3.i Work Study
3.i Work Study
i
An Introduction to
Industrial Engineering and
Work Study
Industrial
3.i.A
Engineering
Productivity improvement through :
Work Study
Method Study
Work Measurement
Fixing Standard time
Work Sampling
O&M
Plant Layout & Material Handling
Value Analysis & Value Engineering
Quality Control
Statistical Process Control
Problem Solving Techniques
WORK
STUDY
WORK MEASUREMENT
TO DETERMINE HOW
LONG IT SHOULD TAKE
TO CARRY OUT
HIGHER
PRODUCTIVITY
Productivity Concepts
Continuous efforts are put up for improving the Utilization of
resources. This needs defining appropriate measures of
performance.
Productivity Measurement =
National Level MACRO
Industry Level MACRO
Productivity of materials
Productivity of Land – Buildings
Productivity of Labour
Factors Contributing To
Productivity Improvement
Time required to produce one unit of an output. (Man
Hours)
Variation in standard – Actual inputs – (Machine Hours)
Contributing Factors :
Design aspects
Standardization
Quality Standards
Productive Machines
Operating Conditions
Contd…
Factors Contributing To
Productivity Improvement
Interaction between men & machines
Working methods of operatives
Operative efficiency
Role of Management in
coordinating resources of
an enterprises
Techniques For Productivity
Improvement
Work Content and Ineffective Time
Reduce work content
Ineffective time is the time for which the worker or the machine
or both are idle due to the short comings of the management or
the worker
Work Contents And Ineffective
Time
Basic Work Content
Of Product
and / or operation
TOTAL
WORK
CONTENT Work Content Added
By defects in product or
Specifications of product
TOTAL
TIME
OF Work Content Added
OPERATION By inefficient methods of
UNDER Manufacture or operation
EXISTING
CONDITIONS
In efficient Time
Due to short coming
Of the management
TOTAL
INEFFECTIVE
TIME
Ineffective Time
With in the control
Of the worker
Work Content Due To Product
And BASIC
WORK
CONTENT
TOTAL
WORK
CONTENT
OF THE
PRODUCT
Process
A.1. Bad Design Of Product
Prevent use of most economic process WORK CONTENT ADDED
A.2. Lack Of Standardization By defects in design or
Prevent use of high production process specification of the
TOTAL
WORK A.3. Incorrect Quality Standards products
CONTENT Cause Unnecessary Work
INEFFECTIVE
TIME
Ineffective Time Due To
Shortcomings On The Part Of
Management And Workers
BASIC
WORK CONTENT
EXCESS
Content
CONTENT CONTENT CONTENT
TOTAL
Content
TIME WORK CONTENT
IF ALL CONTENT nt
TECHNIQUES nt e
PERFECTLY o
C te d
r k
APPLIED
C.1. Marketing And Specialization wo i na
e ss elim
reduce idle time due to product variety c
C.2. Standardization
Ex eady
idle time due to short runs Alr
C.3. Product Development
reduces ineffective time due to changes in design
C.4.Production Control based on work measurement
Ineffective Time reduce idle time due to bad planning
Totally Eliminated C.5.Material Control
if all Techniques
Perfectly applied
Reduces idle time due to lack of raw materials
C.6. Maintenance – reduces idle time of men and
machines due to breakdowns
C.7. Maintenance – reduces ineffective time due to
plant in bad condition
C.8. Improved Working Conditions
enables workers to work steadily
C.9. Safety
measures reduce ineffective time due to accidents
D.1. Sound Personal Policies and Incentives
reduce ineffective time due to absence, e.t.c
D.2.Personal Policy And Operator Training
reduce ineffective time due to carelessness
D.3. Safety Training
reduces ineffective time due to accidents
3.i.B Work Study
CAN IMPROVE
MENT STUDY
PR
RESULTS MENT IN
AP
BE PRODUCTI
ACHIEVED VITY
3.Reduce the Product Not high Generally Limited – of the Method Study
work content of research compar-ed months same order as (and its
the product Product with 1 and that to be extension,
BETTER MANAGEMEN
4.Reduce the Process Low Immediate Limited, but often Method Study
work content of research of a high order to reduce
the process Pilot plant wasted effort
and time in
Process
operating the
planning
process by
Method Study
T
eliminating
Operator unnecessary
training movement
Value Analysis
Direct Means of Raising Productivity
CH
MEANS
BE ACHIEVED IN
PR
PRODUCTIVITY
AP
schemes
Human Factors In The Application
Of Work Study