further development over the next two years. It details the existing substations and transmission lines, additions made in the last year, and plans for new substations, transmission lines and transformers. It identifies problems of overloading of some feeders and transformers. Support is requested from relevant authorities for land acquisition and permissions to implement the planned infrastructure projects.

Uploaded by

Balaji Naik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
367 views17 pages

Sub-Sation Construction Presentation

The document provides a summary of the existing power infrastructure in Hyderabad city and the plans for further development over the next two years. It details the existing substations and transmission lines, additions made in the last year, and plans for new substations, transmission lines and transformers. It identifies problems of overloading of some feeders and transformers. Support is requested from relevant authorities for land acquisition and permissions to implement the planned infrastructure projects.

Uploaded by

Balaji Naik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 17

PRESENTATION

ON POWER SUPPLY POSITION OF HYDERABAD CITY

23-12-2010

Existing Infrastructure to meet load in GHMC Area

No. Particulars Substations 400 KV 3 Nos. 220 KV 10 Nos. 132 kV 14 Nos. Total 27 Nos. Length of Transmission Lines 400 KV 756 CKM 220 KV 742 CKM 132 kV 660 CKM Total 2158 CKM
2

Infrastructure added during last one year


Sl. No. Project Cost (Rs. Crs.) Date of Commissioning

Details

1 400 KV Substation Malkaram 2 2nd Ckt. LILO to 220 KV Sivarampally SS 3 50 MVA PTR at Malkaram 220 KVSS 4 50 MVA PTR at Gachibowli 220 KVSS 5 50 MVA PTR at Jubilee Hills 13 KVSS 6 31.5 MVA PTR at Shamshabad 220 KVSS 7 50 MVA PTR at Ramachandrapuram 132 KVSS Total Cost

350.00 17-05-2010 3.18 03-06-2010 1.12 23-04-2010 5.31 05-06-2010 4.23 19-07-2010 2.35 31-08-2010 4.25 20-09-2010 370.44
3

Infrastructure Development Plan for next two years


Name of Cost of the Programmed Date of Substation with Line/ Project Status date of Commencement UG Cable (` Crs.) Completion 400 KV Substations 1 Shankarpalli 437.00 Under Execution Sept. 2010 Mar. 2012 220 KV Substations Erragadda GIS with 223.00 Under Execution Sept. 2010 Dec. 2011 1 XLPE Cable Osmania University GIS 223.00 Under Execution Sept. 2010 Dec. 2011 2 with XLPE Cable Imlibun GIS with 306.00 Under Execution Dec. 2010 Dec. 2011 3 XLPE Cable Gunrock (Conventional) 360.00 Work awarded Dec. 2010 Dec. 2011 4 with XLPE Cable Hayatnagar(Conventional) Tenders under 202.00 Mar. 2011 Jun. 2012 5 with XLPE Cable Finalisation Fab City (Conventional) 55.00 Work awarded Dec. 2010 Mar. 2012 6 with OH Line Rayadurg (Conventional) 145.00 Tendering Stage Mar. 2011 Jun. 2012 7 with XLPE Cable Manikonda (Conventional) 35.00 Tendering Stage Mar. 2011 Jun. 2012 8 with XLPE Cable Total 220 KV 1549.00 XLPE: Cross Linked Poly Ethylene; GIS : Gas Insulated Switchgear; OH : Overhead Line Sl. No.

Infrastructure Development Plan for next two years


Sl. No. Name of Substation with Line/ UG Cable 132 KV Substations Balkampet GIS with XLPE Cable Fever Hospital GIS with XLPE Cable Patigadda GIS with XLPE Cable Moosarambagh GIS with XLPE Cable Police Transport Orgn. GIS with XLPE Cable Cost of the Project (` Crs.) 60.00 69.00 69.00 48.00 85.00 55.00 13.00 15.00 100.00 514.00 2500.00 Status Date of Commencement Programmed date of Completion Dec.2011 Dec.2011 Jun. 2012 Jun. 2012 Jun. 2012 Jun. 2012 Dec. 2011 Mar. 2012 Dec. 2012

1 2 3 4

Under Execution Under Execution Tenders under finalisation Tenders under finalisation Tenders under finalisation Work awarded Tenders under finalisation Tenders under finalisation Tenders under finalisation

Oct. 2010 Oct. 2010 Mar. 2011 Mar. 2011 Mar. 2011 Dec. 2010 Mar. 2011 Mar. 2011 Mar. 2011

Narayanaguda GIS 6 with XLPE Cable Mamidipalli Conventional 7 with OH Line LGM Pet Conventional 8 with OH Line NIMS GIS with 9 XLPE Cable Total 132 KV 18 Nos. Grand Total

Problems and interventions in the next 100 days


Sl. No. 1 2 3 4 5 Name of the Work Line augmentation with INVAR Conductor and construction of 132/33 KVSS Chintal 132 KV 2nd Circuit at Madhapur 132 KV SS 2nd Circuit at Medchal 132 KV SS Line augmentation with INVAR Conductor at Bandlaguda 132 KV SS 132 KV Line augmentation with AL 59 conductor from Gachibowli SS to Madhapur SS Total Cost of Project (Rs.Crs) 21.00 1.60 1.76 5.40 1.00 30.76
6

Problems and interventions in the next 100 days


Sl. No. Name of the Work Cost of Project Rs.Crores 4.52 4.42 3.10 3.21 2.13 1.90 1.73 51.77
7

1 160 MVA PTR at 220 KV Medchal SS 2 Addl. 100 MVA PTR at 220 KV Shamshabad SS 3 80 MVA PTR at 132 KV Bandlaguda SS 4 80 MVA PTR at 132 KV Erragadda SS 5 50 MVA PTR at 132 KV Asifnagar SS 6 50 MVA PTR at 132 KV Medchal SS 7 31.5 MVA PTR at 220 KV Ghanapur SS Grand total

Benefits accruing from Infrastructure improvement planned for next 100 days 100 MVA Additional capacity availability

Relief on two major 220 KV substations


Gachibowli

Shapoornagar

Marginal load relief at existing 132 KV Madhapur, Bandlaguda and Medchal Substations

Future Planning
400KV Sub-station at Maheswaram and Narsapur To meet the load growth along the ORR following Substations also envisaged at :
220KV SS 1. Miyapur 2. Bandlaguda 3. RC Puram/Patancheru 4. Turkayamjal 5. Golkonda Kalan 6. Raviryal (ITIR) 7. Sardarnagar (ITIR) 8. Nadargul (ITIR) 9. Mankal (ITIR) Total No. of Substations : 17
132KV SS 1. Mohammednagar (Yakutpura) 2. IIT area 3. Danthanpalli 4. Pocharam 5. Gowlidoddi 6. Adibhatla 7. APPA 8. Peerjadiguda
9

ITIR : Information Technology Investment Region

Support Requested
Land requirements for new sub-stations Corridor for transmission lines/UG cables

Road cutting permissions from GHMC, R&B, HMWS&SB and National Highway
Permission from Traffic Police & Railways Site required for construction of already programmed works:
220 KV sub-station at Miyapur area

10

THANK YOU

Comparison of Conductor Characteristics


Particulars Current carrying capacity Cost Operating Temperature Thermal expansion Conductor sag ACSR 100% 100% 75oC Normal Normal AL 59 125% 130% 95oC Low Slightly higher INVAR 200% 700% 210oC Very Low Normal at higher Temp.

Conductor Material

Thermal Aluminium Alumunium All Aluminium Alloy with Conductor Alloy INVAR Steel re-inforced Conductor (Nickel+Steel) Core

Network requirement to reduce overloading of 220 kV Feeders


S No Name of the Constraint 220kV Feeder Type of the conductor Zebra Present loading ( MW) 205 Additional Substations & Lines already proposed as a remedial measure Proposed 400/220kV Narsaraopeta,220/132kV Parchuru, Narsaraopeta substations (New) Proposed 400/220kV Narsaraopeta,220/132kV Parchuru, Narsaraopeta substations (New) Proposed LILO of 220kV Mamidipally Gachibowli 2nd ckt at Shivarampally Proposed 400/220 kV Malkaram SS will relieve Proposed 400/220 kV Malkaram SS will relieve Proposed LILO of Budidampadu Bhongiri at Waddekothapally 400/220kV Yeddumailaram SS (New) provides relief Proposed 400/220kV Malkaram SS and 400/220kV Yeddumailaram SS provides relief Proposed LILO of Budidampadu Bhongiri at Waddekothapally Proposed 220 kV Palamaneru SS which relieves the overloading 400/220kV Yeddumailaram SS (New) provides relief 220 kKV Jurala SS is proposed Proposed 400/220kV Narsaraopeta relieves over loading Proposed 400/220kV Narsaraopeta relieves over loading

1 Tadikonda -VTPS-I

2 Tadikonda -VTPS-II 3 Shivarampally-Mamidipally Ghanapur-Malkaram-IShapurnagar I Ghanapur-Malkaram-II5 Shapurnagar-II 4 6 Wadekothapally -Budidampadu 7 Shamshabad-Mamidipally 8 Shapurnagar-KTPS 9 Budidampadu-Bhongir 10 Chinakampalli - Kalikiri 11 HIAL - Gachibouli 12 Narnoor - Wanaparthy 13 VTPS-Narasaraopet 14 VTPS - Podili

Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Deer Zebra Moose Moose Moose

205 220 205 205 200 190 206 190 211 190 190 210 210

13

Network requirement to reduce overloading of 132 kV Feeders


S. Name of the Feeder No. 1 2 3 4 5 6 7 8 9 10 11 12 Renigunta - Puttur Renigunta - Tirupati - K.P.Mitta Gachibowli-Madhapur Gachibowli-Erragadda Ghanapur-Bandlaguda Nekkonda-KTS Yeddumailaram - Kandi -II Yeddumailaram - Kandi -I Moulali-Gunrock Yeddumailaram - Sadasivpet Siddipet - Gajwel Tadikonda -Guntur-I Type of the conductor Panther Bear Panther Bear Panther Bear Panther Panther Panther Panther Panther Panther Panther Panther Panther Present loading (MW) 2x80 70 90 82 80 92 85 85 70 95 97 90 90 90 75 Additional Substations & Lines already proposed as a remedial measure Proposed 220kV SS at Nagari Proposed 220kV SS at Palamaneru Proposed 220kV SS at Madhapur Proposed 220kV SS at Erragadda Proposed 220kV SS at Bandlaguda Proposed 132kV KTS - Nekkonda 2nd ckt Proposed 220kV SS at Sadhashivpeta Proposed 220kV SS at Sadhashivpeta Proposed 220kV SS at Gunrock Proposed 220kV SS at Sadhashivpeta Proposed 400kV SS at Gajwel - Provides Relief Proposed 220kV SS at Narsaraopeta and Parchuru - Provides Relief Proposed 220kV SS at Narsaraopeta and Parchuru - Provides Relief Proposed 220kV SS at Hayatnagar Proposed 400kV SS at Gajwel

13 Tadikonda -Guntur-II 14 Ch'Gutta-Bandlaguda 15 Siddipet - Habsipur

14

Network requirement to reduce overloading of 132 kV Feeders


S. Name of the Feeder No. 16 Ch'Gutta-Imlibun 17 RSS-Sultanabad 18 RSS-Bellampally Type of the conductor Panther Panther Panther Panther AAA C Panther Panther Panther Panther Panther Panther Panther Panther Panther Present loading (MW) 90 80 70 70 85 80 80 100 100 90 110 100 100 Additional Substations & Lines already proposed as a remedial measure Proposed 220kV SS at Imlibun Proposed 200 kV DC line from 400/220 kV Warangal SS - Durshed Proposed 220kV SS at Bellampally Provides Relief Proposed 220kV SS at BellampallyProvides Relief Proposed 220kV SS at Jurala Provides Relief Proposed 220kV SS at Sadhashivapeta Proposed 220 kV Hayatnagar provides relief Proposed 2nd 100 MVA at Kamareddy Proposed 220 kV Bachupalli provides relief 220 kV Erragadda SS is proposed Proposed 220 kV Hayatnagar provides relief Proposed 2nd circuit Proposed 200 kV DC line from 400/220 kV Warangal SS - Durshed

19 RSS-Mancherial 20 AP Carbides - Gadwal 21 Pashamailaram - R.C.Puram 22 CHG - Ibrahimpatnam - KM Palli 23 Minpur - Lingampet - Kamareddy Ramachandrapuram - Bollaram 24 Shapurnagar 25 26 27 28 Shapurnagar - Erragadda - IDPL Kalwakurthy - KM Palli Warangal - Waddepalli Durshed - RSS 1,2,3

15

Network requirement to reduce overloading PTRs


S. No. 1 2 3 4 5 Sub-Station Name Siddipeta Dichpally Yeddumylaram Kalwakurthi Bhootpur No of Transformers MVA 2*100 3*100 3*100 2*100 3*100 3*100 2*100 2*100 3*100 3*100 2*100 1*160+3*100 2*100 2*160+2*100 2*100 Present Loading (MW) 2*90 3*100 3*85 2*90 3*90 3*90 2*90 2*90 3*90 3*90 2*90 90% 2*90 90% 2*80 Remarks Will be relieved after commissioning of 400kV Gajwel SS 220 kV Sadasivapet SS will relieve Proposed IIIrd 100MVA Proposed 220 kV Jurala SS Proposed 1 No. 160 MVA Augmentation Proposed 220 kV Jurala SS 220 kV Pulivendula proposed 220 kV Palamaneru proposed 220 kV Nagari proposed Proposed IIIrd 100MVA 220 kV Narsaraopet & Parchur proposed 220 kV Narasaraopet proposed City Ring mains proposed 220 kV Pulivendala SS proposed
16

6 A.P. carbide 7 8 9 10 11 Wanaparthy Hindupur Kalikiri Renigunta Chittoor

12 Tadikonda 13 Nagarjuna sagar 14 Chandrayangutta 15 Kadapa

Network requirement to reduce overloading PTRs


S. No. 16 17 18 19 Sub-Station Name KM Palli Kakinada Kondapalli Kalyandurg No of Transformers MVA 2*100 2*100 2*100 1*100 2*100 1*100 2*100 2*100+1*160 3*100 Present Loading (MW) 2*90 2*90 2*86 1*85 2*90 1*80 2*80 90% 3*90 Remarks 220 kV Hayatnagar SS is proposed 3rd 100 MVA transformer proposed 3rd 100 MVA transformer proposed 2nd 100 MVA transformer proposed 2nd circuit from Yeddumailaram proposed 2nd 100 MVA transformer proposed along with 2nd 220 kv circuit from Gajwel already proposed 3rd 100 MVA transformer proposed 220 kV Bachpalli SS already proposed Hyderabad Augmentation Scheme will relieve Over loading will be relieved after commissioning of 400 KV Malkaram & Yeddumailaraml SSs Proposed another 2*315MVA Over loading will be relieved after commissioning of 400 KV Malkaram & Yeddumailaraml SSs Once the 220 kv lines from Wgl. To Durshed from 400 kV Warangal SS are in place overloading of this SS will get relieved

20 Tandur 21 Kamareddy 22 Nandyal 23 Shapurnagar 24 Sivarampalli II 315MVAS 1 Ghanapur 2 Veltur 3 Mamidipalli

3*315 1*315 3*315

100% 100% 90%

4 Malayalapalli (RSS)

1*315+2*250+2*200

90%