Al Asab Hse Presentation June-14
Al Asab Hse Presentation June-14
THAMMAMA C
AL ASAB CONTRACTING EST.
HIGHLIGHTS
1. HSE Statistics
2. Near Miss Reporting
Usage of diesel powered Equipment without Fire extinguisher.
Defective Hand tool used by a labor.
3. In-house Trainings. (Al Asab)
HIRA Communication
Heat Stress
Fire Extinguisher Demonstration
Equipment operation safely
HSE Roles and responsibilities awareness training
4. HSE Appreciation Award
JUNE-2014
HSE STATISTICS (BUHASA)
May- 2014
AL ASAB CONTRACTING EST.
JUNE-2014
Description:
On 24-May-2014 at 08.30 am, While daily site inspection it is found
that the asphalt cutter was found using without fire extinguisher near
by or at the easy reach.
Immediate Cause
1. Unaware about the necessity of fire extinguisher.
2. Lack of Knowledge about the spark generation potential
3. Lack of supervision
4. Lack of HIRA communication by the supervisor
NEAR MISS REPORTING - 1
JUNE-2014
AL ASAB CONTRACTING EST.
Corrective Action
1. DCP fire extinguisher were
placed immediately at the
premises
2. Special In-House training given
to the operators Regarding the
Safe use of Equipment
3. HIRA communication was done
by the HSEO.
4. Safety Inspection should be
carried out at regular intervals
JUNE-2014
AL ASAB CONTRACTING EST. AL ASAB CONTRACTING EST.
NEAR MISS REPORTING - 2
Description:
On 16-May-2014 at around 03.00 pm, during carpentry work ,it was found that
one of the worker was using with a defective hammer which had a small crack
on the wooden handle which can result into breakage .
Immediate Cause
1. Carelessness of the worker and site supervisor
2. Hand tools were not inspected prior to work.
3. Poor supervision
JUNE-2014
AL ASAB CONTRACTING EST.
Corrective Action
1. The damaged tools were
immediately removed from the
site
2. Supervisor and the workers were
strictly instructed to do daily
inspection on the tools they are
using
3. Tool Box Talk given on this topic
4. All workers should be aware of all
hazards related to usage of
defective tools
JUNE-2014
HIRA COMMUNICATION(IN-HOUSE TRAININGS)
HIRA COMMUNICATION
Topic Discussed
What is HIRA?
Importance of HIRA
RISK Associated with particular
activities like Concreting,
Excavation& Lifting
Control measures to minimise the
Risk
AL ASAB CONTRACTING EST.
JUNE-2014
IN-HOUSE TRAININGS
AL ASAB CONTRACTING EST.
HEAT STRESS AWARNESS (ON SITE)
JUNE-2014
HEAT STRESS
Heat Related Illnesses
Importance of drinking more
water.
Symptoms of Heat Stroke
What to do in case of Heat
Exhaustion or Heat Stroke
Prevention and Control Measures
OPERATING MACHINE SAFELY
(IN-HOUSE TRAININGS)
EQUIPMENT OPERATION
Topic Discussed
Precaution while using inside plant
Emergency stop button
Ensuring availability of extinguishers
Ensuring the complete control
measure discussed in HIRA
Dangers of entanglement , Crush
etc.
AL ASAB CONTRACTING EST.
FIRE EXTINGUISHER DEMONSTRATION
Topic Discussed
How to use a fire extinguisher at the time
of emergency
PASS
Storage of extinguishers
AL ASAB CONTRACTING EST.
HSE ROLES & RESPONSIBILITIES
JUNE-2014
AL ASAB CONTRACTING EST.
HSE ROLES & RESPONSIBILITIES
JUNE-2014
AL ASAB CONTRACTING EST.
AL ASAB CONTRACTING EST.
HSE APRECIATION AWARD
JUNE-2014
AL ASAB CONTRACTING EST.
JUNE-2014