100% found this document useful (1 vote)
267 views

Lifting Operations

This document provides guidance on lifting and rigging operations. It discusses preliminary lifting operation verifications such as weight evaluation, crane lifting capacity, and weight distribution. It also covers equipment safety maintenance assessments, recommended sling angles, and calculations for material weights. Proper sling loading techniques are described, including considerations for the center of gravity and rigging triangles.

Uploaded by

spalaniyandi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
267 views

Lifting Operations

This document provides guidance on lifting and rigging operations. It discusses preliminary lifting operation verifications such as weight evaluation, crane lifting capacity, and weight distribution. It also covers equipment safety maintenance assessments, recommended sling angles, and calculations for material weights. Proper sling loading techniques are described, including considerations for the center of gravity and rigging triangles.

Uploaded by

spalaniyandi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 45

ELECTRICAL DEPARTMENT

LIFTING AND R IGGING


OP ERATIO NS

09/24/09 1
LI FTING AND RIGGIN G OPER AT ION S
PR ELIMI NARY LIFT IN G O PERAT IO NS’
VERIFI CA TIO N:
• Wei ght eva lu at ion
• Sling lif ting point
• Cr an es li fting cap aci ty ( di ag rams and li fting
char t )
• Wei ght ripa rtit ion (bar ice nt er conce pt )
• Sling lif ting point
WEI GHT SLIN GING VERIFI CAT IO N:
• Liftin g ge ar cap acit y
• Use of so ft mat er ial s be twee n sh arp
ed ge an d th e sli ng
09/24/09 2
LIFT ING AND RI GGING
OPE RAT IONS
EQUI PME NT SAF ET Y MAIN TEN ANC E
ASSESSME NT

09/24/09 3
RECO MM ENDE D S LING ANGLE

09/24/09 4
SLINGI NG AN D LIF TI NG O F
LOAD S

09/24/09 5
LIFTING OPE RATI ONS
PREL IMI NARY VERIF ICA TI ON:

• Pr es en ce of ma ter ia ls n ot secu re d

• Pay at ten tion to t he po sit ions of han ds &


fee t

• Knowle dg e of co nv en tiona l crane sig nal

• Th e wei gh t mu st be free from obs tr uct io n


an d not co nnect ed to the gro un d
09/24/09 6
LIFTING OPE RATI ONS
PREL IMI NARY VERIF ICA TI ON:

• Pr es en ce of obst acles in the dir ect ion of the


li fting .

• Keep the we ig ht cl ose to th e gr ound lev el .

• Th e cha in s or sl ings are to be free from


obs tacle s

• Ta g co ntrolli ng lin e mu st be use d.

09/24/09 7
LIFTING OPE RATI ONS
PREL IMI NARY VERIF ICA TI ON:

• Ho rse pl ay or st an di ng on li fted wei gh t is


forbid de n.

• Th e cra ne oper at or mu st follow the ba nks


man in dicati on dur ing the lif tin g o pe rat io ns .

09/24/09 8
LIF TIN G O PER ATI ONS
SHIF TI NG OF LOA D

09/24/09 9
SL INGING AND LOAD ’S LIFTING

09/24/09 10
CH OKER HI TCH
•TH E CH OKER HITCH
IS OFT EN USED WHE N
GRIPPI NG THE LOAD &
WILL IMPR OVE LOA D
CO NTROL .TH E
THE CAP ACI TY
OF A CH OKER CAPAC ITY OF A
HITCH I S CHOK ER HITCH IS
75%TO 80% OF BAS ED ON THE HITCH
THE SI NG LE
LEG.
BEING PROPER LY
FO RMED. IN OTH ER
CHAI N, WIR E
RO PE AND
FO R THE FU LL CHOK ER
SY NTHE TIC CAPAC ITY TO BE
SL INGS AR E AV AIL AB LE, THE
AFFE CTED
AN GLE OF CHO KE FO R
AL L TYPE OF SLI NGS
SH OULD BE AT L EAST
120 °
09/24/09 11
LIFTING OPE RATI ONS
PREL IMI NARY VERIF ICA TI ON:

• pr es en ce of obs tr ucti on in th e work in g ar ea.

• wei gh t lan di ng area cl ear ly def in ed .

• do n’t ke ep th e lo ad su spe nded .

• go od sta ckin g posi ti on ( pi pe ).

• slo wly rai se the we ig ht .

09/24/09 12
LIF TIN G OPE RATIO NS
LOWERIN G OF LOAD S

09/24/09 13
CAL CU LATIO N OF MATE RIALS ’
WEIGH T

09/24/09 14
CAL CU LATIO N OF MATE RIALS ’
WEIGH T

09/24/09 15
CAL CU LATIO N OF MATE RIALS ’
WEIGH T
CONVENTIONAL WEIGHT OF MATERIALS

MATERIALS MEASURAMENT UNIT WEIGHT IN KG.

STEEL ONE CUBIC METER 7600 - 8100 KG.

WATER AT 4 DEGREE C' ONE CUBIC METER 1000 KG.

ASBESTOS ONE CUBIC METER 2100 - 2800 KG.

BRONZE ONE CUBIC METER 7500 - 8300 KG.

CONCRETE ONE CUBIC METER 2200 - 2500 KG.

ALLUMINIUM ONE CUBIC METER 2800 KG.

IRON ONE CUBIC METER 7400 - 7900 KG.

CAST IRON ONE CUBIC METER 7000 - 7800 KG.

WOOD ONE CUBIC METER 760 - 950 KG.

NICHEL ONE CUBIC METER 8900 - 9200 KG.

BRASS ONE CUBIC METER 8500 - 8600 KG.

STONE ONE CUBIC METER 3000 KG.

LEAD ONE CUBIC METER 11200 - 11300 KG.

COPPER ONE CUBIC METER 8600 - 8900 KG.

SAND ONE CUBIC METER 2000 KG.

TIN ONE CUBIC METER 7300 - 7500 KG.

ZINC ONE CUBIC METER 7200 KG.

09/24/09 16
CEN TER O F GRAVITY AND S LING
LO AD ING
WHE N LI FTIN G
VER TI CALL Y,TH E L OAD
WILL BE SHARE D EQU ALL Y
SL ING 1 SLING 2
IF, THE CE NTRE OF
GRAVITY IS PL ACE D
EQU AL LY B /W TH E PICK
POI NTS .I F THE W EI GHT O F
TH E LO AD IS 10000K g,
1000 0kg TH EN EACH SLING W ILL
HAV E A LOA D OF 5000K g.
EACH SH ACK LE A ND EYE
BOL T WILL AL SO HAVE A
D1 =5m LOAD OF 5000K g.
D2 =5m

09/24/09 17
CENTE R OF GRAVITY AN D S LI NG
LO AD ING
TH E LO CATIO N
OF TH E CE NTR E
SL ING 1 SL ING 2
OF G RAV ITY
REL AT IVE TO THE
PI CK PO IN TS I S A
VER Y IMPORT ANT
1000 0kg
CO NSIDERATIO N

D1=5 m
D2=5 m

09/24/09 18
CEN TER O F GRAVITY AND S LING
LO AD ING
WHEN THE CE NT RE OF GRAV ITY IS
NO T EQ UAL LY SPACE D B/W THE
PICK POIN TS, THE SLING S AND
SL ING 2 FI TTINGS WI LL NOT CA RR Y AN
SL ING 1
EQ UA L SHAR E OF THE LOAD . THE
SLING CO NNECT ED TO THE PICK
POINT CLOSES T TO THE CEN TRE OF
GR AV ITY WI LL CARRY THE
GR EA TES T SHA RE OF THE LO AD.
1000 0kg
SLING 2 IS CLO SES T TO C.O.G ,IT
WIL L HAVE THE GRE AT EST SHARE
OF LOA D:
SLING 2=1 0000 X 8/(8 +2)=8 000kg
D1 =8m D2 =2m
SLING 1=1 0000 X 2/(8 +2)=2 000kg

09/24/09 19
THE RIGGING TR IANGLE AND
TH E WO RKING LO AD L IMI TS O F
RI GGING GEAR
IN MOST LIFT S, ONL Y A SI NGL E
ALL A DD TO
180 DEGR EES HOOK IS AVA IL ABLE. THIS
MEANS TH AT MU LT IPL E LEG
SL INGS MU ST BE C OL LECT ED
AT T HE LOAD HOOK. W HEN
THIS IS DONE, WE FOR M WHAT
INC LUDED
WE CALL A R IGGING T RIANGLE.
ANGL E
THE INCLU DED A NGL E IS
VE R TICAL
SL IN G
AN G LE
CHE CKED FOR PR OPE R
CONNEC TI ON OF HOIST HOOK
OR C OL LECT OR RING. THE
HOR IZON TA L
SLI NG ANG LE
HOR IZON TA L
SLI NG ANG LE
SL ING ANGLE MUST BE KNO WN
TO PR OPER LY SE LECT SL INGS
AND FIT TINGS AT T HE LOA D
LO AD CONNEC TI ON.

09/24/09 20
TH E RI GGING TRIAN GLE BAS IC
FACTS
WHE N
SID E LO ADIN G CA N OC CU R AT LO AD. CO LECTE D AT
SLI NG LEN GT H AFFE CT S HOR IZO NT AL TH E HOO K OR
SLI NG ANG LE . CO LL ECTOR
30° VERT ICAL SLING ANG LE IS BES T, RING, SLI NGS
60° IS WOR ST. PLA CE A SID E
AS VERT IC AL SLING ANG LE BEC OMES LO AD ON TH E
LARG ER , THE LO AD IS “C RUS HED ” EYE BO LT OR
AND SLI NGS WO RK HA RD ER .
LI FTIN G PO IN T
THE FIT TING S AT LOAD CON NEC TION
AT THE LOAD .
SEE SAM E LOAD AS SLI NG.

09/24/09 21
THE RIGGI NG T RIANGLE 30
DE GREE VERTICAL S LI NG ANGLE

YOU HAVE A 30° (OR AS THE SLI NG


SMA LLE R) VERT ICA L SLI NG
AN GLE WHEN:
LENGTH IS
LE NGTH OF SLI NG (IN CLUDE S SH ORTE NED,
SHAC KLE) IS EQUA L TO OR
LENG TH OF
LO NGER THAN DI ST ANCE TH E VERTI CAL
SL ING
BET WEEN PI CK POI NT S SLI NG AN GLE IS
INCR EASE D A S
TH E SLIN G
LENGTH IS
TAP E
INCR EASE D, THE
SLI NG AN GLE IS
DECRE ASE D.
DIS TAN CE BETW EE N PICK POI NTS

09/24/09 22
THE INCLUDE D A NGLE HOIST
HOOK S
DO NO T EX CEED 9 0
DEG REE S.

TH E W ORK ING NEV ER FO UL THE


LOAD DEP ENDS O N
IT AND THE S LINGS LATCH OF A NY
SI T IN THE BASE HOO K, CA RE MU ST
OF THE HOO K AN D
CLEAR OF TH E BE TAKEN WHE N
LAT CH . PL ACI NG SLING S
INTO HOOK .
NEV ER “FO UL” A
INCLUDE D
ANG LE : 90
DEGR EE S
LATCH BY
MA XIMUM
AL LO WING THE
SLI NG TO BEAR
AG AIN ST TH E
LATCH .

09/24/09 23
THE V ERTI CAL SLING ANGLE
LO AD MULTIPLIER
EAC H SLING
AS THE VER TIC AL
SEES 1/2 OF SLI NG AN GLE BECO MES
WEI GHT .
GREATE R, TH E SLINGS
PL US
CR USHING
AN D FITTIN GS AT TH E
LOA D LOAD CO NNECTI ON
WORK HARDER . THE
SLI NGS A LSO PL ACE
MOR E CR US HIN G
FO RCE ON THE LOAD .

AS VER TI CAL SLING A NG LE BECOMES


LAR GE R, THE CR US HING LOAD GOES UP.

09/24/09 24
TH E VE RTICAL S LING ANGLE
LO AD MULTIP LIER
ANG LE GR EA TER AS
THE SLI NG ANGL E
SLI NG LOA D= VER TICA L LOAD X FAC TOR APRO AC HES
60°,THE
MUL TIPLI ER
30° 45° 60° 80° INC RE AS ES
SIGNI FI CAN TLY.
1.155 1.414 2.0 5.789 ABOV E 60° THE
(1.2) (1.4) (2) (6) MUL TIPLI ER
INC RE AS ES EVEN
SLI NG LOA D= VER TICA L LOAD X L/H MORE
DRA MAT ICAL LY.
NE VER ALL OW A
VERT ICAL SLING
THA N 60°.

10 30 45 60 DEGREES
09/24/09 25
TH E VE RTICAL S LING ANGLE L/H
AN D LO AD MULTIPLI ER
IN THE RIG GING
TR IAN GLE, IF YO U TAKE
TH E LEN GTH O F THE
SLI NG,( BEARING POINT
L
TO BEARIN G PO IN T) AN D
H DIVID E BY THE DROP, YO U
HAV E THE LO AD
MU LTI PLIER.

L/H = LO AD MULT IP LI ER

09/24/09 26
MEAS UR E TH E VERTICAL S LING
ANGLE B Y USE OF L/ H
TH E US E O F L /H
OFFER S US
L SE VER AL TOOL S
TH AT CAN BE
USE D IN RIG GING.
TH E MOST BASI C
H
TOO L IS TH AT TH E
SLI NG AN GLE CAN
BE MEAS URE D BY
USE OF A TAPE
IF L/H VE RTI CA AN GLE
MEASU RE.
1. 15 5 (1. 2) 30 DEGREES
1. 41 4 (1. 4) 45 DEGREES
2 60 DEGREES

09/24/09 27
CALCULATE TH E LO AD IN EACH
LEG BY U SE OF L/H
A MOR E POWERFU L
TOO L I S THE USE OF L/H
L TO CAL CU LATE TH E
H
LOAD IN EACH SLING
LEG AN D I N TH E
FI TTI NG A T TH E L OAD
CO NNECTI ON .
10000 kg REM EM BER TH AT TH E
IF L/H T HE N LO AD LOAD MULTIPL IER
1.2 1.2 X INCR EASE THE VE RTI CAL
5000 =6 000 kg
1.4 1.4 X
LOAD (THE LO AD IF TH E
5000 =7 000kg SLI NGS W ER E PU LLIN G
2 2 X ST RAI GHT UP).
5000 =1 0000 kg
09/24/09 28
DETE RM INE CAPACI TY OF BRI DLE
IF AN GLE D IFFERENT F ROM TH AT
ON T AG
IF VE RT ICAL SLING AN GLE
IS GRE ATE R THAN THE
AN GLE INDI CAT ED ON THE
TAG , THE SLI NG CAPAC ITY
MU ST BE D ER ATE D

CA PA CI TY= CAP AC ITY ON TA G X L/H FOR AN GLE ON TA G

L/ H FOR ACT UAL ANGLE

09/24/09 29
LI FTING AND RIGGING
OPERATION S
LIF TI NG CAPA CI TY VARI AT IO N
REL AT ED WIT H TH E SL IN GS
AN GLE

09/24/09 30
09/24/09 31
LIF TIN G OPE RATIO NS
MET AL LIC WI RE AN D CA BLE

09/24/09 32
HOIS TS HO OK S LATCH
REQ UIREMENTS
ANS I\ASME REQU IR EMEN TS
HOO KS ON CHAI N
“HOO KS S HALL BE E QU IP ED
WITH LATCHES” FAL LS, BL OC KS,
“LAT CH EQ UIP PE D HOO KS
BLO CK A ND TACK LE
SHAL L BE USED” AN D HOISTI NG
PER SON NEL BAS KETS AND WINCHE S MUST
LOCK ING LAT CHES -O SH A
HAV E L ATCHE S.
“HOO KS S HALL BE O F TY PE
THAT CAN BE CL OSED AN D WHE N USE D IN
LOCK ED”
PE RS ONNEL
LIFTI NG, THE
LATCH ES LOC KI NG
ME THO D MUS T BE
EN GA GED.

09/24/09 33
LIF TIN G OPE RATIO NS
SL INGIN G REMO VAL AN D HO OK RA ISIN G

09/24/09 34
LIFT ING AND RI GGING
OPERATION S

• SLINGS, CHAINS & LIFTING GEAR

VERIFICATION OF METALLIC SLINGS

WHEN IS IT REQUIRED TO REPLACE


THE SLING ?

09/24/09 35
LIFT ING AND RI GGING
OPERATION S
CAUS ES O F SLING S B RE AKING :

• Overl oad ing

• Be nding on shape edg e

• Re duction s of re sist ing se ction s (wir e bro ke n).

• Wire squeez e

• Wire eccessiv ely worn

09/24/09 36
ME TA LLI C ROPE S BRE AKI NG CA USE S
AND MAJ OR DA MA GE

09/24/09 37
LIF TIN G OPE RATIO NS
SL IN GS, CH AI NS & LIF TIN G GEAR

• WO RK HARD EN IN G

• WEAR

• LOOSE WELDI NG

• FL ESS ION AC TI ONS

• YI ELD
09/24/09 38
CH AINS LIFT ING CAP AC ITY
RE DUC TION RE LAT ED TO TH E
WORKI NG A NGLE

09/24/09 39
LIF TI NG OPERATION S
NYL ON AN D TEXT IL E
RO PES

09/24/09 40
LIF TI NG OPERATION S - HOOK S

09/24/09 41
LIF TI NG OPERATION S
CL AMP S AND PU LLEY
SE CTI ON

DIS TA NCE

DIA MET ER OF T HE BOL T

09/24/09 42
LIFT ING AND RI GGING
OPERATIONS
COM MO N IN JURI ES HAPP ENED AT THE
RIG GERS:

• Squ ee ze ( at fin ge r, feet & h ands ).

• Ab rasi on, cuttin g, prick.

• Co ntusi on in so me par t of the body .

• Fa ll in g from el ev at ion.
09/24/09 43
LIFTING OPERATIONS

09/24/09 44
END

THANKS
09/24/09 45

You might also like