Oracle OSP
Oracle OSP
Program Agenda
1.
2.
3.
4.
5.
Introductions
Fabless Semiconductors: Features and Challenges
Silicon Storage Technologys (SST) Challenges
USJade Solutions
Questions
Page 2
Presenters
Jeff Lin VP of Backend Manufacturing
Silicon Storage Technology (SST)
Project Sponsor LIMO (Long-term Integrated Mfg Operations )
Implemented OSFM/B2B and continued supporting SST as their acting Cost Accounting Manager
for ~1 year.
Page 3
USJade Introduction
USJade provides mission critical business solutions,
delivering cost effective, revenue-impacting results
Enterprise System Integration & Consulting firm
Founded in year 2000 by former BIG4 consultants and industry experts
Corporate Headquarters: San Jose, CA
Offshore Center of Excellence in Pune, India
Right Shore Delivery Model
Experience with Global Implementations
Over 160 Consultants Worldwide
Certified Oracle Partner
Oracle Business Accelerator: Exclusive Solution Provider for Fabless
Semiconductor
Page 4
Vendor-neutral Methodology
With ability to make unbiased recommendations based exclusively on client's
individual needs, objectives and technology environment
Page 5
Services Overview
Information Management
Services
Strategic Services
Enterprise Application
Integration
Independent Testing
Technical Implementation
Infrastructure Support
Services
Business Continuity &
Disaster Recovery
IT Optimization / Green IT
IT Security & Identity
Management
Page 6
Page 7
Page 8
Founded in1989
Headquartered in Sunnyvale, CA
700+ Employees in offices worldwide
Manufacturing outsourced to 40+ vendors
Customers include: Apple, HP, Infineon, IBM
Motorola Nintendo, NEC, Philips and Sony
http://www.sst.com/
Page 9
Page 10
Program Agenda
1. Introductions
2. Fabless Semiconductors- Features and
Challenges
3. SST Challenges
4. USJade Solutions
5. Questions
Page 11
Fabless Semiconductor
Features & Challenges
Dynamic market conditions with high fragmentation
on both supply and demand side.
Very short Product Life and Time to Market.
High product lead times- ~ 3 months
Lower margins and fierce competition
Globally dispersed operations
Too many channels to manage
Lot traceability issues
Page 12
Fabless Semiconductor
Features & Challenges (cont.)
Inadequate and delayed information in ERP systems
Web of sundry systems and reports outside ERP
Page 13
Fabless Semiconductor
Features & Challenges (cont.)
Inadequate controls on OSP charges and vendor payments
Complex cost accounting
Different OSP charges for different vendors
Operation Yield Costing and WIP Accounting
Inadequate variance analysis tools
Page 14
Agenda
Introductions
Fabless Semiconductors- Features and Challenges
SSTs Challenges
USJade Solutions
Questions
Page 15
SSTs Challenges
Previous Business Process & Challenges
Transactions
sent through
email
Error
Management
WFG
Sort
Error
Management
MBE
Copy on the GDrive + Run
formatting macros
Input transaction
Access databases
VTC
IC
Error
Management
Processing
databases
Error
Management
SWR
ARP
OJM
AVC
Checker
IV
LVC
Expense
PO
Ship Alert
Ship Alert
Flat
Files
EMTT
Oracle
Interface
table
Oracle
IC
Page 16
selection)
Splits, Merges and lot updates not/poorly supported
Additional lot information maintenance/propagation not supported
Page 17
Page 18
Agenda
Introductions
Fabless Semiconductors- Features and Challenges
SST Challenges
USJade Solutions
Questions
Page 19
Page 20
OSFM Implementation
Project Overview
Coupled with B2B, OSP automation, Part number changes,
conversion and changes to other systems
Manufacturing flow converted from 2 stage to 5 (+) stages
Standardized product structure and part numbers
WIP routings converted to Network routings
Created BOMs for new product structure
Operation Yields entered to enable yield costing and accounting
New Sub-inventories created to allow for additional stages
New variance/valuation accounts created for granularity
Reports created for users to verify items/ BOMs/ Routings load
Costs rolled up and updated for new items
Page 21
OSFM Implementation
Project Overview (cont.)
Old and New product cost reports.
Dynamic data conversion (lot level):
All lots in INV and WIP converted to new parts/stages.
Child lots created with vendor support wherever needed.
Reports created to compare before and after lot qty/values.
Page 22
Portal for
From
Customers
Manufacturing
to View and
Vendors
download
Manufacturing
B2B
Inbound/
B2B
Outbound/
Outbound/
B2B
Database
Middleware
Transactions
Customer
Portal
Page 23
B2B Architecture
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
OSP Integrations
Page 31
Page 32
Enhanced Reports
Page 33
&
Q A
2009 USJade Corp Proprietary and Confidential
Page 34
Contact Us
Manoj Rathi
Principal Consultant
USJade Corp
[email protected]
Office: 408-436-8303 x48
USJade Corp
2001 Gateway Place,
Suite 570W
San Jose, CA 95110
http://usjadecorp.com
USJade Ltd.
E-Space IT Park, A-3, 2nd Floor,
102 D/E, Wadgaon Sheri,
Pune-Nagar Road, Pune 411014
Page 35
Page 36