Operation Management
Operation Management
A predetermined minimum
level that triggers the order
of a fixed quantity of the
product
Re-Order
Point=Normal consumption
during lead-time + Safety Stock
On-hand
Inventory
R
Order
Placed
Time
OH = ON HAND
SR=SOURCE REGISTER
IP= INVENTORY POSITION
OH=ON HAND
BO=BACK ORDER
Solution
R = Total demand during lead time = 30*2 =
60 bottles
IP = OH + SR BO
= 15 + 50 0 = 65 bottles
65 > 60 so a new order is NOT needed
With
safety stock:
safety stock:
1.
2.
Safety stock
Reorder point
Reorder Point
Variable Demand and Lead
Time
When
Solution
d = 80 bottles
d = 10 bottles
L = 3 weeks
dLT = d (L) = 10(3) = 17.32
z = 1.64
Safety stock = zdLT = (1.64)(17.32) = 28.40 or 28 bottles
Reorder Point = dL + safety stock = (80)(3) + 28 = 268
bottles
Solution
d = 50 bottles
d = 10 bottles
L = 2 weeks
LT = 1 week
dLT = (L2d + d22LT) = [(2)(10)2 + (50)2(1)2] = 51.96
bottles
z = 0.84
Safety stock = zdLT = (0.84)(51.96) = 43.64 or 44 bottles
Reorder point = dL + safety stock = (50)(2) + 44 =144
bottles
Practice problem
Suppose
Solution
sL = st
L =5
Safety stock =
units
= 7.1
Reorder point
= dL + safety stock =
2(18) + 9 = 45 units
C=
($15) +
($45) + 9($15)
C = $562.50 + $561.60 + $135 = $1259.10
Solution
IP = OH + SR BO
= 0 + 0 5 = 5 sets
T IP =400 (5) = 405 sets
Solution
Safety stock (SS)
= zsL
= 2.33(22) = 51.3
= 51 boxes
2.33 is the number of standard
Reorder point = DL + SS
deviations, z, to the right of
= 250 + 51 average demand during the
= 301 boxeslead time that places 99% of the
area under the curve to the left
of that point.
Solution
Solution
Safety stock = zdLT = 1.645(40) = 65.8 or 66 units
R = Average demand during lead time + Safety
stock
R = 85 + 66 = 151 units
Find the safety stock, and reorder point R, for
an 85 percent cycle-service level.
Safety stock = zdLT =1.04(40) = 41.6 or 42 units
R = Average demand during lead time + Safety
stock
R = 85 + 42 = 127 units
Solution
d
Cont
The