Presentation On The Monthly Production Report
Presentation On The Monthly Production Report
Golora, Manikgonj
We believe in continuous development
ACKNOWLEDGEMENT:
First of all, we would like to thank the almighty ALLAH for blessing us & giving us strength to work properly. We would like to express my sincere gratitude & appreciation to the honorable Director, Mr. Sheikh Jamil Uddin sir. My heartfelt thanks to him for allowing me to present the monthly production report. we are also very grateful to the honorable Executive Director, Mr. M.R. Jamil sir for his guidance, encouragement & for enriching us with his thoughtful advice.
CONTENTS
Year
Month
Production (kg)
Dyes (kg)
Chemicals (kg)
Remarks
2011 2011 2011 2012 2012 2012 2012 2012 2012 2012
October November December January February March April May June July Total
2,484 17,398 54,967 47,458 50,944 47,910 72,574 91,444 48,645 67,802 501,626
150.5 874 1,8537 1,6005 1,0689 1,7882 2,3942 2,9139 1,6901 1,9909
1,057 17,057 31,725 28,645 25,297 40,768 39,661 71,533 25,086 32,075
70,100
60,100 50,100 40,100 30,100 20,100 10,100 Production(Kg) Dyes(Kg) Chemicals(Kg)
Amount in Kg
100
The report of the last months production, maximum machine capacity & maximum production capacity is given below:
Maximum machine capacity day (approx.) Maximum allowable capacity (approx.) Target production day (approx.) Total production of Month of July Daily production
= 7,500 kg per
Shortage & size of order Shortage of soft winding machine Type of order Lack of consistency from the utility support (steam pressure, electricity, quality of soft water & compressor) Shortage of manpower Shortage of hard winding machine
Buyer
Noor check York Fashion KFS Adnan fabrics Amin fabrics Far east starling Far east starling Newage Shagor Garments FCE BD Noor check SIGNET Bonded fashion KFS Adnan textiles NAZ knit wear Bonded fashion Unifill
Quantity
2,077 kg 21,700 kg 30 kg 577 kg 2,307 kg 623.5 kg 466.7 kg 2,822 kg 467 kg 56 kg 3,100 kg 140 kg 1513 kg 63 kg 1,300 kg 3,600 kg 50 kg 414 kg
So, Total production of the soft package = 3,300 + 2,600 kg = 5,900 kg (approximately) This is the maximum estimated capacity of soft packages for the yarn count of 40/1.
To achieve the goal of producing 6 tons per day, the availability of the soft package is an essential. The batch scheduling, machine programs & most of all the production will be delayed if the soft packages are not prepared in time. Secondly, sometimes we do not get proper support from the spinning section. Especially in case for the order with a shorter lead time, the spinning department usually transfers the hard packages directly to the dyeing section.
14/7/12
16/7/12 17/7/12 17/7/12 17/7/12 17/7/12 17/7/12 17/7/12 20/7/12 24/7/12 28/7/12 29/7/12 30/7/12
6.45 am to 8.15 am
9.35 am to 11.00 am 10.00 am to 11.55 am 10.00 am to 1.20 am 2.00 pm to 3.30 pm 2.00 pm to 5.00 pm 5.20 pm to 7.00 pm 8.25 pm to 9.00 pm 9.20 pm to 10.00 pm 4.50 am to 5.50 am 2.00 pm to 3.00 pm 5.40 am to 6.00 am 9.00 pm to 9.22 pm
1.5 hours
1.5 hours 2 hours 3 hours 20 min 1.5 hours 3 hours 2 hours 40 min 35 min 40 mins 1 hours 1 hours 20 min 22 min
TOTAL
32.6 hours
=
= =
550m/min
512 pcs 40/1 (as for example)
This is the maximum production capacity of hard winding machine for the yarn count of 40/1. From the above result, it is clear that, we are almost 1.5 tons shorter then the required hard winding capacity. Because for each day production we will be 1.5 tons shorter everyday & the load to clear previous order will be increased gradually. Thus we will be unable to maintain the lead time.
SHORTAGE OF MANPOWER
These are the working personnel required in the production:
Department No of machines 22 0 Designation Operator Helper Operator Helper In charge Supervisor Lineman / Operator Helper Operator Helper In charge Supervisor Lineman/Operator Helper Supervisor Packing helper Q.C. Q.C. helper ATO Lab asst. Lab helper Current no of employees( in 3 shifts) 21 22 0 18 1 0 3 18 3 16 0 0 4 41 3 15 3 8 2 5 8 Required on of employees( in 3 shifts) 33 42 4 24 1 3 4 24 4 30 1 3 4 50 3 30 4 12 3 6 10 Total shortage 12 20 4 6 0 3 1 6 1 14 1 3 0 9 0 15 1 4 1 1 2
Soft winding
2&2
Hard winding
0 0
Laboratory
TOTAL
`191
295
104
FUTURE PLANS
These are the future plans which will help us to achieve the target production. Larger order quantity: Without larger order the target production cant be achieved. So, the marketing team has to give more effort to get orders of larger quantities. New soft & hard winding machines: We need at least 2 new soft winding & 2 new hard winding machines to fulfill our requirement. Support from the spinning section: The spinning department has to support us with the soft packages. They have to ensure us to give at least 3 tons of soft packages per day. Proper support from the utility department: We need uninterrupted power supply, proper compressor & steam pressure to maintain the in time production. Also the quality of the water has to be good to prevent faulty dyeing.
SUGGESTION:
We propose a planning cell or MIS department, whose job will be to communicate with the marketing department, to look after a buyers order from the start to end & to improve correlation between Spinning ,Dyeing & Weaving department.