This document provides an installation program and assumptions for Contract 1020, which involves trackwork and overhead line installation for the MTRC Kwun Tong Line Extension. It outlines the access points and timing, planned resources including labor and plants, installation sequences and schedules, and productivity assumptions. The track and overhead line installation will be done in stages from various access points between May 2014 to December 2015 using one work front with various sub-teams. Productivity is expected to peak at 750 linear meters of track and 925/1700 linear meters for the 1st/2nd fix of overhead lines per month.
Download as PPTX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
105 views
Revised Programme Presentation - 23 May 14
This document provides an installation program and assumptions for Contract 1020, which involves trackwork and overhead line installation for the MTRC Kwun Tong Line Extension. It outlines the access points and timing, planned resources including labor and plants, installation sequences and schedules, and productivity assumptions. The track and overhead line installation will be done in stages from various access points between May 2014 to December 2015 using one work front with various sub-teams. Productivity is expected to peak at 750 linear meters of track and 925/1700 linear meters for the 1st/2nd fix of overhead lines per month.
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 11
TRANSPORT
MTRC Kwun Tung Line Extension
Contract 1020 - Trackwork and Overhead Line Installation
Installation Programme Presentation
Date 20 th May,2014 Transport Finance 2 C1020 Core Assumptions - I Access Points with Scope Description Access Point Material Concrete Remarks Start End Start End GAR - - - - Only Site Personnel Access for track & OHL installation work. WAB SHAFT 30 May 2014 30 Sept 2014 30 May 2014 End Jan 2014
Material (sleepers fasteners/OHL components etc.)/Concrete HOM End June 2014 End June 2014 Nil Nil Only Material (Turnouts, Short Rails,) for 3 days FAT KWONG 15 July 2014 End Nov 2015 15 July 2014 9 Feb 2015
Material/Concrete and TRIP support. WHA- End Shaft 27 Jan 2015 End march 2015 3 Nov 2014 End march 2015 Material delivery will be further discussed due to size constraint. Transport Finance 3 Planned Labour Resources:
Activities Staging Area Forklift 1No Track Installation Forklift 2No Mobile Gantry 1No Crane Lorry 1No Flat Bed Trailer OHL Installation To be prosposed and confirmed later UNIMOG 1No Works Train 1No Transport Finance One work front (with various sub teams i.e. pre- assembly, logistic, track installation, concreting etc.) for track installation will be deployed At Peak - Track installation productivity will be approx. 750lmst/month Approx. 60 working days to install crossover.
4 C1020 Core Assumptions Trackwork Installation Transport Finance One work front for both 1 st & 2 nd Fix will be deployed. OHL 1 st fix will be carried out simultaneously with track installation. OHL 2 nd fix works to be done by Works Train At Peak - OHL 1 st Fix will be approx. 925lmst/month At Peak OHL 2 nd Fix will be approx. 1700lmst/month
5 C1020 Core Assumptions OHL Installation Transport Finance 6 C1020 Track Installation Productivity S-Curve Transport Finance 7 C1020 OHL 1 st Fix Productivity S-Curve Transport Finance 8 C1020 OHL 2 nd Fix Productivity S-Curve Transport Finance 9 Down Track Installation Km 0.0 Year M t hs M t h No. Wk No. M t h No.M t hs Year Jan 32 32 Jan Feb 33 33 Feb 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
47 Apr 46 Mar Oct 2 0 1 5 Jan 44 44 Jan May 36 36 May Jun 37 37 Jun 2 0 1 5 Feb 45 45 Feb Nov 42 42 Nov Dec 43 43 Dec 2 0 1 4 Mar 46 2 0 1 4 Mar 34 34 Mar Apr 35 35 Apr Sep 40 40 Sep Oct 41 41 Jul 38 38 Jul Aug 39 39 Aug 0.5 1.0 1.5 2.0 2.5 3.0 BCT MTRC - KWUN TONG LINE EXTENSION Revised Trackwork & OHL Programme (DN Track) Legend : C&C Contract Number C&C Chainage (KTED/T) Dn Track Connection with existingKTL 1001 1002 to HUH SoftgroundTunneling Mechanical Breaking Fireman Access for Refuge Siding Drill &Blast Drill &Blast Drill &Blast Trackform BCT BCT BCT BCT Drill &Blast 8+580 8+460 8+700 ch 9+360 to 9+380 8+350 9+950 8+550 8+600 10+000 8+800 9+500 9+000 8+500 8+000 7+500 ch 7+400 FKSP shaft: Date Revision Checked Approved Programme No. : Intial Draft 20 May 2014 Time Chainage Programme - Initial Draft TM PH Revised KTE Track Access 30 May14 1 Jun14 8+050 15 Sep14 15 Jul14 7+555 7+890 7+790 7+690 7+835 3 Nov14 10 Dec14 27 Jan15 8+900 30 Sep14 15 Nov14 30 Dec14 Trackwork Material Storage Trackwork Material Storage at Dn for both Up & Dn (CH9370 - CH8710) DRAFT (Dated: 20th May 2014) Rail, Turnout and Material Delivery via HOM 1001 Hoisting Facility E n d
o f
K T E
D n
T r a c k OHL 1st Fix OHL 2nd Fix OHL 2nd Fix Working Sequence Track Installation Sequence Diamond Crossing Installation Turnout Installation T 84 T 82 Trackwork Material Storage for CH 8550 - CH8710 Trackwork Material Delivery via WAB Shaft Access Date Degree 1 Completion Degree 2 Completion Material Delivery Prepared KK Transport Finance 10 Up Track Installation Km 0.0 Year M t hs M t h No. Wk No. M t h No.M t hs Year Jan 32 32 Jan Feb 33 33 Feb 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Apr 47 Mar Oct Jul 2 0 1 5 Jan 44 44 Jan 36 36 May Jun 37 37 Jun 2 0 1 5 Feb 45 45 Feb Nov 42 42 Nov Dec 43 43 Dec 2 0 1 4 Mar 46 46 2 0 1 4 Mar 34 34 Mar Apr 35 35 Apr Sep 40 40 Sep Oct 41 41 38 38 Jul Aug 39 39 Aug May 0.5 1.0 1.5 2.0 2.5 3.0 BCT MTRC - KWUN TONG LINE EXTENSION Revised Trackwork & OHL Programme (UP Track) Legend : C&C Contract Number C&C E Chainage (KTED/T) YMT WHA Dn Track Up Track HOM Connection with existingKTL 1001 1002 SCL (EWL) to TAW to HUH SoftgroundTunneling Mechanical Breaking Club de Recreio Shaft (EAP) Fat Kwong Street Playground Shaft Fireman Access for Refuge Siding End of Existing YMT O/R Tunnel Drill &Blast Drill &Blast Drill &Blast Trackform BCT BCT BCT BCT Drill &Blast 8+580 8+460 7+555 7+890 8+700 ch 9+360 to 9+380 8+350 9+950 8+550 8+600 10+000 8+800 7+790 7+690 9+500 9+000 8+500 8+000 7+500 ch 7+400 FKSP shaft: 15 Apr14 15 Sep14 1 Jun14 8+050 15 Jul14 7+835 OHL 1st Fix OHL 2nd Fix E n d
o f
K T E
U p
T r a c k 30 Sep14 30 May14 8+900 15 Nov14 DRAFT (Dated: 20th May 2014) Revised KTE Track Access 30 Dec14 Track Installation Sequence OHL 2nd Fix Working Sequence Rail, Turnout and Material Delivery via HOM 1001 Hoisting Facility Rail Delivery and Storage thru Kowloon Bay Depot Trackwork Material Storage T 83 T 81 Turnout Installation Diamond Crossing Installation Trackwork Material Storage for CH 8550 - CH87100 Access Date Degree 1 Completion Date Revision Checked Approved Programme No. : Intial Draft 20 May 2014 Time Chainage Programme - Initial Draft TM PH Prepared KK Degree 2 Completion Transport Finance 11 C1020 Question and Answer