Risk Management in Design and Build Hospital Projects

The document discusses the need to manage risks in design-build hospital projects using India as a case study, as these types of complex projects that involve ongoing changes in health care planning and technology transfer most risks to contractors. It reviews literature on using quantitative fault tree analysis and fuzzy arithmetic operations to assess, model, analyze, and mitigate risks. The objectives and scope of the study are to identify critical risks in a design-build hospital project, develop a fuzzy fault tree model to identify root causes, and assess the probability of failure due to these critical risks.

Uploaded by

Lingesh Siva
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Risk Management in Design and Build Hospital Projects

The document discusses the need to manage risks in design-build hospital projects using India as a case study, as these types of complex projects that involve ongoing changes in health care planning and technology transfer most risks to contractors. It reviews literature on using quantitative fault tree analysis and fuzzy arithmetic operations to assess, model, analyze, and mitigate risks. The objectives and scope of the study are to identify critical risks in a design-build hospital project, develop a fuzzy fault tree model to identify root causes, and assess the probability of failure due to these critical risks.

Uploaded by

Lingesh Siva
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Risk Management in Design and Build Hospital Projects

Supervisor: Prof. Dr. K.C.Iyer Presented by: Archana . N 2011C C!"0!

Introduction
Construction is an art of convertin# p$ans and specifications into physica$

structures and faci$ities under different contractin# syste%s.


&raditiona$ construction de$ivery syste%s' bein# too s$o( and e)pensive'

contractors and o(ners are turnin# to(ards Desi#n * +ui$d syste%s.


,ospita$ pro-ects bein# co%p$e) in nature due to on#oin# deve$op%ents in

hea$th care p$annin# and techno$o#y and $on# desi#n and construction periods' Desi#n * +ui$d concepts is %ore preferred tend to transfer %ost ris.s to contractors. by o(ner (hen they

Need for Study

A sin#$e entity acceptin# the responsibi$ity for desi#n and construction

%eans it is assu%in# a$$ the ris.s invo$ved.


/ac. of fa%i$iarity of Desi#n * +ui$d syste%s in India is due to the $ess

co#ni0ance of these ris.s invo$ved. &his in turn $eads to e)tra ordinary c$ai%s and e)tension of ti%e fro% contractor forcin# o(ner to be$ieve that Desi#n * +ui$d (as probab$y not a correct option.
,ence 1is. %ana#e%ent in Desi#n * +ui$d pro-ect is necessary to obtain

the .ey indices ensurin# #ood profitabi$ity or botto% $ine.

/iterature Survey
As pro-ect co%petition beco%es hi#her' contractors have to device %ore a(areness

of ris. and strate#i0e on assessin#' %ode$in#' ana$y0in# and %iti#atin# the ris.s 23. .3#unsan%i' 3. A. Sa$a.o' and 3. 4. A-ayi ' 20115'
6uantitative fau$t7tree ana$ysis usin# 8u00y arith%etic operations a$$o(s the e)perts

to $in#uistica$$y assess the probabi$ity of occurrence of basic events' (hich in turn he$ps in estab$ishin# %ore effective ris. response strate#ies 24oha%ed Abde$#a(ad' A%inah 1obinson 8aye.' 20115.
1is. ana$ysts tend to assu%e probabi$ity distributions of basic events' (hich adds

further uncertainty to the ana$ysis. &his cou$d be overco%e by usin# fu00y arith%etic operations for probabi$ity distributions. 24oha%ed Abde$#a(ad ' A%inah 1obinson 8aye. ' 8ernando 4artine0' 20105.

3b-ectives and Scope


3b-ectives:
&o identify critica$ ris.s in a Desi#n * +ui$d ,ospita$ Pro-ect. &o deve$op a fu00y fau$t tree %ode$ to identify root causes of

these critica$ ris.s


&o assess probabi$ity of fai$ure of the desi#n7bui$d process due

to the above critica$ ris.s.

Scope :
&he scope of the pro-ect is restricted to the ris.s invo$ved (ith the

contractors of Desi#n * +ui$d pro-ects.

4ethodo$o#y

1eferences:
Abdelgawad, Mohamed & Fayek, Aminah Robinson. Fuzzy Reliability Analyzer (2011 .

!uantitati"e Assessment o# Risk $"ents in the %onstru&tion 'ndustry (sing Fuzzy Fault) *ree Analysis. +ournal o# %onstru&tion $ngineering and Management.
,gunsanmi, , $. , -alako, , A., A.ayi, , M. (2011 Risk %lassi#i&ation Model #or /esign

and 0uild 1ro.e&ts. +ournal o# $ngineering 1ro.e&t and 1rodu&tion Management


Mohamed Abdelgawad , Aminah Robinson Fayek , Fernando Martinez, 2010 .

!uantitati"e Assessment o# 2orizontal /ire&tional /rilling 1ro.e&t Risk (sing Fuzzy Fault *ree Analysis .%onstru&tion Resear&h %ongress 2010
3arimiazari, Amirreza., Mousa"i, 4eda., Mousa"i, - Farid., 2osseini, -eyedbagher (2011 .

$56ert -ystems with A66li&ations Risk assessment model sele&tion in &onstru&tion industry. %onstru&tion Management and $&onomi&s

6uestions on first presentation:


1esearch p$an Desi#n bui$d in hospita$ pro-ects777 ob-ective

%ention 99
,ospita$ -ust an e# :