Risk Management in Design and Build Hospital Projects
Risk Management in Design and Build Hospital Projects
Introduction
Construction is an art of convertin# p$ans and specifications into physica$
hea$th care p$annin# and techno$o#y and $on# desi#n and construction periods' Desi#n * +ui$d concepts is %ore preferred tend to transfer %ost ris.s to contractors. by o(ner (hen they
co#ni0ance of these ris.s invo$ved. &his in turn $eads to e)tra ordinary c$ai%s and e)tension of ti%e fro% contractor forcin# o(ner to be$ieve that Desi#n * +ui$d (as probab$y not a correct option.
,ence 1is. %ana#e%ent in Desi#n * +ui$d pro-ect is necessary to obtain
/iterature Survey
As pro-ect co%petition beco%es hi#her' contractors have to device %ore a(areness
of ris. and strate#i0e on assessin#' %ode$in#' ana$y0in# and %iti#atin# the ris.s 23. .3#unsan%i' 3. A. Sa$a.o' and 3. 4. A-ayi ' 20115'
6uantitative fau$t7tree ana$ysis usin# 8u00y arith%etic operations a$$o(s the e)perts
to $in#uistica$$y assess the probabi$ity of occurrence of basic events' (hich in turn he$ps in estab$ishin# %ore effective ris. response strate#ies 24oha%ed Abde$#a(ad' A%inah 1obinson 8aye.' 20115.
1is. ana$ysts tend to assu%e probabi$ity distributions of basic events' (hich adds
further uncertainty to the ana$ysis. &his cou$d be overco%e by usin# fu00y arith%etic operations for probabi$ity distributions. 24oha%ed Abde$#a(ad ' A%inah 1obinson 8aye. ' 8ernando 4artine0' 20105.
Scope :
&he scope of the pro-ect is restricted to the ris.s invo$ved (ith the
4ethodo$o#y
1eferences:
Abdelgawad, Mohamed & Fayek, Aminah Robinson. Fuzzy Reliability Analyzer (2011 .
!uantitati"e Assessment o# Risk $"ents in the %onstru&tion 'ndustry (sing Fuzzy Fault) *ree Analysis. +ournal o# %onstru&tion $ngineering and Management.
,gunsanmi, , $. , -alako, , A., A.ayi, , M. (2011 Risk %lassi#i&ation Model #or /esign
!uantitati"e Assessment o# 2orizontal /ire&tional /rilling 1ro.e&t Risk (sing Fuzzy Fault *ree Analysis .%onstru&tion Resear&h %ongress 2010
3arimiazari, Amirreza., Mousa"i, 4eda., Mousa"i, - Farid., 2osseini, -eyedbagher (2011 .
$56ert -ystems with A66li&ations Risk assessment model sele&tion in &onstru&tion industry. %onstru&tion Management and $&onomi&s
%ention 99
,ospita$ -ust an e# :