Epc Introduction
Epc Introduction
ENGINEERING
INSTRUMENTATION ENGINEERING
ENGINEERING DELIVERABLES
FORMATS & CONTENTS
INPUT REQUIREMENT
HAZARDOUS AREA PROTECTION
ENGINEERING DELIVERABLES
PHILOSOPHY DOCUMENTS
Instrumentation & Control Philosophy
Instrument Design Basis
Instrument Signal Earthing Philosophy Drawing
STUDIES
HAZOP / SIL
CALCULATIONS
Sizing Calculations-Valves
Sizing Calculations-Safety Valves
Sizing Calculations-Flow Elements
Utility Consumption-(Air)
Utility Consumption-(Power)
ENGINEERING DELIVERABLES
ENGINEERING DELIVERABLES
Cause and Effects- F&G
Alarm and Trip Schedule
Cable Block Diagrams
Control Room Layout Drawings
Instrument and JB Location Drawings
Fire and Gas Detector Layouts Plant
Fire and Gas Detector Layouts Buildings
Cable/ Tray-Trench Routing & Layouts
Junction Box Schedule
Cable Schedule
Cable Drum Schedule
Interconnection/ Termination Drawings
Instrument Loop Drawings
ENGINEERING DELIVERABLES
Process Hook-up Drawings
Pneumatic & Hydraulic Hook-up Drawings
Electrical Hook-up Drawings
Bulk Material Take-off List
As-built Drawings
SPECIFICATIONS
Control and Safety System Specifications
Specifications for Metering Systems
Specifications for Well Head Control Systems
Specifications for HIPPS Systems
Specifications for SCADA Systems
Instrument Installation Specifications
Specification for Control Valves
ENGINEERING DELIVERABLES
Specifications for On-Off Valves
Specifications for Relief Valves
Field Instrument Specifications
Bulk Material Specifications
Instrument Requirement for Packages
INSTRUMENT DATASHEETS
Valves Datasheets
Special Instruments Datasheets
Analysers Datasheets
Field Instrument Datasheets
ENGINEERING DELIVERABLES
MATERIAL REQUISITIONS
System Requisitions
System Bid Evaluations
Valves Requisitions
Valves Bid Evaluations
Field Instrument Requisitions
Field Instruments Bid Evaluations
Bulk Material Requisitions
Bulk Bid Evaluations
VPRM
INPUT REQUIREMENT
IEC Vs NEC
IEC
NEC
Zone-0
(Zone-20 dust) Division 1
Zone-1
(Zone-21 dust)
Zone-2
Division 2
(Zone-22 dust)
IEC Groups
Ignition
Energy
Propane
IIA
180
Ethylene
IIB
60
Hydrogen
IIC
20
Acetylene
IIC
20
IEC Groups
Ignition Energy
Acetylene
20
Hydrogen
20
Ethylene
60
Propane
180
Maximum surface
temperature
450
300
200
135
100
85
APPROVAL (NEC)
FM (USA) and CSA (Canada) issue certificates
for approved equipment, defining how it may be
used. FM and UL (USA) and CSA (Canada)
issue reports and publish listings of approved
equipment, defining how it may be used.
STANDARDS (NEC)
PROTECTION METHODS
Method of Protection
CENELEC
Standard
EN-50015
EN-50016
EN-50017
EN-50018
EN-50019
EN-50020
EN-50028
EN-50021
PROTECTION METHODS
BASIS OF PRINICIPLE
Fuel
Ignition
Triangle
Oxygen
Ignition Source
PROTECTION METHODS
Method of Protection Protection Principle
Pressurized / Purged
Encapsulation
Keep flammable gas out
Oil Immersion
Non-incendive
No arcs, sparks or hot surface
Increased Safety
Powder Filled
Contain the ion and quench the flame
Flame Proof
Limit energy of sparks and surface
Intrinsic Safety
temp.
PROTECTION METHODS
Method of Protection
Zones of Use
Zones 1 & 2
Zones 1 & 2
Zones 1 & 2
Zones 1 & 2
Zones 1 & 2
Zones 1 & 2
Encapsulation (EEx m)
Zones 1 & 2
Non-incendive (EEx n)
Zone 2 only
PROTECTION METHODS
Ex Markings (CENELEC)
EEx d [ia] IIC T5
Where
EEx European Standard
d
Method of Protection
[ia] I.S Output
IIC Gas Group
T5 Temperature Class
PROTECTION METHODS
Ex Markings (NEC)
Explosion proof with I.S output, Class-1,
Div-1, Gr A,B,C,D, T5
Where
Ex-proof with IS O/P Method of Protection
Class-1
Permitted Class
Div-1
Permitted Division
Gr A,B,C,D Permitted Gas Group
T5
Temperature Class
INGRESS PROTECTION
1st Number
2nd Number
IP
IP
No protection
No protection